Loading...
HomeMy WebLinkAboutNC0021474_Pretreatment Audit Inspection Supporting Documentation_20200917 (3)+ NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT AUDIT REPORT Water Resources ENVIRONMENTAL QUALITY Background Information [Complete prior to audit; review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: City of Mebane WWTP 2. Control Authority Representative(s): Amy Varinoski 3. Tide(s): Water Resources Compliance Manager 4. Address of POTW: Mailing 106 E. Washington Street City Mebane Zip Code 27302 Phone Number 919-304-9217 Fax Number 919-563-6144 E-Mail avarinoski(a)cityofinebane.com 5. Audit Date 09/15/2020 6. Last Inspection Date: 07/ 25 / 2019 Inspection Type: ® PCI ❑ Audit 7. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s) ? ® Yes ❑ No If No, Explain. 8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ® Yes ❑ No If Yes, Explain. July 2019 — WET violation, February 2020 — DO violation. These were likely due to lab error. 9. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No Order Type and Number: Are Milestone Dates Being Met? ❑ Yes ❑ No ® NA Parameters Covered Under Order ICIS Coding Main Program Permit Number INIC101012 I1 I4 I7 I4 I MM/DD/YY 109I15I20 10. .................................................................................................................................................................................................................................................................................................... Current Number of Significant Industrial Users (SIUs)? 5 11. .................................................................................................................................................................................................................................................................................................... Number of SIUs with No IUP, or with an Expired IUP? 0 12. .................................................................................................................................................................................................................................................................................................... Number of SIUs Not Inspected by POTW in Last Calendar Year? 0 13. .................................................................................................................................................................................................................................................................................................... Number of SIUs Not Sampled by POTW in Last Calendar Year? 0 14. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC for Limits Violations During Either of Last 2 Semi -Annual Periods? 0 15. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC for Reporting During Either of Last 2 Semi -Annual Periods? 0 16. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC with Pretreatment Schedule? 0 17. .................................................................................................................................................................................................................................................................................................... Number of SIUs on Schedules? 0 18. Current Number of Categorical Industrial Users (CIUs)? 3 19. Number of CIUs in SNC? 0 NC DWR Pretreatment Audit Form Revised: December 2016 Page 1 20. PRETREATMENT PROGRAM ELEMENTS REVIEW- Review POTW files, verify POTW has copy of each Program Element in their File. complete with all sunnortin2 documents and PERCS Approval Letter. and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 3/24/16 ® Yes ❑ No 6/3/16 ® Yes ❑ No 3/31/21 Industrial Waste Survey (IWS) 1/4/16 ® Yes ❑ No 3/7/16 ® Yes ❑ No 12/1/20 Sewer Use Ordinance (SUO) 11/2/12 ® Yes ❑ No 12/10/12 ® Yes ❑ No Enforcement Response Plan (ERP) 2/5/20 ® Yes ❑ No 2/13/20 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 6/20/19 ® Yes ❑ No 7/18/19 ® Yes ❑ No Legal Authority (Sewer Use Ordinance-SUO) 21. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction? ❑ Yes ® No If yes, Please list these towns and/or areas. 22. If yes to #21, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts? ❑ Yes ❑ No ®NA A copy, if not already submitted, should be sent to Division. 23. If yes to #21, Have you had any trouble working with these towns or districts? ❑ Yes ❑ No ® NA If yes, Explain. 