Loading...
HomeMy WebLinkAbout20190049 Ver 1_Meeting Request Review_20200929ID#* 20190049 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Erin Davis Pre -Filing Meeting Request submitted 9/29/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jordan Hessler jhessler@wildlandseng.com Carpenter Bottom Mitigation Site NCDMS/Wildlands Engineering, Inc. Gaston Street Address 167-B Haywood Road Address Line 2 aty Asheville Rbstal / Zip Code 28802 Is this a transportation project?* r Yes r No State / Frovince / Region North Carolina Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below. The project area is located within a rural watershed in Gaston County, NC. The project proposes to restore and preserve 4 unnamed tributaries to Carpenter Branch, and to re-establish, rehabilitate, and enhance wetlands. The project will generate stream and wetland mitigation credits in the Catawba River Basin 03050102. Please give a couple of dates you are available for a meeting. 10/12/2020 10/14/2020 10/26/2020 Please attach the documentation you would like to have the meeting about. Preli mi na ry_Ca rpenter 16.84MB Bottom_ Impact_Maps.pdf pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/29/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2018-02062 County: Gaston U.S.G.S. Quad: NC- Lincolnton West NOTIFICATION OF JURISDICTIONAL DETER-MNATION Requestor: Kristi Suggs Address: 1430 S. Mint Street #104 Charlotte, NC 28203 Telephone Number: 704-332-7754 ext 110 E-mail: ksuggs(&wildlandseng.com Size (acres) 20 Nearest Town Lincolnton Nearest Waterway Beaverdam Creek River Basin Santee USGS HUC 03050102 Coordinates Latitude: 35.410705 Longitude:-81.260321 Location description: The review area is located 0.211 miles Gaston-Webbs Chanel Road and Huffstetler Lane in Gaston County. PIN(s): 3621-62-8677, 3621-72-0270, 3621724534, 3621-70-1117, 3621-62-6176, & 3621-61-2994.. Indicate Which of the Following Apply: A. Preliminary Determination ® There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation map dated 3/12/2020. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. ❑ There appear to be waters, including wetlands on the above described project area/property, that may be subject to Section 404 of the Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters, including wetlands at the project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the above described project area/property subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlands on the above described project area/property subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. SAW-2020-02062 ❑ The waters, including wetlands on your project area/property have been delineated and the delineation has been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on DATE. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Catherine M. Janiczak at 704-510-1438 or C atherine.M.Janiczaknn ,,u sace. armv.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 05/20/2020. D. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Phillip Shannin, Review Officer 60 Forsyth Street SW, Room 1OM15 Atlanta, Georgia 30303-8801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: i� Date of JD: 05/20/2020 Expiration Date of JD: Not applicable SAW-2020-02062 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND For REQUEST FOR APPEAL Applicant: 1jr1S11 a s File Number: SAW-2018-02062 Date: 05/20/2020 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT Standard Permit or Letter ofpermission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.anny.mil/Missions/CivilWorks/RegulatoiyProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division Mr. Phillip Shannin, Administrative Appeal Review Officer Attn: Catherine M. Janiczak CESAD-PDO Charlotte Regulatory Office U.S. Army Corps of Engineers, South Atlantic Division U.S Army Corps of Engineers 60 Forsyth Street, Room 1 OM15 8430 University Executive Park Drive, Suite 615 Atlanta, Georgia 30303-8801 Charlotte, North Carolina 28262 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportuni to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Catherine M. Janiczak, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Phillip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 05/20/2020 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Kristi Suggs, 1430 S. Mint Street #104,Charlotte, NC 28203 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, Carpenter Bottom PJD, SAW-2018-02062 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The review area is located 0.211 miles Gaston-Webbs Chapel Road and Huffstetler Lane in Gaston County. PIN(s): 3621-62-8677, 3621-72-0270, 3621724534, 3621-70-1117, 3621-62-6176, & 3621-61-2994.. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Gaston City: Lincolnton Center coordinates of site (lat/long in degree decimal format): Latitude: 35.410705 Longitude:-81.260321 Universal Transverse Mercator: Name of nearest waterbody: Beaverdam Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECKALL THAT APPLY): ❑ Office (Desk) Determination. Date: ® Field Determination. Date(s): 05/20/2020 TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Estimated amount Geographic authority Site Number Latitude Longitude of aquatic resources Type of aquatic to which the aquatic (decimal (decimal in review area resources (i.e., resource "may be" wetland vs. non - degrees) degrees) (acreage and linear subject (i.e., Section feet, if applicable wetland waters) 404 or Section 10/404) 1.) Carpenter Branch Non -wetland (Perennial) 35.408603 -81.259961 2,176 LF waters Section 404 2.) Carpenter Branch Non -wetland 35.409587 -81.260431 376 LF Section 404 (Intermittent) waters Non -wetland 3.) UT1 35.407605 -81.259788 123 LF Section 404 waters Non -wetland 4.) UT2 35.409336 -81.260015 245 LF Section 404 waters Non -Wetland 5.) UT3 35.409270 -81.260510 387 LF Section 404 Waters Non -Wetland 6.) UT4 35.407494 -81.260019 61 LF Section 404 Waters 9.) Wetland A 35.404910 -81.258531 0.07 Wetland waters Section 404 10.) Wetland B 35.406346 -81.259584 0.01 Wetland waters Section 404 11.) Wetland C 35.405102 -81.259098 0.01 Wetland waters Section 404 12.) Wetland D 35.406650 -81.259826 0.01 wetland waters Section 404 13.) Wetland E 35.407647 -81.259794 0.001 Wetland waters Section 404 Estimated amount Geographic authority Type of aquatic Site Number Latitude Longitude of aquatic resources to which the aquatic (decimal (decimal in review area resources (i.e., resource "may be" degrees) degrees) (acreage and linear wetland vs. non- subject (i.e., Section feet, if applicable wetland waters) 404 or Section 10/404) 14.) Wetland F 35.435084 -81.259752 0.07 Wetland waters Section 404 15.) Wetland G 35.408871 -81.259671 0.01 Wetland waters Section 404 16.) Wetland H 35.409599 -81.259679 0.39 Wetland waters Section 404 17.) Wetland 1 35.409577 -81.260181 0.36 Wetland waters Section 404 18.) Wetland J 35.409340 -81.260397 0.01 Wetland waters Section 404 19.) Wetland K 35.409333 -81.260885 0.01 Wetland waters Section 404 20.) Wetland L 35.409334 -81.260740 0.02 Wetland waters Section 404 21.) Wetland M 35.411225 -81.259599 1.02 Wetland waters Section 404 22.) Wetland N 35.410976 -81.261605 2.35 Wetland waters Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AID or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Figure 3 (Dated 03/12/2020)_ ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concur with data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: 1:24000 Scale Lincolnton W quandrangle. ® Natural Resources Conservation Service Soil Survey. Citation: NRCS Web Soil Survey Website_ ®Nationalwetlands inventory map(s). Cite name: USFWS National Wetlands Inventory _ ❑ State/local wetland inventory map(s): ❑ FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Figure 3 (Dated 03/12/2020) or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later Jurisdictional determinations. Signature and date of FOulatorV staff member completing PJD 05/20/2020 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Figure 3 Delineation Overview Map bkwW I L D L A N D S 0 250 500 Feet Carpenter Bottom Mitigation Site ENGINEERING I I Catawba River Basin 03050102 Gaston County, NC 03/12/20 Assessment Area J • lank ,. 1% • A O Site Lat/Long Location �, • ,� '" Soo .f -� r l �/ -1- �n8 Sta - _ . AP Site Coordinates: (35.410705,-81.260321) -oINCOLN GASTON C ' Vow \' ` `♦' , 1 40 � •r - � ; , t—= �,�� • Imo' _ �, • ! y Qo WILDLANDS 0 800 E N G I N E E R I N G I I I USGS Topographic Map Carpenter 1,600 Feet Bottom Mitigation Site Catawba J River Basin 03050102 Gaston County, NC 03/12/20 F.. " � r � w 10 +rr J� x _ Assessment Area Q Project Parcels ® Existing Wetlands Wetland Impacts (W#) Permanent Temporary Y Project Streams Ephemeral Intermittent Perennial Non -project Streams Stream Impacts (S#) Permanent Temporary s VVVVUI/liV� �' �i. .,....:. 0 Figure 1 Overview - Jurisdictional Impacts %VW I L D L A N D S 0 250 500 Feet Carpenter Bottom Mitigation Site WV E N G I N E E R I N G I i i i I Catawba River Basin 03050102 USACE Field Verification: 5/20/2020 Map Created: 8/10/2020 Gaston County, NC a Aw Wetland M W16: Temporary - 0.143 AC Wetland N MiLLL Temporary - 2.143 AC M iF `Ci Wetland W10: Temporary - Wetland J W12: Permanent - 0.011 AC 14.4, '7tl& r •a o _ Assessment Area Q Project Parcels Existing Wetlands Wetland Impacts (W#) Permanent Temporary ��9°AIL1P Project Streams Ephemeral Intermittent Wetland M 1 W17: Permanent - 0.237 AC •r Wetland M W16: Temporary - 0.143 AC Wetland H W9: PermanenIII t - 0.012 AC Wetland H W8: Temporary - 0.150 AC V . RUM Rmm= -SOD %traact Wetland F W7t. Tempo_ "nary Perennial Non -project Streams l(f� Stream ) S# Impacts � 9f� 00 p ( Permanent " Temporary4V Figure 1.1 Jurisdictional Impacts W I L D L A N D S 0 125 250 Feet Carpenter Bottom Mitigation Site E N G I N E E R I N G I i i i I Catawba River Basin 03050102 USACE Field Verification: 5/20/2020 Map Created: 8/10/2020 Gaston County, NC _ SS"" �fy ti Wetland W5: Temporary - 0.011 AC J '. � '. •�� � �.. Wetland B iP 14 ,r 3 qlcm 10 19 Assesment Area Q Project Parcels Existing Wetlands Wetland Impacts (W#). � 1 Permanent ' Temporary s Project Streams Ephemeral Intermittent Perennial Non -project Streams Stream Impacts (S#) Permanent Temporary temporary - 0.012 AC Wetland C Iermanent I ot Visible On Map) Wetland A Tempo_ vary - 0.007 AC - 2018 Aeri / Photography 1 Figure 1.2 Jurisdictional Impacts W I L D L A N D S 0 100 200 Feet Carpenter Bottom Mitigation Site E N G I N E E R I N G I J Catawba River Basin 03050102 USACE Field Verification: 5/20/2020 Map Created: 8/10/2020 Gaston County, NC Soils Map W I L D L A N D S 0 250 500 Feet Carpenter Bottom Mitigation Site E N G I N E E R I N G I i i i I Catawba River Basin 03050102 Gaston County, NC 03/12/20