Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20040688 Ver 1_Complete File_20040429
imap://rob.ridings%40dwq.denr.ncmail.net @cros.ncmail.net:143/fet... Subject: Re: 040688 From: Mike Thomas <Mike.Thomas@ncmail.net> Date: Wed, 28 Jul 2004 15:26:08 -0400 To: Rob Ridings <rob.ridings@ncmail.net> yep. Rob Ridings wrote: Ok...I'll assume that means I can file it away as Withdrawn. Thanks Mike Thomas wrote: I remember this one now. It was a precautionary step by the DEO to get a cert for removing trees but they did not need to remove them. I am not sure how it got sent to you because my intention was to hold it and send it if they needed me to. Sorry for the confusion. Thanks Rob Ridings wrote: OK it was NBR only. I never sent a copy to you.... looks like WaRO got it and sent us a copy so I had assumed you already had it. I'm faxing it over to you now so you can see. thanks r Mike Thomas wrote: I cannot find it in any of my records. Was it NW3 or a NW14? I did one in March on NC 55 but don't have anything electronic or otherwise for this DWQ number. Rob Ridings wrote: Mike, Did you ever issue this project? (040688, NC 55 culvert, Craven Co.) We got a copy of PCN from you back in April ...but not of any approval letter. Let me know, Thanks. rob Mike Thonas Environi-nental Specialist !I! 7C D': Q 6`7aRO 252-9.16-6,181 oxt :231 I of 1 7/28/2004 3:34 PM N APR 2 3 20011 DWONVARO oFWArFR ?O? Q G 0? >J =1 cl? - ' Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules This form is to be used for projects qualifying for any of the U.S. Army Corps of Engineers' (USACE) Nationwide, Regional or General Permits as required by Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act, and for the North Carolina Division of Water Quality's (DWQ) associated General 401 Water Quality Certifications. This form is also to be used for any project requiring approval under any Riparian Buffer Rules implemented by the N.C. Division of Water Quality. This form should not be used if you are requesting an Individual 404 Permit or Individual 401 Water Quality Certification. The USACE Individual Permit application form is available online at littp:/hvww.saw.usace.army.mil/wetlands/Perm app.htm. The USACE is the lead regulatory agency. To review the requirements for the use of Nationwide, Regional or General permits, and to determine which permit applies to your project, please go to the USACE website at http://?vxvw.saw.usace.army.mil/wetlands/regtour.litni, or contact one of the field offices listed at the end of this application. The website also lists the responsible project manager for each county in North Carolina and provides additional information regarding the identification and regulation of wetlands and waters of the U. S. The DWQ issues a corresponding Certification (General or Individual), and cannot tell the applicant which 401 Certification will apply until the 404 Permit type has been determined by the USACE. Applicants are encouraged to visit DWQ's 401/Wetlands Unit website at http://h2o.enr.state.nc.us/ncwetlands to read about current requirements for the 401 Water Quality Certification Program and to determine whether or not Riparian Buffer Rules are applicable. The applicant is also advised to read the full text of the General Certification (GC) matching the specific 404 Permit requested. In some cases, written approval for some General Certifications is not required, provided that the applicant adheres to all conditions of the GC. Applicants lacking access to the internet should contact DWQ's Central Office in Raleigh at (919) 733-1786. Trout Waters Coordination - Special coordination with the North Carolina Wildlife Resources Commission (NCWRC) is also required for projects occurring in any of North Carolina's twenty-five counties that contain trout waters. In such cases, the applicant should contact the appropriate NCWRC regional coordinator (listed by county on the last page of this application). Page 1 of 12 CAMA Coordination - If the project occurs in any of North Carolina's twenty coastal counties (listed on the last page of