Loading...
HomeMy WebLinkAboutNCS000155_Renewal Application_20130513A C® R North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, PE Governor Director March 1, 2013 . Dave Whetton Gkn Driveline 6400 Durham Rd Timberlake, NC 27583 John E. Skvarla, III Secretary Subject: NPDES Stormwater Permit Coverage Renewal GKN Automotive Incorporated Permit Number NCSOOO155 Lee County Dear Permittee: Your facility is currently covered for stormwater discharge under NPDES Permit NCSOOO155. This permit expires on 9/30/2013. To assure consideration for continued coverage under your individual permit, you must apply to the Division of Water Quality (DWQ) for renewal of your permit. Enclosed you will find an individual permit Renewal Application Form, Supplemental Information request, and Stormwater Pollution Prevention Plan Certification for your facility. Filing the application form along with the requested supplemental information will constitute your application for renewal of this permit. Until your permit renewal is completed and you receive a new permit, please continue to comply with all conditions and monitoring requirements in your expired NPDES stormwater permit. Please comlete and return the application and supplemental information to DWQ by April 5, 201.3. Failure to request renewal within this time period may result in delay of your permit renewal. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions regarding permit renewal procedures please contact Bradley Bennett of the Stormwater Permitting Unit at (919)-807-6378 or bradley.bennett@ncdenr.gov. Sincerely, Bradley Bennett, Supervisor Stormwater Permitting Unit Cc: SPU Files Central Files 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 \ FAX: 919-807-6492 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer Nne orthCarolina A"Uralil� f Permit Coverage o� <-°�-.,L Renewal Application Form National Pollutant Discharge Elimination System Stormwater Discharge Permit Permit Number NCS000155 The following is the information currently in our database for your facility. Please review this information carefully and make all corrections/additions as necessary in the space provided to the right of the current information. Owner Affiliation Information Owner / Organization Name: Owner Contact: Mailing Address: Phone Number: Fax Number: E-mail address: * Reissued Permit will be mailed to the owner Gkn Driveline . Dave Whetton 6400 Durham Rd Timberlake, NC 27583 (336)364-6220 Facility/Permit Contact Information Facility Name: GKN Automotive Incorporated Facility Physical Address: 4901 Womack Rd Sanford, NC 27330 Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: Discharge Information Receiving Stream Little Buffalo Creek Stream Class: C Basin: Cape Fear River Basin Sub -Basin: 03-06-11 Number of Out:falls: 4 1�ir1.I�J,a. zJi`ttx'_E�'ct'1S;(,t 11auuj' Impaired Waters/TM.DL Does this facility discharge to waters listed as impaired or waters with a finalized TMDL? ❑ Yes O No ❑ Dor.'t Know ( for information on these waters refer to http://h2o.enr.state.nc.us/su/Impaired Waters TMDL/ ) CERTIFICATION I certify that 1 am familial- with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate. Signature "'�" Date Print or type name of person signing above Title Stormwater Permitting Unit Please return this com Meted renewal application form to: Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 MAY 1 4 2013 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. 2. A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. ThE� summary can consist of a table including such items as outfall number, parameters sampled, lab Jresults, date sampled, and storm event data. H 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such itoms as outfall number, parameters surveyed, observations, and date monitoring conducted. /4. A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include information on these BMP's. 