Loading...
HomeMy WebLinkAboutNCC204228_ESC Approval Submitted_20201001ROY COOPER Governor MICHAEL S. REGAN Secretary# rx x S. DANIEL SMITH quit Director NORTH CAROLINA EnvhvnmwtW Qualfty August 28, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Wentworth Holdings, LLC ATTN: Harry Rakestraw, Managing Member PO Box 283 Wentworth, NC 27375 RE: Project Name: Wentworth Holdings, LLC. Rehab Acres Approved: 4.28 Project ID: ROCKI-2021-007 County: Rockingham City: Wentworth Address: Justice Center Dr. River Basin: Cape Fear Stream Classification: WS-V NSW Submitted By: Bruce Nooe, PE, PLS Date Received by LQS: August 03, 2020 Plan Type: New Dear Mr. Rakestraw, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. North Carolina Department of Environmental. Qtallty I Division of Energy. httneral and Land Resources �DKQ��'Winston-Salem Regional Office 1 450 Hanes W Road, Suite 3001 Winston-Salem. North Carolina 27103 "1° 336.776.9800 Letter of Approval Wentworth Holdings, LLC August 28, 2020 Page 2 of 4 This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govfNCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas(@ncdenr goy or Paul Clark at Pau LdarkPncdenr.goy. After you submit a complete and correct N0I Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance - oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution- Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Letter of Approval Wentworth Holdings, LLC August 28, 2020 Page 3 of 4 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a precanstructian conference. Your L-ooperatian is appreciated. Sincerely, Jack Dalton Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet Modifications Required for Approval cc: Stoltzfus Engineering, Inc. ATTN: Bruce Nooe, PE, PLS 747 Park Lawn Court Kernersville, NC 27284 WSRO File Letter of Approval Wentworth Holdings, LLC August 28, 2020 Page 4 of 4 Comments 1. Per phone call with Bruce Nooe, PE, approval is pending a revised plan showing a culvert installed under the construction entrance. MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Wentworth Holdings, LLC. Rehab Project ID: ROCKI-2021-007 County: Rockingham 1. Additional measures may be required - The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115) 2. Please provide sequentially phased construction and provide very detailed sequencing such that the extent and duration of the land -disturbing activity is minimized. Indicate that basins will be installed before diversions. [15A NCAC 04B .0106(a)(2)] 3. Approval by a representative of the Land Quality Section will be required prior to removal of erosion control measures and/or conversion of the sediment basin(s) to post -construction stormwater SCMs. [15A NCAC 4B .0106(a)(5)] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities