HomeMy WebLinkAbout20201292 Ver 1_Meeting Request Review_20200923 DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnlrtl Qua fay
ID#* 20201292 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Erin Davis
Pre-Filing Meeting Request submitted 9/23/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* worth creech
Contact Email Address* worth@restorationsystems.com
Project Name* crane mitigaiton site
Project Owner* restoration systems
Project County* Lee
Owner Address: Street Address
1101 Haynes Street
Address Line 2
suite 211
City State/Rovince/Region
raleigh nc
Fbstal/Zip Code Country
27604 US
Is this a transportation project?* ( Yes r No
Type(s)of approval sought from the DWR:
fJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Erin Davis
Please give a brief project description below.*
This is a 3,217 SMU and 8.9 WMU DMS mitigation project in the Cape Fear
03030004 Cataloging unit.The Technical Proposal has been added to the
IRT Portal.There is a planned IRT field meeting scheduled for September
29 at 9:00AM.
Please give a couple of dates you are available for a meeting.
9/29/2020
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
�}vt e
Submittal Date 9/23/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No