Loading...
HomeMy WebLinkAbout20201340 Ver 1_Meeting Request Review_20200930ID#* 20201340 Version* 1 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 9/30/2020 Contact Name * Becky Ward Contact Email Address* becky.ward@timmons.com Project Name* 1100 Old English Court Stream Bank Stabilization Project Owner* Bethanee Byarlay-City of Raleigh project Drainage assistance program Project County* Wake Owner Address: Street Address 1100 Old English Court Address Line 2 aty State / Frovince / Region Raleigh NC Rbstal/Zip Code Country 27615 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Stephanie Goss Please give a brief project description below. This is a stream bank repair project that has qualified through the City of Raleigh Drainage Assistance program. The stream has eroded back to a point on the property that is in close proximity to the structure. Bank stabilization through the use of gabion baskets are proposed for this project. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. 60% Construction Plans Complete Set.pdf 6.01 MB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/30/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No 0 0 M Old English Court VICINITY MAP Scale: NTS NOTES: 1. ALL STORM, SEWER, WATER AND SEDIMENT/ EROSION CONTROLS TO BE BUILT TO CITY OF RALIEGH STANDARDS. 2. CONTRACTOR SHALL VERIFY LOCATIONS AND ELEVATIONS OF ALL EXISTING UTILITIES. ALL UTILITIES SHALL BE LOCATED d8 HOURS PRIOR TO MOBILIZATION ON SITE. NORTH CAROLINA ONE CALL CENTER DIAL 811. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES DURING CONSTRUCTION. 4. ALL AREAS OUTSIDE OF THE TEMPORARY CONSTRUCTION LIMITS TO REMAIN UNDISTURBED. S. DAMAGED EDGES OF ASPHALT OR CONCRETE SHALL BE SAW CUT PRIOR TO PATCHWORK. 6. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF RALEIGH AND/OR NCDOT STANDARDS, DETAILS AND SPECIFICATIONS. 7. ANY DISTURBANCE WITHIN THE RIGHT OF WAY WILL BE REQUIRED TO BE REPLACED TO CITY OF RALEIGH AND/OR NCDOT STANDARDS AND INSPECTED. Plans Prepared By: CAD File Path: Becky L, Ward, P.E. IMMONS GROUP .••'�'•• THIS DRAWING PREPARED AT THE RALEIGH OFFICE 5410 Trinity Road, Suite 102 1 Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com North Carolina License No. C-1652 Contact —Becky L. Ward P.E., Becky.Ward@Timmons.com CITY OF RALEIGH PROJECT MANAGER TODD RALL, P.E. (919)996-4006 P.O. BOX 590 RALEIGH, NC 27602 Portal Email: Todd.Rall(kraleighnc.gov PUBLIC WORKS DEPARTMENT Right -of -Way Obstruction Notes: • Lane and Sidewalk closures or detours: Prior to any lane or sidewalk obstruction, the contractor or engineer shall submit a traffic control and/or pedestrian plan along with a Right -of -Way Services Application to request the obstruction prior to the start of work. riehtofwayservicesCc)raleiehnc.eoy far approval. • The City of Raleigh requires an approved Right -of -Way Obstruction Permit for work an any public street or sidewalk and NCDOT road within Raleigh's Jurisdiction. • Ali Traffic Control Signage and practices shall adhere to the Manual on Uniform Traffic Control, and the latest edition of the NCDOT "Standard Specification for Roadway Structures", NCDOT "Roadway Standard Drawing Manual", and the NCDOT supplement to the MUTCD. • All public sidewalks must be accessible to pedestrians who are visually impaired and/or people with mobility concerns. Existing and alternative pedestrian routes during construction shall be required to be compliant with the Public Rights of Way Accessibility Guidelines (PROWAG), the ADA Standards for Accessible Design and the Manual on Uniform Traffic Control Devices (MUTCD). ■ Prior to the start of work, the Client shall schedule a Pre -Construction meeting with the Engineering Inspections Coordinator to review the specific components of the approved plan, and ensure all permits are issued. • All permits must be available and visible on site during the operation. CITY MANAGER RUFFIN L. HALL PROJECT SURVEY DATA FOR 1100 OLD ENGLISH COURT PROVIDED BY: RWK, PA ENGINEERING AND SURVEYING DATUM: HORIZONTAL NAD83 VERTICAL NAVD88 MORPHOLOGIC DATA COLLECTED BY: TIMMONS GROUP of R I �4 Construction Plans Sheet Index 1. Title Sheet 2. Existing Conditions and Demolition Plan 3. Erosion Control Plan 4. Proposed Plan 5. Cross Sections 6. Stabilization Plan 7. Erosion