Loading...
HomeMy WebLinkAboutSW7080723_Final Permit_20090218M NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 18, 2009 Mr. William E. Hollan, Jr., Manager Linear Bay Properties, LLC 1100-C South Stratford Road, Suite 300 Winston Salem, NC 27103 Subject: Stormwater Permit No. SW7080723 Linear Bay Subdivision Low Density Subdivision Permit Beaufort County Dear Mr. Hollan: The Washington Regional Office received a complete Stormwater Management Permit Application for Linear Bay Subdivision on July 31, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7080723, dated February 18, 2009, for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact either Samir Dumpor or me at (252) 946-6481. Regional Supervisor Surface Water Protection Section North Carolina Division of Water Quality Internet: www.ncwateraualitv.ore 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/l0% Post Consumer Paper NorthCarolina Natmallty Page 2 of 2 AH/sd: J:\WPDATA\WQS\ State SW-SD\Permits - Low Density cc: David A. Deel, PE, Quible & Associates, P.C. Beaufort County Building Inspections Division of Coastal Management Washington Regional Office Central Files State Stormwater Management Systems Permit No.SW7080723 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Linear Bay Properties, LLC Linear Bay Subdivision Beaufort County FOR THE construction, operation and maintenance of a 25% low density subdivision in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS Each of the 400 lots is limited to a maximum of (see attached table) square feet of built -upon area, as indicated in the approved plans. CAMA regulations may reduce the allowable built -upon area for those lots within the AEC. The overall tract built -upon area percentage or lot sizes for the project must be maintained at 25% per the requirements of Section .1005 of the stormwater rules. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 4. Projects covered by this permit will maintain a minimum 50 foot wide vegetative buffer between all impervious areas and surface waters. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. All roof drains must terminate at least 50' from the mean high water mark. It. SCHEDULE OF COMPLIANCE Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. Page 2 of 5 State Stormwater Management Systems Permit No.SW7080723 2. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b. Sediment removal. C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any of the items shown on the approved plans, including the stormwater management system, design concept, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, or selling of the project area. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 7. No piping shall be allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road and that minimum amount needed under driveways to provide access to lots. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner, provided that the permittee complies with the requirements of Section 11.11 of this permit. 10. Within 30 days of completion of the project, the permittee must certify in writing that the project's stormwater controls, and impervious surfaces have been constructed within substantial intent of the approved plans and specifications. Any deviation from the approved plans must be noted on the Certification. 