HomeMy WebLinkAboutNCS000140_Renewal Application_201509039,
CertainTeed
SAINT-GOBAIN
CERTIFIED MAIL
7011 1150 0001 9727 5843
Ken Pickle, PE
Environmental Engineer
NCDENR/ DWQ/ Stormwater Permitting Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
SUBJECT: NPDES Stormwat Permit Renewal
Certainteed Corp ration
Permit Number S000140
Granville County
Mr. Pickle,
—AO# 8
'a j3���
August 28, 2015
SCp 0 3 20151t1.
BEN Wqr
401 8 -PBUhFEr2 F�Rn�r�CES
Certainteed Corporation is submitting two (2) copies of the enclosed application for renewal of
NPDES Stormwater Permit NCS000140, which is scheduled to expire on December 31, 2015.
Certainteed Corporation is continuing to address the infrequent copper exceedances. Feel free to
contact me if questions. Thanks.
Sincerely,
Robert W. Yurek
Environmental Coordinator
RECEIVED
sp 0 8 2015
p ,NR-I-ANn o'.I!1\L `ry
S-'ORNAWATER pERIVII'l-PING
.rftYTY,
SAINT GOBAIN
CertainTeed Roofing
200 Certainteed Rd. • Oxford, NC 27565 • USA • Tel: (919) 693-1141 • Fax: (919) 693-9400 • www.certainteed.com
Permit Coverage
Renewal Application Form
National Pollutant Discharge Elimination System
Stormwater Discharge Permit
Raleigh Regional Office
Permit Number
NCS000140
1pp YlATf�
G �G
T ' ` g is the information currently in our database for your facility. Please review this information carefully and make all
correc ions/additions as necessary in the space provided to the right of the current information.
Owner Affiliation Information
*Reissued Permit will be mailed to the owner address
Owner / Organization Name:
Certainteed Corporation
Owner Contact:
Mark Heilman
Mailing Address:
200 CertainTeed Rd.
Oxford, NC. 27565
Phone Number:
919-693-1141
Fax Number:
919-693-9400
E-mail address:
Mark.r.heilman@saint-gobain.com
Facility/Permit Contact Information
Facilitv Name: Certainteed Corporation
Facility Physical Address: 200 CertainTeed Rd
Oxford, NC 27565
Facilitv Contact: Robert Yurek
Mailing Address: same
Phone Number:
919-693-1141
Cell Phone
919-482-0206
E-mail address:
Robert.w.yurek@saint-gobain.com
Discharge Information
Receivinq Stream:
Hachers Run & Fishinq Creek
Stream Class:
Basin:
Tar -Pamlico River Basin
Sub -Basin:
03-03-01
Number of Outfalls:
4
Impaired Waters/TMDL
Does this facility discharge to waters listed as impaired or waters with a finalized TMDL? X Yes Nt(o� Don't Know
( for information on these waters refer to httpy/h2o.enrstate.nc.us/su/Impaired Waters ITMDU�t
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
(Do not submit the site Stormwater Pollution Prevention Plan)
Initials SEE ATTACHMENTS 1 THROUGH 6
RY 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities (including storage of materials, disposal areas, process areas and
loading and unloading areas), drainage structures, drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
RY 2. A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled, and storm event data.
RY 3. A summary of the Visual Monitoring results. Do not submit individual monitoring
reports. The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
RY 4. A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
RY 5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
practices, and/or changes in the raw materials used by the facility.