24. Date of Last SUO Adoption by Local Council 09/13/2013 25. Have you had any problems interpreting or enforcing any part of the SUO? ❑ Yes ® No If yes, Explain. Enforcement (Enforcement Response Plan-ERP) 26. Did you send a copy of the ERP to your industries? ® Yes ❑ No If no, POTW must send copy within 30 days. 27. Have you had any problems interpreting or enforcing any part of the ERP (i.e. any adjudication, improper enforcement, etc? ❑ Yes ® No If yes, Explain. 28. List Industries under a Schedule or Order and Type of Schedule or Order N/A Resources 29. Please Rate the Following: S=Satisfactory M=Marginal U=Unsatsfactory Rating Explanation, if Unsatisfactory Personnel Available for Maintaining POTW's Pretreatment Program ®S ❑M ❑U Access to POTW Vehicles for Sampling, Inspections, and ®S ❑M ❑U Emergencies Access to Operable Sampling Equipment ®S ❑M ❑U Availability of Funds if Needed for Additional Sampling and/or Analysis ®S ❑M ❑U Reference Materials ®S ❑M ❑U Staff Training (i.e. Annual and Regional Workshops, Etc.) ®S ❑M ❑U Computer Equipment (Hardware and Software) ®S ❑M ❑U NC DWR Pretreatment Audit Form Revised: December 2016 Page 2 30. Does the POTW have an adequate data management system to run the pretreatment program? ® Yes ❑ No Explain Yes or No. Computer database. 31. How does the POTW recover the cost of the Pretreatment Program from their industries? Explain. Sampling & administrative cost recovery. Public Perception/ Participation 32. Are there any local issues affecting the pretreatment program (e.g.. odor, plant closing, new or proposed plants)? ® Yes ❑ No If yes, Explain. There are occasional odor complaints. A planned upgrade to the facility to 3 Mgd should take care of this problem. 33. Has any one from the public ever requested to review pretreatment program files? ❑ Yes ® No If yes, Explain procedure. If no, how would the request be addressed? A request would have to be submitted in writing to our City Clerk. Arrangements would then be made for review on a case -by -case basis. There are applicable fees in the City's fee schedule for the public to obtain copies. 34. Has any industry ever requested that certain information remain confidential from the public? ® Yes ❑ No If yes, Explain procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential from public. If no how would the request be addressed? As long as the information/data requested to be held confidential isn't effluent data, the request would likely be honored. Confidential information is kept in a locked file drawer. 35. In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No 36. Is the public notified about changes in the SUO or Local Limits? ® Yes ❑ No 37. Were all industries in SNC published in the last notice? ❑ Yes ❑ No Not applicable — no SNC Permitting (Industrial Waste Survey-IWS) 38. How does the POTW become aware of new or changed Users? IU inspections & data review, Mebane's Technical Review Committee, Alamance & Orange County Chamber of Commerce directories, Manufacturer's Register 39. Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision? (Who is an SIU?) Definition of SIU (also use 5% MAHL as guideline for non -organic parameters); Sampling, IWS short form, and/or IU Permit application. 40. Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate? ❑Yes ®No If Yes, How many are there? Please list each site and how it is permitted, if applicable. 41. Does the POTW accept waste by (mark if applicable) ® Truck ❑Dedicated Pipe ❑ NA 42. If the POTW accepts trucked waste, what controls are placed on this waste? (example. designated point, samples drawn, manifests required) Trucked waste only accepted from vac trucks pumping from our collection system (ic. Lift - station repairs, maintenance, etc.) 43. How does the POTW allocate its loading to industries? Mark all that apply ❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other Explain Other: 44. Review POTW's copies of current allocation tables for each WWTP. Are there any over allocations? ❑ Yes ® No If yes, what parameters are over allocated? 