Control Details MARY-ANN BALDWIN MAYOR 1100 Old English Court 1 60% REVIEW SET 0 b O 0 0 SHEET NO. 1 OLD U In 0) C w O m 0 co 0 N N 1 / I \ I I I I I I WV 9X �X WV TBM 2 I 1 0 I ISH COURT I I �xls TING SSMH RIM=316.0 FT. INV. 1N=309.32 FT. INV. OUT=309.02 I EXISTING CURB I AND GUTTER I (TO BE REMOVED AND REPLACED lF DAMAGED) I TING 3 INLET I I , \ � Z83 \ \ / — — — — — — S 1? \ � Z _��� `+L) I I I I I ZI I I ti I I �I�J I i I I / Z nG�zII J \ 97 20' �v —u BUFF30,EBU �FER ZONE �1 Z� I III l"I j ti�� \ I K 1C N\ u N C It / I �cyj OG DBL b��� 1 I ��•� � j I I 11 I I I I � \ � III � v � , �' Z�G �i — ZcY I I I I�� �dJ II I EXISTING TOP OF BAW3 ���✓ I I I 4 11 � 1 '�- z�JC S 3 N osi, I , / I I ZcYJ N 'A p � EXIS I I cYj i� g 1 n K 7 a, 7 / 1 / 1 I II� N �� c� N C LINEI / I II N I ; .CR \ \ \ r) I �� C —� Z OF S M I / I ` C) I �> OP 12 �v ��J CR2 N ti \ \ N \ \ i n I fc� 1 I ti 1 / I c \ R 1 c J / I 1 1 I I rLv \ C\ G\ P \ u \\ G 1 � CITY OFRALEIGH L 311 \ / 13 a0l + III \\ G I PIN- 1707247549 �� CRZ \ Z�C \ \ TIFF / / / I Ii i Q� GII III I Qrn <37G� 7 \ Zcy���%—RK8 / I I O// I CRZ 4 I � CRZ / C �' d, J EXISTM / / v / \ I I c - I C GRti G 14 G� �'� ��J \ \ TOP Of ,I ti I XS-2 ti u �� ti GR / \ _.: / I 'N 14 I c� I 1 1 I I I II y Iti�� N N J CRZ '� 7 CR CRZ 1 I I::::::...... Z \ 2 ti EXIS G \ �/ \ X 1 / v YAEMSIRI, JAK & DUSDEE / / ' / I I / 1 �SI I u \ N / I \ / CR CRZ / RIFFL 1108 OLD ENGLISH CT.�II:::::;::: \ 1 \ PIN: 1707244734 I / nCRZ I P G� 1 \ z \:;:::::: ............ ..............:... ........ .:. I I c� CRZ ��--------------------- ---- 9 G 15 u \ ti CL C I i O I \ Nc, 1 3+00 -- — — — _ _ n ` \ � (� � ............. 3 1 � ................... II N _- ..................... � v' c c \ �� \ \ \ \ \ I Illi .. ::::hl\ �TBM4 '/, �J __—___ �� r � cps C-) �Z� C` ! LgI-'8� \ \ ./50EXISTING DRIVE — \ \ \ 1 Z?JC /I� d 7 / I �..... I 1\ \ \ \ I � ® C2� \ \ 1 I III \ cT 9 — ,I \ \ I I I. � \�� ti , /, \ \ /// ♦ �� / ��7 J \ J \ �`� I\ ` I i // � / / �� Ill I i II J �l A ' \ I I / Y OK 12 zEXIS/TING \\\111 IIII/I -- _ ^�J/ x / I � CRZ n n I /'fey ' 1 ` I / `) 10 '//� :l "\ (� < \11 1 I l za3 \ n\ 20 I 1 100 OLD ENGLISH CT. N 6 I EXISTING ONE STORY / \\\\ — —I CRZ / I \ WOOD HOUSE ` \ �\\� `_ *40\1 / I �i dC Z -� % l/la �\// / AK23 j A/ n I -_� / /G� / I1 �� / /j I I \ OG Cj N 14 \ G? I z?J�z?JC ZcYJ cY / J / n / 01 / v n ' dJ / l v 1 BYARLAYBATHANEE / / s � ��� / / �� c�� \ \ C / �� ) R2 l RZ -+'c�J a- / 1100 OLD ENGLISH CT. c�C �'� CRZ 4 PIN:1707244662 /l / /' //\ c G ' / / G I Z c P iw f/\\ L� / z a C K 341 n // CR2 ���� / \ /p� CRZ N / I G 14 / C CONST�U cRZ a01 / / c N cR I �z ACCESS ION / G�ti� ,' apl ���� OK 1 N I z�c G // 296 CRZ / CRZ �/ \ / / QOl A 1 8� N/ II / O N i aoil ^� C Z CR Nd- "� n \ / / l/ / 6 n O 3 u I ' 7 / U �' I / 170 // N 12 �ti �— ' SG U _ n 156 LF OF EX/SING 8" I \� c�,� ''S �/ /G� N / A � ' _ 0/ TCP SANITARY SEWER l / \ / /CRz o / c�� S 8 ��f/l, o / /' / N / 1 / I ill W I \ \ / / /� / � �`- �C I /j / EIPIt Q I \ \ / / / / / R /'/� �� i\ _ l / / EXISTING SSMH 1 / / �� s Rz 1 f/ /N RIM=303.84 FT. F OF�`Xj � / INV. IN. =293.64 FT. / I /' INV. 1N=293.15 FT. EXISTING SSMH \ / 1 TING TCPSAN/TARP / l / RIM=303.94 FT. > 1 -_ EWER / INV. OUT=293.08 EXIST/NG 15' \\ ---- T P/'� --_ I /I — — / INV. 1N=294.32 FT.� TBM 1 INV. OUT=293.90 FT. SCHAEFFER, DEAN A & KAREN B /\ / /--------------1 CRZ 1101 OLD ENGLISH CT. EXIS C �— — 'G�� — —_ _t 1 III PIN: 1707244561 _ - \ / — . g � Z CRZ = ---- ------ -- CAR Q ©vP%1C W= s •i ONLY • Ln o \ = z Q 3 U \ Lu ¢ LL co m z \ ,Lu c O \ M a 0 UJ \ z_jcnx U Q w G \ p LL- o U ° BANK EXIST \ M z p TOE OF BAWK o OR w rn \ \ J w «i \ o EXISTING CENTERLINE \ OF STREAM XS'6 o w w � 1 ° Q z I O > I o SCALE 1 "=10' NOR 0 10' 20' CONTROL POINT NORTHING EASTING ELEVATION DESCRIPTION TBM 1 774569.90 2102559.47 ELEV=300.22 60D TBM 2 774596.95 2102389.08 ELEV=317.17 PK NAIL TBM 3 774669.40 2102479.11 ELEV=310.02 60D TBM 4 774662.87 2102529.84 ELEV=301.66 60D NOTES: 1. UNDERGROUND UTILITY LOCA TIONS APPROXIMA TE. CONTRACTOR TO VERIFYALL LOCATIONS PRIOR TO CONSTRUCT/ON. 2. PROPERTY BOUNDARY SHOWM N BASED ON PLANEMETRICS EXCEPT WHERE E/P LOCATED BY SURVEYOR. 