11. Deed restrictions are incorporated into this permit by reference and must be recorded with the Office of the Register of Deeds prior to the sale of any lot. Recorded deed restrictions must include, as a minimum, the following statements related to stormwater management: The following covenants are intended to ensure ongoing compliance with Page 3 of 5 State Stormwater Management Systems Permit No.SW7080723 State Stormwater Management Permit Number SW7080723, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot is (see attached table) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons. h. Lots within CAMA's Area of Environmental Concern may have the permitted built -upon area reduced due to CAMA jurisdiction within the AEC. i. Each lot will maintain a 50' wide vegetated buffer between all impervious areas and surface waters. j. All roof drains shall terminate at least 50' from the mean high water mark. 12. The permittee shall submit a copy of the recorded deed restrictions which indicates the approved built -upon area per lot within 30 days of the date of recording. 13. If the permittee sets up an Architectural Review Committee (ARC) to review plans for compliance with the restrictions, the plans reviewed must include all proposed built -upon area (BLIA). Any approvals given by the ARC do not relieve the lot owner of the responsibility to maintain compliance with the permitted BUA limit. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. Stormwater conveyances will be located in either dedicated right-of-way (public or private), recorded common areas or recorded drainage easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 16. A copy of the approved plans and specifications shall be maintained on file by Page 4 of 5 State Stormwater Management Systems Permit No.SW7080723 the Permittee at all times. III. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Qualityy, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 5. The permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. 6. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the permit transfer request. Transfers to third parties by the permittee where the required documentation has not been submitted to the Division does not relieve the permittee of responsibility for transferring the permit. 7. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. If any of those permits result in revisions to the plans, a permit modification must be submitted. 8. The permittee grants permission to DENR Staff to enter the property during business hours for the purposes of inspecting the stormwater management system and it's components. 9. The permittee shall notify the Division of Water Quality of any name, ownership or mailing address changes within 30 days. Permit issued this the 18th day of February, 2009. NIRTH,gAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. -Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 5 Project Area for Coverage LOT # TOTAL AREA UPLAND AREA Coverage Calcs Allowed %Coverage 1 18,879 0.43 18,879 100.00% 18,879 4,720 25.00% 2 21,153 0.49 21,153 100.00% 21,153 5,288 25.00% 3 21,153 0.49 21,153 100.00% 21,153 5,288 25.00% 4 j 18,551 0.43 18,551 100.00% 18,551 4,638 25.00% 5 18,690 0.43 18,690 100.00% 18,690 4,672 25.00% 6 20,727 0.46 20,727 100.00% 20,727 5,182 25.00% 7 20,727 0.48 20,727 100.00% 20,727 5,182 25.00% 8 20,727 0.48 17,878 86.25% 20,727 5,182 25.00% 9 31,149 0.72 19,905 63.90% 26,539 6,107 23.01% 10 28,249 0.65 23,934 84.73% 28,249 6,500 23.01% 11 27,030 0.62 22,468 83.120/. 