Loading...
HomeMy WebLinkAbout20200936 Ver 1_Riparian Buffer Authorization Request_20200926Buffer Authorization Application Form 15ANCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Fo Update 10/23/2018 Original Submittal 9/26/2020 A. Owner/Applicant Information General Information Primary Contact Email:* roger@hendrickconstruction.com Rease list the contact person's en -ail for questions or payrrent on this project if needed. Who is submitting the application?* W Owner r Applicant other than Owner r Agent Is there an agent working on this application r Yes but not submitting it? r No 1. Property Owner Information: la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* 704-968-2061 Roger Hendrick N/A (for Corporations) Street Address 2199 Yellow Fork Trail East Address Line 2 aty State / Province / Pbegion Nebo NC Fbstal / Zip Code Country 28761 US B. Project Information and Prior Project History 1. Project Information le. Email Address:* roger@hendrickconstruction.co m 1a. Name of Project:* Slide Repair (Subdivision, facility, or establishrrent narre) 1b. Is this a publicly -funded transportation project?* C' (-- No 1d. Subdivision Name: 1780 le. Nearest Nebo Municipality: 1f. Property Size: 5.00 acres 1g. County (or Counties) where the project is located:* Burke 1h. Property ID# Date of Purchase 1743165110 7/30/2010 Tax RN or Parcel id 1 i. Deed Information Type of Book Book#11 Page# Deed Map 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent FDF only 1k. How would you like to provide the Latitude and Longitude information?* r Address Lookup r Manually Address Lookup Latitude * 35.7391049 Street Address 2199 Yellow Fork Trail East Address Line 2 City State / Frovince / Region Nebo NC Postal / Zip Code Country 28761 Us Longitude *-81.8948795 11. Is the project located in any of North Carolina's twenty coastal counties? r Yes r No 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Lake James 2b. Water Quality Classification of nearest receiving water:* Lake James 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 0 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing shoreline undisturbed Lake James 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. (lick the upload button or drag and drop files here to attach docurrent FDF only 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docurrent FDF only 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* Slide. Repaired bank to original condition with soils. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent FDF only 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* r Yes r No 6. Project History ................................................................................... 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans ............................................................................................................... 7a. Is this project a phased project?* C Yes a No C. Proposed Impacts Inventory Buffer Impacts Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) r Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) C Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 02B.0607) Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. �1Site# - Reason I Stream Name Buffer Impact* Impact Type *IF Zone 1 Zone 21� Slide NIA Temporary Exempt 0.00 0.00 lVbp label (e.g. Road (T) Square Square Crossing1) FbrmorTerrp Feet Feet Total Zone 1 Impacts: 0.00 Total Zone 2 Impacts: 0.00 Total Buffer Impacts: 0.00 Comments: Returned to original state D. Impact Justification and Mitigation .... ......... ..... ...... ...... ...... ...... ..... ...... ...... ..... ...... ...... ...... 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Erosion control maintained during re -compaction work. Reseeding upon completion 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.* Silt fence, diversion ditches, seed, straw. E. Diffuse Flow Plan 1a. What type of SCM are you providing?* r Level Spreader Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) rJ Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation* (lick the upload button or drag and drop files here to attach document Slope Repair.pdf 64.88KB PDF only F. Supplementary Information Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes r No 2b. Is this an after -the -fact buffer authorization application? F Yes r No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): This was an emergency repair and not new planned improvement. For documentation purposes. G. Additional Information Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FDF only Additional Comments: H. Sign and Submit By digitally signing below, I certifythat: o I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the application form." Print Name:* Roger J. Hendrick Signature Submission Date: 9/26120 (Auto populated field) Initial Review Is this accepted into the review process?* Is this project a public transportation project?* ID#* Version:* Select Reviewer: Select Reviewing Office* Has payment been received?* r Yes r No f Yes r No 20201314 1 Amy Annino:eads\amannino Asheville Regional Office - (828) 296-4500 r No Payment Needed f Fee Received r Need Fee - send electronic notification Slope Repair 2199 Yellow Fork Trail Nebo, NC • Remove overburden to sufficient depth for stabilization fabric in recommended intervals • Terragrid RX1200 (See attached cut sheet) • All fabric layers shall be tied into sufficient horizontal distance into the bank • Replace material in lifts while benching into the existing undisturbed bank • Consolidate soil close to or beyond surrounding native soil compaction • Grade as close to (2:1) slope as possible • Stabilize with see/mulch/straw/matting