Loading...
HomeMy WebLinkAboutNCS000570_Facility Comments on Draft Email_20200519Gamble, Aana C From: David Waters <dwaters@fujisilysia.com> Sent: Wednesday, May 20, 2020 7:19 PM To: Garcia, Lauren V Cc: Edgerton, Thom Subject: RE: [External] Form 3510-2F CAUTION:I email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to nc. ov Thank you Lauren! Sent from my U.S.Cellular@ Smartphone -------- Original message -------- From: "Garcia, Lauren V" <lauren.garcia@ncdenr.gov> Date: 5/19/20 4:20 PM (GMT-05:00) To: David Waters <dwaters@fujisilysia.com> Cc: "Edgerton, Thom" <thom.edgerton@ncdenr.gov> Subject: RE: [External] Form 3510-2F Hi again David, I followed up with our lab and we are going to amend the draft so that sodium and sulfate can be tested for separately instead of as the compound. Thanks! Lauren From: Garcia, Lauren V Sent: Tuesday, May 19, 2020 3:43 PM To: David Waters <dwaters@fujisilysia.com> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov> Subject: RE: [External] Form 3510-2F Hi David, 1 You are not obligated to take samples until the permit is finalized. There is a monitoring schedule on page 9 of the draft that explains how and when samples should be taken: The perinittee shall complete the analytical saInplings in accordance with the schedule specified below in Table 2, unless adverse weather conditions prevent sample collection (seeAdveme Weather in Definitions]_ Santplingis not ivquired autside of the facility's normal operating hours. A minimum of CO days rnu st separate Period 1 and Period 2 sample dates, unless monthly monitoring has been instituted under a "Tier Two" response. Inability to sample becattse of adverse weather conditions must be documented in the SWPPP and recorded on the DMR. The permittee must report the results from each sample taken within the monitoring period [see Part Ill, Section E]- However, for purposes of benchmark comparison and Tiered response actions, the permittee shall use the analytical results from the first samyIc with valid results within the monitoring period. Table 2. Monitoring Schedule Semi -Annual Start Date find Date Footnotes; 1 Maintain Se3rni-annual M1)nitpring until eithor arnGther permit IS issued for tbiS fiLCfllty or until thlS permit is revoked or rescinded. The permittee niust submit an apgllcation for renewal of coverage before the submittal dcadiIn@ (180 days bLbfQre expiration) to be considered for renewed raverage under the permit. The permittee must continue analytical monitoring throughout the permit renewal pTvrres, even if a rene-al permit i5 not issued until afker expiration of this permit. 2 If no discharge occurs during the Sampling period, the permittee must submit a monitoring report indicating "No Flow" or`"No Disrhargg" within 34 Mays of the end of the samplLng perlod. 3 Mcnituring periods remain consistent through the permit term and through the renewal process. The first sampling period begins In Period [DRAFT] an [DRAM - Failure to monitor semi-annually per permit conditions ivay result in the Division requiring monthly monitoring For all parameters For a specified time period, "No discharge" from an outfall during a monitoring period does not constitute failure to monitor, as long as it is properly recorded and reported_ Monitoring Eventst.2 (All Years)s [All Years]3 Period 1 ]ainlaly 1 June 30 So if the permit were to be finalized next month, the first sample would need to be taken between July 1 and December 31. Let me know if you have any more questions! Lauren From: David Waters <dwaters@fuiisilysia.com> Sent: Friday, May 15, 2020 9:29 AM To: Garcia, Lauren V <lauren.garcia@ncdenr.gov> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov> Subject: RE: [External] Form 3510-2F email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Thank you Lauren, I will forward this to the lab and see...... This may sound like a dumb question, but for clarity, Our first report is not due until we finalize the permit? Thanks again, Hope you have a great weekend! David From: Garcia, Lauren V[mailto:lauren.garcia@ncdenr.gov] Sent: Thursday, May 14, 2020 1:57 PM To: David Waters <dwaters@fulisilysia.com> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov> Subject: RE: [External] Form 3510-21F Hi David, I was forwarded your questions about sodium sulfate. The parameter code is 82392. This will be included in the permit when it is finalized. Does this help? Thanks, Lauren From: David Waters <dwaters@fulisilysia.com> Sent: Monday, December 09, 2019 1:43 PM To: Garcia, Lauren V <lauren.garcia@ncdenr.gov> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.goy>; Brian Baymiller <bbaymiller@fulisilysia.com> Subject: RE: [External] Form 3510-21F External email. Do not click links or open attachments unless you veri report.spam@nc.gov Hi Lauren, I will review and be in touch Thank you, David 0 Pd i Si t"Mia David Waters Fuji Silysia Chemical USA, Ltd. Plant Manager 1215 Sugg Parkway, Greenville, NC 27834 PH 252-413-0003 FX 252-413-0490 dwaterskfujisilysia.com web address www.fujisilysia.com [fuiisilysia.coml From: Garcia, Lauren V [mailto:lauren.garcia@ncdenr.gov] Sent: Monday, December 09, 2019 12:14 PM To: David Waters <dwaters@fulisilysia.com> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.goy>; Brian Baymiller <bbaymiller@fulisilysia.com> Subject: RE: [External] Form 3510-2F Hi David, I have the draft permit ready for review and a 30-day comment period. The draft is also sent to the regional office for review and is published for a 30-day comment period. Any comments or questions you have can be addressed during this time. Thanks, Lauren From: David Waters <dwaters@fuiisilysia.com> Sent: Monday, September 30, 2019 3:52 PM To: Garcia, Lauren V <lauren.garcia@ncdenr.gov> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.eov>; Brian Baymiller <bbaymiller@fulisilysia.com> Subject: RE: [External] Form 3510-2F External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ��.spam(cDnc.gov Thank you for the help, Have a great day, David From: Garcia, Lauren V [mailto:lauren.garcia@ncdenr.eov] Sent: Monday, September 30, 2019 3:19 PM To: David Waters <dwaters@fuiisilysia.com> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.eov>; Brian Baymiller <bbaymiller@fuiisilysia.com> Subject: RE: [External] Form 3510-2F Hi David, This is all looking good! I will have your draft permit ready in the next week or so for a 30-day comment period. Any questions or comments you have can be addressed during this time. The draft is also published for a 30-day public comment period and sent to the Washington Regional Office Inspector for review as well. I have attached an example permit so you can become familiar with the template before your review. Thanks, Lauren From: David Waters <dwaters@fulisilysia.com> Sent: Monday, September 30, 2019 2:19 PM To: Garcia, Lauren V <lauren.garcia@ncdenr.gov> Cc: Edgerton, Thom <thom.edgerton@ncdenr.gov>; Morman, Alaina <alaina.morman@ncdenr.goy>; Brian Baymiller <bbaymiller@fulisilysia.com> Subject: [External] Form 3510-2F External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Lauren, Attached; Form 2F and supporting documentation, Please refer to the "Civil Site Plan" and USGS stream image attachments for section 3.1 (drainage maps). As in Form 1; the yellow comment boxes on the first drawing in the civil drawing attachments contain descriptions. Thank you, David David Waters Fuji Silysia Chemical USA, Ltd. Plant Manager 1215 Sugg Parkway, Greenville, NC 27834 PH 252-413-0003 FX 252-413-0490 dwaters e,fujisilysia.com web address www.fujisilysia.com [fuiisilysia.coml