Loading...
HomeMy WebLinkAboutWQ0041812_Application (FTSE)_20200812State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 112T .0300 , FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA (14-16 & SUPPORTING DOCUMENTATION Application Number 0 0V -1 1 V 1 X tto br utmp1c1cd by D") All item~ must he completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name. Chatham Park Investors LLC (company, municipaiitw, I-IOA, utility, etc.) 2. Applicant type- ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State,:County ❑ Municipal ®Other 3 Signature authority's name "I iino1hy R Smith per 15A NCAC 02 ' 010f Title: Vice President 4. Applicant's mailing address. 105Weston Estates Way City: Ca.State NC lip: 27513- 5. Applicant's contact infbrmation, Phone number. 9( 19) 481-3000 Email Address: robing resiondev.com II. PROJECT INFORMATION: ea a 1. Project name: Chatham Park -Section 5.1 Subdivision West - Phase 213 4, 2 APPlication/Prol�cstatus; Proposed (New Permit) ❑ !-.xisting PermiUProjLct If a modification, provide the existing permit number: WQOO and issued date: N o ajJ If new construction but part ol'a master plan, provide the existing permit number: WQOO t- 3- County where project is located Chatham w Q A 0 4. Approximate Coordinates (Decimal Degrees). Latitude; 35.729 Longitude:-79.100 5 Parcel ID (il'applicable): 0007386 Q (or Parcel ID to closest downstream sewer) 7 III. CONSULTANT INFORMATION: Professional Engineer: Nicholas J- Antrilh, PE License Number: 38549 Firm: WithersRavenel Mailing address 115 MacKenan Drive City: -Cary State NC Zip: 2751 1- Phnnc number: U 469-334() Email Address: nantnllit<wilhersravenel com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: i facility Name_ Town of Pittshoro WWTP Permit Number: NCO020354 Owner Name: Town of Pittshoro V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s). W 039848 Downstream (Receiving) Sewer Size 8 inch System Wide Collection System Permit Number(s) (if applicable). WQCS00146 Owner Name(s): Town of Pittshoro - See Cover Sheet for further Fs lanation of Permitting status for Downstream Sewer FORM: I -TA 04-1 G Page I of 5 VI. GENERAL REQUIREMENTS I . If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N,A 2. If* the Applicant is a Developer of lots to be sold, has a Developer's Qperdtional Agreement I-ORM' DEV been attached? ® Yes ❑No ❑N:A 3. If the Applicant is a HoL!Prorpertv Owners' ssoc tion laas nn ()-neraliori:al A rcentenl FORN1- IIOAA been attached? ❑ Yes ❑No ®N:A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Residential ❑ Car Wash Leased ❑ RetaiI with food preparation/service ❑ hotel and/or Motels ❑ School! preschool ! day care ❑ Medical; dental ! veterinary facilities ❑ Food drink ❑ Swimming Pool !Clubhouse and facilities ❑ Churclt ❑ !Businesses i offices I factories ❑ Nursing Home ❑ Swimming PoollFiltcr Backwash ❑ Other (Explain in Attachment) 5. Nature of wastewater : 100 % DomesticlCommercial % Commercial °J° Industrial (Scc 15A NCAC 02T .010320 ) 1Is there a Pretreatment Program in effect? ❑ Yes ❑ No G. Hasa flow reduction been approved under 15A NCAC 02T ,0I 1401? ®Ycs []No Y If ves, Provide a co v of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (sec 1111.11lgffl) Daily Design Flow''' No. of Units Flow Single Family housing 180 gailday 81 14,580 GPD gala' GPD gal.? GPD gaff GPD gal! GPD gall GPD 1 Total 14,580 GPD a See 15A NCAC o2,f .01 14h d e 1 and e 2 for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development rises, public access facilities located near high public use areas; and residential property Iocated south or cast of'the Atlantic Intracoastal Waterway to he used as vacation rental~ as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114 1 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data_ 8. Wastewater generated by project: 14,580 GPD (per 15A NCAC 021- _0114) Do not include future flows or previously permitted allocations !!'permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number. ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain) - FORM: F"fA 04.16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - f12T .03115 & hIDC(Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material R" 2.040' PVC Section 11 & III of the MDC fur Permitting of Gr vity Sewers contains information related to design criteria % Section III contains information related to minimum slopes fir gravity sewer(s) i Oversizing lines to meet minimum slope requirement is not allowed and a violation of the l%IDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC(Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT I . Pump station number or name. 2- Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s), _ gallons per minute at feet total dynamic head (TDI-1) 5 Summarize the fierce main to be permitted (far this Pump Station): Size (inches) Length (feet) Material G. Power reliability in accordance with 15A NCAC 02`I` -0305 h I : ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(l3)_ Required f'or all pump stations with an average daily flow greater than or equal to 15,000 gallons per day Must be permanent to Iltcility Or ifthe pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02'F .