Loading...
HomeMy WebLinkAbout20201293 Ver 1_Pre-Filing Meeting Request_20200929 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20201293 Version* 1 Regional Office* Asheville Regional Office-(828)296-4500 Reviewer List* Kevin Mitchell Pre-Filing Meeting Request submitted 9/29/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Yates Allen Contact Email Address* ryallen@ncdot.gov Project Name* Bridge 73 over Foster Creek Project Owner* NC Department of Transportation Project County* Madison Owner Address: Street Address 55 Orange Street Address Line 2 City State/Rovince/Region Asheville NC Fbstal/Zip Code Country 28801 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below.* The project consists of the replacement of bridge 73 on SR 1341 Foster Creek Road over Foster Creek in Madison County, NC.The bridge replacement will not result in any impacts to Foster Creek. However, an existing plastic driveway pipe carrying an unnamed tributary(UT)to Foster Creek will be/has been extended by 16 linear feet. I spoke with Kevin by phone yesterday. I sent in the Notification of Work in Trout Watershed form yesterday believing this project would classify as a non-notifying project. Kevin responded that it does not because Foster Creek is classified as Class C, ORW,Tr.We talked on the phone and explained that the UT does not show up on the plans and that I found out about the pipe extension in the last few days and that the contractor was planning to extend the pipe ASAP to avoid the trout moratorium. I informed Kevin that the PCN would be'after-the-fact'.Therefore, I did not have time to submit this form 30 days before submitting the PCN. Kevin and I agreed a meeting for this project would not be necessary. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature gated(j17l Submittal Date 9/29/2020 Reviewer Meeting Request Decision ................. Has a meeting been scheduled?* C Yes a No