this application) the applicant should also contact the North Carolina Division of Coastal Management (DCM) at (919) 733-2293. DCM will determine whether or not the project involves a designated Area of Environmental Concern, in which case DCM will act as the lead permitting agency. In such cases, DCM will require a Coastal Area Management Act (CAMA) Permit and will coordinate the 404/401 Permits. USACE Permits - Submit one copy of this form, along with supporting narratives, maps, data forms, photos, etc. to the applicable USACE Regulatory Field Office (addresses are listed at the end of this application). Upon receipt of an application, the USACE will determine if the application is complete as soon as possible, not to exceed 30 days. This PCN form is designed for the convenience of the applicant to address information needs for all USACE Nationwide, Regional or General permits, as well as information required for State authorizations, certifications, and coordination. Fully providing the information requested on this form will result in a complete application for any of the USACE Nationwide, Regional or General permits. To review the minimum amount of information that must be provided for a complete PCN for each USACE Nationwide permit, see Condition 13, 65 Fed.Reg. 12893 (March 9, 2000), available at http://Nvww.saw.usace.arniy.mil/wetlands/nwpfinalFedReQ.pdf. Processing times vary by permit and begin once the application has been determined to be complete. Please contact the appropriate regulatory field office for specific answers to permit processing periods. 401 Water Quality Certification or Buffer Rules - All information is required unless otherwise stated as optional. Incomplete applications will be returned. Submit seven collated copies of all USACE Permit materials to the Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. If written approval is required or specifically requested for a 401 Certification, then a non-refundable application fee is required. In brief, if project impacts include less than one acre of cumulative wetland/water impacts and less than 150 feet cumulative impacts to streams, then a fee of $200 is required. If either of these thresholds is exceeded, then a fee of $475 is required. A check made out to the North Carolina Division of Water Quality, with the specific name of the project or applicant identified, should be stapled to the front of the application package. For more information, see the DWQ website at httpJ/l12o.ehrnr.state.nc.us/ncwetlands/fees.litmi. The fee must be attached with the application unless the applicant is a federal agency in which case the check may be issued from a separate office. In such cases, the project must be identifiable on the U.S. Treasury check so that it can be credited to the appropriate project. If written approval is sought solely for Buffer Rules, the application fee does not apply, and the applicant should clearly state (in a cover letter) that only Buffer Rule approval is sought in writing. Wetlands or waters of the U.S. may not be impacted prior to issuance or waiver of a Section 401 Water Quality Certification. Upon receipt of a complete application for a 401 Certification, the Division of Water Quality has 60 days to prepare a written response to the applicant. This may include a 401 Certification, an on-hold letter pending receipt of additional requested information, or denial. Page 2 of 12 Office Use Only: Form Version April 2001 USACE Action ID No. DWQ No. J If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. No processing fee NCDOT Work Order Dumber: 36936 1. Check all of the approval(s) requested for this project: ? Section 404 Permit ? Section 10 Permit ? 401 Water Quality Certification ® Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: Buffer Certification only 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information WETLANDS/ 401 GROUP Name: North Carolina Department of Transportation Mailing Address: P.O. Box 1587 r?rH • Z) 701 Greenville N.C.27835 WA N Telephone Number: 252 830 3490 Fax Number: 252 830 3341 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Jav Johnson Company Affiliation: Division 2 Environmental Officer Mailing Address: Same as above Telephone Number: Same Fax Number: Same E-mail Address: jbjohnsonndot.state.ne.us Page 3 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Craven NC 55 2. T.I.P. Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Craven Nearest Town: Jasper Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc Take NC 55 west from Newbern site # 75 is west of Jasper 5. Site coordinates, if available (UTM or Lat/Long): 35 10.877N 77.10989W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Existina paved highway 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Jumping Run Creek 9. River Basin: Neuse (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://l12o.enr.statc.nc.us/admin/maps/.) Page 4 of 12 10. Describe the purpose of the proposed work: Replace existing two concrete 7'x6' box culvert with a 30411xll3" aluminum box culvert. Stream buffer impacts will include cutting three trees inside zone 1 to allow the crane to pivot the new structure in place as well as creating a temporary parldna pad for the crane to operate from 11. List the type of equipment to be used to construct the project: Typical road construction couinment. 12. Describe the land use in the vicinity of this project: Residential, Agriculture IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream. and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Nationwide permit #3 has been issued. V. Future Project Plans Are any additional permit requests anticipated for this project in the future? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: No additional permit requests are anticipated in the near future. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 5 of 12 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Fill in stream/ open water Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** (es/no Distance to Nearest Stream linear feet Type of Wetland*** * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For darns, separately list impacts due to both structure and flooding. # * 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at httpJ/w-\v\v.fcma.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: N/A Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Culvert replacement Replacing an existing 7'x6'eonerete box with a 304" x 113" aluminum box Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) Culvert & ripra 14' Jumping run 10' P * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and alter, and net loss(gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles shoving the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest dowvnstrcam named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at a tiw.us s. ov. Several internet sites also allow direct download and printing of USGS maps (e.g., wv\ w.topo7one.com, w,x\w.mapquestcom, etc.). Page 6 of 12 Cumulative impacts (linear distance in feet) to all streams on site: Existinn 251 to 40' nine 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. N/A Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name Wate) (if applicable) Type of Waterbody (lake, and estuary, bay, ocean,etc sound, * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation N/A If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation Page 7 of 12 DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at littp://li2o.enr.state.nc.us/ncwetlands/stmii,ide.litml. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that Page 8 of 12 you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hup://ti2o.cr,r.state.nc.iigN?,M/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: N/A Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Neuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify Neuse )? Yes ® No ? If you answered "yes", provide the following information: Page 9 of 12 Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213 .0242 or .0260. * All buffer impacts on this road are under 40 linear feet total and contained inside DOT R/W. Stream buffer impacts will include cutting