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T-0305(h)(1)(C): It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel limcframcs, shall be provided in the case of multiple station power outage - FORM: rl'A 04-16 Page 3 ol`5 IX. SETBACKS & SEPARATIONS — (02B .0200 & ISA NCAC (12T .11305(t)): 1. Does the project comply with all separations lbund in I SA NCAC 02T _0305 i & ® Yes ❑ No 15A NCAC 0210305(a) contains alternatives where separations in 02T�ff) cannot be achieved, "Stream classifications can be identified using the Division'~ NC Surface Water Classifieutions webl2ise Y If noncompliance with 02 f.03051I) or.el. see Section X of this application 2_ Does the project comply with separation requirements fir wetlands? (50 feet of separation) ® Yes ❑ No ❑ N;'A See the Division's draft separation requirements liar situations where separation cannot be mart No variance is required if the alternative design criteria specified is utilized in design and construction As built documents should reference the location of areas ellceted 3. Does the project comply with setbacks found in the river basin rules per I SA NCAC 02B _0200? ® Yes ❑ No ❑ N.-'A i- This would include Trout Buflcred Streams per 15A NCAC 213 0202 4. Does the project require coverage..authorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? �- Inlbrmation can be obtained from the 401 & BuMr Permtttina Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permit.- certifications)? ® Yes ❑ No Per 15A NCAC 02T 0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied limr, or have been obtained. Issuance ofthis permit is contingent on issuance ol'dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6, Does this project include any sewer collection lines that are deemed "high-priorky?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting; surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorales the sewer. ❑ Yes ® No ❑ NiA �- Il'yes, include an attachment with details fibr each line, including type (aerial line, size, material, and location). High priority lines shall he inspected by the permitter or its representative at least once emery six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. rORM: i' A 04-1 f Page 4 of 5 DocuSign Envolopo ID: 4249C6ED•C579AC56.1i4B3-D6131040B266 X. CER,riFICATIONS: L Does the submitted system comply with LEA CAC ORT, the Mink um Dc-4ign rileria for t ie Periniitingt)r_ump Stations and force Mairts (latest vcm-ionl and the GravityScweS Cyliuimum Design Crite is latest version) as applicable? ® Yes [:1 No IfNo, complete and submit the VarianccrAiternativc Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is reguired prior to submittal of the Fast Track Application and supporting documents. 2 Professional Engineer's Certification; 1, Nicholas J. An trill], P.E. attest that this application for (Professional Engineer's name from Application Item 11LL) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge, I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version), A41jough othcr professionals may have developed certain portions of this submittal packagc, inclusion of these materials under my signature and seal signifies that 1 have reviewed ,his material and have judged it to be consistent with the proposed design. NOTE - In accordance with General Statutes 143-215.6A and 143-215.6f3, any person who knowingiy makes any false statement, representation, or ccrlitication in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,000, as well as civil penalties up to $25,000 per violation. !North Cnrolina Professional Engineer's seal, signature, and date: .•°•�rr1 �CARO 2•.:�FrE[SS'/Qy ;tiy i a�A[I�IDpi��H}pPad try. • ' W�YMSi�S �+'. J. i 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Timothy R. Smith, Vice President attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. 1 also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will he returned to me as incomplete. NOTE — In accordance with General Statutes J.43 L,tc and 43-215,613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10,000 as well as civil penalties up to S25,000 per violation Signature: ✓ _ / -- 70 2s7 pate: FORM; FTA 04-16 Page 5 of 5 State of North Carolina Department of Environmental Quality Division of Water Resources Dtvtslon of water Resources Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Chatham Park Investors LLC Project Name for which flow is being requested: CP Section 5.1 Subdivision West Phase 2B More than one FTSE may be required jar a single project !f the owner of the ;TTYTP is not responsible for all pump stations along the mute of the proposed wastewaier flow. i_ Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name* Town ofPittsboro WWTP b. WWTP Facility Permit #: NCO020354 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used Afl flows are in AfGD 0.75 0.1361 UW29 0.6390 5 /o I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)-(B*C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow" Current Avg. Tributary Flow Plus (Name or Capacity, " (Firm f pf), Daily Flow, Daily Flow, Obligated Available Plumber) MGD MGD MGD MGD Flow Capacity` —;'The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Pittsboro WWTP Downstream Permit Number: NCO020354 Page 1 of 6 FTSE 04-16 Ill_ Certification Statement: I John Poteat certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which 1 am the responsible party. Signature of this form indicates acceptance of this wastewater flow AL Ji,+� r�ti ctul Ngnature Date Page 2 of 6 FTSE:0-l-16 40 WithersRavene[ 4 ■ Our People, Your Success. August 7, 2020 Department of Environmental Quality Division of Water Resources Attn: Jason Robinson 3800 Barrett Drive Raleigh, NC 27609 RE: Chatham Park - Chatham Park Section 5.1 Subdivision West Phase 