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) (Based on peak storage of 100 drums) Hydraulic System Reservoirs, Total Capacity = 3715 gallons Power Transformers, 1843 gallons Oil Storage Capacity of the Facility = 27,400 gallons I.HU ITILrI J:\u UrIVe-CSaCKUp_LU IL-U/-I ItUeSI emp\IUoLol Vr lwuo/of VtVV_rlg Ures.awg r LV I ICU: 01/1/U IJ 1Z:00 F'IVI 0T: aaroy nowell y s ^r- 7 � may-• ' .'k - RAW k r • � � � 'Y� ;��. `j, - .�- 1. .j(i � .a,`' 344 �. Ilk - rol. 7t rt e •♦ � �+rK 3� 4� • ♦ �,• art;,• � 4" 4i WfA ~ " r , _ or.4 of r�i77tr s t � • - ,se�,� ew �, 1 Wig. � ' f � •� �'� k • • T Source: Lee County GIS (000*--KLE//VFELOER PROJECT NO. 108267 Figure 3of 3 _ Bright People. Right Solutions. DRAWN BY: DJH Property Boundary Map CHECKED BY: LL The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no DATE: 05/1612012 representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for use as a land survey product nor is it designed or intended as a construction design document. The u of the information contained on this graphic REVISED: GKN PRECISION FORMING 4901 WOMACK ROAD representation is at the sale dsk of the parry using or misusing the information. 108267 GKN FIGURES.DWG - SANFORD,NC M 0 N O M cM ti N U Z = (n W r Oco LL � U Q Q O-1 Y Y Q Q ti JLO NT W o�- co W o 2E rn -j � Y rn LO LO 0 0 0 U Z Of W LLI m� 2i Q :D Z f}- W LLI Z C)� Z ry, U = 0 U O W Q O o 0= a LL U Q n- d cts L — N M— N CO � N CO t-- N M= N M= N M= N M r N M— N M M 0 U U Z Q� . W W m � Q Z z>- } r tz r W ui �JZ cr ,. Z U D 0 0 0 W Q O o O S d LL U Q d d O d p N O r0 ac C N C N c m m c m a E O O O N C C O Q O O N m w NN�CmC �.. ? EN`C d'EN d _ O QQ.000Q!QQ.a o.c'mc EQQ:QQ J J > > $a'o..s [ZZ Z-.Z Z.ZZZZZ`.ZZ dMO,C,mzZZZ.m N N O > m�jf°mGj c a _. U 0- C= 'c a N N J' C: N J C LL. �§ E ac nn>.c �-o > p E .> ` E ZZZ Z :,Z ZZ-ZZ Z'Z'ZZ. Z Z'Z;Z'Z Z Z Z'.ZZ Z)z,Z;zZ ZZZ!ZZ Z ZZZZZ-._Z Z Z;Z Z-" Z Z Z;Z'Z'Z ZZ Z�Z� Z ,Z Z Z Z Z Z C6 M M C. ZZZ Z ', 'O O , O Z. ZaO O� O. O, O0.O a; O O O: O aZ'a:0 O O : O'0aa;a 00;00 ®.O, 0 O O' O O o- o o o v >>aa 0,m0 3.000�� a' V o rn o�m`m J 2 o;o o mo;o m' o oUU'U a U � 0] m Ol J O N: N o o'o 0 0 oio o m m W O W O) O O O O O O •- N N O C,O O O O 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N W W C O aCE°o -`ao O N d.m 0 of .`O. 0 o aDi c (JJ a J N m 0 a a naQ- Q m r C N N d > y O 03 > >. C E `: m N LL v. m m ' Z ":Z ` Z Z Z Z Z.:. Z " z Z Z, Z', ' 3 Z z Z Z 2Z, Z"> - M M O O OT N O O O' O 0' Oi >. c 3 N O O, e 0 . i tV N C; N N M C2 M GKN Driveline North America, Inc. Sanford Precision Forming Facility 4901 Womack Road Sanford, North Carolina 27330, USA May 8, 2013 Stormwater Permitting Unit Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Permit No. NCS000155 Permit Renewal — Brief Description of Significant Industrial Activity Changes Since Last Issuance To Whom It May Concern: The following significant changes to our industrial activities have occurred since the last permit issuance: 1. Elimination of Waste Water Treatment Operations 2. Elimination of Phosphate Coating Operations 3. Installation of 2 Single Flow Lines using Oil Sizing vs. Phosphate Coating 4. Closure of adjacent manufacturing building on the same permit (2008) and utilization of space for warehousing/shipping. 5. Elimination of 10 Propane Powered Forklifts and Material Handling processes allowing flow to be handled by electric pallet jacks. i Sincerely;'" 1 Kimberly A. Killian, ,- EHS Specialist CSHO, MESH GKN Driveline North America, Inc. Sanford Precision Forming Facility 4901 Womack Road Sanford, North Carolina 27330, USA May 8, 2013 Stormwater Permitting Unit Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Permit No. NCS000155 Permit Renewal — Summary of Best Management Practices (BMPs) To Whom It May Concern: In order to further reduce the potential for stormwater contamination the following non- structural BMPs should be employed as outlined in the Integrated Spill and Stormwater Contingency Plan. General • All piping and equipment should be inspected regularly for leaks. Areas on which to focus attention include valves, pumps, flanges, and connections. Any leaks