Loading...
HomeMy WebLinkAbout20060201 Ver 5_401 Application_20200924DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 1, 2020 Ver 3.2 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20060201 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Amy Annino:eads\amannino Information for Initial Review 1a. Name of project: Camp Lake James Shoreline Stabilization 1a. Who is the Primary Contact?* Ryan Chamberlain 1b. Primary Contact Email:* chamberlain4l@msn.com Date Submitted 9/24/2020 Nearest Body of Water Lake James Basin Catawba Water Classification WS-V,B Site Coordinates Latitude: 35.75628 A. Processing Information County (or Counties) where the project is located: Burke Is this a NCDMS Project r Yes r No Longitude: -81.91811 Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 5 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (309)310-8585 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: r 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit W Individual Permit 13 - Bank Stabilization le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: F- 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r- Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Camp Lake James Master Recreational Association, Inc. 2b. Deed book and page no.: 2c. Responsible party: Ryan Chamberlain 2d.Address Street Address 3100 Campbells Trace Address Line 2 city Nebo Postal / Zip 0ode 28761 2e. Telephone Number: (309)310-8585 2g. Email Address:* chamberlain4l@msn.com State / Rwince / Ifgion NC Country USA 2f. Fax Number: r- Yes r No r Yes r No C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (d appropriate) 1780 1c. Nearest municipality/town: Nebo, NC 2. Project Identification 2a. Property Identification Number: 1734337774 2c. Project Address Street Address 3100 Campbells Trace Address tine 2 city Nebo Postal / Zip Code 28761 3. Surface Waters 3a. Name of the nearest body of water to proposed project:" Lake James 3b. Water Resources Classification of nearest receiving water:* WS-V,B 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12-digit HUC in which the project is located. 030501010303 4. Project Description and History 2b. Property size: 29 State / Province / Ibgion NC Country USA 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Peninsula and dock area surrounding Camp Lake James. The facility is a private residential club with 300+ members 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4c. If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000). DWR 2006-0201 Project History Upload 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) CLJ Site.pdf 2.43MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Shoreline Soil DWR CLJ.pdf 404.79KB 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:* The shoreline continues to erode year after year due to heavy boat traffic. Walkways and docks are becoming unsafe and need to be supported with shoreline stabilization 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Shoreline stabilization will be completed from water by barge. approximately 10' of rip rap will be place to stabilize 900' of bank. 4j. Please upload project drawings for the proposed project. Camp Shoreline overview.pdf 1.5MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No C Unknown Comments: No wetlands or streams on the proposed area 5b. If the Corps made a jurisdictional determination, what type of determination was made? r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: Sd1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams -tributaries r Open Waters r Pond Construction E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Project to be completed by barge so minimal effect on surrounding area and buffer r Buffers 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Project to be completed by barge so minimal effect on surrounding area and buffer 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: This project does not meet the requirements for compensatory mitigation as described in the Final EA and regulatory analysis section 2.2 F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: There are no riparian buffers in the project area. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: This project is low density in nature given the calculation outlined in 15A NCAC 02H .1003(2) G. Supplementary Information U u u 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 21-1.1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. There will be no additional development as a result of this project. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor NIA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA Essential fish habitat website query mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* National Register of Historic Places mapper 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* FEMA Floodplain maps Miscellaneous Comments Miscellaneous attachments not previously requested. Signature P By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Ryan Chamberlain Signature ��jctrz �.fnsyrL�t�izist Date 9/24/2020 u UNITE STATES M USGS U.S. D.S. GEOLONGICOAI. SURVEY�DR DEPARTMENT OF AGRICULTURE "1°"1 �1C1isipNpiy'� FOREST SERVICE Produced by the U.S. Geological Survey Re d by We U.S.Forest Service kv n.�a.rerenea nre. zz� 1 �a �o aooemo�n�x:. +11M KI sown H awnN �o�re. n�k. SCAfE 1:24 000 ASHFORD QUADRANGLE NORTH CAROUNA 7.5-MINUTE SERIES (TOPOGRAPHIC) USGS Library Heston, vA. T0013 Archive HRwnrs Arvo R— rrIG ...... Quaw.watwrnmry _.. u �mw a. ew .. ASHFORD, NC 1994 22 zm VBOCT 3 1818 D0418106 9 rvn zu sw Soil Map —Burke County, North Carolina, and McDowell County, North Carolina (CLJ) In o 416840 416880 416920 416960 417000 417040 35o 45' 27" N g d R rm N r 35o 45' 15" N 416940 416980 416920 416960 417000 Map Scale: 1:1,710 if printed on A portrait (8.5" x 11") sheet. o Meters N 0 25 50 100 150 Feet 0 50 100 200 300 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 417040 o 417080 g 35o 45' 27" N d 8 n N r 35o 45' 15" N 417080 in 9/24/2020 Pagel of 4 Soil Map —Burke County, North Carolina, and McDowell County, North Carolina (CLJ) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot 0 Landfill A. Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip o Sodic Spot Spoil Area Stony Spot fb Very Stony Spot V Wet Spot 4� Other M� Special Line Features Water Features Streams and Canals Transportation — Rails . 0 Interstate Highways US Routes Major Roads Local Roads Background D6 Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Burke County, North Carolina Survey Area Data: Version 28, Jun 2, 2020 Soil Survey Area: McDowell County, North Carolina Survey Area Data: Version 21, Jun 4, 2020 Your area of interest (AOI) includes more than one soil survey area. These survey areas may have been mapped at different scales, with a different land use in mind, at different times, or at different levels of detail. This may result in map unit symbols, soil properties, and interpretations that do not completely agree across soil survey area boundaries. Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Dec 2, 2010—Nov 9, 2017 USDA Natural Resources Web Soil Survey 9/24/2020 Conservation Service National Cooperative Soil Survey Page 2 of 4 Soil Map —Burke County, North Carolina, and McDowell County, North Carolina (CLJ) MAP LEGEND MAP INFORMATION The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shiftina of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 9/24/2020 Conservation Service National Cooperative Soil Survey Page 3 of 4 Soil Map —Burke County, North Carolina, and McDowell County, North Carolina C LJ Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI RhD Rhodhiss sandy loam, 15 to 25 percent slopes 1.7 23.9% W Water 1.8 24.9% Subtotals for Soil Survey Area 3.5 48.8% Totals for Area of Interest 7.2 100.0% Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI HeD Hayesville-Evard complex, 15 to 25 percent slopes 1.7 24.2% W Water 1.9 27.0% Subtotals for Soil Survey Area 3.7 51.2% Totals for Area of Interest 7.2 100.0% USDA Natural Resources Web Soil Survey 9/24/2020 Conservation Service National Cooperative Soil Survey Page 4 of 4 ''6 b ,3 rw 1n 4hx �` a 'k ysa. LJ5 s4"