27,030 6,220 23.01 12 35,934 0.82 21,489 59.800% 28,652 6,593 23.01% 13 121,143 2.78 26,37235,163 8,092 23.01% 14 1 56,148 1.29 26,812 47.75% 35,750 8,227 23.01% 15 46,313 1.06 19,118 41.28% 25,490 5,866 23.01% 16 31,362 0.72 20,490 65.33% 27,320 6,287 23.01% 17 31,650 0.73 19,466 61.50% 25,954 5,972 23.01% 18 26,046 0.60 17;566 67.44% 23,421 5,855 25.00% 19 25,624 0.59 20,822 81.26% 2-5 5,897 23.01% 20 29,927 0.69 23,885 79.81% 29,927 6,887 23.01% 2624 1 27,973 0.64 22,583 80.73% 27,973 6,437 23.01% 22 31,771 0.73 19,323 60.82% 25,764 5,929 23.01% 23 42,517 0.98 16,560 43.65% 24,747 6,187 25.00% 24 36,449 0.84 29,816 81.80% 36,449 8,388 23.01% 25 31,409 0.72 27,309 86.959/6 31,409 7,228 23.01% 26 26,527 0.61 25,298 95.37% 26,527 6,104 23.01% 27 18,990 0.44 18,990 100.00% 18,990 4,747 25.00% 28 1 18,346 0.42 18,346 100.00% 18,346 4,586 25.00% 29 19,806 0.45 19,806 100.00% 19,806 4,952 25.00% 30 18,776 643 18,776 100.00% 18,776 4,694 25.00% 31 1 19,468 0.45 19,468 100.00% 19,468 4,867 25.00% 32 1005 0.42 18,305 100.00% 18,305 4,576 25.00% 33 23,061 0.53 23,061 100.00% 23,061 5,765 25.00% 34 29,806 0.68 22,806 76.52% 29,806 6,859 23.01% 35 33,531 0.77 23,851 71.13% 31,801 7,318 23.01% 36 37,938 37 35,627- 38 39,572 39 52,261 40 44,271 41 47,463 42 I 26,661 43 74,176 44 , 163,358 45 44392 46 833 47 137,310 48 139,631 49 63,843 50 66,911 51 36,999 52 34,960 53 31,795 54 27,136 55 29,143 0.67 0.82 0.91 1.20 1.02 1.09 au25,116 1.70 3.75 1.02 1.44 3.15 3.21 1.47 1.54 0.85 0.80 0.73 0.62 0.67 20,698 - 20---,772 25,035 31,796 30,810 31,965 37,905 94,;M 26,916 25527 63,954 73,638 24,892 38,604 28,606 22,758 20,759 25,045 21,635 54.56% - 58 30% 63.26% 60.84% 69.59/° 67.35% 93.50% 51.10% 57.6M 66mo/. 40.63% 46.58% 52.62% - 38.969/. 57.69% 77.32% 65.106X. 65.296/6 92.296/. 74.24% 27,597 - 27'696-- 33,379 42,394 41,080 42,621 26, 861 50,540 125,642 35,887 34,636 85,273 98,184 __. 33,190 51,472 36,999 30,345 27,678 27,136 28,847 6,351 6,373 - 7,681 -9,756 9,453 9,808 6,181 11,630 28,912 82258 7,832 19,622 22,594 7,637 11,644 8,514 6,983 6,369 6,244 6,638 23.01 % - _...... 23.01% 2_3.-- - 23.01% 23.01% 23.01% _. 23.01% 23.01% 23.01%° 23.01% 23.01% 23.01% 23.01% 23.61% 23.01% 23.016/6 23.01% 23.01%° 23.01% 23.01% Project Area for Coverage CoverageCalcs Allowed %Coverage 56 42,358 0.97 26,916 63.54% 35,887 8,258 23.01% 57 34,403 0.79 22,853 66.43% 30,471 7,012 23.01% 58 52,968 1.22 41,401 78.16% 52,968 12,189 23.01% 59 59,100 1.36 27,632 46.76% 36,843 8,478 23.01% 60 37,751 0.87 31,147 82.51% 37,751 8,687 23.01% 61 42,810 0.98 30,896 72.170% 41,194 9,479 23.01% 62 40,701 0.93 29,136 71.58% 38,848 8,939 23.01% 63 50,091 1.15 35,957 71.78% 47,943 11,032 23.01% 64 36,631 0.84 27,943 76.280% 36,631 8,429 23.01% 65 32,613 0.75 25,823 79.18% 32,613 7,505 23.01% 66 30,443 0.70 26,096 85.72% 30,443 7'005 23.01 67 39,479 0.91 31,140 78.880% 39,479 9,085 23.01% 68 32,651 0.75 32,510 99.57% 32,651 7,513 23.01% 69 22,569 0.52 22,569 100.00% 22,569 5,642 25.00% 70 29,110 0.67 23,270 79.94% 29,110 6,699 23.01% 71 21,667 0.50 18,166 83.84% 21,667 5,417 25.00% 72 23,113 0.53 21,709 93.92% 23,113 5,778 25.00% 73 22,000 0.51 21,884 99.47% 22,000 5,500 25.00% 74 22,000 0.51 21,913 5-9 60% 22,000 5,500 25.00% 75 32,162 0.74 19;657 61.7401. 