Loading...
HomeMy WebLinkAbout20201292 Ver 1_Meeting Request Review_20200923 DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20201292 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Erin Davis Pre-Filing Meeting Request submitted 9/23/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* worth creech Contact Email Address* worth@restorationsystems.com Project Name* crane mitigaiton site Project Owner* restoration systems Project County* Lee Owner Address: Street Address 1101 Haynes Street Address Line 2 suite 211 City State/Rovince/Region raleigh nc Fbstal/Zip Code Country 27604 US Is this a transportation project?* ( Yes r No Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below.* This is a 3,217 SMU and 8.9 WMU DMS mitigation project in the Cape Fear 03030004 Cataloging unit.The Technical Proposal has been added to the IRT Portal.There is a planned IRT field meeting scheduled for September 29 at 9:00AM. Please give a couple of dates you are available for a meeting. 9/29/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature �}vt e Submittal Date 9/23/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No