3. PROPERTY TOPOGRAPHIC SURVEY BY. - RINK, PA ENGINEERING AND SURVEYING 101 W. MA/NSTREET, SUITE202 PO BOX 444 GARNER, NC 27529 (919)779-4854 DATUM: HORIZONTAL NAD83 VERTICAL NAVD88 TREE LEGEND BL BLACK LOCUST CM CREPE MYRTLE OK OAK PN PINE PL POPLAR SG SWEET GUM SR SHRUB ------- ------- EXISTING CONTOURS — — — — — — PROPERTYL/NE L® L® L® LIMITS OFDISTURBANCE -:�___-- ----- --- EXISTING SANITARY SEWER — — — — — — EXISTING STREAM CENTERLINE CRITICAL ROOTZONE EXISTING TREE LINE EXISTING TREES — — BUFFER LIMITS CONSTRUCTION ACCESS 0 TEMPORARY BENCHMARK TBM ® TREE REMOVAL 60% REVIEW SET DATE 8-13-2020 D RAW N BY ie Vander DESIGNED BY Abrham Asfaw CHECKED BY Becky Ward SCALE 1"=10I � z z z o J O O i--i U<� J _ = � O O z Lu H� 0 J 0 0 O z Q w (n LU < z O Q= J J 0 Oro L U O� Our 1� Lu JOB NO. 363.009 SHEET NO. 2 J L GENERAL NOTES: ```,1111111111/,,��1 CAR �N,...., 0 L Ln w O O O 0 v 0 0 II I I i I /I I / / I / / I / / 14 3 SIL T FENCE > / I IKI 119 1 OP 12 2 TREE 7 PROTECTION / I I C) / / r PROPOSED \ in / l Rl iRAP \ AS y I 1 I I P OK DBL17 \\ ~ 1 \ \ II I I K 7 OS13 �-10 �� S8 11 R12 0PROPOSEDI" S 11 \ ROCKTOE 6 PROPOSED \ \ STREAM TOE \ 5 ROCK \ 7 SIL T SCREEN l I / \ POI301 - __ R9 4#G 15 .....,, _ .............................. .......................... 1 f� .. - \ _77 / / / I ' 1 \ \ \ 5 \ I �IIII i •\ 1 ` z � 3'012 � � I 1 1, i RROPOSED 2 I I I ,N CONSTRUCTED RIFFLE 6 r `L�' OK 12 I/ \ IPROPOSED`CENTERLINE _ , - R10 SG 20 1100 ��\\\ \ \ ��W / 3p �p TOP - _ - I / SIL T FENCE 3 / / I OLD ENGLISH COURT / I \ \ \ O 300 i 7 PROPOSE \ / IPRAP 1 \ r / / I / I OK20/ PK26 \ OK23 \ j SIG 8 l l\ \ prO� / I\ LQ I I ///� 44 PN 14 l K 14 / / "� I / / �-++ // OK 12 1\0 A OK 8 / 14 LM !TLODl I // / / / �i ✓ i // � \ K 34 '7' l � � � �am a01 OK it / / / I i �ii ;%296 an { / / r M�b / / ,OK81 O 3 iN G 22OK 7 <65 / I CONSTRUCTION ENTRANCE 7 \ \ I / / // -_� S / ' ' 1- # / CURB/INLET 16-------- -- r / / SILT FENCE 3/ 7 _/ it � / --- �! SCALE 1 "=10' 0 10' 20' PUMP ZONE ACTIVE WORK ZONE 250' MAX DISCHARGE WITH STABLE OUTLET (NOTE 3) OR ON BEDROCK DISCHARGE HOSE Fr SPECIAL STILLING BASIN WITH ROCK PAD F� w DEWATERING SEDIMENT PUMP FLOW AS NEEDED DIVERSION PUMP RAW PUMP BASE FLOW NOTES: 1. WORK AREA TO BE STABILIZED AT THE END OF EACH WORK DAY. 2. ROCK SILT SCREENS REQUIRED FOR PUMP AROUND OPERATIONS ARE CONSIDERED INCIDENTAL TO PUMPING. 3. STABLE OUTLET TO CONSIST OF ROCK PLACED IN CHANNEL FOR ENERGY DISSIPATION AND 45' ELBOW INSTALLATION AT THE END OF THE PIPING SO THAT THE WATER DISCHARGES VERTICALLY UP IN THE AIR. THE OUTLET WILL BE APPROVED BY THE DESIGNER PRIOR TO PUMPING. TYPICAL PUMP AROUND OPERATION NO SCALE SUMP HOLE OR POOL '1 INTAKE HOSE Table 6.10a Temporary Seeding Specifications for Winter and Early Spring Seeding Mixture Spedes Rate (lb/acre) Rye Grain 120 Seeding Dates Mountains >2500 ft <2500 ft. Piedmont Coastal Plain 15-Feb to 15-May 1-Feb to 1-May 1-Jan to 1-May 1-Dec to 15-Apr Soil Amendments Follow recommendations of soil tests or apply 2 ton/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. Use 400 gallons of tack per acre or straw covered with pinned netting. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or damage. Table 6.10a Temporary Seeding Specifications for Summer Seeding Mixture Spedes Rate (lb/acre) German Millet 40 In the Piedmont and Mountains, a small -stemmed sundangrass may be substituted at a rate of 50lb/acre. Seeding Dates Mountains 15-May to 15-Aug Piedmont 1-May to 15-Aug Coastal Plain 15-Apr to 15-Aug Soil Amendments Follow recommendations of soil tests or apply 2 ton/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. Use 400 gallons of tack per acre or straw covered with pinned netting. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or damage. TEMPORARY SEEDING SPECIFICATIONS NO SCALE Table 6.10a Temporary Seeding Specifications for Fall 1. TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL PROTECT ALL TREES AND SHRUBS OUTSIDE OF THE LIMITS OF DISTURBANCE. THE CONTRACTOR IS ALSO REQUESTED TO SAVE ALL OTHER EXISTING TREES AND SHRUBS WHERE POSSIBLE. TREE ROOTS EXPOSED AND/OR DAMAGED DURING CONSTRUCTION SHALL BE PRUNED USING EQUIPMENT SPECIFICALLY DESIGNED FOR PRUNING. ALL PRUNING SHALL BE ACCOMPLISHED BY AN ISA CERTIFIED ARBORIST. 2. GRASSED SURFACE RESTORATION: ALL EXISTING GRASSED AREAS DISTURBED DURING CONSTRUCTION ARE TO BE SEEDED AND MULCHED PER THE SPECIFICATIONS UNLESS OTHERWISE INDICATED ON THE DRAWINGS OR AS DIRECTED BY THE ENGINEER. 