RY 6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility (Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to filing the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e. do not withhold renewal submittal
waiting on lab results)
ATTACHMENT I
SITE MAP FROM THE STORMWATER POLLUTION PREVENTION PLAN
gC
/
wo�
N
♦ z�
� s �
1�
l ,
�y a:
¢¢ LL m
um P'w 1-1 veld a1i1 1111110-1111\11EI1E11 "Ild P111x0 pa aluieuaJ\LO\53l[j OVJ 00\+11'd 11a101d "Ilk:-
ATTACHMENT 2
ANALYTICAL MONITORING RESULTS
AlU
M
N
O
N
t0
'C 0
0 W
N
1 �
M O
r
N
or
W
O
N
V
M
UD N
A M
f0
Q Q
O V
O v
N
0 0
N
O
O
o
N
r
((a N
N O
Z Z
M
N
Mr
M
O OOZ
N
CIJ
i�NZ
O
O
Q Q
Z Z
M
N#
M
r N
0 I,
N o
o z
N
N
.may,. fO
0 0
M N
r
N
O o
O
0 0
Q
z
O
O
N
a
O
N
3k to
�
N N
O
M^
a
N O
Q Q
Z Z
t" i
N
n
N N
t0 M
o O
Q Q
N
N
V O
M tP
cq to
Q
Q
Ct
M
In
N
Q Q
N
W
MO
�N
V
zZ
NXto�
rOooZZ
V:t(ri6
�
(OnNoZz
to
V
N
M
V: �
V' m
W
N
t{ O
W M
0> om
N o
w
N
N (OD
t0 (D
�. (NO
O O
W
N
ay W
(0 ,7
o N
Opi
O W
n
f] O
N
ik C1
0
ti
O V
o OV
m
N o
r
O
V o
o
r
0
r r
O O
6
a
(0
O
N M
t0 V
(0 t0
N M
N M
o W
r O
0oz
Q
�t
O
N
V
M O
M
O (+�
o
t� N
0 0
r
0@
N
O
N M
V
N f�
(O n
O
0
N
0
Q
p
N
M N
t0
(p ,�.
W
r:
n
N N
<Y O
O Q
<{ r
t� N
ro
N
Mr
Nti
m V
Oz
W
N O
r
N
V V
Z
(p
r
0
OO
V
V z
to
t0 13)
N N
I�
7 op
z
d'
`
O
O M
V O
O Z
N
N
N n:
o ry
r
ti�
O O
z
r V
m
CO O
p Z
t0
r
r
0
N
M
r
r 0
0
m
O
r
0
(0
r
0
N
O V
p
n
a
m
a
r
O
N
(n h
to N
h
N O
O Q
Q
o
N
V
O
W7
t0 N
N
(O O
Q Q
O
N_
N
O ti
V
t!? N
N
O Q
Q
N
m
N r
N
W N
Q Q
V' o
N
t` N
o z
z
N
N)
(+�
O
r n
O V
Z z
a� 3t
N ci
r
r
V Z
z
O
3t r
V'
o
r O
(.� p
Z z
N
p
N [Y
m
O p
M
o
IT d.
rn V
0 0
F-
O
N
N
V
m
V I�
tt') h
V' N
M O
M~
0 O
M
p
N LL{'
N V
(� N
M t0
r
to
� N
p p
~
w
r
p
N
O
V'
it
f�
O 0�
M (D
M~
W
N
to
M
M
O
CO I�
O O
V
r
0
r V
O Vu
N
r O
O
O O
V
a
O
O
Op0
O
N
o
n
O
OU
M
O
M M
(O
n
O N
O 0
Z
a_
O
N
M
N
N N
OV
N
p
#
N o
!.b
r N
N
N I
oV 4
z
0
0
N
o
y
rL
O O
tj')
t-
O
n
z
O
t:,
O
p 0
O
a
0
0
O
Z
r
Q
W
O
N
M
ro p
N
to
ao
N O
Q
o
N
N
N
N
tU N
oQ
p
N
N 1-
t0
N
p
04
WW
p m
lO0
"COJ
pN
p
nO
O
r
N
Z\
i
O
OVo
z
aN
0
0V
(D
Z
t\
o
O
to
w1
O
V
W
M
w p
N
tv
DJ N
V'
w1
p
N
M
N
N
pV
r
w p
O
N
p
t0 O
Q Q
U
O
Q
�it
O DM
ozZ
((�
n
.-O~
rn
Zz
O�Cit
N
�-p
00
z�`
oar*
m
6
o
N O
Z Z
N
L
C
N
N
L
C
N
N
L
C
i
N
L
C
....
N
ID
O
Z
O
�C�
O
(C...
C
J_
J_
J
._.