that are found should be fixed promptly. Vehicle Loading/Unloading • The unloading area for the chemicals should be designed to prevent spills or leakage from exiting the property, by ensuring that graded pavement, berms, curbing, and sealing catch basin covers and inlet pipes are used to divert the flow of stormwater and contain spills. Chemical Storage • All chemical containers and tanks should be checked regularly for leaks or signs of damage. The person conducting the inspection should make sure that all containers are properly closed or sealed. Also, dry chemicals stored in bags should be checked for signs of water or moisture damage. • All chemical containers and tanks should be clearly labeled to help employees identify chemicals and to warn them of potentially dangerous substances. Also, Page 2 of 2 areas in which chemicals are stored should be clearly marked with signs indicating the dangers of any hazardous chemicals (e.g. flammable, corrosive, volatile, etc.) The names and numbers of personnel to contact in the event of a spill or other emergency are posted in each department. Sincerely, Ki`mberly,A. Killian, CSHO, MESH EHS Sq`e%ialist DEVELOPMENTSTORMWATER-POLLUTION PREVENTION PLAN CERTIFICATION North Carolina Division of Water Quality - Stormwater Permitting Unit Facility Name: GKN Automotive Incorporated Permit Number: NCS00015 5 Location Address: 4901 Womack I'd Sanford, NC 27330 County: Lcu "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under :my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible 'or gathering the information, the information gathered is, to the best of my knowledge and belief, tr ue, accurate and complete." And "I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been tull} implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. u' Signature Date`_ (�{✓ G-tY$> G 3M (if�(it �� L -%f fd12eeG-7G''z Print o- type name of person signing above Title SPPP Certification 5/09 i Permit Coverage Permit Number a, Renewal Application Form NCS000155 National Pollutant Discharge Elimination System Stormwater Discharge Permit The following is the information currently in our database for your facility. Please review this information carefully and make all corrections/additions as necessary in the space provided to the right of the current information. Owner Affiliation Information * Reissued Permit will be mailed to the owner Owner / Organization Name Owner Contact: Mailing Address: Phone Number: Fax Number: E-mail address: Gkn Driveline . Dave Whetton 6400 Durham Rd Timberlake, NC 27583 (336)364-6220 Faci1iWPermit Con "ict Information Facility Name: GKN Automotive Incorporated Facility Physical Address: 4901 Womack Rd Sanford, NC 27330 Facility Contact: Mailing Address: Phone Number: Fax Number: E-mail address: Discharge Information Receiving Stream Little Buffalo Creek Stream Class: C Basin: Cape Fear River Basin Sub -Basin: 03-06-11 Number of Outfalis: Iml2aired Waters /TM.DLL Does this facility discharge to waters listed as impaired or waters with a finalized TMDL? ❑ Yes O No C] Don't Know ( for information on these waters refer to http://h2o.enr.state.nc.us/su/Impaired Waters TMDL/ ) CERTIFICATION U`I.ur�Y�rGt'.l`'� i certify that I am familiar with the information contained in the application and that to the best of my knowledge and belief such information is true, complete and accurate Signature—.L�Z.�- e, Date ' 2� `" r3 Print or type name of person signing above Please return this completed renewal application form to: Title Stormwater Permitting Unit Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 MAY 1 4 2013 SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL NPDES STORMWATER PERMIT Two copies of each of the following shall accompany this submittal in order for the application to be considered complete: (Do not submit the site Stormwater Pollution Prevention Plan) Initials 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of industrial activities (including storage of materials, disposal areas, process areas and loading and unloading areas), drainage structures, drainage areas for each outfall, building locations and impervious surfaces should be clearly noted. 