3. EXISTING DECK: THE CONTRACTOR SHALL DOCUMENT THE EXISTING DECK CONDITON AND PREVENT FURTHER DAMAGE TO THE EXISTING STRUCTURE DURING CONSTRUCTION. REPAIRS TO THE EXISTING DECK IS NOT A PART OF THIS CONTRACT. 4. STOCKPILE AREAS: ALL STOCKPILE AREAS SHALL BE AT LEAST 50 FEET FROM ANY STREAM OR STORMWATER STRUCTURE AND SHALL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES. 5. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF RALEIGH AND/OR NCDOT STANDARD DETAILS AND SPECIFICATIONS. 6. ANY DISTURBANCE WITHIN THE RIGHT-OF-WAY WILL BE REQUIRED TO BE REPLACED TO THE CITY OF RALEIGH AND/OR NCDOT STANDARDS AND INSPECTED. 7. CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES IN ACCORDANCE WITH THE LATEST CITY OF RALEIGH STANDARD DETAILS AS FOUND ON THE CITY WEBSITE: HTTP:HWWW.RALEIGHNC.GOV/BUSINESS/CONTENT/PLANDEV/ARTICLES/DEVSERV/DRAWINGSSTANDARDDETAILSINDEX.HTML CONSTRUCTION SEQUENCE: 1. INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO THE AREA NECESSARY TO INSTALL THE MEASURES. 2. COMMENCE LAND DISTURBING ACTIVITY. 3. INSTALL ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES AND/OR INCREASE MAINTENANCE FREQUENCY WHERE APPROVED MEASURES FAIL TO PREVENT ACCELERATED EROSION, OFF -SITE SEDIMENTATION, OR REPETITIVE NON-COMPLIANCE ISSUES. 4. MOBILIZE TO THE STREAM AT SOUTHEAST SIDE OF THE EXISTING BUILDING. 5. PERFORM CLEARING, GRUBBING, AND DEBRIS REMOVAL AS SHOWN ON THE PLANS. 6. INSTALL STREAM PUMP -AROUND OR OTHER STREAM DIVERSION MEASURE TO PROTECT WORK AREA ALONG STREAM. 7. WORKING FROM UPSTREAM TO DOWNSTREAM RECONSTRUCT EASTERN BANK WITH GABION AND RENOMATTRES, INSTALL RIFFLE AND ROCK TOE. SEED AND MAT DAILY AS WORK PROGRESSES. 8. REMOVE TEMPORARY PUMP -AROUND AND BRIDGE MATS. 9. INSTALL WOODY VEGETATION AS CALLED FOR ON THE PLANTING PLAN. 10. SEED ALL DISTURBED NON -PAVED AREAS. SEEDING AND MULCHING SHALL BE PER THE PLANS AND SPECIFICATIONS. 11. MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. INLET PROTECTION, AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. 12. REMOVE EROSION CONTROL MEASURES ONLY AFTER THE SITE IS STABILIZED AND APPROVAL HAS BEEN OBTAINED BY THE CITY PROJECT MANAGER. DISTURBED AREA= 10,333 SF. 0.24 AC. LEGEND: EXISTING CONTOURS 324 PROPOSED CONTOURS - - - - - - PROPERTYLINE L13D L13D L13D LIMITS OF DISTURBANCE SF SF SF SILT FENCE TP TREE PROTECTION �. = ----- EXISTING SANITARY SEWER — — — — — EXISTING STREAM CENTERLINE CRITICAL ROOTZONE EXISTING TREE LINE EXISTING TREES — — BUFFER LIMITS CONSTRUCTION ACCESS TREE REMOVAL OUTLINE TOP LAYER OF BASKETS ------------------------- OUTLINE BOTTOM LAYER BASKETS Seeding Mixture Spedes Rate (lb/acre) Rye Grain 120 In the Piedmont and Mountains, a small -stemmed sundangrass may be substituted at a rate of 50lb/acre. Seeding Dates Mountains 15-Aug to 15-Dec Coastal Plain and 15-Aug to 30-Dec Piedmont Soil Amendments Follow recommendations of soil tests or apply 2 ton/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. Use 400 gallons of tack per acre or straw covered with pinned netting. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb/acre Kobe (Piedmont and Coastal Plain) late February or early March 60% REVIEW SET dF L�f 1L.�YY F` Q `�y : ��' I '" •......... 1'NN� ���/1111111111� E 0 U o � %.0 o ",N E E LU z a + N kD Q 3 U 0 LU ro O LU a' N a LL cV O� 2", LU LU 0 M N a = co c> z LN�0`1 J x 0 o U Ln H > Q1 L _ E z o � �ko o rn Ln rn J LU M 0 0 IY LU > U Q z 0 0 w Q 0 DATE 8-13-2020 D RAW N BY Shane Vanderarif DESIGNED BY Abrham Asfaw CHECKED BY Becky Ward SCALE AS -NOTED JOB NO. 363.009 SHEET NO. 3 �a N =) �0 �Df o O CL Tz �0 0 E o MU) MN d o U) zN 0 �Q �x a) o 0 0 0 Q o § Q (1).9 >_ U) 2 �N U iu o � U �3 J L- V i 20' BUFFER ZONE 2 I I I I / I / / , / I I30' ' // 111114 1 � OS12 T I I I % BUFFER ZONE 1 I III I , / � I�I 1 1 OS13 EA, , l I II II S9 K7 \ OjAS8 / CENTERLINE I/ / I I �� 1 / OF STREAM I I / I 1 j�I I 1 OP 12 \AR 12 \ \ + G 19\ EX/STNG I \\ C° I< \ \ \ / 13 / RIFFLE I l l / i ml + Jill G 11 aol I Oz \ �� KS Lo mn III °' ::: PROPOSED CENTER OF PL aO STA 2+70 O : ::.:.:::ELEV 296 K7 w EXTEND JN 14 ao \ / P E �0 a w EXISTING RIFFLE \ ROPOSED 1 �XJSfING I n I 1 �I I�Il.`:::�:aa:::::a:q \ `30� ROCKTOE 5 TOP OF BANK 1 PROPOSED, PO 5 RIPRAP 1 \ \ I �................