O
�C7
O
C
J
O
O
:s
O
NUS
O
C
J
c�
O
J_
=
O
J
o 3
ig`
E
E E"
3 m
E E
E
3°
E
E E"
3
E E
E
d O
O O)
E
za
to
'
'
N
-du
O
E
za
N
E-a��
'�
N O
E
za
`w
N
-'
'�
N
-at�C)
O
0)
E
za
N
('`m
'
I
m
Itom
o as
m Ito
m o
am
2
m
°-hUO
am
m
a
mF°Hw'h
ahFUO
Ot°F°w'F-I
1--rUO
OHr°w'H=
Oi°-Hw'�=F°-F°UO
ATTACHMENT 3
VISUAL MONITORING RESULTS
CertainTeed Corporation - Oxford, NC
Stormwater Outfall Qualitative Monitoring Summary
7/18/2015
3/30/2015
7/15/2014
2/21/2014
8/21/2013
2/7/2013
8/19/2012
1/27/2012
9/2/2011
4/16/2011
10/14/2010
Outfall #
1
1
1
1
1
1
1
1
1
1
1
Very light
Very light
Color
Clear
Clear
Very Light Brown
Brown
Brown
Light Brown
Clear
Brown
Light Brown
Brown
2
Odor
None
None
None
None
None
None
None
None
None
None
Brown
Clarity
2
1
2
3
2
3
1
5
2
4
None
Floating Solids
2
1
2
2
2
3
2
2
3
4
4
Suspended Solids
2
1
2
3
2
2
1
4
2
2
2
Foam
lNo
No
No
No
No
No
No
No
No
INo
2
Oil Sheen
No
No
No
No
No
No
No
No
No
No
No
Deposition at out
No
No
No
No
No
No
No
lNo
No
No
Erosion
No
No
No
No
No
No
No
No
No
Discharge was
Discharge was
just beginning
just beginning
and some
and some
organic material
organic
Discharge was
was in sample
material was in
just beginning
Ponds were
Recently
some
sample some
and some
disturbed in fall
sprayed
construction
construction
organic material
by digging out
and dug out
Other
lNone
INone
INone
lNone
I None lbeing
done.
lNone
being done.
was in sample
cattails
Icattalls.
7/18/2015
3/30/2015
7/15/2014
2/21/2014
8/21/2013
2/7/2013
8/19/2012
1/27/2012
9/2/2011
4/16/2011
10/14/2010
Outfall #
2
2
2
2
2
12
2
2
2
22
Very Light
Very light
Color
Clear
Clear
Ve Li ht Brown
Li ht Brown
Brown
Clear
Clear
Brown
Light brown
Brown
Light Brown
Odor
None
None
None
None
None
None
None
None
None
None
None
Clarity
2
1
2
5
2
1
1
2
1
4
1
Floating Solids
1
1
2
2
3
1
1
2
2
4
1
Suspended Solids
2
1
2
5
2
1
1
2
1
3
1
Foam
No
No
No
No
No
No
No
No
No
No
No
Oil Sheen
No
No
No
No
No
No
No
No
No
No
No
Deposition at out
No
No
No
No
No
No
No
No
No
No
Erosion
No
No
No
No
No
No
No
No
No
No
Dishcharge
Was just
begging
and some
organic
Ponds were
Recently
Exit pipe
material
No issues
disturbed in fall
sprayed
foundation
was in
Extremely clean
vey clean
by digging out
and dug out
Other
lNone
1 None
lNone
lerroding
sample
land clear
lwater
lNone
INone
cattails
Icattalls.
7/18/2015
3/30/2015
7/15/2014
2/21/2014
8/21/2013
2/7/2013
8/19/2012
1/27/2012
9/2/2011
4/16/2011
1 10/14/2010
Outfall #
3
3
3
3
3
3
3
3
3
3
3
Color
Clear
Clear
Clear
Very light
Brwon
Clear
Light Brown
Clear
Clear
Very light
Brown
Brown
Brown
Odor
None
None
None
None
None
None
None
None
None
None
None
Clarity
1
1
1
2
1
4
1
1
3
4
4
Floating Solids
1
1
1
2
1
5
1
1
3
4
3
Suspended Solids
1
1
1
2
1
4
1
1
1
2
2
Foam
lNo
No
INo
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
N
No
No
No
No
No
No
No
No
No
No
No
rosiflon
None
INone
INone
lNone
Extremly
clean and
clear
Discharge was
just beginning
and some
organic material
lwas in sample
Extremely
clean water
None
Discharge was
just beginning
and some
organic material
was in sample
Ponds were
disturbed in fall
by digging out
cattails
Recently
sprayed
and dug out
cattails.
