HomeMy WebLinkAbout20070417 Ver 1_Approval Letter_20070402O~O~WAT~9QG
~ I ^ W tom"'
l Vw`.~ ~
O `~ `C
Santa Fe Tobacco Company
Attn: Mr. Michael A. Little
3220 Knotts Grove Road
Oxford, NC 27565
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Apri12, 2007
Alan W. Klimek, P.E. Director
Division of Water Quality
DWQ Project # 2007-0417
County: Granville
Subject Property: Santa Fe Natural Tobacco Company Warehouse Addition
Hatchers Run [030301, 28-11-3-(2), C, NSW]
AUTHORIZATION of Tar Pamlico River Buffer Rule (15A NCAC 02B .0259) Authorization
Certificate
Dear Mr. Little:
You have our authorization, in accordance with 15A NCAC 02B .0259 and any conditions listed below,
to impact approximately 1,840 ftz of Zone 1 and 4,031 ftz of Zone 2 of the protected riparian buffers for
the purpose of constructing the block and gravel driveway and retaining wall at the subject property as
described within your application dated March 6, 2007, received by the Division of Water Quality on
March 9, 2007, with additional information received by DWQ on March 30, 2007. In addition, you
should obtain or otherwise comply with any other required federal, state or local permits before you go
ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge
regulations.
This authorization is for the purpose and design that you described in your application. If you change
your project, you must notify us and you may be required to send us a new application. If the property is
sold, the new owner must be given a copy of this authorization letter and is thereby responsible for
complying with all conditions. This authorization requires you to follow the conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
Amount A roved (Units) Plan Location or Reference
Zone 1 Buffers 1,840 s uare ft.) Pa e 11 of PCN
Zone 2 Buffers 4,031 (s uare ft.) Pa e 11 of PCN
2. Erosion & Sediment Control Practices
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices in order to protect surface waters standards:
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands
No°ehCarolina
~atura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper
Santa Fe Tobacco Company
Page 2 of 2
April 2, 2007
a. The erosion and sediment control measures for the project must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Sediment and Erosion Control Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal, or exceed, the requirements specified in the most
recent version of the North Carolina Sediment and Erosion Control Manual. The devices
shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects,
including contractor-owned or leased borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed,
operated, and maintained in accordance with the most recent version of the North Carolina
Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in
accordance with the requirements of the Sedimentation Pollution Control Act.
No Waste, Spoil, Solids, or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond
the footprint of the impacts depicted in the Pre-Construction Notification. All construction
activities, including the design, installation, operation, and maintenance of sediment and erosion
control Best Management Practices, shall be performed so that no violations of state water quality
standards, statutes, or rules occur.
4. No Sediment & Erosion Control Measures w/n Wetlands or Waters
Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum
extent practicable. If placement of sediment and erosion control devices in wetlands and waters
is unavoidable, they shall be removed and the natural grade restored within six months of the date
that the Division of Land Resources has released the project.
5. Diffuse Flow
An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive
velocities through the protected stream buffers and will not re-concentrate before discharging into
the stream as identified within 15A NCAC 2B .0259(5).
6. Protective Fencing
The outside buffer, wetland or water boundary and along the construction corridor within these
boundaries approved under this authorization shall be clearly marked with orange warning fencing
(or similar high visibility material) for the areas that have been approved to infringe within the
buffer, wetland or water prior to any land disturbing activities to ensure compliance with 1 SA
NCAC 2B .0259.
7. Certificate of Completion
Upon completion of all work approved within this authorization, and any subsequent
modifications, the applicant is required to return the attached certificate of completion to the 401
Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail
Service Center, Raleigh, NC, 27699-1650.
8. Deed Notifications
Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands,
waters and protective buffers in order to assure compliance for future wetland, water and buffer
impact. These mechanisms shall be put in place prior to impacting any wetlands, waters and/or
buffers approved for impact under this Authorization Certificate. A sample deed notification can
Santa Fe Tobacco Company
Page 2 of 2
April 2, 2007
be downloaded from the 401/Wetlands Unit web site at: http://h2o.enr.state.nc.us/ncwetlands.
The text of the sample deed notification may be modified as appropriate to suit to this project.
Any disputes over determinations regarding this Authorization Certificate (associated with the approved
buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is
subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall
expire five (5) years from the date of this letter.
This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B
.0259. If you have any questions or would like a copy of the buffer rules, please call Amy Chapman at
(919) 733-1786. This letter does not authorize any impacts to either Waters of the United States or
Waters of the State. Please contact the US Army Corps of Engineers (US CE) or NC Division of Water
Quality (DWQ) if any impacts are proposed to either of these waters.
Si
Alan W. Klimek, P.E.
AWIUcbk/asc
Enclosures: Certificate of Completion
cc: Lauren Cobb, DWQ Raleigh Regional Office
DLR Raleigh Regional Office
File Copy
Central Files
Filename: 070417SantaFeTobaccoCoWarehouseAdd ition(W ake)NBR