45. If yes to #44, What is being done to address the over allocations? (short-term IUPs, HWA to be revised, pollutant study, etc.) 46. Does the POTW keep pollutant loading in reserve for future growth / safety? ® Yes ❑ No If yes, what percentage of each parameter >10% currently 47. Has the POTW experienced any difficulty in allocation? (for example: adjudication by an industry) ❑ Yes ® No If yes, Explain. NC DWR Pretreatment Audit Form Revised: December 2016 Page 3 48. How does the POTW decide on which pollutants to limit in the permits? Monitor for? (for example: were only those pollutants listed on the application limited; categorical parameters; NPDES Pollutants of Concern) Limit: Categorical pollutants, >5% MAHL BOD, N113-N, TSS; Monitor: NPDES POCs as applicable based on permit app & sampling 49. How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits? Explain. Discharge volume & historical compliance record Permit Compliance 50. Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No If yes, which industries? What was (will be) the outcome of the adjudication? 51. Demonstrate how the POTW judges compliance. This should include compliance judgment on all violations of limits, reporting requirements, and permit conditions, as well as for SNC. Compliance summary sheets are used for all self -monitoring data submittals that address reporting, limits, and SNC. Look for permit condition violations during inspections. 52. Does the POTW use the Division's model inspection form or equivalent? ® Yes ❑ No If no, does the POTW form include all Division data? ❑ Yes ❑ No 53. Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ❑ Yes ® No If no, Explain. All SIUs are required to have spill/slug plans 54. What criteria are used to determine if a slug/spill control plan is needed? Required for all SIUs unless they can prove it's not needed (ic. chemical storage practices, no floor drains, etc.) 55. What criteria does the POTW use to determine if a submitted slug/spill control plan is adequate? Use PERCS guidance as minimum 56. How does the POTW decide where the sample point for an SIU should be located? End of process for Categoricals (after PT, if applicable). End of Process for others if possible, otherwise End of Pipe 57. Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time? (example: correct location; proper programming of sampler; clean equipment; swirling the sample bucket uniformly) POTW: ® Yes ❑ No SIU: ® Yes ❑ No If yes, Explain. Pretreatment Coordinator is present for all POTW sampling events at SIU. PT Coordinator trains SIU personnel and/or commercial lab personnel hired by SIU to ensure proper sampling for self -monitoring. These procedures are reviewed periodically during SIU inspections. 58. Who performs sample analysis for the POTW for Metals R&A, Meritech Conventional Parameters R&A, Meritech, Mebane WWTP Lab Organics R&A 59. Explain the Chain of Custody Procedure used for both in house and commercial lab samples. All samples are collected by Mebane WWTP lab personnel. There is an in-house CoC book where sample locations, dates, times, sample collector, & preservation are documented. Information is transferred to commercial lab CoCs when applicable. Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA) 60a. 60b. 60c. 60d. 60e. 60f. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO Is LTMP/STMP Data Maintained in Table or Equivalent? ® YES ❑ NO Is Table Adequate? ❑ YES ❑ NO All LTMP/STMP effluent data on Discharge Monitoring Report (DMR)? ® YES ❑ NO Division Inspector, verify yourself! If NO to any above, list violations Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: 61. Do you complete your own headworks analysis (HWA) ? ® Yes ❑ No If no, who completes your HWA? Phone ( ) -- 62. Do you have plans to revise your HWA in the near future? ® Yes ❑ No If yes, what is the reason for the revision? (mark all that apply) ❑Increased average flow ❑More LTMP data available ❑Resolve over allocation ®5 year expiration ❑NPDES limits change ❑ Other NC DWR Pretreatment Audit Form Revised: December 2016 Page 4 Explain. 63. In general, what is the most limiting criteria of your HWA? ❑Inhibition ® Pass Through ❑Sludge Quality 64. Do you see any way to increase your loading in the future (Example: obtaining more land for sludge disposal)? ❑ Yes ❑ No Explain. N/A — would only increase Pass -Through loadings if we pipe discharge to a larger receiving stream Summary 65. Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment? No significant PT program changes planned. In the process of upgrading hcadworks & sludge handling facilities at WRRF. Also looking to upgrade plant from 2.5MGD to 3.OMGD. NC DWR Pretreatment Audit Form Revised: December 2016 Page 5 INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS AND 1 IU INSPECTION) 66. User Name 1. Synergy Health 2. Sandvik 3. Industrial Connections 67. IUP Number 0126 0118 0111 68. Does File Contain Current Permit? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 69. Permit Expiration Date 6/30/21 6/30/22 6/30/22 70. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A ----- 433.17 433.15 71. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes ❑ No ®Yes ElNo to Permit Issue Date? 72. Does File Contain Inspection Completed Within Last Calendar Year? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 73. a. Does File Contain Slug/Spill Control Plan? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) b. ❑Yes ❑No b. ❑Yes ❑No b. ❑Yes ❑No 74. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑No®N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Organic Management Plan (TOMP)? 75. a. Does File Contain Original Permit Review Letter from Division? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 76. During Most Recent Semi -Annual Period, Did POTW Complete its ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No Sampling as Required by IUP, including Flow? 77. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 78. During Most Recent Semi -Annual Period, Did SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Sampling as Required by IUP, including Flow? 79. During Most Recent Semi -Annual Period, Did SIU submit all reports on ®Yes❑No❑N/A ®Yes❑No❑N/A ®Yes❑No❑N/A time? 80a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A file include process/dilution flows as Required by IUP? 80b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A production rates and/or flows as Required by IUP? 81. During Most Recent Semi -Annual Period, Did POTW Identify All ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Limits Non -Compliance from Both POTW and SIU Sampling? None None None 82. During Most Recent Semi -Annual Period, Did POTW Identify All ❑Yes❑NoON/A ❑Yes❑No®N/A ❑Yes❑No®N/A Reporting -Non -Compliance from SIU Sampling? 83. a. Was POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW within 30 Days? v.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A c. If applicable, did POTW resample and obtain results within 30 days of c'❑Yes❑No®N/A becoming aware of SIU limit violations in the POTW's sampling of SIU? c.❑Yes❑No®N/A c.❑Yes❑No®N/A 84. During Most Recent Semi -Annual Period, Was SIU in SNC? ❑ Yes ® No ❑ Yes ® No ❑ Yes ® No 85. During Most Recent Semi -Annual Period, Was Enforcement Taken as ❑Yes❑NoON/A ❑Yes❑NoON/A ❑Yes❑No®N/A Specified in POTW's ERP (NOVs, Penalties, timing, etc.)? 86. Does File Contain Penalty Assessment Notices? ❑Yes❑NoON/A ❑Yes❑No®N/A ❑Yes❑No®N/A 87. Does File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A 88. a. Does File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 89. Did POTW Representative Have Difficulty in Obtaining Any Requested ❑ Yes ®No ❑ Yes ® ElYes ® No Information For You? IF !o� FILE REVIEW COMMENTS: Files are complete and well organized. NC DWR Pretreatment Audit Form Revised: December 2016 Page 6 INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY N I C I 0 I 0 1 2 11 14 17 14 109 115 120 I 1. Industry Inspected: MetoKote PPG Coating Services 2. Industry Address: 1020 Corporate Park Drive, Mebane, NC 27302 3. Type of Industry/Product: Application of Protective Coatings to primarily auto parts 4. Industry Contact: Mike Magnall Title: Operations, Quality, Maintenance Manager Phone: 919-563-5003 Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ® Yes ❑ No 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ® Yes ❑ No B. Plant Tour ® Yes ❑ No C. Pretreatment Tour ® Yes ❑ No D. Sampling Review ® Yes ❑ No E. Exit Interview ® Yes ❑ No Industrial Inspection Comments: At the time of the inspection, the facility was coating auto drive shafts for GKN Driveline. The facility has an interior 3-stage (chemical precipitation, flocculation, and pH adjustment) pretreatment system There are 57 employees working one shift, three days a week with occasional Saturday work. The facility is very well run, clean, and well maintained. The staff is very knowledgeable and maintains an excellent operation. Audit SUMMARY AND COMMENTS: Audit Comments: An extremely well run pretreatment program. Requirements: None Recommendations: None NOD: ❑ Yes ® No NOV: ❑ Yes ® No QNCR: ❑ Yes ® No POTW Rating: Satisfactory ® Marginal ❑ Unsatisfactory ❑ Audit COMPLETED BY: Jim Gonsiewski DATE: 09/17/2020 Winston-Salem Regional Office NC DWR Pretreatment Audit Form Revised: December 2016 Page 7