HomeMy WebLinkAbout20190159 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20190159
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Erin Davis
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jamey McEachran
jmceachran@res.us
Strawberry Hill
North Carolina Division of Mitigation Services
Johnston
Street Address
217 West Jones Street
Address Line 2
aty
Raleigh
Rbstal / Zip Code
27603
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
2019-0159
Do you know the name of the staff member you would like to request a meeting with?
Erin Davis
Please give a brief project description below.*
The Strawberry Hill Mitigation Project is located within a mostly rural
watershed in Johnston County in Smithfield, NC at the crossroads of
Yelverton Grove Road and Brogden Road. The Project lies within the
Neuse River Basin, North Carolina United States Geological Survey (USGS)
8-digit Cataloguing Unit 03020201 (Neuse 01) and 14-digit hydrologic unit
code (HUC) 03020201140010, a NC Division of Mitigation Services (DMS)
Targeted Local Watershed (TLW) and the Division of Water Resources
(NCDWR) sub -basin 03-04-02 (Figure 1). This Project was selected by
DMS as a full delivery project to provide stream mitigation units and buffer
credits in the Neuse 01. The Project proposes to restore 3,719 linear feet
(LF) that will provide water quality benefit for 383 acres of drainage area.
Additionally, the Project will restore and preserve riparian buffer area within
the project area, which will provide 656,593.451 buffer credits for the
Neuse 01 watershed. Also, notably, the Project is in very close proximity
(approximately 0.4 miles) to the RES Polecat Stream Mitigation Bank Site,
offering even more functional uplift to the local watershed.
The Project area, in whole, is comprised of a 22.12-acre easement
involving two unnamed tributaries to Polecat Branch, which eventually
drains to the Neuse River. One of the tributary streams, and its associated
ditches, will not be subjected to stream mitigation and will only be utilized
for buffer mitigation. The stream mitigation component of the Project
involves one tributary, totaling 3,267 existing LF.
Please give a couple of dates you are available for a meeting.
10/9/2020
10/12/2020
10/19/2020
Please attach the documentation you would like to have the meeting about.
Figures_Combined_StrawberryHill.pdf 14.64MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
I" &r"4ul
Submittal Date 9/24/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No
pale�a
8rog e
Green Chapel Missionary
Baptist Church
=J C=====3
Stevens Sausage Co., Inc IQ
2--
F�
gro9de, Rd r
Project Coordintates:
35.469579,-78.323896
o ";
Chapel Nils �
Raleigh
° Zr�s W i
Legend Strawberry Hill
Proposed Easement '`",�yeHd
Mitigation Project
Polecat Mitigation Site 14213
Neuse River Basin - 03020201 421 l I
TLW - 03020201140010 401
" Figure 1 - Project Vicinity Date: 6/23/2020
Strawberry Hill Drawn by: SCF res
0 50
s Mitigation Project Checked by: JRM
0 1.000
Feet Johnston County, North Carolina 1 inch = 11000 feet
01
Legend
Proposed Easement
Project Parcels
Parcels
rr�' :iinlrr�►�►��til
► :�i1 �i J����f ��
William Christian
Carpenter,:
2602110f36'4710
Jan Penny Hill
Jan Penny,Hill
" Figure 3 - Landowner Parcels
w E Strawberry Hill
5 Mitigation Project
250 500
FP� Johnston County, North Carolina
Date: 6/11/2020
Drawn by: MDD rps
Checked by: JRM
1 inch = 500 feet 10
I—
�' kw
y a 6
g� 4
Legend
Proposed Easement
® Drainage Area
Land -use
Agriculture (55%)
- Forest (21 %)
Brush (11%)
- Residential (6%)
i Racetrack (3%)
Impervious (2%)
Industrial (1%)
- Open Water (1%)
N
w E
_ s
0 500 1,000
Feet
A,
S
ti
y d'p
�1«
ITV�.z
x
�= f
Figure 4 - Land -use
Strawberry Hill
Mitigation Project
Johnston County, North Carolina
Date: 6/11/2020
Drawn by: SCF
Checked by: JRM
1 inch= 1,000 feet
we I
VVU Existing Culvert LJ
HI -A
Crossing -M
Fire Hydrant
Fire Hydrant
PUB,Hx .... ..
Existing Pond
Existing Culvert
Crossing
PUBI-Ii
JH2
Legend
Proposed Easement RUBH x
Existing Wetland Exposed
Irrigation Pipe
NWI Wetlands (USFWS 10/09/2019)
(Abandoned) Existing Pond
FEIVIA Zone AE (None)
'Fal-
Existing Intermittent Stream
PUBHX
Existing Ditch
Existing Swale X
Utilities
PF04A
T Overhead Power Line
Sewer Line
v.
Water Line PUBHh
N Figure 7 - Existing Conditions Date 7/23/2020
w+- F Strawberry Hill Drawn by: MDD res
49W 0 25sO 500 Mitigation Project Checked by: JRM
10
Feet Johnston County, North Carolina 1 inch = 500 feet
e' w
v
, '
w.
+
•
Y
Replace Culvert
4'
y
"
Tie yard swale
to JH1-B
Tie field ditch
to JH1-A
JH1-A
Fill Ditch
u
r
P
AX
:v
� � z
Legend
Proposed Easement (22.12 ac)
Stream Mitigation Approach
Restoration
-- No Credit
Ditch
Swale
N
w e
5
0 250 500
Feet
I
Oe
Strawberry Hill Project Stream Credits
Reach Mitigation Type Proposed Length (LF) Mitiation Ratio SMUs
i JH1-A Restoration 1,007 1:1 1,007.000
� JH1-B Restoration 1,054 1:1 1,054.000 ;
Restoration 1,658 1:1 1,658.000
Totals 13,719 3,719.000
Figure 8 - Stream Mitigation Conceptual Date: 7/23/2020
Strawberry Hill Drawn by: MDD rps
Mitigation Project Checked by: JRM
Johnston County, North Carolina 1 inch =500 feet
ti
"
ktx .
"
ktx .
h
r�wt.
,Vh ,
2
�s , , • �,, �H3
h
Legend
Proposed Easement (22.12 ac)
Planting Area
Fixed Vegetation Plots
Stream and Buffer r� 77 - Buffer Only
Stage Recorder'`` 6'
Flow Gauge r00
,
47
Cross Section.
Stream Mitigation Approach Fixed image locations will exist at each cross section, each
Restoration vegetation plot, each stage recorder, and each flow gauge.
-- No Credit In addition to the 7 fixed vegetation plots there will be 4���
random vegetation plots, for a total of 11 plots utilized for
— Ditch stream vegetative success. The random plots will only be
r placed in the northern easement section but will vary in
Swale location from year-to-year.
" Figure 9 - Stream Monitoring Plan Date: 7/23/2020
Strawberry Hill Drawn by MDD res
s Mitigation Project Checked by: JRM
0 250 500
Feet Johnston County, North Carolina 1 inch = 500 feet