Loading...
HomeMy WebLinkAboutSW7120608_Modification_20190614ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interlm Director NORTH CAROLINA Environmental Quality June 14.2019 Christopher Houtz, Director Harvey Point Defense Testing Activity 2835 Harvey Point Road Hertford, NC 27944-8470 Subject: Stormwater Permit No. SW7120608 Modification Harvey Point Admin Complex Overall Low Density Commercial Development with Areas of High Density Perquimans County Dear Christopher Houtz: The Washington Regional Office received a complete Stormwater Management Permit Application for Harvey Point Admin Complex project on April 25, 2019. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120608MOD, dated June 14, 2019, for the construction of the subject project. This permit shall be effective from the date of issuance until June 29, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 946-6481. Sincerely, William Carl Dunn, PE Environmental Engineer cc: David A. Deel, PE — Deel Engineering, PLLC (dadeeleng@gmail.com) Perquimans County Inspections Washington Regional Office North Caroltna Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washtngton Square Mall I Washington, North Carolina 27889 252.946.6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW DENSITY COMMERCIAL DEVELOPMENT WITH AREAS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Harvey Point Defense Testing Activity Administration Complex Perquimans County FOR THE construction, operation and maintenance of an overall low density commercial development with one wet detention pond in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 29, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The built -upon area percentage for the low density portion of this project must be maintained at 24% per the requirements of Session Law 2008-211 and 15A NCAC 2H .1000. This project is permitted for a maximum of 224,757 square feet of BUA (for both Low Density and High Density portions of this project). 3. The stormwater systems proposed to treat the runoff generated by the designated high density area has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. 4. This project will maintain a minimum 50 foot wide vegetated buffers between all impervious areas and surface waters on new development and a minimum 30 foot wide vegetated buffer on all existing and previously permitted impervious areas. Within the low density portions of the permitted project, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and as shown on the approved plan. The following design elements have been permitted for the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: b. Total Impervious Surfaces, ft2: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ft2: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour: k. Post development 1 year 24 hour: I. Controlling Orifice: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower, HP o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: 13.16 134,886 1.50 3.0 90 % 2.50 20,298 18,054 3.25 7.70 11.30 V notch weir, 30 degrees 7,348 1/6 hp Perquimans River / Pasquotank 30 - 6 - (7) "SB° II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 5. The runoff from all built -upon area within the drainage area of the high density portion of the project must be directed into the permitted stormwater control system(s). 6. Within the low density portions of the permitted project, all roof drains shall terminate at least 50 feet from the mean high watermark of surface waters. 7. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 8. The Director may determine that other revisions to the project should require a modification to the permit. 9. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project must be recorded showing all such required easements, in accordance with the approved plans. 10. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 11. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 12. If the stormwater system was used as an Erosion Control device, it must.be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 13. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 14. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 15. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 16. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 17. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, -and the -maintenance work performed at each inspection. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the applicable documents as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 12. This permit shall be effective from the date of issuance until June 29, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 14th day of June, 2019. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for nanny smitn, interim uirector Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit Number SW7120608 p10N MANAGEMENT A a r SCAL i' � = ' � 4 � � Date S ,GR SIC � I I a 25 100 200 NOTES: S4 llloiey StormwaterPemitNo.50 ° !� W� y= Io 1. OWNER / APPLICANT: HARVEY POINT DEFENSE /- In TESTING ACTIVITY o �cil 2835 HARVEY POINT ROAD (tN'EET) ,' 1 itfe- 50 ft.� IGf HERTFORD, NC 27944 €a£s ,•' ` OVERALL PROJECT AREA,! Ex. CONC. Xi ` �, 2. TAX MAP PARCEL ID. 2-0073-0031g6 PIN: 7886-94-5371 €( (pd€ - PAD (TYP.)I STORMWATER PERMIT 3. LOCATION: HARVEY POINT DEFENSE TESTING ACTIVITY SW7120608 I I HARVEY POINT, NC _# 4. SCOPE OF PROJECT: HARVEY POINT PROPOSES THE --- ---- -r l INSTALLATION OF A NEW 30' X 40' GRAVEL DRIVE TO -------`-��- ---'--'- ACCESS A PUMP STATION WITHIN THE LOW DENSITY AREA OF STORMWATER PERMIT SW7120608. p 5. TOPOGRAPHIC INFORMATION SHOWN ON THIS PLAN IS BASED ON GIS & LIDAR INFORMATION PROVIDED BY -� THE HARVEY POINT DEFENSE TESTING ACTIVITY I'. EX. BUILDING ���� FACILITY. BOUNDARY INFORMATION SHOWN IS BASED I, l' 7-51 ON DEED DESCRIPTIONS AS APPLIED TO FILE S li PROVIDED BY HARVEY POINT. EX. BLDG 6. PROPERTY IS LOCATED IN F.I.R.M. ZONE "X". F.I.R.M. 7-54 I- 11 I/ ZONES SUBJECT TO CHANGE BY F.E.M.A. 7. NO WORK IS PROPOSED IN USACE JURISDICTIONAL 0 _.._. _.._.._.. ._.._.. -. -.. WETLANDS. 3 •._ _^__..r 8. PROPOSED GRAVEL ACCESS DRIVE IS LOCATED WITHIN THE LOW DENSITY DRAINAGE AREA (1L) OF SWM Ex -.-ASPHALT _ i r--=---------�---- ; \ PERMIT #SW7120608. THE LOW DENSITY COMPONENT A, OF THE IT ALLOFUP TO 24% OF TOTAL I I V �� COVERAGE. THE REVISEDCOVERAGE BREAKDOWN .` FOR 1L IS AS FOLLOWS: O Z 00 _ EXISTING COVERAGE: 69,025 SF z N A, % /! PROPOSED GRAVEL DRIVE: 1,200 SF < Q Q Ex. SEWAGE �' r' HIGH —DENSITY �� �i r- 1 . FUTURE COVERAGE: 39.646 SF TOTAL: 109,871 SF J (V to PUMP STATION 1 ' DRAINAGE AREA, / �i • Lo Q r PROP. 40 LF — 15" RCP (( `. `CULVERT W/ ENDWALLS /� ��� i� o Z w a Z o LEGEND a w (MATCH EX. SWALE GRADES) J > a 1 PROP. 30' X 40' `'� 1 `"` __� EXISTING CONCRETE W LLI i GRAVEL ACCESSWAY --_ '� I ' -. -"•' EXISTING ASPHALT PAVEMENT Q Q O _ U i i LOW —DENSITY i DRAINAGE AREA i I i PROPOSED GRAVEL PAD 0 1 EXISTING ASPHALT A. PARKING LOT EXISTING CONTOUR s U °A° DATE V 019 RECEIVED APR 2 5 2019 SHEET NO 0NOMA ti'i ii31! U fQ 1 ;f k � -., t�Pf h�1ts9 �istr-ITri,� I - _--.-_..._ . y� p u, -tI.1 KI 11110. (i','!AAH-fvk)'-I:i'ii, i Y� IDA .':!l23T _'t'I lic.'9 v rflAt' 'v8S .JI Ii.ulA' 4Av. .a'` �S -r YiNriJA 0011 '1 `I3-;0 40=1 Y:Mr Vi ACCTl011., .-. 1 f ,,I trh)a , i F ,I1 311T Tih ' Y.VA H 10 39UJ2 ' t :.Yf rVIpG 19VA1' W, ,: Cc N.111 A 10 s01,fYA.,JA12W YIi'03 J 1Y0J 3)Il O I py MWAT1 %A J� A 2?3OOA ! n aLFI V1< ;ttAsio-1 7IL A351A l I I ,, , ? 21 1T 110 1 LOH V ATAN9,0101 ^Ir19As,D90T . . Y8 U301VOP`i V1il1iA1A031111 AACLI A 213 ✓iO 03?A8 YTIVITJA �411-TiT 3-203130 TV11O9 %'!VA'4H 3r4T J 12AC 21 14WOH2 HOITAM9COi11 YSMOU00 YTIMA.1 3113 Oi (131J�19A ;-'A lliT4lflO?3Q t1330 V!0 - J = ' ).,.r.l.; X,. rn :.A .}1. U'l AOATAJ0.1 21 Y1A539 390.d -L.i1 ...- .A M.3.1 YU 30ANHO OT T03L9U' 23110S f }�.pl ilt-Ji'lislP,,. ll.. q;?U VI f33e.090W) 71 Ai "irl OW i I .1tHdAJT3t1 M1,14 COTAOOi Z1 lY10 c<C.aOA DIVA 1, C;3W'-a)Rc1 £} In 3 f h iuP 30AWAAfi YT12V!3C W J 3HT s • — — _ t ° UO 1 'Y l0 1 ,. Yt0 J '3" l ,8Gd0' v'y;pj f INA39 JATt T 10 %Ms ,4 9U 10 I U011 IA i'MCd39 3HT 30 1V.00AA.isi<l 3�a.A3VOO TKNUA 3Ht .IOMMOD o U :2N'OJJO? 2A 2! Ji 54)i jOA313VOO a41POIX3 -i2 QOS.! :-Alft Y3NAAO 03?O90519 '!% 1\8 ECIf t.JAI'OT i 713AJt403.)N;TPIA ' I r _ a _I 'Uul ) ,Y1 I:', M sr ` � u _-.fg'N _Yilm , J j fit i f i 3 Ci 1 j }rlo- v-4 I ` � .•'' i'� /... , :., r�,. i /�. iyn T �l C�s'9 .J.IA �a':-C� . tiat, / - ! I �, ilU>1J�1 ii'!',vtra�c:l�f,✓�_... I7-L I...__._..,__.. I J'AH9'.A .YJ � I Ilk .�.n 6 /' A:�IY1A J�ANIA ii_7 �, 01 A -14lU - `' (- -- I , i � f