� .............., I I 30 — — —- - -`_� - 301- - - II':\......::::;::::� I I AS 11 9 G 15 EXISTING .. \ nihn �,:r:rrrr:r.r:r:{y': rrr:r:71 I /n , r�� �r' nneui \ TOP 3f EXISTING \ 303'...........::::::=� CENTERLINE 1d r _ _ I -: M�--- 1: :::::::::::::: \ FLO �� �97-� .:::.:.:::.:.:::.:.:::::.::: ___•� OFSTREAM TA 2 > P 9'l - ................ S \ / / �.� ................ ........... ................... ........................ 1 \ TOP \ ...r ��l 'Si , % _:::.:.:..: F 1 �� 306�� / — I PROPOSED 1: :::::;:::::::;: 3,L25 \ \ \ \ 1 I CENTERLINE =.........:............................ \ / / f:: _ - 99- EISTING FZ1F�L \ I I _ 2 _ K STA 2+08 �� \ \ �\ \ \ 11 ` �••. � I `� \I \ / ,, ' i I � �/ / � 1 ' � � �\ \ � -=��'�\\ \ \ \ `�I )\ \ 1 \ 1 �8 EL \ \ \ \ 11� \. �I ` 1 \ � �J 1111 i •\ � � � / I I ,r � / l � I I t 9 s� / TOP 9 O 1 z rn 1 I I I I 1 ! r h 3041 \ \\ \I\\\\ -_• 1 tic�0 ss 'LS N > OK 12 I I / / /' /�°/ /ij/y�'j T,9�SF - w co w K 12 > > ; '�. ' % _ / ;10 'r / TOPY / I302 20/ \\ \\\� I \ / PROPOSED I TOR\\\\ O v'O ` I CONSTRUCTED RIFFLE / I/gv 1 300IAS OK20 I lhK PROPOSED 1 , -� j RIPRAP \ / / \ SG 8 0o U Cl) I / \ PROPOSED CENTER OF P60L I %� to c/ t: \ 9 STA 2+37 /\ \ � + N I ELEV 296 pp 12 O O B 41 0* �� ' k LOD K34 TYPE D ttOl �x / Z / I G 14 // r �� ' ; r� TYPICAL 6x9 am,� an, ��l \ OKII ' rr� / LID i / // ;�` 296 % r� RENO MATTRESS / W ' = K 8 r / Hlfc O� 1 //i ; 4 / '/ ' �// O 3 OK .i'� 22 12 G 24/45 ��_�---__ i LOD/I , , / // EXIST/NG / �' J/f , \\\ li /// I i I1 - I SSMH ii/ �/ �11 II TYPEA SCALE 1 "=10' 0 10' 20' B M TOP OF BASKET LOCATION ELEVATION 1 297 FT. 2 300 FT. 3 301 FT. 4 302 FT. 5 303 FT. 6 304 FT. 7 305 FT. 8 306 FT. 9� 306 FT. 10 303 FT. 11 300 FT. 1 __d 297 FT, GABION BASKET DETAIL 310 Lu J W Co J w 310 LL LL LL N N N LL LL M Q' M ? z w Lo 0 �00 O 305 W X+ PROPOSED O a, X 305 " Q �01ID Q " Q w U EXISTING w U w cn GROUND 300 PROPOSED 300 CONSTRUCTED RIFFLE 295 295 ..... ......::::::::::......::::: RIFFLE PROP CONISTRUG-TEED rg� RIFFLE 290 EXTEND 290 EXISTING RIFFLE TAIL O ~ ~ ~ 285 LL LL LL LL Lo LL Lo O LL 285 cl 00 r- Co r- Co r- r- Co - N N N N N N N N N w J Lo W W W W W W W W W 0 U 280 w w w w w w w w w qRn 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 SCALE 1 "=10' HORIZONTAL 1 "=5' VERTICAL SCALE 1 "=10' 0 10' 20' m NTS TYPE E TYPICAL 9x9 RENO MATTRESS LEGEND: 46.5' ELEVATION VIEW A -A 1 "=5' 324------ EXISTING CONTOURS 324 PROPOSED CONTOURS - - - - - - PROPERTYLINE LOD LOD LOD LIMITS OF DISTURBANCE ___:S:S--_____-----_-- EXISTING SA NI TA R Y SE WER — — — — — EXISTING STREAM CENTERLINE CRITICAL ROOT ZONE EXISTING TREE LINE EXISTING TREES — —BUFFER LIMITS CONSTRUCTION ACCESS TREE REMOVAL OUTLINE TOP LAYER OF BASKETS ------------------------- OUTLINE BOTTOM LAYER BASKETS PROPOSED CONSTRUCTED RIFFLE EXISTING RIFFLE PROPOSED RIPRAP PROPOSED ROCKTOE i MATCHLINE L--4.5'---1 L-4 L-3 -2 NOTE I. - PLACE BASKETS ON CURVE MATCHING FRONTS. BASKET WILL HAVE GAPS TOWARDS REAR AS FRONTS ARE FORMED. FIELD ADJUST TO FIT. SEE NOTE 1 ZI , Js 2 6 4.5' Z:cs �\ 4.5' I \ p B A A B E\ I , , 7' I 1 FLOW 2+00� 2+04.5 L-^ STREAM CENTERLINE SEE NOTE 1 / 2 X1 U 9 6' 6' 4.5' Ql q A C A A C B 3; A \ \ O p \ 8.5' 11 FLOW +00 /� 2+03 2 . 3� 2x L-3 STREAM CENTERLINE SEE NOTE 1 6' STREAM CENTERLINE 2+00 SEE NOTE 1 3' A A A A B A P G O _ VON � 2+00 C..G STREAM CENTERLINE M N GABION BASKETS PLAN VIEW LAYOUTS NTS 60% REVIEW SET ```111111111/////'' CARq �OI� V�VV 01: dt /\ - . c� %/ 111' ".V````` 0 r, CS � r- 0 E N E = z + ,r a u 0 W 76 O wU�N R- °O �; z O wu0oM C oR U a z�cn°' U x= ¢�°Cru� M w 0 0 0 U L �� Q\ L z L z cn 0 oo w rn Lu � rn J w vi 0 0 0 0 w w U 0 Q z 0 cn DATE 8-13-2020 0 DRAWN BY hane Vandergrift DESIGNED BY Abrham Asfaw CHECKED BY Becky Ward SCALE AS -NOTED J I..L z W 0 0 Uu� _ U) � Q O Co �z ~� O J V � O m Q zw W < 0 �? z w q O J J LL o 0 O Lu Ouo r-I O 30B NO. 363.009 SHEET NO. 4 0 c N U 0 0 t U) 0 Q Q `o U) 0 m t C Q `o 0 31 C 30� 300 295 290 TYPICAL CROSS SECTION 1 STA 2+11 (AS VIEWED LOOKING DOWNSTREAM) 19.51 - i 4' 8'- 12' 6o 17� 3-5W 1 V 7-7-7—:7/ TIE INTO 308 I F777f7 7— —7 CONTOUR TIF INTQ'I)l EXISTING GROUND CONTOUR 544TER141 Fmil I RFHINn F)rCAVATED BASKETS GEOTEXT LE FABRIC cur i V= 7 PROPOSED GROUND 4H = BEHIND GABION BASKET LL C) C) UP (9 w cy) cy) m I Z C14 CN > > W > w w WT� ^ w 0 w w L 3' J 31 310 30 305 301 300 3 29! 