2B Sewer System Extension Permit Dear Mr. Robinson, On behalf of Chatham Park Investors LLC, please find the attached documentation in support of a Fast Track Application (FTA 04-16) for the referenced project. As noted in the application, this project will consist of 2,040 LF 8" PVC sewer located north of Thompson Street and will connect to sewer within Subdivision West -Phase 1 being permitted and constructed under separate cover. Subdivision West - Phase 1 then connects to sewer permitted, constructed and certified under permit # WQ0039848. The proposed sewer described within this application will serve Phase 2B of Subdivision West containing 81 single family and townhomes within this development. The proposed project will meet all of DWR's minimum design criteria for sanitary sewer extensions. The design flow rate for this project is calculated at 14,580 gpd based on NCAC 2T Rules for wastewater flow rates and the DEQ approved sewer flow reduction of 60 gal/bedroom approved under separate cover for Chatham Park and included with this submittal package. The proposed sanitary sewer line sizes are more than adequate to convey the design flow rates. Please find attached the following information in support of the application: • Fast Track Sewer System Extension Application (FTA 04-16) • Flow Tracking/Acceptance Form for Sewer Extension Applications (FTSE 04-16) • Certificate of Existence, Secretary of State • Developer's Operational Agreement • USGS Map • Street Level Map • Chatham Park Flow Rate Reduction Approval If you have any questions regarding this request or if you require any additional information, please feel free to contact me at 919-238-0354 or aalbini@withersravenel.com. Sincerely Withei-SRavene! lie 1464;a Alicia R. Albini Senior Project Manager 115 MacKenan Drive I Cary, NC 27511 t: 919.469.3340 I f: 919.467.6008 I www.withersravenel.com I License No. C-0832 Cary I Greensboro I Pittsboro I Raleigh I Wilmington ME PH Lurqt,�Doo 34 �Q� P u s* Lei n a 00ce.4.1 "1 nnn U�y N C m d U � m aca w m WO Vx Na 60 w Z 0oo CIO, 000 J E E E V L f6 lfl lD �iUU U ar ,01 N6 L _ 111.4 as , in rb sue' � ♦ � �°�♦►� .—.— R J d L. ..0 CO fm 0-1 ull 0 a m C C Qi m � m d w 4) a y G} at° R4. a ti v R 00 do Lb bs �Oa P$114M01 a olo N .45 470 Ou ° N 450 450 v n 460 ♦ ♦ e 410 40 ♦♦♦♦ ♦ ♦♦�♦♦♦♦♦ ♦f ♦♦♦♦ ♦ ♦ ♦♦ r r� w �f Na i �¢ E a � C7 Lu U c c c Z� 000 o ,�UUU 2 E Z t 2 m ca ti� U U U 49 ;:WithersRavenel. Drr Pr,:p a Yoi r 5uccess 55 Grant Drive, Suite D Pittsboro, North Carolina 27312 t: 919-469.3340 1 f: 919.467,6008 TO: NCDEQ- Division of Water Resources 3800 Barrett Drive, MAIL: 1628 Mail Service Center Attention: Jason Robinson (919) 791-4249 Raleigh, NC 27609 WE ARE SENDING YOU THE FOLLOWING ITEMS ❑ Shop Drawings ❑ Copy of Letter Letter of Transmittal 8/11/20 • : • 150098.23 • 0 Jason Robinson Chatham Park - West Phase 28 NCDEQ Sewer System Extension Permit ❑ Under Separate Cover via ® Prints ❑ Plans ❑ Samples ❑ Change Order ® Diskette ® Other ❑ Specifications Check 713 8/11/20 (1) Cover Letter $480.00 Application Fee Submitted Previous) 8/11/20 (2) 3 8/11/20 (3) Fast Track Sewer System Extension Application (FTA 04-16) *** 3 8/11/20 (4) Flow Tracking/Acceptance Form for Sewer Extension Applications (FTSE 04-16) 3 8/11/20 (5) Chatham Park Flow Rate Reduction Approval 3 8/11/20 (6) 1 USGS Ma 3 8/11/20 (7) Street Level Ma C Dept of Environtnental ua ti fy 3 8/11/20 (8) Certificate of Existence from Secretary of State 3 1 8/11/20 (9) Developer's Operational Agreement 1 1 8/11/20 (10) CD with submittal files (PDF) Vice TNFSE ARE TRANSMITTED as check -A helow: ® For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ Other ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints REMARKS: Please contact Alicia Albini via email at aalbini@withersravenel.com or via phone at 919-238-0354 with questions and/or comments. COPY TO: SIGNED: If enclosures are not as noted, kindly notify us at once. ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Dirccmr Chatham Park Investors, LLC c/o Tim Smith 100 Weston Estates Way Cary, NC 27513 NORTH CAROLINA Environmental Quality January 14, 2019 Subject: Adjusted Daily Sewage Flow Rate Approval Chatham Park Development Chatham County Dear Mr. Smith: NC Dept of' i:nvironnlellt aI Q14ahl, AUG 12 2020 Raleigh Regional Office On July 16, 2018, the Division of Water Resources (Division) received an adjusted daily sewage flow rate (flow reduction) request that would apply to all permitted but not yet tributary residential connections and all future residential connections within the Chatham Park Development service area. In accordance with 15A NCAC 02T .0114(f)(2), the Division has evaluated the request as well as additional information received on October 15, 2018, and based on the data submitted and the Division of Water and Infrastructure (DWI) guidance, the Division hereby approves for use by the Chatham Park development an adjusted daily sewage design flow rate with the following conditions: • The flow reduction is applicable to residential single family dwellings only. • The minimum flow for 1 and 2 bedroom dwellings shall be 120 gallons per day. • Each additional bedroom above two bedrooms shall increase the volume by 60 gallons per day per bedroom. • This flow reduction shall not apply to sewer extension applications and/or permits for any other public or private organizations whose wastewater flows are or might become tributary to Chatham Park collection system. Future sewer extension applications should be made using the flow reduction amount stated above. All other aspects of the permitting process remain unchanged, and all applications must be in compliance with the statues, rules, regulations and minimum design criteria as certified by the owner and engineer. Regardless of the adjusted design daily wastewater flow rate at no time shall the wastewater flows exceed the effluent limits defined in the NPDES Permit for the treatment _facilit r�or exceed the, capacity of the sewers downstream of any new sewer extension or service connections . w _ North Carolina Department oiEnvlronmentai Quality D1v{slol1of Wate3 RrSaUTreES �'J�� 512 Nomh Sallshury Street E 1617 Mail Service Center Raleigh, North Carolina 27699-1617 i = n.