Loading...
HomeMy WebLinkAboutSW7120603_Final Permit_20120622ORA North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, PE Dee Freeman Governor Director Secretary June 22, 2012 Mr. George W. Radford, Jr., Environmental Affairs Officer Marine Corps Air Station, Cherry Point Building 4223 Access Road PSC Box 8006 Cherry Point, NC 28533-0006 Subject: Permit No. SW7120603 Design / Build Access Road Running Trail Low Density Stormwater Project Dear Mr. Radford: Craven County The Washington Regional Office received a complete Stormwater Management Permit Application for the Design / Build Access Road Running Trail (N40085-09-D-9025 TO 0014) on June 14, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120603 dated June 22, 2012, for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Scott Vinson or me at (252) 946-6481. Regional Surface 1 AH/sv: S:\WQS\STORMWATER\PERMIT\SW7120603 cc: Myron Meadows, PE — Carolina Engineers, PA Craven County Inspections ;�YlVashington Regional Office North Carolina Division of Water Quality Internet: www.newaterguglity.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Protection Section One NorthCarohna Aahmally State Stormwater Management Systems Permit Number SW7120603 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO MCAS — Cherry Point Design / Build Access Road Running Trail Craven County FOR THE construction, operation and maintenance of a low density development in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: 1. DESIGN STANDARDS This permit covers the construction of 75,969 square feet of built -upon area. 2. The overall tract built -upon area percentage for the project must be maintained at 24%, as required by Section .1005 of the stormwater rules. 3. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 4. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 5. No piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access and that which is shown on the approved plans for conveyance down the impact berm. 6. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 7. Roof drains must terminate at least 50 feet from the Mean High Water line. Page 2 of 6 State Stormwater Management Systems Permit Number SW7120603 II. SCHEDULE OF COMPLIANCE 1. Projects covered by this permit will maintain a minimum 50 foot wide vegetative buffer between all impervious areas and surface waters. 2. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. Prior to the subdivision and/or sale of this project, in whole or in part, the following deed restrictions must be recorded with the Office of the Register of Deeds: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120603, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. Lots within CAMA's Area of Environmental Concern may the permitted maximum built -upon area reduced due to CAMA jurisdiction within the AEC. g. Construction of additional built -upon area in excess of 75,969 square feet will require a permit modification. h. Construction of additional impervious areas such that low density requirements are no longer met must be submitted to DWQ and a permit modification must be issued prior to construction. An engineered system will be required to collect and treat the runoff from all built -upon area associated with the project, including that area permitted under the low density option. i. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with this development, except for average driveway crossings, is strictly prohibited by any persons. j. A minimum 50 foot wide vegetated buffer area shall be provided between surface waters and all impervious surfaces. Page 3 of 6 State Stormwater Management Systems Permit Number SW7120603 5. A copy of the recorded restrictions must be received in this Office within 30 days of the date of sale. 6. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. 7. Projects within CAMA's Area of Environmental Concern (AEC) are subject to a reduction of the permitted amount of built -upon area due to CAMA jurisdiction within the AEC. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 9. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated; and be operational for their intended use prior to the construction of any built -upon surface. 10. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 11. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include:. a. Inspections b Sediment removal. C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 12. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 13. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. III. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Quality, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. 2. The permit issued shall continue in force and effect until revoked or terminated. Page 4 of 6 State Stormwater Management Systems Permit Number SW7120603 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 21-1.1000; and North Carolina General Statute 143-215.1 et. al. This permit is not transferable except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. The permittee is responsible for compliance with all permit conditions until the Director approves the transfer. 6. The permittee grants permission to DENR Staff to enter the property for the purpose of inspecting all components of the stormwater management facility. 7. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 8. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. Permit issued this the 22"d day of June 2012. N RTH C ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -- — ---- - ---- - ---- for Charles Wakild, PE, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7120603 Page 5 of 6 QUA NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor From: Charles Wakild, PE Division of Water Quality Charles Wakild, PE Director June 22, 2012 Director's Certification Dee Freeman Subj: Waiver of Deed Restrictions and Protective Covenants for Marine Corps Air Station (MCAT CherryPoint Stormwater Permit No. SW7120603 Design/Build Access Road Running Trail As provided in the Director's Certification provisions of NCAC of 15A NCAC 2H .1003(d)(4), this letter waives the requirements for mandatory deed restrictions and protective covenants contained in 15A NCAC 2H 1003(d)(1) for MCAS Cherry Point Stormwater Permit No. SW7120603, Design/Build Access Road Running Trail. In lieu of these deed restrictions and protective covenants MCAS Cherry Point will be required to submit written correspondence certifying that the Base Master Plan will be appropriately modified to ensure that the subject development will be maintained consistent with the plans and specifications approved by the Division of Water Quality in Stormwater Permit No. SW7120603. Cc: Al Hodge, WaRO SW file North Carolina Division of Water Quality Internet: wv w ncwaterquality ore 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal OpporlunitylAffirmative Action Employer— 50% Recycledl10% Post Consumer Paper NorthCarohna Naturally Page 2 of 2 ,