2. A summary of Analytical Monitoring results during the term of the existing permit (if your permit required analytical sampling). Do not submit individual lab reports. The summary can consist of a table including such items as outfall number, parameters sampled, lab results, date sampled, and storm event data. H 3. A summary of the Visual Monitoring results. Do not submit individual monitoring reports. The summary can consist of a table including such items as outfall number, parameters surveyed, observations, and date monitoring conducted. /4, A summary of the Best Management Practices utilized at the permitted facility. Summary should consist of a short narrative description of each BMP's in place at the facility. If the implementation of any BMP's is planned, please include information on these BMP's. 5. A short narrative describing any significant changes in industrial activities at the permitted facility. Significant changes could include the addition or deletion of work processes, changes in material handling practices, changes in material storage practices, and/or changes in the raw materials used by the facility. 6. Certification of the development and implementation of a Stormwater Pollution Prevention Plan for the permitted facility (Sign and return attached form). If the final year analytical monitoring of the existing permit term has not been completed prior to filing the renewal submittal, then the last years monitoring results should be submitted within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal waiting on lab results) din* e^ine= rM";r.�u ril�r:rr s I-- rfl N W O_ CD z Y r- O N SO M e F— U�'' a Q cr o°� GIs Z N ZUp 0 < W 0 Lu a o- o — I U p I� N Cl �� a: J U Q CO N 1 ] � I�flt' Ir 7 is w a T o CC E rn� m 4 rl, � r 4'• � tic ��v�o `o `o L,,1111C GKN Driveline Sanford Precision Forming Facility Key for Site Map Figure 2 of 3 STORAGE TANKS Tank Material Oil Location Tank Capacity, of Contents Containment Content No. gallons Construction Outside Boiler 2 250 Steel Diesel Oil 100% Room Double -wall 3 5,000 Fiberglass Graphite- water Dilce 50°/u Tank Farm 4 3,000 Polypropylene Graphite- water Dike 100% Tank Farm Tank Farm 5 1,100 Polypropylene Used oil 50% Dike Outside Tank Lube oil — Farm 6 2,000 Steel DTE Extra Heavy Double -wall 100% under shelter Outside Tank 7 2,000 Steel Lube oil DTE 26 Double -wall 100% Farm under shelter Tank No. Tank Capacity, gallons Material of Construction Contents Containment Oil Content Location Outside Tank Lube oil- Farm under 19 2,000 Steel Vectra (soon Double -wall 100% shelter to be DTE 26) Outside Tank 20 1,500 Steel Lube oil DTE Extra Heavy Double -wall 100% Farm under shelter 21 235 Steel DTE Extra Heavy Dike/pit 100% K1 press Main Oil 22 50 Steel DTE Extra Heavy Dike/pit 100°10 K1 ress Transfer 23 235 Steel DTE Extra Heavy Dike/pit 100% K2 press Main Oil 24 50 Steel DTE Extra Heavy Dike/pit 100% K2 press Transfer 25 500 Steel Mobil 600 Dike/pit 100% Schuler press Main Oil 26 200 Steel Mobil 600 Dike/pit 100% Schuler Press Transfer 27 35 Steel Mobil 600 Dike/pit 100% Schuler Press Overload 28 15 Steel Mobil 600 Dike/pit 100% Schuler Press Helma Clamp 29 225 Steel DTE 26 Double Wall 100% [Gamei Shears 30 225 Steel DTE 26 Double Wall 100% Gamei Shears 31 500 Steel DTE 26 Trench 100% Verson Cold Form Tank Material Oil Location Tank Capacity, of Contents Containment Content No. gallons Construction 32 500 Steel DTE 26 Trench 100% Verson ColdForm 33 525 Steel DTE 26 —][Trench 100% Gamei Press 34 420 Steel DTE 26 Trench 100% Greenard Press Square D 35 None N/A Dry Type N/A N/A Transformer 1 Inside Square D 36 None N/A Dry Type N/A N/A Transformer 2 Inside Square D 37 None N/A Dry Type N/A N/A Transformer 3 Inside Westinghouse scheduled for 38 190 Steel Silicone Fluid N/A N/A decommission in 2012 Transformer 4 Inside Uptegraff 39 551 Steel Type II Oil None None Transformer 5 Outside Uptegraff 40 551 Steel Type II Oil None None Transformer 6 Outside Uptegraff 41 551 Steel Type II Oil None None Transformer 7 Outside Total oil storage capacity in tanks = 16,850 gallons Total oil storage capacity in drums = 5,000 gallons (Based on peak storage of 100 drums) Hydraulic System Reservoirs, Total Capacity = 3715 gallons Power Transformers, 1843 gallons Oil Storage Capacity of the Facility = 27,400 gallons CAD FILE: J:\C Drive-Backup_2012-07-17\Desktop\Temp\108267 GKN\108267 GKN_Figures.dwg PLOTTED: 5/7/2013 12:58 PM BY: darby howell •sue � .