Loading...
HomeMy WebLinkAboutNCG050303_Inspection_20191219Compliance Inspection Report __permit: NCGO50303 Effective: 06/01/18 Expiration: - 05/31/23 Owner: Dmnova Solutions Inc SOC: Effective: Expiration: Facility: DMNOVA Solutions County: Union 2011 Rocky River Rd Region: Mooresville Monroe NC 281.10 Contact Person: , Kathy Brown Title: Phone: 704-225-2040 I Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 12/17/2019 Primary Inspector: Lily C Kay Secondary inspector(s): Certification: _ Phone: Entry Time: 04:OOPM Exit Time: 04:30PM Phone: 704-663-1699 Reason for Inspection: Routine Inspection Type: Conpliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: 0 Compliant ® Not Compliant Question Areas: Storm Water (See attachment summary) NCGO60303 Owner - Facility:Omnova Solutions Inc Permit. Inspection Date: 12/17/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: I' th ermit re uirements All documentation The permittee has implemented their SWPP and appear to be in comp lance - p q appeared complete. If you have any questions, please contact me at Lily.Kay@ncdenr.gov or by phone at (704) 235-2137. Permit: NCGO50303 Owner - Facility:Omnova Solutions Inc Inspection Date: 12/17/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0El El El # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? ®® # Does the Plan include a list of significant spills occurring during the past 3 years? 0® ❑ ri # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? E®® # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ®� #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ®❑ # Does the facility provide and document Employee Training? #Does the Plan include a list of Responsible Party(s)? ®� # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? ®® El Comment:. The SWPPP is implemented and is updated annually. All documentation appeared complete Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E® n Comment: Qualitative monitoring is being conducted every 6 months. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®® E El # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? El El N El Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? 0 El El El # If the facility has representative outfall status, is it properly documented by the Division? El El 0 El # Has the facility evaluated all illicit (non stormwater) discharges? El El N El Comment: There are two outlets in series and one should be eliminated since the discharge is the same Page 3 of 3