Hi Amy
Thank you for calling me back Friday. We would like to switch the permit for lot 15 in the peninsula to a by
water permit. There is no need to try to complete this project by land. I will add Carissa to this email so we can
get this completed in the fastest and most efficient way possible.
Thank you
Stefangbennick rg ading com
On Fri, Oct 2, 2020 at 12:30 PM Annino, Amy M <amy.anninokncdenr.gov> wrote:
Please see the email I sent to Carissa.
Amy Annino
Environmental Specialist —Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
2090 U.S. Hwv. 70
Swannanoa, N.C. 28711
828 296 4656 office
984 232 1222 mobile
amy.anninoa-ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety
of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing
changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff
before visiting
our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue
to serve the public during this challenging time.
From: Annino, Amy M
Sent: Tuesday, September 29, 2020 3:57 PM
To: Carissa Parker <carissagbennick radin com>
Subject: DWR 2020-1167 - Dodds, Lot 15 Additional Information required
Carissa,
The Division will need to know the location, width and length, and any proposed tree removal for the
temporary construction access corridorsQ proposed within the 50 foot buffer. This would include a corridor
parallel to the shoreline.
Please see below.
On September 8, 2020, the Division of Water Resources (Division) received your application requesting a 401
Water Quality Certification from the Division for the subject project. The Division has determined that your
application is incomplete
and cannot be processed. The application is on -hold until all of the following information is received:
1.
Please provide information regarding proposed impacts to the Catawba Riparian Buffer for the
temporary construction access corridor(s). The Division needs to understand the location of the
access corridor(s), as well as proposed width
and length. Please also provide information as to whether any trees will have to be removed for the
construction of the temporary construction access corridor. [15A NCAC 02H .0502(b)]
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information
for the proper consideration of the application. Please respond within 30 calendar days of receipt of this email
by sending one
(1) copy of all of the above requested information to me via email.
If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division
will be unable to approve the application and it will be denied as incomplete. The denial of this project will
necessitate
reapplication to the Division for approval, including a complete application package and the appropriate fee.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act/ Isolated
Wetlands and Isolated Waters Rules/Buffer Rules for this activity and any work done within waters of the state
may be a violation of North
Carolina General Statutes and Administrative Code.
Please contact me directly if you have any questions or concerns.
Amy Annino
Environmental Specialist — Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ — Division of Water Resources
2090 U.S. Hwy. 70
Swannanoa, N.C. 28711
828 296 4656 office
984 232 1222 mobile
amy.anninoa-ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety
of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing
changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff
before visiting
our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue
to serve the public during this challenging time.
Stefan Wilson- Shoreline Project Manager
828-334-9094
stefan@bennick rg ading com
Bennick Grading
7836 Hwy 70 E Nebo,
NC 28761
828-659-1000