295 290 65 70 75 80 85 90 95 lbo 105 110 115 120 125 SCALE: 1 "=5' HORIZONTAL 1 "=5'VERTICAL TYPICAL CROSS SECTION 2 STA 2+28.5 (AS VIEWED LOOKING DOWNSTREAM) 70 75 80 85 90 95 100 105 110 115 120 125 130 135 SCALE: 1 "=5' HORIZONTAL 1 "=5' VERTICAL TYPICAL CROSS SECTION 3 (STA 2+37) (AS VIEWED LOOKING DOWNSTREAM) 310 23 io, 1-2.5' CUT 305 TIE I CD CD CD CONTOUR CD C) CD C) CD C) ................ ............... .................. ....... .................. ... ............... ...... .............. II II II .......... ...... ..... ...... W......... . 77. .................................. Lu uj_ TIE INTO 303.5/ 300 ..... ............................ ............................ .................................. ................... .............. .--:.--:...:.*.:.*.:.*.*.*.*..-.*.*.*.*.*.*....N CONTOUR ................... ..................... . . . . . . . . . . . .................................... ................... ................... . ...... ...... lvL ........................ ............... .......... ......... ...... ........ ...... ........ --------- ---------- PROP C SED ---TZTPTZ-AF' SFD I ND 3' SELECT GROU 295 —CUT/ MATERIAL �-ILL 3' \ GEr)TE TILE FABRIC LL W LL LL LL LL IE! CD co UP BEHIND GABION BASKET 290 m rn co CY5 04 z 04 W > w LJ) w W w _j w X w w WLL 55 60 65 70 75 80 85 310 05 30 95 90 90 95 100 105 110 115 120 125 130 135 SCALE: 1 "=5' HORIZONTAL 1 "=5'VERTICAL 310 305 300 295 290 291 t. CAR9� TYPICAL CROSS SECTION 4 (STA 2+46) L\ i f E (AS VIEWED LOOKING DOWNSTREAM) ()W4 _y 1.8' 6.3' 6.2'— 2.4' 5.2'— 1. 9' 4.3'— EXISTING TIE INTO 301.0 CONTOUR CUT ............................... ... I V TIE INTO 300.0 7 7 PROPOSED FILL/ _FI L GROUND CO STRUCTEDI LL LL LL ULL - cc� LL CD CD m co co N CN co > W > w > w > > w >1 w w i I I _j w w w _ii u w 310 305 1'N N % o 'o E u E 300 � Lu z " Lo < Q) U Lu0 �! z LU CS ,�� < LLL CO a;2. L Lu 0 0 295 a- CO u 4-62 u U) < < af M LL (u Lu 0 0 u O� _q Lo Ln ON 290 0 z 0 U) ko C, W > Lu Ln 0) _j Lu 80 85 90 95 lbo 105 110 115 120 vi SCALE: 1 "=5' HORIZONTAL M 1 "=5'VERTICAL 0 0 Lu > Lu u z 0 cn DATE TYPICAL CROSS SECTION 5 (STA 2+59) M 0� 8-3-2020 (AS VIEWED LOOKING DOWNSTREAM) 0 >_ DRAWN BY TIE INTO 3F.0 CONTOUR 70 75 80 85 90 31 'Cue 30( 29! 290 310 Shane Vandergrift �j • DESIGNED BY Abrham Asfaw EX16 I INC;— 305 • PROPOSED GRotjw) 1 •CHECKED BY I ut TIE INTO 301.0Becky Ward CONTOUR• SCALE —300 • AS -NOTED -CUT V1 2H 295 LL LL L LL LL up c6 rn 5-0 co ,all 290 z N N > > W w w w w w 95 lbo 105 110 115 120 125 SCALE: 1 "=5' HORIZONTAL < 1 "=5'VERTICAL OJ 0 u u TYPICAL CROSS SECTION 6 (STA 2+86) (AS VIEWED LOOKING DOWNSTREAM) O r A z 310 0 0 U Lu 0 U Lu 305 � w < U) o 0 U 300 w O z LL 0 0 r 295 O u o CN 290 W CD I 80 85 90 95 100 105 110 115 120 125 130 135 < U) SCALE: 1 "=5' HORIZONTAL SCALE 1 "=l 0' 1 "=5' VERTICAL CD 0 1 1 20' 30B NO. 44363.009 60% REVIEW SET SHEET NO. 5 c EXISTING GROUND — — — — — — — — — — — — CUT T7_77 CONSTRUCTED RIFFLE LL rn LL LL rn LL LL rn r- ke I- CF) C) N z N N N > w > w > w U> 5w iW l W W w W. Wi L U s Ln w O 0 0 0 m v 0 0 BANKFULL ELEV. VARIES EROSION CONTROL FABRIC C-700 COIR MAT STREAM BANK SEE AND STRAW PRIOR TO MAT INSTALLATION 1V 2H END TOE PROTECTION AT BANKFULL ELEVATION APPROXIMATELY ELEV. 300 FT. SEE CROSS SECTIONS ON PLAN SHEETS. CLASS II ROCK TOE MIX 65% CLASS II RIPRAP 25% CLASS B RIPRAP 10% #57 STONE MIX PRIOR TO PLACEMENT / 24" (\ NON -WOVEN GEOTEXTILE ROCK TOE PROTECTION (CLASS II) SCALE: NOT TO SCALE STREAM CHANNEL 5' TAIL LENGTH L (TYP.) IN J J STREAM FLOW H LL LL w PROPOSED 0 Aft CHANNEL SLOPE CENTERLIN 0 w RIFFLE z w C TAPER ROCK FROM BOTTOM OF TRENCH SLOPE 3HAV RIFFLE END OF RIFFLE TO DEPTH "B" AT STONE MIX LONGITUDINAL VIEW NTS =riTllln I 1I:I I M.1 I SECTION VIEW "A -A" VARIES 9' TAIL LENGTH (TYP.) EXISTING ---Rr—�rr- �.IIIIIIII BANKFULL TRENCH SIDES PRIOR TO STONE PLACEMENT STONE MIX IN AREAS OUTSIDE OF ROCK TOE NTS TABLE 1.0 - CONSTRUCTED RIFFLE DIMENSIONS Class Length "L" (ft) Width "A" Depth "B" (ft) (in) As shown on II plan view $ 24 TABLE 2.0 - CONSTRUCTED RIFFLE MIX Riffle Mix Chart Percent of Mix NCDOT NCDOT NCDOT NCDOT NCDOT Riffle Class Boulder Class II Class I Class B Class A #57 Riprap Riprap Riprap Riprap Stone I I 0% 65 % 00/ 30% 0% 5% PROPOSED CONSTRUCTED RIFFLE SCALE: NOT TO SCALE EXISTING