7/18/2015
3/30/2015
7/15/2014
2/21/2014
8/21/2013
2/7/2013
8/19/2012
1/27/2012
9/2/2011
4/16/2011
10/14/2010
Outfall #
4
4
4
4
4
4
4
4
4
4
4
Color
Reddish
Brown
Clear
Clear
Clear
Clear
Li ht Brown
Clear
Brown
Clear
Brown
Brown
Odor
None
None
None
None
None
None
None
None
None
None
None
Clarity
8
1
1
1
1
2
1
5
1
3
3
Floating Solids
8
1
1
1
1
2
1
4
1
4
3
Suspended Solids
7
1
1
1
1
2
1
5
1
2
3
Foam
INone
No
No
No
No
No
No
No
No
No
No
Oil Sheen
None
No
No
No
No
INo
No
lNo
No
No
No
De osition at out
None
No
No
No
No
No
No
No
No
Erosion
Not at outfall
No
No
No
No
No
No
No
No
Other
This rainfall
was so hard
that the
hillside to
this outfall
had some
lerosion.
INone
lNone
lNone
Extremely
clean and
clear
INone
Water
extremely
Iclean
Construction
being done,
draining to
outfall all
required
protection was
lin place.
Clearest
cleanest
sample I
remember
taking
Ponds were
disturbed in
fallby digging
out catials
Recently
sprayed
and dug out
catails.
ATTACHMENT 4
BEST MANAGEMENT PRACTICES
BEST MANAGEMENT PRACTICES FROM THE STORMWATER POLLUTION PREVENTION PLAN
The following BMPs are in place at the CertainTeed facility:
• Secondary Containment — Secondary containment is provided for all storage tanks exposed to
storm water.
• Spill Kits — Spill kits are located near material storage areas including the still yard and the storage
buildings. The spill kits are inspected and material is replaced as needed.
• Inspections — An inspection program is in place for visually inspecting all BMPs. Inspections are
performed frequently on areas where materials are exposed to storm water and for all BMPs.
• Stormwater Retention Wetlands Maintenance Program — Details of the maintenance program for
the four stormwater retention wetlands are provided in the Draft September 2009 Stormwater
Best Management Practices Inspection and Maintenance Plan. The Plan includes specific
requirements for inspecting for clogs and excess debris, maintaining the vegetated areas,
inspecting the structural components, and evaluating the need for component replacement.
• Facility -wide Maintenance Program —The maintenance programs covers electrical equipment,
mechanical equipment, tanks, valves and pipes with potential to cause spills that could enter the
storm water system.
• Proper Storage of Finished Product — Finished product is properly stored with wraps and/or bags.
If wraps and/or bags are torn, finished product will be re -wrapped and/or re -bagged.
• Proper Labeling of Containers — All storage containers for chemicals, petroleum products, and
hazardous wastes are properly labeled for content and hazards.
• Proper disposal of waste materials — Waste disposal areas are identified throughout the site.
Wastes are segregated and disposed in appropriate containers.
• Good Housekeeping — Good housekeeping procedures are implemented to maintain a clean and
orderly work environment.
• Training — All facility personnel receive annual spill prevention briefings that include spill
prevention practices and response procedures.
ATTACHMENT 5
SIGNIFICANT CHANGES IN INDUSTRIAL ACTIVITIES
m
0
U
O
Q
RS
a)
t
C
w-
C
Rf
C a)
O 'C
M
E U)
c- C
N a) E
-a E
6 (6
@ Ry O
O
U N
a) a)
O T
(U � B
(U
a) >
> O
O O Q
c Q. a
c (o o
w= (n
a) (a M
r � �
N i0
C
O 0)
O U "
o (a o
m
00 I=
o•F�
U) ` o
C) -C n.
z 0
E a)
0)
a) o c
Q-o�
a) 2 O
cn
o co
0 U) 0
c Q
cn
� o
cn
M
a) C N
a) C a)
U O C
(6 O
iT) 0) 0
ATTACHMENT 6
STORMWATER POLLUTION PREVENTION PLAN IMPLEMENTATION
CERTIFICATION
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
North Carolina Division of Water Quality — Stormwater Permitting Unit
Facility Name:
Permit Number:
Location Address:
County:
Certainteed Corporation
NCS000140
200 Certain Teed Rd
Oxford, NC 27565
Granville
"I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all attachments were
developed and implemented under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information required by the SPPP. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the
information gathered is, to the best of my knowledge and belief, true, accurate and complete."
And
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP has been
fully implemented at this facility location in accordance with the terms and conditions of the stormwater discharge
permit."
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
Sign (according to permit signatory requirements) and return this Certification. DO NOT
SEND STORMWATER POLLUTI01'54 , EVENTION PLAN WITH THIS CERTIFICATION.
Signature
e'III"
Print or type name of person signing above
Date /2 7 //3
a AA (3, Y1 (1, qt
Title
SPPP Certification 8/15