HomeMy WebLinkAboutNCG500110_Compliance Evaluation Inspection_20200923EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NCG500110 20/09/23 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Tuxedo Hydroelectric Project
Pot Shoals Rd
Flat Rock NC 28731
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
11:30AM 20/09/23 16/01/19
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
12:15PM 20/09/23 20/07/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Chuck Ahlrichs,14550 N Frank Lloyd Wright Blvd Ste 210 Scottsdale AZ
85260//480-551-1771/4805511991
Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Operations & Maintenance Self-Monitoring Program Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Daniel J Boss DWR/ARO WQ/828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 467027D6-46AE-4EE0-A798-370AEDF9D261
10/1/2020
10/1/2020
NPDES yr/mo/day
20/09/23
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 9/23/2020, I (Daniel Boss) conducted a compliance evaluation inspection of the Tuxedo
Hydroelectric Plant for it's non-contact cooling water discharge permit. I met with the plant manager,
Jeff McCraw.
The tailrace, upstream, and downstream locations all looked fine. No adverse water quality effects
were observed.
Upstream and downstream sampling is taking place, but samples are not being taken at the tailrace.
Effluent samples need to be taken before the effluent combines with the receiving stream.
NCG500110 17 (Cont.)
Page#2
DocuSign Envelope ID: 467027D6-46AE-4EE0-A798-370AEDF9D261
Permit:NCG500110
Inspection Date:09/23/2020
Owner - Facility:
Inspection Type:
Tuxedo Hydroelectric Project
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Effluent sampling is not being performed.Comment:
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, and
sampling location)?
Comment:
Page#3
DocuSign Envelope ID: 467027D6-46AE-4EE0-A798-370AEDF9D261