DRIVE / / 1 / � I / I / I I I \ � I i FBI P Z_- `-_--_-`-- / ' \ ///' i I ------_- / I I-------�---------- i� ---- �� SCALE 1 "=10' PLANTING NOTES: 0 10 20' 1 WOODY SPECIES TO BE PLANTED WITH A COMBINATION OF A MINIMUM OF 6' THE FOLLOWING TREES AND SHRUBS' PLANTING ZONES (ROOTED PLANT PLUGS/TUBELINGS - 12 -18" IN HEIGHT. LIVE STAKES MAY BE USED UPON APPROVAL BY THE ZONE A DESIGNER). SPECIES SUBSTITUTIONS REQUIRE PRIOR APPROVAL FROM THE DESIGNER. CONTRACTOR TO SUBMIT PLANT QUANTITIES BY SPECIES AND ZONE FOR APPROVAL PRIOR TO PLANTING. ZONE B AMELANCHIER ARBOREA - SERVICE BERRY ZONE C LINDERA BENZOIN - SPICEBUSH ILEX VERTICILLATA - WINTERBERRY CEPHALANTHUS OCCIDENTALIS - BUTTONBUSH PROPOSED ROCKTOE/RIPRAP CALYCANTHUS FLORIDUS - SWEET -SHRUB SAMBUCUS- ELDERBERRY XANTHORHIZA SIMPLICISSIMA - YELLOW ROOT CORNUS AMOMUM - SILKY DOGWOOD PHYSOCARPUS OPULIFOLIUS - NINE BARK CORPINUS CAROLINIANA - IRONWOOD ALNUS SERRULATA - TAG ALDER 2. STREAM BANKS TO BE MATTED WITH FIBERWONDERS COIR MAT C-700 OR APPROVED EQUAL. PLACE RIPARIAN SEED, EROSION CONTROL SEED AND THIN LAYER OF STRAW PRIOR TO MATTING INSTALLATION. SEE COIR MATS CHANNEL INSTALLATION DETAIL SHEET 7. 3. PLANTING STOCK TO BE GROWN BY NURSERIES WITHIN THE SAME PHYSIOGRAPHIC REGION (PIEDMONT) AND WITHIN 200 MILES OF THE PROJECT SITE. 4. FERTILIZER RECOMMENDATIONS CONTRACTOR TO FIELD VERIFY WITH ON SITE SOIL CONDITIONS: LIME'/2 TON/AC PHOSPHATE 20-40 LBS/AC POTASH 50-70 LBS/AC WATERING REQUIREMENTS ONCE/WEEK IF NO RAIN 5. RIPARIAN SEED MIX ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX OR APPROVED EQUAL BY DESIGNER. APPLICATION RATE 25 LBS/AC. 6. TEMPORARY SEED TO BE PLACED IN ALL ZONES SEE EROSION CONTROL SHEET 3. 7. SEE PLANTING ZONE TABLE BELOW. PLANTING ZONES ROOTED RIPARIAN LAWN SEED STRAW ZONE AREA (SF) C700 MATTING (SY) PLANT PLUGS NOTES SEED (SY) FESCUE (SY) MULCH (SY) (EA) SPACING 5' OC- SHRUB A 4050 450 450 200 SPECIES ONLY B 2430 270 270 MATCH EXISTING GRASS C 2250 250 Totals 8730 700 270 270 450 200 60% REVIEW SET ```,1111111111/1��'I �� NCAR,...., 0 *©Ft VtRM �\ 0Y ......... Z"S* NN /1111111/ F- 0 U Uj O O 'D O n E N = Z Q 3 U 0 W ro O LU ( ck� N_, i z aL LLL N � a) M M N a2'-'0? U X x � LL rya 0 0 i U L TL L _ `1: zO Ln0) J w U) M O U O 0 w > U Q z O M O O a U U) w 0 z O U) > w w Q 0 DATE 8-13-2020 D RAW N BY Shane Vandergrif DESIGNED BY Abrham Asfaw CHECKED BY Becky Ward SCALE 1"=10' I..L z OJ UU =tea O z J � � � z z Q V O z U � Q N Uj Q p= m a J U) O� LL JOB NO. 363.009 SHEET NO. 6 -oa N D 00 o O °z �o o � E o c o �N d o c U) zN O2 �Q �x X �r- o 0 0 0 Q o § Q") >` -� U� �N W. U o �3 �N (6 0 N o E-0 U � o U N C N � U 2 r_ M(n Uo � U O Q� U)2 J L- 50' MIN. AND SUFFICIENT TO KEEP o SEDIMENT ON SITE 0 00 0pooOOOo 000a oo00 000 } Q oo Do0 o 0 00 0000 0 0oO 0 o0 OOOoo o o o O o 0000 00 0 000 0 000000 25' OR FULL WIDTH a0 00000ao a� 0o Da00oo 3" - 4" STONE TO BE USED OF PROPOSED STREET 0-1 000 oo0oO SURGE STONE OR OR ENTRANCE, zoo 00000a oRAILROAD BALAST) a o WHICHEVER IS 000 o0oo 00a00o aoo0000Oao00 GREATER.a Wo00oo`oOOo 0( 000o o000`0000 0 0 o o oa0000 oo 0 0 0 0000 000 00 O 000O0000000 00 00 000 000 0 00 O PLAN SILT FENCE (SEE NOTE 1) EXISTING ROADWAY 35' MIN. 0000000 00 000 o O 6" MIN. 0000000 0 ooDOOo< 0 °a Oo 0 000 000 O o 0 $oOOc °°I III IIIFABRIC UNDER STONE CROSS SECTION RESIDENTIAL CONSTRUCTION ENTRANCE 1 SCALE: NOT TO SCALE 2' 6/'r '—,- (150MM) LONGITUDINAL ANCHOR TRENCH :STAKE'AT 3'-5� INTERVALS P TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH CHECK SLOT AT 25' INTERVALS (MIN) IsoP-111 INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT NOTES: 1. SILT FENCE SHOULD BE INSTALLED TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF MUD IS NOT REMOVED FROM THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD OR THE LENGTH OF THE CONSTRUCTION ENTRANCE EXTENDED. NEW CONSTRUCTION 15' MIN. - c o 0 00 0 o 12" MIN. :) ao0o o 000 III 0° ICI o 0 � MAINTENANCE: ADD ADDITIONAL STONE AND "FLUFF" TOP DRESSING WITH 2" STONE. SEE N.C. DEQ EROSION and SEDIMENT CONTROL PLANNING and DESIGN MANUAL FOR CONDITIONS WHERE PRACTICE APPLIES; PLANNING CONSIDERATION & DESIGN CRITERIA. TOP OF BANK 'c"L POST BEN WIRE FABRIC %RNING SIGN )RANGE, UV RESISTANT MIN. 10 GA. iIGH - TENSILE STRENGTH LINE WIRE )OLY BARRICADE FABRIC (TYPICAL) IIIII-11 II II SIDE VIEW NOTE: FOR TREE PROTECTION ONLY 8' MAX. PLASTIC OR / WIRE TIES MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE IIIII=11' PROVIDE WARNING LANGUAGE IN BOTH ENGLISH AND SPANISH, FRONT VIEW AS SHOWN 40" �T TREE PROTECTION AREA DO NOT ENTER ZONA DE PROTECCION M M PARA ARBOLES - NO ENTRE v� WARNING SIGN DETAIL NOTES: 1. TREE PROTECTION FENCING MUST BE INSTALLED AT A MINIMUM RADIUS OF THE CRITICAL ROOT ZONE ( SEE DETAIL TPP-02 FOR EXAMPLES) 2. THE TREE PROTECTION FENCING MUST REMAIN IN PLACE FOR THE DURATION OF THE PROJECT UNLESS OTHERWISE APPROVED BY URBAN FORESTRY STAFF. 