Loading...
HomeMy WebLinkAboutSW7170709_Final Permit_20170808Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY August 8, 2017 U. S. Marine Corps Air Station Cherry Point Mr. C. E. Schulz, Deputy Facilities Director PSC Box 8006 Cherry Point, NC 28533 Dear Mr. Schulz: ROY COOPER Governor MICHAEL S. REGAN Secretary TRACY DAVIS Director Subject: Stormwater Permit No. SW7170709 Infrastructure to Support Gator— MACS/2 Low Density Stormwater Project Craven County The Washington Regional Office received a complete Stormwater Management Permit Application for the Infrastructure to Support Gator— MACS/2 on July 28, 2017. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7170709 dated August 8, 2017 for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the SCM(s), recordation of deed restrictions, certification of the SCM's, procedures for changing ownership, and transferring the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the SCM's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 946-6481. Sincerely, William Carl Dunn, PE Environmental Engineer cc: Kevin Avolis, PE — Avolis Engineering, PA (PO Box 15564 New Bern, NC 28561) Craven County Inspections Washington Regional Office State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Washington Regional Ofnce 1 943 Washington Square Mall I Washington, NC 27889 252 946 6481