� Oi' 919.7079000 The granting of this flow reduction does not prohibit the Division from reopening, revoking, reissuing and/or modifying the flow reduction as allowed by the laws, rules, and regulations contained in 15A NCAC 02T, NCGS 143-215.1, or as needed to address changes In State and/or Federal regulations with respect to wastewater collection systems, protection of surface waters and/or wastewater treatment. If you have any questions, please contact Christyn Fertenbaugh, P.E., at (919) 707-3625, or via email at Christyn.Fertenbaugh@,ncdenr.itov. Sincerely, for Linda Culpepper Director, Division of Water Resources by Deborah Gore, Supervisor Pretreatment, Emergency Response and Collection Systems Branch Cc_ Nisha Thuruthy, McKim & Creed (MThuruthymckimcreed.com) Mike Meyers, Old North State Water Company (Mrggeyers�Eenvlrolinkinc.com) Raleigh Regional Office, Water Quality Regional Operations PERCS (electronic copy) 4 E V 44 -�l J i llJ � ", 08 s LF BC4� O ova ��D a Gw�'� Veey,�0ecy` c cps b ol 0 d CD � N N N N d w a . f coop, , qt sm a+ y ram. _.Ip* "-W— 1 o r sh c U I w K ` s� Q U; ow E� !� VJ O C7 Uj z��m000 �UUU U t L m m w w c°�7000 W U UJ 5 V� LW/ a Orr 'a PH auw- ekCre�` C.+ cps�� r. e �n m F r w N m ;a NORTH CAROLINA ,- Department of the Secretary of State CERTIFICATE OF EXISTENCE (Limited Liability Company) 1, Elaine F. Marshall, Secretary of State of the State of North Carolina, do hereby certify that CHATHAM PARK INVESTORS LLC is a limited liability company duly formed, and existing under the laws of the State of North Carolina, having been formed on 2nd day of December, 2004 I FURTHER certify that, as of the date of this certificate, (i) the said limited liability company is not dissolved under the terms of its articles of organization, (ii) the said limited liability company's articles of organization are not suspended for failure to comply with the Revenue Act of the State of North Carolina, (iii) that said limited liability company is not administratively dissolved for failure to comply with the provisions of the North Carolina Limited Liability Company Act, (iv) that this office has not filed any decree of judicial dissolution, articles of dissolution, articles of merger, or articles of conversion for said limited liability company. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal at the City of Raleigh, this 7th day of August, 2020. IM/ �i -.1 �R,01.0.0 � F 1- - Scan to verify online. Certification# 107991549-I Reference# I6443608- Page- I of I Secretary of State Vcrif} this cerlificale online al hltns'.:www_sosnc,gov..'vcrification State of North Carolina DWR Department of Environmental Quality Division of Water Resources I5A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION DIv[slon of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION 11iis application is for sewer extensions involving gravity sewers_ pump stations and fierce mains, or any combination that has been certified by a professional engineer and the applicant (lint the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Crileria and that plans, specifications and supporting documents have been prepared in accordance with, 14. A NCAC 02T, I5A NCAC 02T .0300, Division Policies and good engineering ractices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a best track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 021 0305 and the applicable ininimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permuted (do not require a permit from the Division) are explained in .15A C 02T.0303. Projects not eligible for review via the fast track process (must be submitted for full teclutical review); NC Dept of Environmental Qual it) Projects that require an environmental assessment in accordance with 15A NCAC t C .0 RX), i Projects that do not meet any part of tine minimum design criteria (MDC) document; AUG 12 2020 Projects that involve a variance from the requirements of I SA NCAC 2T; i Pressure sewer systems utilizing septic lank -effluent pumps (STEPS) or simplex grinder pumps; STEP or simplex grinder pumps connecting to pressurized systems (e.g_ force mains); Vacuum sewer systems Raleigh Regional Office :^ General - When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information_ Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation, A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in die application package, as well as a brief description of Ilse requested permilting action. Be specific as to the system type, number of homes served, flow allocation required, etc. If necessary for clarity, include attachments to the application form, C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of S480.110 dated within 90 days of application submillal. Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. .- If necessary for clarily or due to space restrictions, allaclimenis to the application may be made. ® If the Applicant Type in ltem 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. • If the Applicant Type in Item 1,2 is a partnership or d/b+a, enclose a copy of the certificate filed with the Register of Deeds in file county of business. ® The Project Name in Item 11. I shall be consistent will] the project name on die flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, scaled and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .010C b Per I5A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who ineets the criteria in 15A NCAC 02T ,010G(b). INSTRUCTIONS FOR FORM. ITA 04-16 & 5I JPPORTING DOCUMINTATION Page 1 ol'3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ® Submit file completed and executed FTSE form from the owners of the downstream sewers and treatment facility. Multiple forms maybe required where flee downstream sewer owner and wastewater treatment facility are different. The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. Location of the project (gravity sewer, pump stations & force main) Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level snap (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing pennit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305 h 1 , submit documentation of power reliability for pumping stations. ►- This alternative is only available for average daily !lows less than 15,000 gallons per day Y It shall be demonstrated to the Division that the portable source is owned or contracted by rite applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "tile portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station,,' %- If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timcframes, shall he provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115 a I provide the Certificate of Public Convenience and Necessity from die North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a Ietter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOAIPOA and Developers for lots to he sold): p Hamc.'Pronerty Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement(FORM- HA). [I Per 15A NCAC 02T .01 15(c), submit a copy of the Articles of Incorporation, Declarations and By-laws- * Developers of lots to be sold ® Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement FORM: DEW Fot- more infbi-inallon, visit the Division's COU Actio I syslems lttehSlle NSTRUCTIONS FOR DORM ITA 04-16 & SUPPORTING DOCUMENTATION Page 2 ot'3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE - REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee. Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 4WO707 Fax Mooresville Reaional Office 610 E_ Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, lredell, Lincoln, Mecklenburg, Rowan (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1626 Granville, Halifax, Johnston, Lee, Nash, (919) 7914200 Northampton, Orange, Person, Vance, Wake (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort. Bertie, Camden, Chowan, Craven, Water Quality, Section Washington, North Carolina 27889 Currituck, Dare. Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquolank (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910)350-2004 Fax Winston-Salem Reaional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: F'rA 04-I6 & SUPPORT[NG DOCUMENTATION Page 3 ut'3 wo 00� lull IT Robinson, Jason From: Oldham, Robbie <ROldham@withersravenel.com> Sent: Thursday, September 24, 2020 10:32 AM To: Robinson, Jason; jpoteat@pittsboronc.gov; ckennedy@pittsboronc.gov Cc: Cashion, Ted Subject: [External] RE: RE: RE: Chatham Park Section 5.1 West Sewer Ext Applications - Additional Info Request Attachments: Pittsboro_Sewer 2015_24x36 rto.pdf, Thompson St Subd Overall Utility Plan rto.pdf, West Phase 1 Overall Utility Plan rto.pdf • External entail. Do not-elloWinks or open attachments unless you verify. send ifssuspicious email as a atita11 17 nt�to m &qgYpox Jason, This is quick and basic but hopefully provides the information requested and answers your question. • The first exhibit is an overall Town sewer distribution map that Hydrostructures prepared for the Town back in 2015. 1 have highlighted the subject gravity lines from our project to the Town's WWTP and added approximate location of the gravity sewer that was permitted and installed with the Thompson Street Subdivision plans. I wanted to provide a third party exhibit plus this is the only overall sewer map that I have. The second exhibit is the overall utility plan from the Thompson Street Subdivision construction plans that provides additional detail. The sewer and infrastructure were installed over the last two years with the sewer certified and as -built. • The last exhibit is the overall utility plan for Subdivision West Phase 1 which of course is what we are trying to permit now. Phase 2A and 2B are just extensions of this development as shown with the phasing. Please let me know if you have any questions. Robbie Oldham, PE, LEED AP Vice President, Principal Consultant WithersRavenel 55 Grant Dri%e. Suite D . Pip,hort), NC 27312 Oitice 919 -4h9 3340 I Direct: 919 j33.3180 \lubiic: 919,795.0395 roldhamr withersravenel.com in fRw,1 ► 4 CONFIDENTIALITY AND NONDISCLOSURE From: Robinson, Jason <jason.t.robinson@ncdenr.gov> Sent: Wednesday, September 23, 2020 4:43 PM To: Oldham, Robbie <ROldham@withersravenel.com>; jpoteat@pittsboronc.gov; ckennedy@pittsboronc.gov Cc: Cashion, Ted <ted.cashion@ncdenr.gov> Subject: RE: RE: RE: Chatham Park Section 5.1 West Sewer Ext Applications - Additional Info Request HI Robbie, John & Chris Sorry for this being so drawn -out, but we've got another inquiry based on internal conversations we've had about these projects: For all three of the Chatham Park Section 5.1 projects that we currently have applications for, how do they make it to Pittsboro's plant? From the applications, I see they all list WQ0039848 as the downstream sewer extension, which is the "Chatham Park -Thompson Street Subdivision" project. I plan to look at that application the next time I'm in the office (likely tomorrow afternoon) and see if the application states the receiving downstream permit, but I wanted to go ahead and get the ball rolling on this. Do you know what is downstream of WQ0039848? Does it go to another newly permitted and constructed line? Or flow into an old line in Pittsboro's existing collection system? We're trying to get a better understanding of all the different construction going on out there. We've already issued at least 9 Chatham Park permits, I think some go to Pittsboro's existing system, some may go into new interceptor lines (or be new interceptor lines), some go to Chatham Park's WWTP, and we're trying to better understand this for each Chatham Park application. Are you able to provide plans that shows how these 5.1 projects flow to the Pittsboro treatment plant? If not, even a hand -drawn sketch would be helpful. Again, apologies for all these hassles. -Jason ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E mail correspondence to and from this odY,ess may be subject to the North Corolino Public Records Lmv and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Robinson, Jason Sent: Monday, September 21, 2020 4:16 PM To: Oldham, Robbie <ROldham@withersravenel.com> Subject: RE: [External] RE: RE: Chatham Park Section 5. 1 West Sewer Ext Applications - Additional Info Request Got it, thanks Robbie. Hopefully we'll get this to you soon, although I'm waiting for the "ok" from our Central Office. Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates" E-mail correspondence to and from this address may be subject to the North Carolina Public Records Low and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Oldham, Robbie mailto:ROldham withersravenel.com Sent: Monday, September 21, 202011:24 AM To: Robinson, Jason <iason.t.robinson@ncdenr.eov> Subject: [External] RE: RE: Chatham Park Section 5.1 West Sewer Ext Applications - Additional Info Request ICAUJIOUREK4t email. Darn c Iln Qif o n aMchmerits unless you verify: Send ail suspicious email as an.aftacilmentto e is 8m Hey Jason, Hope you had a good weekend and able to enjoy this awesome weather. I know we just replied to your comments last week but wanted to make sure you did not need anything else or call to discuss anything. I will be on vacation next week and just going through my list. Thanks. Robbie From: Oldham, Robbie Sent: Tuesday, September 15, 2020 3:45 PM To: Robinson, Jason <iason.t.robinson@ncdenr.eov>; robin@prestondev.com: Antrilli, Nick <nantrilli@withersravenel.com> Cc: ipoteat@pittsboronc.gov; Albini, Alicia <aalbini0withersravenel.com>; ckennedv@pittsboronc.gov; Cashion, Ted <ted.cash ion 0ncdenr.eov>; Fertenbaugh, Christyn L <christen.fertenbaueh@ncdenr.gov>; Vinson, Scott <scott.vinson@ncdenr.eov> Subject: RE: RE: Chatham Park Section 5.1 West Sewer Ext Applications - Additional Info Request Mr. Robinson, Thanks for your time and consideration regarding our conversation last Wednesday. Please find below our responses to your questions which I believe are consistent to our conversation. I have also attached the updated FTSE forms for all three phases that have been initialed and dated by Mr. Poteat today. Please let us know if you need any additional information. Robbie Oldham, PE, LEED AP Vice President, Principal Consultant WithersRmenel 5; Grant Drke. Sunc 1] Piu;hnro, \C 2 +I' Office 919469.3340 DircLt ill{) j;; i1W Mobile: 919.79; 0395 5 rnldham cI withcrsracencl.catn CONFIDENTIALITY XND NO\DISCLOSURE 1. These applications state that the downstream sewer and the downstream facility that will receive and treat the wastewater is Pittsboro's. we know that Pittsboro has plans to eventually decommission their plant and send their wastewater to Sanford. Therefore, will the flow from these Chatham Park projects eventually go to Sanford's treatment plant? (item V.1) That is correct, the flow from these three phases will be tributary to the Town's WWTP via existing gravity sewer that flows south and west of the project. This flow will eventually go to Sanford's WWTP once the Town's WWTP flow is redirected. 2. it was our understanding that we will initially issue this permit to Chatham Park Investor's LLC, but after construction and certification, it will be transferred to the Town of Pittsboro. However, a Developer's Agreement was included in the resubmittals that essentially states that the project will be transferred to the "Chatham Park Residential Association, Inc. ". Please confirm who the project will be transferred to upon completion and certification of the project. (Item Vi.2 and DOA included in the opp) Per our conversation last Wednesday, it is Chatham Park's intent that the permit and collection system will be transferred to the Town of Pittsboro. It is my understanding that the Town is in agreement as well but will let Mr. Kennedy and Mr. Poteat advise if necessary. However, in order to provide a complete application we included a signed Developer's Operational Agreement which is required with this type of application. The Developer's Operational Agreement lists Chatham Park Residential Association, Inc. as the corporation that would handle the operations of the Disposal System but again, the intent is that the permit and collection system will be transferred to the Town of Pittsboro with no need for the Agreement to be executed. It is our thought that the Developer's Operational Agreement remains on file and only used if necessary. 