26,476 6,093 23.01% 76 27,279 0.63 15,966 58.53% 21,288 5,322 25.00% 77 51,582 1.18 38,602 74.84% 51,469 11,844 23.01% 78 20,744 0.48 18,654 89.93% 20,744 5,186 25.00% 79 22,819 0.52 22,819 100.00% 22,819 5,705 25.00% BO 31,961 0.73 26,502 82.92% 31,961 7,355 23.01% 81 30,626 0.71 24,026 77.94% 30'826 7,093 23.01% 82 39,585 0.91 33,498 84.62% 3-9585 9, 009 23.01% 83 43,881 1.01 36,545 83.28% 43,881 10,098 23.01% 64 30,346 0.70 24,659 81.26% 30,346 6,983 23.01% 85 37,222 0.85 26,877 72.21 % 35,837 8,247 23.01% 86 45,730 1.05 32,772 71.66% 43,696 10,055 23.01% 87 37,376 0.86 26,247 70.22% 34,996 8,053 23.01% 88 23,851 0.55 23,851 100.00% 23,851 5,963 25.00% 89 73,227 1.68 44,154 60.300/. 58,872 13,547 23.01% 90 129,809 2.98 66,745 51.42% 88,993 20,479 23.01% 91 170,402 92 64,0B4 93 24,463 94 26,327 95 20,908 96 16486 97 16,488 98 j 20,476 99 46,441 100 76,092 - 101 171,605 102 I 166,249 103 45,711 164 34,742 105 31,298 106 21,010 107 19,820 168 18,313 109 16,800 110 17,641 3.91 1.47 0.56 0.60 0.48 0.38 0.38 0.47 1.07 1.75 3.94 3.82 1.05 Om 0.72 _. 0.48 6.45 0.-42 0.39 0.40 47,894 33,457 17,816 26,327 20,158 16,488 16,488 201476 41,210 40,308 73,626 69,329 29,843 19,797 28,700 21,010 19,820 18,313 16,800 17,262 28.11% 52.21% 72.83% 100.00% 96.41% 100.00% 100.00% 100.00% 88.74% 52.97% 43.02% 41.70% 65.296/. 56M6/. 91.70% 100.00% 100.00%o 100.00% 100.00% 97.85% 63,859 44,609 231755 26,327 20,908 16,488 16,488 20,476 46,441 53,744 98,435 92,438 39,790 26,396 31,298 21,010 19,820 18,313 16,800 17,641 14,695 10,265 5,939 6,058 -5,227 4,122 4,122 5,119 10,687 12,367 22,651 21,271 9,156 6,074 7,202 5,253 4,955 4,578 4,260 4,410 23.01% 23.01% 25 00% 23.01% 25.00% 25.00% 25.00% 25.00% 23.01% 23.01 23.01 23.01% 23.01% 23.016% 23.01% 25.00% 25.00% 25.00% 25.00% 25.00% Project Area for Coverage LOT'# ! TOTAL AREA 111 25,850 0.59 UPLAND 25,850 AREA 100.00% Coverage Calcs Allowed 5,948 % Coverage 23.01% 25,850 112 39,636 0.91 22,965 57.940% 30,621 7,046 23.01% 113 94,189 2.16 53,345 56.64% 71,126 16,367 23.01% 114 65,203 1.50 36,789 56.42% 49,052 11,288 23.01% 115 106,106 2.44 66,681 62.84% 88,909 20,459 23.01% 116 ' 30,192 0.69 30,192 100.00% 30,192 6,948 23.01% 117 31,264 0.72 27,450 87.80% 31,264 7,194 23.01% 118 32,660 0.75 27,965 85.62% 32'660 7,516 23.01% 119 j 25,479 0.58 22,600 88.70% 25'479 5,863 23.01% 120 25,542 0.59 22,428 87.81% 25,542 5,877 23.01% 121 I, 25,604 0.59 21,286 83.140/6 25,604 5,892 23.01% 122 32,080 0.74 2-6 84.09% 32,080 7,382 23.01% 123 31,960 0.73 27,731 66.77% 31,960 7,354 23.01% 124 24,930 0.57 21,378 85.75% 24,930 6,233 25.00% 125 24,275 0.56 20,910 86.14% 24,275 6,069 25.00% 126 23,620 0.54 19,854 84.06% 23,620 5,905 25.00% 127 i 25,312 0.58 17,618 69.61% 23,491 5,873 25.00% 128 32,716 0.75 20,212 61.78% 26,950 6,202 23.01 129 44,884 1.03 31,518 70.22% 42,024 9,670 23.01% 130 84,180 1.93 4Q965 48.66% 54,620 12,569 23.01% 131 66,047 1.52 48,251 73.06% 64,335 14,804 23.01% 132 46,822 1.07 38,811 62.69% 46,822 10,774 23.01% 133 28,747 0.66 24,373 84.78% 28,747 6,615 23.01% 134 33,477 0.77 25,149 75.12% 33,477 7,704 23.01% 135 °: 3Q 124 0.69 21,340 70.84% 28,454 6,548 23.01% 136 32,615 0.75 20,344 62.38% 27,126 6,242 2 3. 01 % 137 31,902 0.73 26,731 83.79% 31'902' 7,341 23.01% 138 23,553 0.54 21,734 92.28% 23,553 5,888 25.00% 139 33,506 0.77 25,971 77.51% 33,506 7,710 23.01% 140 52,734 1.21 28,660 54.35% 38,213 8,793 23.01% 141 63,483 1.46 38,331 60.389/. 