3. APPROVED IMPACT PROTECTION DEVICES MUST BE REMOVED AFTER CONSTRUCTION WHEN APPLICABLE. 4. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER FOR THE REMAINDER 5. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTED AREA. 6. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 7. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH BASED ON ACTUAL FIELD CONDITIONS. 8. SIGNS ARE TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL WITH LETTERS A MINIMUM OF 3" HIGH, CLEARLY LEGIBLE AND SPACED AS SHOWN. Iqi■r----�■■,i11 ipl J■I.//..,►....III II�.......J■L II :►_. /,....►_._�■■■■■■■�►_....,..._._.,.IIIPP C STANDARD TREE PROTECTION FENCE 2 bAbL Ur JINLAVI TOP VIEW 1'-6" MIN. TOP OF BANK— ' DEN STAKES STREAM BED FRONT VIEW NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. SEDIMEN CONTROL STONE 1'-6" MIN. �3' MAX. _..RUCTURAL STONE CROSS SECTION NOTES: USE CLASS B STONE FOR STRUCTURAL STONE AND PAY FOR AT THE CONTRACT UNIT PRICE PER TON STONE FOR EROSION CONTROL, CLASS B. USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL AND PAY FOR AT THE CONTRACT UNIT PRICE PER TON SEDIMENT CONTROL STONE. CONSTRUCT DAM A MAXIMUM OF 1 FOOT ABOVE NORMAL FLOW DEPTH. HARDWARE CLOTH 1/4" - 1/2" MESH OPENING) OV R DEWATERING HOLES 1/ \I/ CURB INLET ,lam/ \I/ NO. 57 WASHED STONE PERSPECTIVE VIEW MAINTENANCE: CLEAN OUT AT 50% CAPACITY LIFE OF FENCING: 6-9 MONTHS NOTES: 1. FLOW SHALL NOT RUN PARALLEL WITH THE FENCE. 2. END OF SILT FENCE NEEDS TO BE TURNED UPHILL. 3. SEE NC DEQ SEDIMENT DESIGN MANUAL FOR CONSTRUCTION SPECIFICATIONS, WHERE PRACTICE APPLIES AND PLANNING CONSIDERATIONS. 4. SILT FENCE SHOULD NOT BE USED ALONE BELOW GRADED SLOPES GREATER THAN 10' IN HEIGHT. MIN. 10 GA. LINE WIRES SILT FENCE 3 SCALE: NOT TO SCALE STEEL POST WOVEN WIRE FABRIC FILL SLOPE GRADE SILT FENCE GEOTEXTILE FABRIC SIDE VIEW IIII■�■■■■■■■■■■■■IIIII 11 11��.1��.�� ►.1 11100 ♦♦ OA01, 04 ���`` . • --�:�.i�i�i�i�i�i�i�i��i�i��i��i��il�ll • ► ► 1 AA0►1*111 1'♦►...:401 ��.lop";��.�.l►�11 lllals. `Il�i�i�i�i�i��i�i�►���i�?�Ti-�-_-_--_-- II II 2.1 SLOPE NO. 57 FILTERED WATER WASHED STONE SEDIMENT LADEN RUNOFF 2"X4" CONCRETE OVERFLOW STUD BRACE BLOCK 0 ° `oeoo `oea° HARDWARE CLOTH (1/4" - 1/2" ° o a o 1 MESH OPENING) OVER ° o° III DEWATERING HOLES , CONCRETE GUTTER CURB INLET CROSS SECTION VIEW NOTES: 1. TWO CONCRETE BLOCKS SHALL BE PLACED ON THEIR SIDES ABUTTING THE CURB AT EITHER SIDE OF THE INLET OPENING, A 2" X 4" STUD SHALL BE CUT AND PLACED THROUGH THE OUTER HOLES OF THE SPACER BLOCKS TO BRACE THE FRONT BLOCKS. FRONT BLOCKS ARE PLACED ON THEIR SIDES ACROSS THE INLET AND ABUTTING THE SPACER BLOCKS. 2. WIRE MESH OR HARDWARE CLOTH WITH 1/4" - 1/2" OPENINGS SHALL BE PLACED OVER THE OUTSIDE VERTICAL FACE (WEBBING) OF THE BLOCKS, TO PREVENT STONE FROM BEING WASHED THROUGH THE HOLES IN THE BLOCKS. 3. STONE SHALL BE PILED AGAINST THE WIRE TO THE TOP OF THE BLOCK. (NO. 57 WASHED STONE) 4. CHECK DEVICE AFTER EACH RAIN AND REPLACE WASHED STONE IF IT CLOGS WITH SEDIMENT. PLASTIC OR WIRE TIES MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE IIIIIIII=1� --I •••••..•••• Y N N /1111111/ O U (n O O O n E N = IN Z LLn O) 3 Q 3 U LuU�NLLI z cil- im ai °'Ln z Lu O CDM a ct�(D 0 a- = CO U LD d (D ' � z Lu M x = U ra LL � Lu 0 o U L r, z T Q) L 0' z L ^ U) CDCO w i O� IY U., Ol J w F- (n O O 2 H 0 Lu > Lu Lu I-_ Q 0 Z O DATE > 8-13-2020 O DRAWN BY have Vandergrif DESIGNED BY Abrham Asfaw CHECKED BY Becky Ward Z O i SCALE NTS z o J V / Uua = 1 W O ~ ' � J O (D z _ O � z we z W < U 0 'z = O J w J Oro LL Or w O~ U JJ lJJ l� COIR MATS CHANNEL INSTALLATION 4 SCALE: NOT TO SCALE ROCK SILT SCREEN 5 SCALE: NOT TO SCALE CURB INLET PROTECTION 6 SCALE: NOT TO SCALE 60% REVIEW SET JOB NO. 363.009 SHEET NO. 7