three trees inside zone 1 to allow the crane to pivot the new structure in place as well as creating a temporary narking pad for the crane to operate from XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. When adequate upland is present in the existing R/W new side ditches from the Proiect will contain and transport stormwater toward wetlands or streams however the stormwater will flow through a silt basin and over vegetated uplands prior to entering wetlands or the stream bufffer area. A detail map is enclosed. When no upland exists to construct side ditches stormwater will sheet flow over the vegetated road shoulder and into wetlands. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Page 10 of 12 Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applica ?/ g is ignatur Date (Agent' gn re is valid ily if an authorization letter from the applicant is provided.) US Army Corps Of Engineers Field Offices and County Coverage Asheville Regulatory Field Office Alexander Cherokee Iredell Mitchell US Army Corps of Engineers Avery Clay Jackson Polk 151 Patton Avenue Buncombe Cleveland Lincoln Rowan Room 208 Burke Gaston Macon Rutherford Asheville, NC 28801-5006 Cabarrus Graham Madison Stanley Telephone: (828) 2714854 Caldwell Haywood McDowell Swain Fax: (828) 271-4858 Catawba Henderson Mecklenburg Transylvania Raleigh Regulatory Field Office Alamance Durham Johnston Rockingham US Army Corps Of Engineers Alleghany Edgecombe Lee Stokes 6508 Falls of the Neuse Road Ashe Franklin Nash Surry Suite 120 Caswell Forsyth Northampton Vance Raleigh, NC 27615 Chatham Granville Orange Wake Telephone: (919) 876-8441 Davidson Guilford Person Warren Fax: (919) 876-5283 Davie Halifax Randolph Wilkes Washington Regulatory Field Office Beaufort Currituck Jones US Army Corps Of Engineers Bertie Dare Lenoir Post Office Box 1000 Camden Gates Martin Washington, NC 27889-1000 Carteret* Green Pamlico Telephone: (252) 975-1616 Chowan Hertford Pasquotank Fax: (252) 975-1399 Craven Hyde Perquimans Pitt Tyrrell Washington Wayne D Union Watauga Yancey Wilson Yadkin *Croatan National Forest Only Page 11 of 12 Wilmington Regulatory Field Office Anson Duplin Onslow US Army Corps Of Engineers Bladen Harnett Pender Post Office Box 1890 Brunswick Hoke Richmond Wilmington, NC 28402-1890 Carteret Montgomery Robeson Telephone: (910) 251-4511 Columbus Moore Sampson Fax: (910) 251-4025 Cumberland New Hanover Scotland US Fis US Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 Raleigh, NC 27636-3726 Telephone: (919) 8564520 h and Wildlife Service / National N US Fish and Wildlife Service Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 Telephone: (828) 665-1195 [arine Fisheries Service National Marine Fisheries Service Habitat Conservation Division Pivers Island Beaufort, NC 28516 Telephone: (252) 728-5090 North Carolina State Agencies Division of Water Quality 401 Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Telephone: (919) 733-1786 Fax: (919) 733-9959 Division of Water Quality Wetlands Restoration Program 1619 Mail Service Center Raleigh, NC 27699-1619 Telephone: (919) 733-5208 Fax: (919) 733-5321 CAMA and NC Coastal Counties State Historic Preservation Office Department Of Cultural Resources 4617 Mail Service Center Raleigh, NC 276994617 Telephone: (919) 7334763 Fax: (919) 715-2671 Division of Coastal Management Beaufort Chowan Hertford Pasquotank 1638 Mail Service Center Bertie Craven Hyde Pender Raleigh, NC 27699-1638 Brunswick Currituck New Hanover Perquimans Telephone: (919) 733-2293 Camden Dare Onslow Tyrrell Fax: (919) 733-1495 Carteret Gates Pamlico Washington NCWRC and NC Trout Counties Western Piedmont Region Coordinator Alleghany Caldwell Watauga 3855 Idlewild Road Ashe Mitchell Wilkes Kemcrsville, NC 27284-9180 Avery Stokes Telephone: (336) 769-9453 Burke Surry Mountain Region Coordinator Buncombe Henderson Polk 20830 Great Smoky Mtn. Expressway Cherokee Jackson Rutherford Waynesville, NC 28786 Clay Macon Swain Telephone: (828) 452-2546 Graham Madison Transylvania Fax: (828) 506-1754 Haywood McDowell Yancey Page 12 of 12 PROJECT o N.C.M.A. SITE 75 NC 55 OVER JUMPING RUN C I y _1 Z 1: 'x 'x 'x 'x It O ?r n n r n 0 Z A ? C A a C ? `" cn I? 9 ro >. b 23 < ? O z v i ? z O e ro p O O A I' QI z z ? A j S,! r x z A ' Y i v g air AV, I C7 I o ? I c ? I = o in 0 14 0 1 z 101 ICI I Ix1 Iz I I? IU` ? I I ?..? I I ix C • Iz IC'I? Ih l? I h 1v I.j1 IC I ?.,? I 1 17' i u ; V I? ill ? Z M? n la Irl 1 I? I?I? I? w I ?mn- x 10 I?1"o Iz I 11 z ir-l I' I I : I Izz I I In 1'j c: 10 I I.y I I I 10.4 I n I? I Ih I/?