51,108 11,761 23.01% 142 135,396 3.11 63,092 46.60% 84,123 19,358 23.01% 143 119,988 2.75 56,578 47.15% 75,437 17,359 23.01% 144 123,028 2.82 61,568 50.04% 82,091 18,690 23.01% 145 129,035 2.96 64,792 50.21% 86,389 19,879 23.01% 146 134,850 147 199,885 148 30,379 149 27,362 150 � 27461 151 23,882 152 19345 , 153 18,646 154 j 46,556 155 _ 33,173 156 29,845 157 30,618 158 36,442 159 49,884 160 54,471 161 43,414 162 30,006 163 30,076 164 382643 88 165 90,2 3.10 4.59 0.70 0.63 0.63 0.55 . 044 0.43 0.93 0.76 0.69 0.70 0.84 1.15 1.25 1.00 0.66 0.69 0.89 2.09 57,086 66,151 19,688 19,749 22,455 23,882 19,345 17,941 19,277 29,892 21,959 21,467 22,818 31,337 22,084 21,803 22,579 20,116 23,520 68,720 42.33% 33.09% 64.81% 72.18 /0 81.77% 100.00% 10000% . 96.22% 47.53% 90.11% 73.58% 70.11% ° 62.61 /0 62.82% 40.54% 50.22% 75.25% 66.88% - 60.87% 75.61% 76,114 88,202 26,251 26,332 27,461 23,882 19,345 16,646 25,703 33,173 29,278 28,622 30,424 41,783 29,445 __. . 29,070 30,006 262821 31,360 90,882 17,515 20,297 6,041 6,059 6,319 5,971 4,836 4,-- 5,915 7,634 6,737 6,586 7,001 9,615 6,776 6,689 6,905 6,172 7,216 20,913 23.01% 23.01% 23.01% 23.01% . 23.016% 25.00% 25.00% 25.00% 23.01% 2161% 23.01% 23.- 23.01% 23.01% 23.01 23.01% 23.01% 23.01% 23.01% 21W0/. Project Area for Coverage LOT # TOTAL AREA UPLAND AREA Coveraae Cal- Allowed % Coveraae 166 59,843 1.37 42,125 70.39% 56,167 12,925 23.01% 167 40,336 0.93 26,316 65.24% 35,089 8'074 23.01% 168 38,177 0.88 31,678 82.98% 38,177 8,785 23.01% 169 36,776 0.84 24,848 67.579/. 33,131 7,624 23.01% 170 35,328 0.81 24,892 70.46% 33,190 7,637 23.01% 171 34,214 0.79 29,398 85.92% 34,214 7,873 23,01% 172 27,808 0.64 23,064 82.94% 27,808 6,399 23.01% 173 28,281 0.65 25,377 89.73% 28,281 6,508 23.01% 174 25,549 0.59 20,404 79.860% 25,549 5,879 23.01% 175 23,900 0.55 21,129 88.41% 23,900 5,975 25.00% 176 27,350 0.63 22,373 81.80% 27,350 6,294 23.01% 177 28,990 0.67 25,063 86.45% 28,990 6,671 23.01% 178 30,952 0.71 23,046 74.46% 30,728 7,071 23.01% 179 31,518 0.72 27,834 88.31% 31,518 7,253 23.01% 180 28,959 0.66 24,639 -3-,596 85.08% 28,959 6,664 23.01% 181 27,071 0.62 2 87.17% 27,071 6,229 23.01% 182 27,234 0.63 21,521 79.02% 27,234 6,267 23.01% 183 27,655 0.63 19,880 71.89% 26,507 6,100 23.01% 184 27,096 0.62 23,647 87.270/- 27,096 6,235 23.01% 185 30,979 0.71 23,799 76.820/b 30,979 7 ,129 23.01% 186 32,487 0.75 22,379 68.89% 29,839 6,866 23.01% 187 31,440 0.72 19,616 62.39% 26,155 6,019 23.01% 188 28,428 0.65 15,566 54.76% 20,755 5,189 25.00% 189 26,601 0.61 14,413 54.18% 19,218 4,604 25.00% 190 25,223 0.58 16,622 65.900/6 22,162 5,541 25.00% 191 24,255 0.56 17,143 70.68% 22,857 5,714 25.00% 192 16,066 0.37 16,066 100.00% 16,066 4,016 25.00% 193 24,463 0.56 19,570 80.00% 24,463 6,116 25.00% 194 78,567 1.80 42,582 54.20% 56,775 13,065 23.01% 195 106,783 2.45 23,650 22.15% 31,533 7,256 23.01% 196 68,528 1.57 34,248 49.98% 45,664 10,508 23.01% 197 40,181 0.92 31,578 78.590% 40,181 9,246 23.01 % 198 34,247 0.79 32,076 93.66% 34,247 7,881 23.01% 199 26,867 0.62 26,547 98.81 % 26,867 6,183 23.01% 200 25,858 0.59 25,259 97.68% 25,858 5,950 23.01% 201 j 22,386 202 20,437 203 23,930 204 1 36,771 205 47,495 206 286,870 207 174,352 208 i 36,093 266 25,280 216 19,329 211 19,430 212 32,305 213 50,840 214 170,837 215 ': 941327 216 63709 83 217 28,6 218 25,154 219 25,511 220 31,641 0.51 0.47 0.55 6.84 1.09 6.59 4.00 0.83 0.58 0.44 0.45 0.74 1.17 3.92 2.17 1.46 0.66 0.58 0.59 0.73 22,386 _- 16,147 17,136 25,107 30,159 45,848 29,295 16,726 16,962 17,004 17,163 30,894 21,212 32,412 34,798 35,896 22,540 23,083 23,656 26,574 100.00/° - _o _. - 79 Ot /0 7161% 68.28% 63.50% 15.98% 16.80% 46.34% 67.10% 87.97% 88.33% 95.63% 41.72% 18.97% - 36.896% 56.34% 78.59% 91.77% 92.73% 83.996% 22,386 _..._. 