Loading...
HomeMy WebLinkAboutNC0065412_Compliance Evaluation Inspection_20200929ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director James Radford P.O. Box 2533 Christiansburg, VA 24068 NORTH CAROLINA Environmental Quality September 29, 2020 SUBJECT: Compliance Evaluation Inspection Pleasant Ridge MHP WWTP NPDES Permit No. NCO065412 Rockingham County Dear Mr. Radford, On September 16, 2020, Gary Hudson, of this office, met with Paul Smith, Operator in Responsible Charge (ORC) to perform a Compliance Evaluation Inspection at the Pleasant Ridge MHP Wastewater Treatment plant. This type of inspection consists of two basic parts: an in -office file review and an on -site inspection of the treatment facility. The attached EPA inspection form details the areas that were evaluated during this inspection. The inspection of the facility was satisfactory. If you have any questions regarding the inspection or this report, please contact Gary Hudson or me at (336) 776-9800 or by email at gary.hudson(a)-ncdenr.gov or Ion. snider(a)_ncdenr.gov. Sincerely, Docu SiTgnedl�by: 145B49E225C94BA.. Lon Snider Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: EPA Water Compliance Inspection Report cc: Laserfiche No�rHC�.Apl oewrtmam m �o-o�me�i o�ai� North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0065412 111 121 20/09/16 I17 18 LC] I 19 I s I 20L] 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I n, I 71 I 74 79 I I I I I I I80 701 I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10:OOAM 20/09/16 16/07/01 Pleasant Ridge 109 Southfork Dr Exit Time/Date Permit Expiration Date Reidsville NC 27320 10:30AM 20/09/16 21/04/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Paul Matthew Smith/ORC/336-932-9347/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Paul Smith,109 Southfork Dr Reidsville NC 27320//336-932-9347/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar 0 Records/Reports Self -Monitoring Progran 0 Facility Site Review Effluent/Receiving Wate Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Gary Hudson DWR/Division of Water Qua Iity/336-776-9694/ Signature of Ma &rg-, j javiewer Agency/Office/Phone and Fax Numbers Date - -T 9/29/2020 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO065412 I11 12I 20/09/16 117 18 i c i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) * The WWTP appeared to be well maintained and operated. * The permit became effective July 1, 2016 and will expire April 30, 2021. * The effluent was clear on the day of the inspection. Page# Permit: NCO065412 Inspection Date: 09/16/2020 Operations & Maintenance Is the plant generally clean with acceptable housekeeping? Owner -Facility: Pleasant Ridge Inspection Type: Compliance Evaluation Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The WWTP appeared to be well maintained and operated. Permit (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: The permit became effective July 1, 2016 and will expire April 30, 2021. Record Keeping Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain -of -custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification Is a copy of the current NPDES permit available on site? Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ■ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 3 Permit: NCO065412 Inspection Date: 09/16/2020 Owner -Facility: Pleasant Ridge Inspection Type: Compliance Evaluation Record Keeping Facility has copy of previous year's Annual Report on file for review? Comment: . Bar Screens Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Aeration Basins Mode of operation Type of aeration system Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin's surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/I) Comment: . Secondary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Yes No NA NE ❑ ❑ ■ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE Ext. Air Diffused • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ IY-Tvki[•7►/_90I:4 • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 4 Permit: NC0065412 Owner -Facility: Pleasant Ridge Inspection Date: 09/16/2020 Inspection Type: Compliance Evaluation Secondary Clarifier Yes No NA NE Is the drive unit operational? 0 ❑ ❑ ❑ Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) ❑ ❑ ❑ Comment: . Disinfection -Tablet Yes No NA NE Are tablet chlorinators operational? 0 ❑ ❑ ❑ Are the tablets the proper size and type? 0 ❑ ❑ ❑ Number of tubes in use? Is the level of chlorine residual acceptable? ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑ Comment: . De -chlorination Yes No NA NE Type of system ? Tablet Is the feed ratio proportional to chlorine amount (1 to 1)? 0 ❑ ❑ ❑ Is storage appropriate for cylinders? ❑ ❑ 0 ❑ # Is de -chlorination substance stored away from chlorine containers? ❑ ❑ 0 ❑ Comment: . Are the tablets the proper size and type? 0 ❑ ❑ ❑ Are tablet de -chlorinators operational? 0 ❑ ❑ ❑ Number of tubes in use? 2 Comment: . Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ ❑ Are the receiving water free of foam other than trace amounts and other debris? ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ❑ Comment: The effluent was clear on the day of the inspection. Page# 5