DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnlrtl Qua fay
ID#* 20201293 Version* 1
Regional Office* Asheville Regional Office-(828)296-4500
Reviewer List* Kevin Mitchell
Pre-Filing Meeting Request submitted 9/29/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Yates Allen
Contact Email Address* ryallen@ncdot.gov
Project Name* Bridge 73 over Foster Creek
Project Owner* NC Department of Transportation
Project County* Madison
Owner Address: Street Address
55 Orange Street
Address Line 2
City State/Rovince/Region
Asheville NC
Fbstal/Zip Code Country
28801 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below.*
The project consists of the replacement of bridge 73 on SR 1341 Foster
Creek Road over Foster Creek in Madison County, NC.The bridge
replacement will not result in any impacts to Foster Creek. However, an
existing plastic driveway pipe carrying an unnamed tributary(UT)to Foster
Creek will be/has been extended by 16 linear feet.
I spoke with Kevin by phone yesterday. I sent in the Notification of Work in
Trout Watershed form yesterday believing this project would classify as a
non-notifying project. Kevin responded that it does not because Foster
Creek is classified as Class C, ORW,Tr.We talked on the phone and
explained that the UT does not show up on the plans and that I found out
about the pipe extension in the last few days and that the contractor was
planning to extend the pipe ASAP to avoid the trout moratorium. I informed
Kevin that the PCN would be'after-the-fact'.Therefore, I did not have time
to submit this form 30 days before submitting the PCN.
Kevin and I agreed a meeting for this project would not be necessary.
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
gated(j17l
Submittal Date 9/29/2020
Reviewer Meeting Request Decision
.................
Has a meeting been scheduled?* C Yes a No