�'i► S-" �5 . �,e �. -9 y .� ? L zat' a; N rr • `.� 4 V..� ? ti o►`it' `t Ii ."i�' _ '' A "�gy• �{c �-� ate'"''' �T' �. v' iUA .a y:T.1 .. "# _�1 ��f^"j�Ss''•w T , �_ � r � f7' A source, Lee County CIS KLE/NFELOER PROJECT NO. 108267 Figure 3of 3 _ Bright People. Right Solutions. DRAWN BY: DJH Property Boundary Map CHECKED BY: LL The information included on this graphic representation has been compiled from a variety of sources and is subject to change without notice. Kleinfelder makes no DATE: 05/16/2012 representations or warranties, express or implied, as to accuracy, completeness, timeliness, or rights to the use of such information. This document is not intended for GKN PRECISION FORMING use as a land s—ey product nor is it designed or intended as a construction design REVISED: document. The use or misuse of the information contained on this graphic 4901 WOMACK ROAD representation is at the sole risk of the party using or misusingthe information. 108267 GKN_FIGURES.DWG SANFORD, NC -a-uD0-n-u = O C) O D m =O OC-)OCn� W N W N W N W N W N— W N W N W N 3 W N 3 h Z CO z c D CO � CO mm CD W w W O) W m W W W V V V w W W 00 W QJ W W W Cfl CO Cfl N N N' — — � — — — z fV N N N N N N N N N N N . >' .. -� --- N N N — —— � � \P \P A N N N .\A A J\- \ ` \ 0 0 0 C`O � Co \ " N N N 00 00 00 'C O N N tV' N N N . N N N N N N N N. N N N N N N N N N N N N CD O O O O' O O O O O O O O, O O O CD'CD O O O O O, O O O O O O 3 n O - -- - - CD O C) CD Q O CO GA W N N N N N N 3 s—- s 3O O O O' O C) : CO CO CO Cfl Cfl O O � Cn CD n O -i o � •p r � (Dm C)mz u (Drn��0 0 O`OO:O000IOO,OOOOOO;OOOOOO"�_10 00 cn C3i Cn C;1: IQN; N N! N N i N 'N, N W, W W N "N N _ p C7 mCn Cn ul c i tri OD D D zo z O- n n n' n n �'n ` A n= n A A cn u, cn : a, cn cn. cn cn 01: cn cn O m p m Z'zZ'oo;ocflocn:o:o.V cnrnov,000. ZZZ CD n �. N 2z CO cQ cQ o : cQ cQ sQ cc iQ cQ '(a (a fD 0 r- N O ca Wo V O a� = n C � 1 CL CD . Z j (C)00 O', W cn OD O) V V ,W -� W • Cn cn .A W .NA 9)ocn •P ,-' C:)0 Ct" j)) CO ., 00 "100 N! V � W ,� ) W V N O N cn 3 rna�rnrn rn a) ornrnrn V cncnvrnrnrnrn0) : a ,tom.. CA z 0 _v-: _i'vn'.i rn h.`-rs1W`m `i.`^w' �...�I__�1.�4 $ N O W M U Q z Z O o LL M Z N O U Z N a 0� 0 LL O CK Z = N U U O - w Q J Z Y Y w Q Q > 2 >, v O 0 3wo Z W o d U J V Y 01 C E E U 0 00.2�� 01 m o�ai o0RO.oEoo n a�.._ o,N. p c L d N NO W (O (p N m t0 W N N: lQ W O N y N C = U C O U- 0: C V C; N. d C :. V N m N QQQ Q..Q QQ-QQQQ.Q-Q: aEo o.S O�c EQQQQ a'a. aa c: c�iaaapi"a ZZ.ZZZZ`.Z Z-ym co �W.:ZZZZ._ca�y'ca _n�Q.. °�y!ca °'� 63Z' Z '.ac � Z Z.. > N, o O LL O E O J; T C D_-.0 n C O. a T C a C U N .3 0 o � � � mom. _.m o m m o E o r. Z�Z Z Z 'r, Z Z ZZ Z Z Z-Z`Z Z .-Z Z Z Z: Z Z Z ej -Z' Z - Z "" Z -'Z' Z. 2;Z,Z Z i�.ZZ ZZ ZZ ZZ Z �ZZZZI Z Z Z Z:Z' Z Z Z Z.,Z`. ZZZ Z Z"Z is Z.ZZ Z,ZZZ' ZZ Z.Z'T Z Z Z �Z' Z', ` Z t N N.N Fa ti c; c, ct=oco co --' � N ' N (� N N N OL0o zo N N N N N w `p. t�0 :-:.. o Z Z Z Z o: o oo;o' ' Za,a s a.at a a, 0 a Z.a a a o a a�o . ao O 0.0 O'O 0-0, O O O O O 9 O 0OO:O, E r 3 S V20O aa U Oj Wo0 0 o n O UE .O..UW a? U NO :a L WO'5:Uoo oO 0, W .5 m, Cl! tV ,. N V V' in ". `"-o o o o of o o a7 0 0) O W in O O O O O N N N N N Q) 0 0 O_ O O O �- 000 0 000 O O N.N N N NN N N N N N N -O 000 O O N Q'N N N N N M M M_ IT v W N W N N N N N m O) 010 O N z- z z- :z� :zM- N .N N N N N N N N V' N N N O� OJ 01 M W W W n t] C'1 (O W N M w GKN Driveline North America, Inc. Sanford Precision Forming Facility 4901 Womack