20,437 22,847 - 33,476 46,213 61,131 _.. 39,060 22,301 22,616 19,329 19,430 - 32,305 28,282 - - 43,216 46,398 473862 28,683 25,154 25,511 31,641 5,597 - 5,109 5,712 7,703 9,254 14,067 8,988 51575 5,654 4,832 4,858 - 7,434 -6,K-8 --9,9. - 9,945 10,677 11,614 6,600 5,788 5,870 7,281 1 25.00% 25.00% 25.00% 2a0-1 % 23.01% 23.01% o 23.01 /o 25.00% 25.00% 25.00% 25.00%0 23.01% 23.01% - 23.01% 23.01% 23.01% 23.01% 23.01% 23.61% 23.01% Project Area for Coverage LOT # : TOTAL AREA UPLAND AREA Coverage Calcs Allowed %Coverage 221 20,385 0.47 20,354 99.85% 20,385 5,096 25.00% 222 24,984 0.57 24,984 100.00% 24,984 6,246 25.00% 223 17,438 0.40 15,763 90.39% 17,438 4,360 25.00% 224 60,756 1.39 37,522 61.76% 50,030 11,513 23.01% 225 67,923 1.56 47,120 69.37% 62,827 14,457 23.01% 226 60,751 1.39 41,193 67.810% 54,924 12,639 23.01% 227 60,886 1.40 42,978 70.59% 57,304 13,186 23.01% 228 73,114 1.68 53,094 72.62% 70,792 16,2 00 23.01% 229 25,876 0.59 19,819 76.59% 25,876 5,954 23.01% 230 21,455 0.49 17,916 83.50% 21,455 5;364 25.00% 231 20,868 0.48 17,292 82.860/. 20,868 5,217 25.00% 232 22,103 0.51 21,836 98.79% 22,103 5,526 25.00% 233 15,991 0.37 15,991 100.00% 15,991 3,998 25.00% 234 15,991 0.37 15,991 100.00% 15,991 3,998 25,00% 235 15,991 0.37 15,991 100.00% 15,991 3,998 25.00% 236 16,000 0.37 16,000 16,000 4,000 25.00% 237 16,000 0.37 16y000 16,000 4,000 25.00% 238 16,000 0.37 16,000 16,000 4,000 25.00% 239 21,152 0.49 21,152 S87.25% 21,152 5,288 25.00% 240 48,191 1.11 44,944 48,191 11,089 23.01% 241 32,558 0.75 28,409 32,558 7,492 23.01% 242 32,179 0.74 29,346 91.20% 32,179 7,405 23.01% 243 33,238 0.76 29,461 88.64% 33,238 7,648 23.01% 244 33,523 0.77 28,229 84.21% 33,523 7,714 23.01% 245 30,533 0.70 21,263 69.64% 28,351 6,524 23.01% 246 27,950 0.64 20,533 73.46% 27,377 6,300 23.01% 247 27,977 0.64 23,713 84.76% 27,977 6,438 23.01% 248 28,003 0.64 24,088 86.02% 28,003 6,444 23.01% 249 33,809 0.78 32,059 94.82% 33,809 7,780 23.01% 250 41,740 0.96 30,635 73.40% 40,847 9,399 23.01% 251 29,670 0.68 23,793 80.19% 29,670 6,827 23.01% 252 30,245 0.69 28,640 94.690/. 30,245 6,960 23.01% 253 38,956 0.89 27,430 70.41 % 36,573 8,416 23.01% 254 52,050 1.19 36,531 70.19% 48,709 11,209 23.01% 255 25,6 77 0.59 19,439 75.74% 25,667 5, 006 23.01% 256 23,649 257 25 868 258 30,916 259 F 36,925 260 31998 262 1 48005 68,1358 263 62,766 30,585 265 17,506 26 6 17,506 267 17,432 268 17,432 17,432 270 172432 , 271 45147 272 20,440 273 2-2,382 274 39,692 275 49,754 0.54 0.59 0.71 0.85 0.73 1.10 1.57 1.44 0.70 0.40 0.40 0.46 0.40 0.40 0.40 1.04 0.47 0.51 0.91 1.14 17,828 17,472 25,147 29,156 27,768 32,031 46,463 35,369 28,550 17,506 17,506 17,432 17,432 17,432 17,432 28359 , 202440 97 18,4 30,876 342016 75.39% 67.54% 81.34% 78966/o 86.78% 66.72% 67.97% 56.35% 93.35% 100.00%_ 100.00% 100.006/. 100.00% 100.00% 100 00% 62.81% 100.00% 84.77% 77.79% 68.369/. 