Loading...
HomeMy WebLinkAboutNCC204382_ESC Approval Submitted_20201002ROY COOPER Governor MICHAEL S. REGAN secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality May 22, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Pure Power Contractors, Inc. Attention: Justin Taylor, President 2812 Gray Fox Road Monroe, North Carolina 28110 RE: Project Name: Ventura Solar, LLC Acres Approved: 37.6 Project ID: ALEXA-2019-003 County: Alexander City: Taylorsville Address: County Home Road River Basin: Catawba Stream Classification: Other Submitted By: Pure Power Contractors, Inc. Date Received by LQS: May 11, 2020 Plan Type: Revised Dear Mr. Taylor, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000, Construction General Permit. After the form is reviewed and found to be complete, you will receive a link"with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at Annette lucaskncdennizov or Paul Clark at Paul clark a ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. E � North Carolina Department of Environmental I Division of Energy.. Mineral and Lan sources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NORTH CaROU .,.. �. ` � —111/ .1— Letter of Approval with Modifications Pure Power Contractors, Inc. May 20, 2020 Page 2 of 3 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. cer ly, Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet Crowley Professional Engineers, Inc. Attention: Michael L. Crowley, PE 1233 Heritage Links Drive Wake Forest, North Carolina 27587 Inspection Department Letter of Approval with Modifications Pure Power Contractors, Inc. May 20, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Ventura Solar, LLC Project ID: ALEXA-2019-003 County: Alexander 1. Please ensure drainage across the site's access road during all applicable phases of grading in the area. [G.S. 113A-57(3)] 2. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: The NCGO1 General Permit, as well as NCGO1 stabilization requirements, NC DWR list of approved PAMS/Flocculants, and NCGO1 Combined Self -Monitoring Form may be found at https://deq.ne.gov/about/divisions/energy-mineral-land-resources/npdes-stormwater-gps