3. Please confirm that the homes will all be three bedroom (180 GPD) (item V1.7). Per our noted conversation, we confirmed that the residential units will be an average of three bedrooms. 4. Please confirm that there are no aerial crossing, no contact of surface waters, and no lines on streambanks that are subject to erosion (Item iV.6). There are no aerial crossings, no contact of surface waters, and no lines on streambanks that are subject to erosion. The flow-tracking/accepton ce form (FTSE) serves as an approval that the receiving treatment facility is willing to accept the wastewater. Item 1.o of the FTSE states that the flow is going to Pittsboro, and Mr. Poteat of Pittsboro signed the form. However, Item if states that the flow for this request is T", even though Item V1.7 of the applications shows flow from new houses. The flow -tracking sheets for all the "West" projects need to be updated to reflect the flow request for each project, and signed by Pittsboro staff Please find attached the updated FTSE forms for all three phases that have been initialed and dated by Mr. Poteat. 6. Item II of the FTSE does not show any downstream pump stations. Please confirm there are no pump stations between these Chatham Park projects and the Pittsboro WWTP. There are no pump stations between these projects and the Town WWTP. As noted above, the existing gravity line serving this area flows south and west to the WWTP. From: Robinson, Jason <'ason.t.robinson ncdenr. ov> Sent: Tuesday, September 8, 2020 4:11 PM To: robin CeDprestondev.com; Antrilli, Nick <nantrilliPwithersravenel.com> Cc: ' oteat ittsboronc. ov• Oldham, Robbie <ROldham@withersravenel.com>; Albini, Alicia <aalbini@withersravenel.com>; ckennedv@pittsboronc.eov; Cashion, Ted <ted.cashion@ncdenr.gov>; Fertenbaugh, Christyn L<christen.fertenbaueh@ncdenr.g-ov>; Vinson, Scott <scott.vinson@ncdenr.gov> Subject: RE:RE: Chatham Park Section 5.1 West Sewer Ext Applications - Additional Info Request Mr. Timothy Smith & Mr. Antrilli, We have begun review of the resubmitted applications (3 of them) and have some questions (an email address for Mr. Smith was not provided on the applications): I. These applications state that the downstream sewer and the downstream facility that will receive and treat the wastewater is Pittsboro's. We know that Pittsboro has plans to eventually decommission their plant and send their wastewater to Sanford. Therefore, will the flow from these Chatham Park projects eventually go to Sanford's treatment plant? (Item V.1) 2. It was our understanding that we will initially issue this permit to Chatham Park Investor's LLC, but after construction and certification, it will be transferred to the Town of Pittsboro. However, a Developer's Agreement was included in the resubmittals that essentially states that the project will be transferred to the "Chatham Park Residential Association, Inc.". Please confirm who the project will be transferred to upon completion and certification of the project. (Item VI.2 and DOA included in the app) 3. Please confirm that the homes will all be three bedroom (180 GPD) (Item VI.7). 4. Please confirm that there are no aerial crossing, no contact of surface waters, and no lines on streambanks that are subject to erosion (Item IV.6). 5. The flow-tracking/acceptance form (FTSE) serves as an approval that the receiving treatment facility is willing to accept the wastewater. Item La of the FTSE states that the flow is going to Pittsboro, and Mr. Poteat of Pittsboro signed the form. However, Item 1f states that the flow for this request is T", even though Item V1.7 of the applications shows flow from new houses. The flow -tracking sheets for all the "West" projects need to be updated to reflect the flow request for each project, and signed by Pittsboro staff 6. Item II of the FTSE does not show any downstream pump stations. Please confirm there are no pump stations between these Chatham Park projects and the Pittsboro WWTP. Thanks, ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 "Subscribe to Collection System & Sewer Permitting Updates— E-mail correspondence to and from this address may be subject to th-- Ph-�r:h Carolina Public Records Lmv and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Robinson, Jason Sent: Tuesday, August 11, 2020 1:27 PM To: Albini, Alicia <aalbini@withersravenel.com>; Cashion, Ted <ted.cashion@ncdenr.eov> Cc: ipoteat@oittsboronc.Qov; Oldham, Robbie <ROldham withersraveneLcom> Subject: RE: [External] RE: Chatham Park Section 5.1 Sewer Ext Applications - Additional Info Request Thanks Alicia. ------------ Jason T. Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919- 791-4200 "Subscribe to Collection System & Sewer Permitting Updates— E-rr;ail corr€-sYandence to and from this address may be subject to the North Carolina Public Records Lmv and may be disclosed to +gird partiu=. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Albini, Alicia [mailto:aalbini@withersraveneLcom,] Sent: Tuesday, August 11, 202012:15 PM To: Robinson, Jason <'ason.t.robinson ncdenr. oy>; Cashion, Ted <ted.cash inn•@ncdenr.go > Cc: j o@pittsboronc.aov; Oldham, Robbie <ROIda ham@withersrave nelcom> Subject: FW: [External] RE: Chatham Park Section 5.1 Sewer Ext Applications - Additional Info Request Ex 'r 'af a ail: Do not c4` Afiks-or open attachh n' unless you iferify� Se'd all suspicious-emad-as an attachment t-o. ' . oft S n O Jason, Based on the below email from July 14`h and discussions with the Town of Pittsboro, please see Sewer Revised Permit Extension Application Packages and supporting documentation for Subdivision West Ph 1, 2A, and 2B in the Sharefile Link below. The Applications have been revised to show Chatham Park Investors LLC as Applicant. Formal submittals will be sent via Fedex as well for your records. Please do not hesitate to contact me with any questions. https:,lLwithersray.sharefile.com/d-s400a4e3eSl544119 Thank You, Alicia Albini WithersRavenel 1 55 Grant Driw. Suite D Pittsboro. NC 27312 Office: 919.469.:3-40 Direct: 919? 38.0154 aalbin irawithcrsravenel.com in f -'►'� CONFIDENTIALITY AND NONDISCLOSURE From: Robinson, Jason <iason.t.robinson@ncdenr.gov> Sent: Tuesday, July 14, 2020 5:57 PM To: nantrilli@withersravenel.com, ahamilton@withersravenel.com; Bryan Blake <BBlake@mckimcreed.com>; John Poteat <ipoteat@Pittsboronc.Rov>; rmorf;an@pittsboronc.gov; )pass@pittsboronc.g_ov Cc: Cashion, Ted <ted.cashion@ncdenr.eov>; Vinson, Scott <scott.vinson@ncdenr.Rov>; Manuel, Vanessa <vanessa.manuel@ncdenr.eov>; Deck, Erin M <erin.deck@ncdenr.eov>; Poupart, Jeff <ieff.poupart@ncdenr.eov>; Montebello, Michael J<Michael.Montebello@ncdenr.eov>; Fertenbaugh, Christyn L <christyn.fertenbaugh@ncdenr. og_v> Subject: Chatham Park Section 5.1 Sewer Ext Applications - Additional Info Request Importance: High Pittsboro Staff, We have received multiple applications from the Town of Pittsboro that propose to use a flow reduction that was approved by DWR for Chatham Park Investors, LLC. Chatham Park Investors, LLC was granted a flow reduction in a letter dated January 14, 2019 (attached). As stated in the letter, this flow reduction cannot be used by the Town of Pittsboro, and therefore the application cannot be processed as submitted (see excerpt from letter below). + This floe., reduction shall -not apply to sews-r extension applications and/or permits for any other pub is or private organizations whose was.ewiter flows are or rntght become tributary to Chatham Park collection system. The applications that the DWR Raleigh Regional Office has received from Pittsboro that propose to use the approved flow reduction are the following: • WQ0041721— Chatham Park — Section 5.1 Subdivision West — Phase 1 • WQ0041811— Chatham Park — Section 5.1 Subdivision West — Phase 2A • WQ0041812 - Chatham Park — Section 5.1 Subdivision West — Phase 213 • WQ0041807— Chatham Park — Section 5.1 Subdivision North - Phases 4A & 413 (application states zero flow, requests "authorization to construct", says permit mod will be submitted with flow after construction is complete and the project is certified) To resolve the issues with these applications, one of the following will need to be done: 1. The applications can be revised using the design flows from 15A NCAC 02T .0114(b). 2. The Town of Pittsboro can apply for a Flow Reduction for single-family residential development that occurs in the Chatham Park Development Area (this would need to be defined). This will require the submittal of updated, recent data in accordance with 15A NCAC 02T.0114(f) as the data utilized for the previous reduction issued to Chatham Park Investors is now approximately two years out of date. 3. The applications can be revised to show Chatham Park Investors, LLC as the applicant/owner. Once the project is constructed and certified, Pittsboro can request that the permit is transferred into their name. Upon approval of the transfer by DWR, Pittsboro will become the owner of the permit/project. In addition, it's my understanding that Chatham Park Investors has recently submitted a request for a flow reduction for multi -family residences as well. As submitted, that request will likely have the same issues. If it is granted as submitted, only sewer extension applications for multi -family residences submitted by Chatham Park Investors, LLC would be able to utilize any approved flow reduction. A response from Pittsboro that resolves this issue is considered required in order to proceed with the review of the applications and issuance of permits. The response should also address the multi -family flow reduction request recently submitted by Chatham Park Investors, LLC. If a complete response is not received within 30 days from the date of this email (7/14), all of the listed applications and supporting documents will be returned to you in accordance with 15A NCAC 02T.0107(e)(2). If you have any questions, please let us know. ------------ Jason T., Robinson, P.E. Raleigh Regional Office Water Quality Regional Operations NC Division of Water Resources, DEQ 919-791-4200 —Subscribe to Collection System & Sewer Permitting U dates** Email correspondence to and from this address may be subject to the North Carolina Public Records La,v and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time.