23,649 _._ 23,296 30,916 36,925 31,998 31,998 61,951 47,159 30,585 17,506 17,506 17,432 17,432 17,432 17,432 37,812 20,440 22,382 39,692 45,346 5,912 5,824 7,114 8,497 _ 7,363 7,363 14,256 10,852 7,038 37 4,6 4,376 4,358 4,356 4,358 4,358 8,701 5,110 5,596 9,134 m435 25.00% _ . _ 25.00% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01%264 2301% 25.00% _._ 25.00% 25.00% 25.00% 25.00% 25.00% 23.01% 25.00% 25,00% 23.01% 23.01% Project Area for Coverage LOT # TOTAL AREA UPLAND AREA Coveraae Calcs Allowed %Coveraae 276 68,038 1.56 51,926 76.32% 68,038 15,657 23.01% 277 43,886 1.01 35,179 80.16% 43,886 10'099 23.01% 278 21,335 0.49 19,282 90.38% 21,335 5,334 25.00% 279 17,540 0.40 17,283 98.53% 17,540 4,385 25.00% 280 19,141 0.44 19,141 100.00% 19,141 4,785 25.00% 281 23,475 0.54 23,475 100.00% 23,475 5,869 25.00% 282 18,448 0.42 18,448 100.00% 18,448 4,612 25.00% 283 19,140 0.44 18,026 94.180/. 19,140 4,785 25.00% 284 22,219 0.51 19,034 §-5 67% 22,219 5,555 25.00% 285 36,132 0.83 27,556 76.27% 36,132 8,314 23.01% 286 52,306 1.20 46,251 88.42% 52,306 12,036 23.01% 287 62,849 1.44 50,592 80.50% 62,849 14,462 23.01% 288 32,554 0.75 27,631 84.88% 32,554 7,491 23.01 % 289 33,566 0.77 28,598 85.20% 33,566 7,724 23.01% 290 - 43,323 0.99 33,399 77.09% 43,323 9,969 23.01% 291 47,660 1.09 36,567 76.72% 47,660 10,967 23.01% 292 63,597 1.46 48,815 76.76% 63,597 14,635 23.01 293 44,331 1.02 31,176 70.33% 41,568 9,565 23.01% 294 25,352 0.58 21,013 82.88% 25,352 5,834 23.01% 295 1 19,993 0.46 19,529 97.680% 19,993 4,998 25.00% 296 20,027 0.46 20,027 100.00% 20,027 5,007 25.00% 297 16,679 0.38 16,679 100.00% 16,679 4,170 25.00% 298 16,136 0.37 15,883 98.43% 16,136 4,034 25.00% 299 17,276 0.40 16,955 98.140/. 17,276 4,319 25.00% 300 18,416 0.42 16,370 88.89% 18,416 4,604 25.00% 301 32,059 0.74 24,334 75.90% 32,059 7,377 23.01% 302 44,701 1.03 35,026 78.36% 44,701 10,286 23.01% 303 56,763 1.30 51,108 90.04% 56,763 13,062 23.01% 304 42,560 0.98 29,016 68.18% 38,688 8,903 23.01% 305 46,377 1.06 35,570 76.70% 46,377 10,672 23.01% - 306 60,194 1.38 49,071 81.52% 60,194 13,852 23.01% 307 79,588 1.83 48,841 61.37% 65,121 14,985 23.01% 308 53,856 1.24 27,604 51.259/- 36,805 8,469 23.01% 309 28,052 0.64 15,483 55.19% 20,644 5,161 25.00% 310 27,301 0.63 15,709 57.54% 20,945 5,236 25.00% 311 26,550 312 30,104 313 26,393 314 25,037 315 221204 316 23,517 317 21,261 318 25,574 319 38,173 320 35,729 321 37,530 322 48,711 _ 323 32,668 26,344 325 33,455 326 25,764 327 56,376 328 114,857 329 462278 330 29,085 0.61 0.69 0.61 0 57 051 0.54 0.49 0.59 6.88 082 0.86 112 0.75 0.60 0.77 mg 1.29 2.64 1.06 0.67 17,323 29,170 20,319 18,164 181209 23,517 16,971 19,558 21,702 19,512 28,046 34,073 24,089 18,193 24,532 24,416 23,509 51,480 29,207 242784 65.25% 96.90% 76.98% 72.63% 82.01% 100.00% 79.K%. MAM/. 56.85% 54.61% 74.73% 69.95% 73.74% 69.06% 73.33/6 94.77% 41.70% 44.82% 63.11% 85.21% 23,098 m 104 26393 24,245 22,204 23,517 21,261 25474 28,936 263016 37,395 45-431 _ _ ._ 32,11-8 24,258 32,710 25,764 311345 68,640 38,942 29,085 5,774 6,927 6,073 6,061 5,551 5,879 5,315 5,885 6,658 5,987 8,605 10,4- 7,391 6,064 7,527 5,929 7,213 15,795 8,961 6,693 25.00% 23.01 23.01% 25.00% 25.00% 25.006X. 25.00% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 1. 