Loading...
HomeMy WebLinkAbout820283_NOV-2020-PC-0429_20200929ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 29, 2020 CERTIFIED MAIL RETURN RECEIPT REQUESTED 7019 0700 0000 3643 1342 Robert Allen Thornton Farm Ms. Cornelia Ford 259 Ethan Ln Clinton NC 28328-8086 Subject: NOTICE OF VIOLATION/NOTICE OF INTENT Administrative Code 15A NCAC 2T .1304 NOV-2020-PC-0429 Incident number 202002628 Robert Allen Thornton Farm Facility Number 82-283 Permit AWS820283 Sampson County Dear Ms. Ford: On September 14, 2020, staff of the NC Department of Environmental Quality (DEQ) Division of Water Resources (DWR), Water Quality Regional Operations Section (WQROS) inspected the Robert Allen Thornton Farm and the permitted waste disposal system. As a result of this inspection, you are hereby notified that, having been permitted to have a non - discharge permit for the subject animal waste disposal system pursuant to 15A NCAC 2T .1304, you have been found to be in violation of your permit as follows: Violation 1: Failure to maintain the maximum waste level in lagoons/storage ponds that shall not exceed that specified in the facility's CAWMP. At a minimum, maximum waste level for lagoons/storage ponds must not exceed the level that provides adequate storage to contain the 25-year, 24-hour storm event plus an additional one (1) foot of structural freeboard except that there shall be no violation of this condition if - Page 2 D E Qbi�� North Carolina Department of Environmental Quality I Division of Water Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 I Fayetteville, North Carolina 28301 vOry rN Cx:40:.itiA � u.p.—l. E..w..�..�.�a.:r� /� 910.433.3300 Ms. Cornelia Ford September 29, 2020 a. there is a storm event more severe than a 25-year, 24-hour event; b. the Permittee is in compliance with its CAWMP and c. there is at least one (1) foot of structural freeboard. — [15A NCAC 02T .1304(b)]. (Permit No. AWGI00000 Section V2) On September 14, 2020, DWR received an email containing aerial pictures of your farm, and they documented ponded waste around the flexible hose at your irrigation pump. DWR documented that the ponded area was still there but none had left the field. DWR staff did document your lagoon level was 18.5 inches, and the minimum designed lagoon level is 19 inches. Based on the time stamp of the aerial photo you were pumping around 11:00 am, and when DWR staff arrived at 5:50pm, your irrigation pump was still running. Based on the debris on top of the horizontal pipe, DWR concluded your level prior to pumping was 17 inches or less. Required Corrective Action for Violation 1: Follow 30-day plan of actions provided to the DWR. In the future maintain your waste level in accordance with your facility's CAWMP. Take all necessary additional legal steps to insure lagoon levels remain in compliance with Section (V2) of your permit. Violation 2: The Permittee shall report by telephone to the appropriate Division Regional Office as soon as possible, but in no case more than twenty-four (24) hours following first knowledge of the occurrence of any of the following events: e. Failure to maintain storage capacity in a lagoon/storage pond greater than or equal to that required in Condition V. 2. of this General Permit. (Permit AWG No.100000 Section 17 e). Your permit specifically requires notification by telephone within 24 hours and a written report within 5 calendar days following first knowledge of the occurrence of a reportable permit condition. DWR has no record of receiving the 24-hour notification and the 5-day written report. On September 14, 2020 as noted above in violation 1, DWR documented that your lagoon was non -compliant. Based on the debris on top of the horizontal pipe on your lagoon marker the lagoon level was less than 17inches for more than 24 hours prior to DWR site visit. Page 3 Ms. Cornelia Ford September 29, 2020 Required Corrective action for Violation 2: In the event of a high freeboard situation, call the regional office within twenty-four (24) hours of the first knowledge of the high freeboard. Prepare and submit within 48 hours a 30 day a Plan of Action (POA) for lowering the lagoon/storage pond to an acceptable level as described in your CAWMP and General Permit. Violation 3; Failure to maintain a protective vegetative cover on all earthen lagoon/storage pond embankments (outside toe of embankment to maximum operating level/compliance level on embankment interior). Lagoon /storage pond areas shall be accessible, and vegetation shall be kept mowed. [15A NCAC 02T .1304(b)]. (Permit AWG 100000 Section II Condition 12). On September 14, 2020, DWR staff documented your lagoon bank had not been mowed and no vegetative cover has been established on the bare areas of your lagoon. The vegetation on the lagoon bank prevent proper inspection of the embankment. Both of these issue were noted in your May 15, 2019 routine compliance inspection. Required Corrective action for Violation 3: Mow your lagoon banks and repair any erosion and seed all bare areas of the lagoon bank within 90 days. The Division of Water Resources requests that, in addition to the specified corrective action above, please submit the following items on or before (October 31, 2020): 1. An explanation from the OIC for this farm regarding how these violations occurred. 2. A list from the OIC concerning the steps that will be taken to prevent these violations from occurring in the future. 3. A copy of your pumping records for the 2020 Bermuda crop and freeboard levels and rainfall for 2020 You are required to take any necessary action to correct the above violations on or before December 31, 2020 and to provide a written response to this Notice by October 31, 2020. Please include in your response all corrective actions already taken and a schedule for completion of any corrective actions not addressed. Page 4 Ms. Cornelia Ford September 23, 2020 As a result of the violations in this Notice, this office is considering a recommendation for a civil penalty assessment to the Director of the Division. If you wish to present an explanation for the violations cited, or if you believe there are other factors, which should be considered, please send such information to me in writing within ten (10) days following receipt of this letter. Your response will be reviewed, and, if an enforcement action is still deemed appropriate, it will be forwarded to the Director and included for consideration. Failure to comply with conditions in a permit may result in a recommendation of enforcement action, to the Director of the Division of Water Quality who may issue a civil penalty assessment of not more that twenty-five thousand ($25,000) dollars against any "person" who violates or fails to act in accordance with the terms, conditions, or requirements of a permit under authority of G.S. 143-215.6A. If you have any questions concerning this Notice, please contact Steve Guyton at (910)-303-0151 or me at (910) 433-3336. Sincerely, DocuSignedd by, _ 5189C2D3DD5C42B... J. Trent Allen Regional Supervisor Water Quality Regional Operations Section Division of Water Resources cc: DWR - WQROS - CAFO Unit — Central Office FRO Compliance Animal Files-Laserfiche Prestage Farms