` I? 1 I? I? 10 1 1 IC I I z .._ ._...... O In O 2 0 ?o orn ^o n CRAVEN _d C h z z x x rn al i ??•? ?•j /'y?_ '\• 1 •? O-1 6?.,! ./ ? \ ? \ .-? 10. ? / .. ------------ cEZI' L09 41 f C ----- E;ZC ?; ,aim i/ _ - /_.. L? -•IV ? ? _... ,?- ~_ -'? .- ? _ ?- r ` ^ j / 1,/i , \ ?=a ?cnr :.c'•I?r? -?:: .. - ? ? .? \= _ orn 71, . r ffid! \ \ / • ' PPP \ \ \ q ?? - 41 ? ?Pa ? I e7 OP \?1` \'\ -? ? \ q ? ? S q 1 N / • •w?`/ /I • 1 •' t•o •?/, /? / ire - -. ,'' /•Ij i 11 ?" - .11t. 11 1 \ /////?// /' I 1 C7 I ..? ? ?s?f aIIa°s 11 n q 1 t - ,J ?5= = ?? ? t aaay aa$ -? _ _ I ?` 1 . ,%• as . ? J Xv .. `.. ` 11 I Y I I I q .? r Py? '?1( n-. i File: d:\My Documents\EROSION\PROJDESC.BAK 4/2/2004, 8:52:34AM PROJECT DESCRIPTION 14C 55 Over Jumping Run,Township Number 9,Craven County; The project is located in the Neuse River Basin. Jumping Run is a Blue Line Stream. The project is located on the Jasper USGS Quadrangle and on Sheet 8 of the Soil Survey of Craven County. Soils are in the Lenoir silt loam and Craven silt loam. SEDIMENTATION & EROSION CONTROL Due to the nature of the project, there is expected to be some sedimentation and minor erosion during heavy and prolonged rains. Enclosed are locations of proposed silt basins. Enclosed at pertinent outlets and project extremities. The construction foreman or suitable representative shall constantly watch for problem areas during construction, especially around crossline and outlet drainage areas, and take the following steps as necessary: (1) When silt basin-check dams approach full capacity, they shall be cleaned out and/ or replaced as needed. (2) Should unforeseen delay in construction occur, temporary or staged seeding and mulching will be used accordingly. (3) Any questions or problems arising concerning sedimentation or erosion control shall be directed to the County Engineer or District Engineer. Page: 1 T :abed 'dSAOO 3AIIKI353A IN3NVNUSd K 7IINn Q3NIVINIVN 3H c inoHS7S32inmN 3S3H,L ' (Q3Q33N 2SI14EEH,LO SK 'do) IN3A3 77VSNIY'd INVOIZINDIS ,TNV 213S3K SS'dnSK3N gO'dIN0O NOIS02i3 7,'dYdOdN3I 77K M'dOM31T 'dO/QNK NK37O (S '0213- Sl SNIQK2iJ 30 3S`1Hd MV SV NOOS SV SV:aUV 02aUnISIQ 77V HOUNyQNKO033S ( 6 S3SS3LJ02id ONIGY'dD SK S3H3IIQ 7,VMCVOd JNO'IK S2'dnSVZN 70VINOD NOISO'dZ 3OFI7d 'S3HOIIQ WMCVOE 30 5NIGVU5 NI53S (£ Q33S 39KIS SUMOSd AVN 3S3H,L 'NOIIVI353A )LS Q3NIVISd 3SHNKONIKH,L 37ONV NV IV S3dO7S3QIS JNIAK37 S3H3II0 77VILOO N`d370 QNV UVE70 (Z 'JNIeEnEJ SUOS39 QNK SNIUVE70 H2I3'd SINIOd 3DdVH3SIQ EaHI0 IV QNK SI37100 77V NI SNK7d OI JNIQ2i0OOK SaU SK3N 7OUINO3 NOISO'dZ 77VISNI (T 27002HDS MUN0O NOIS02i3 NdSZ:£0:£ 'OOOZ/LT/£ >IVS'HOSO'd2\NOISOUZ\G4uaux?z)oQ AN\:p =aTT3 N ? s? ZO W I? ~p; I W (n LX) CO C) C\j L, Q ?o o ?Qa I o Ln00 op Q ?? CL 63 'n V I '? N O 2 wZN ??? o p Wo o,? it LLJ Q) Ln o?g -zoz? W es? S cz WAN C Qj WOE ; CD 12 tn? J S:2?mflj J?ti W I O ?n o41 uj ` W 4 W? ti tb?? tiQ? W 41` o Nth b ?" WWW 4 Q tn?N CC N, ov Z N?? pW T?? ?3? m ?l b?l y"d Q ?sO ? 0 I DN W Lo LU brW ti j _ <sO °I X°e ^? tai a ?. - ---, - t, ?IIN I - :7 L, LU i?l :ter ? --- _ I? o a Ali Li (o Ip Z71 C_ y (m c $ R I 1 O? C\j LL :t L-Li -Li LLJ ZZ) (z Z LLIIJ L" CZ ?? Q In L'i >l ?.' O-Z3 -< C13 I?? C I C C, Lu cc C) a o b` r r? I b c I ti © O CNI LLJ I I O n N W C O I I I Q b ?o Q: L-Li W CO'i c C yx p Lr)? I b p O aCC P LLJ O = ti i'? p ZO Cl- O °LC I 14 Wcl-_ W? o Lj I o pzO?m III o f I I ?' ?', Q: I n d? ; I c d Z Lj_j I . I - Q ti I ' ' a? ?'I G? ?J o I z '` I "I I I° c L W Q) LU Q) LO Y f? N ? o lV 1- CN b vCC ?O p I r ?? Q 4 J r C- ly ?W q3 Z -? F I'D C\i I J oa 41 w 41 LQ C) 4j Lj I W? I I: o ? ? ? om (.0 LO LO Ln Lo j W a, 4, ?' I x