Road Sanford, North Carolina 27330, USA May 8, 2013 Stormwater Permitting Unit Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Permit No. NCS000155 Permit Renewal — Summary of Best Management Practices (BMPs) To Whom It May Concern: In order to further reduce the potential for stormwater contamination the following non- structural BMPs should be employed as outlined in the Integrated Spill and Stormwater Contingency Plan. General • All piping and equipment should be inspected regularly for leaks. Areas on which to focus attention include valves, pumps, flanges, and connections. Any leaks that are found should be fixed promptly. Vehicle Loading/Unloading • The unloading area for the chemicals should be designed to prevent spills or leakage from exiting the property, by ensuring that graded pavement, berms, curbing, and sealing catch basin covers and inlet pipes are used to divert the flow of stormwater and contain spills. Chemical Storage • All chemical containers and tanks should be checked regularly for leaks or signs of damage. The person conducting the inspection should make sure that all containers are properly closed or sealed. Also, dry chemicals stored in bags should be checked for signs of water or moisture damage. • All chemical containers and tanks should be clearly labeled to help employees identify chemicals and to warn them of potentially dangerous substances. Also, H Page 2 of 2 areas in which chemicals are stored should be clearly marked with signs indicating the dangers of any hazardous chemicals (e.g. flammable, corrosive, volatile, etc.) The names and numbers of personnel to contact in the event of a spill or other emergency are posted in each department. Sincerely, f; Kimberly.A. Killian, CSHO, MESH EHS Specialist 19 GKN Driveline North America, Inc. Sanford Precision Forming Facility 4901 Womack Road Sanford, North Carolina 27330, USA May 8, 2013 Stormwater Permitting Unit Individual Permit Renewal 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Permit No. NCS000155 Permit Renewal — Brief Description of Significant Industrial Activity Changes Since Last Issuance To Whom It May Concern: The following significant changes to our industrial activities have occurred since the last permit issuance: 1. Elimination of Waste Water Treatment Operations 2. Elimination of Phosphate Coating Operations 3. Installation of 2 Single Flow Lines using Oil Sizing vs. Phosphate Coating 4. Closure of adjacent manufacturing building on the same permit (2008) and utilization of space for warehousing/shipping. 5. Elimination of 10 Propane Powered Forklifts and Material Handling processes allowing flow to be handled by electric pallet jacks. Sincere -71 Kilerly A. Killian, CSHO, MESH EH Specialist STORAAWATER POLLUTION PREVENTION PLAN I DEVELOPMENT AND IMPLEMENTATION CERTIFICATION North Carolina Division of Water Quality - Stormwater Permitting Unit Facility Name: GKN Automotive Incorporated Permit Number: NCS000155 Location Address: 4901 Womack Rd Sanford, NC 273M County: Lee "I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were developed and implemented under -ny direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP, Based on my inquiry of the person or persons who manage the system, or those persons directly responsible `or gathering the information, the information gathered is, to the best of my knowledge and belief, true, accurate and complete." And I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been full} implemented at this facility location in accordance with the terms and conditions of the stormwater discharge permit." And "I am aware that there are significant penalties for falsifying information, including the possibility of fines and imprisonment for knowing violations." Sign (according to permit signatory requirements) and return this Certification. DO NOT SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION. Signature GC%. meal ►;�, Print o- type name of person signing above Date 57—9 '1-3 Title SPPP Certification 5/09