25.00% 23.01% 23.01 % 23.01% 23.01% 23.01% 23.01% Project Area for Coverage LOT # : TOTAL AREA UPLAND AREA Coverage Calcs Allowed %Coverage 331 25,434 0.58 79.07% 25,434 5,853 23.01% 332 22,773 0.52 85.28% 22,773 5,693 25.00% 333 19,722 0.45 100.00% 19,722 4,930 25.00% 334 50,020 1.15 P218928 71.08% 47,406 10,909 23.01% 335 50,614 1.16 51.36% 34,662 7,976 23.01% 336 47,749 1.10 68.91% 43,872 10,095 23.01% 337 23,646 0.54 92.61% 23,646 5,911 25.00% 338 22,221 0.51 18,494 83.23% 22,221 5,555 25.00% 339 25,467 0.58 17,064 67.00% 22,751 5,688 25.00% 340 21,740 0.50 21,740 100.00% 21,740 5,435 25.00% 341 20,880 0.48 20,880 100.00% 20,880 5,220 25.00% 342 20,880 0.48 20,287 97.16% 20,880 5,220 25.00% 343 34,236 0.79 28,216 82.42% 34,236 7,878 23.01% 344 39,031 0.90 34,896 89.41 % 39,031 8,981 23.01% 345 35,468 0.81 32,598 91.91% 35,468 8,162 23,01% 346 34,666 0.80 30,109 86.85% 34,666 7,977 23.01% 347 34,256 0.79 28,648 83.63% 34,256 7,883 23.01% 348 29,767 0.68 27,962 93.94% 29,767 6,850 23.01% 349 31,792 0.73 26,074 82.01% 31,792 7,316 23.01% 350 23,414 0.54 19,989 85.37% 23,414 5,854 25.00% 351 22,453 0.52 17,899 79.72% 22,453 5,613 25.00% 352 21,427 0.49 16,463 76.83% 21,427 5,357 25,00% 353 20,785 0.48 20,587 99.04% 20,785 5,196 25.00% 354 21,952 0.50 21,952 100.00% 21,952 5,488 25.00% 355 27,137 0.62 25,690 94.67% 27,137 6,245 23,01% 356 21,489 0.49 20,167 93.85% 21,489 5,372 25.00% 357 I 21,667 0.50 19,361 89.36% 21,667 5,417 25.00% 358 20,816 0.48 18,358 88,19% 20,816 5,204 25.00% 359 19,966 0.46 16,679 83.54% 19,966 4,991 25.00% 360 24,285 0.56 21,088 86.84% 24,285 6,071 25.00% 361 26,708 0.61 21,585 80.82% 26,708 6,146 23.01% 362 39,659 0.91 34,395 1 86.73% 39,659 9,126 23.01% 363 78,426 1.80 57,737 1 73.62% 76,982 17,715 23.01% 364 43,187 0.99 32,817 1 75.99% 43,187 9,938 23.01% 365 22,801 0.52 22,801 100.00% 22,801 5,700 25.00% 366 20,525 367 _, 21283 368 25,671 369 28 005 370 27,298 371 2 8, 51 8 K2 30,130 373 39,370 374 59212 375 341028 376 58,020 02 377 64,7 378 42,729 93 379 53 3 360 52 027 381 30,977 382 28,806 383 35,165 384 37,834 385 38,01.96 0.47 0.49 0.59 0.64 0.63 0.65 0.69 0.90 1.36 0.78 1.33 1.49 0.98 1.23 1.19 0.71 6.66 0.81 0.87 0.87 19,893 19,004 24,263 26,770 25,273 22,478 2497 ,7 30,012 45,205 20,582 421155 42,632 34,465 41,996 44,080 18,271 22,053 27,944 28,766 31,242 96.92% 89.299/6 94.51% 95.59% 92.59% 78.82% 8230% 76M61. 76.34% 60.49/° ° 72.66% 65.89% 80.66 /° ° 78.65% ° 84.73% 58.98% 76.56% 79.47% 76.03% 82.019/. 20,525 21,283 25,671 28 005 271298 282518 - 30,130 39,370 59,212 27,442 56,2-M 56,843 42 729 _ 53,393 52 027 24,362 28,806 35,165 37,834 38,096 5,131 5,321 5,907 6,444 6,282 6,562 6933 9,060 13,625 6,315 12,934 13,080 9,832 1.01 2,286 11,972. 6,090 6.629 8,092 8,706 8,767 25.00% 2500% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 23.01% 23 Ot% ° 23 /° 23.01 25.00% 23.01% 23.01% 23.01% 23.01% Project Area for Coverage LOT # TOTAL AREA UPLAND AREA Coverage Calcs Allowed % Coverage 386 44,336 1.02 33,405 75.34% 44,336 10,202 23,01% 387 34,904 0.80 27,257 78.09% 34,904 8,032 23.01% 388 30,715 0.71 22,124 72.03% 29,499 6,788 23.01% 389 41,514 0.95 21,485 51.76% 28,647 6,592 23,01% 390 48,044 1.10 31,881 66.36% 42,508 9,782 23.01% 391 41,635 0.96 37,023 88.92% 41,635 9,581 23.01% 392 30,634 0.70 25,319 82.65% 30,634 7,049 23.01% 393 20,743 0.48 18,488 89.13% 20,743 5,186 25.00% 394 17,913 0.41 17,913 100.00% 17,913 4,478 25.00% 395 17,913 0.41 17,913 100.00% 17,913 4,478 25.00% 396 21,300 0.49 21,300 100,00% 21,300 5,325 25.00% 397 j 21,300 0.49 21,300 100,00% 21,300 5,325 25.00% 398. ''; 21,192 0.49 21,192 100.00% 21,192 5,298 25.00% 399 17,200 0.39 17,200 100.00% 17,200 4,300 25.00% 400 17,200 0.39 17,200 100,00% 17,200 4,300 25.00% Total 15,860,824 364.11 10,855,455 68.44% 13,320,226 3,119,332 1 23.42%