Loading...
HomeMy WebLinkAbout20190159 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20190159 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Erin Davis Pre -Filing Meeting Request submitted 9/24/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jamey McEachran jmceachran@res.us Strawberry Hill North Carolina Division of Mitigation Services Johnston Street Address 217 West Jones Street Address Line 2 aty Raleigh Rbstal / Zip Code 27603 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 2019-0159 Do you know the name of the staff member you would like to request a meeting with? Erin Davis Please give a brief project description below.* The Strawberry Hill Mitigation Project is located within a mostly rural watershed in Johnston County in Smithfield, NC at the crossroads of Yelverton Grove Road and Brogden Road. The Project lies within the Neuse River Basin, North Carolina United States Geological Survey (USGS) 8-digit Cataloguing Unit 03020201 (Neuse 01) and 14-digit hydrologic unit code (HUC) 03020201140010, a NC Division of Mitigation Services (DMS) Targeted Local Watershed (TLW) and the Division of Water Resources (NCDWR) sub -basin 03-04-02 (Figure 1). This Project was selected by DMS as a full delivery project to provide stream mitigation units and buffer credits in the Neuse 01. The Project proposes to restore 3,719 linear feet (LF) that will provide water quality benefit for 383 acres of drainage area. Additionally, the Project will restore and preserve riparian buffer area within the project area, which will provide 656,593.451 buffer credits for the Neuse 01 watershed. Also, notably, the Project is in very close proximity (approximately 0.4 miles) to the RES Polecat Stream Mitigation Bank Site, offering even more functional uplift to the local watershed. The Project area, in whole, is comprised of a 22.12-acre easement involving two unnamed tributaries to Polecat Branch, which eventually drains to the Neuse River. One of the tributary streams, and its associated ditches, will not be subjected to stream mitigation and will only be utilized for buffer mitigation. The stream mitigation component of the Project involves one tributary, totaling 3,267 existing LF. Please give a couple of dates you are available for a meeting. 10/9/2020 10/12/2020 10/19/2020 Please attach the documentation you would like to have the meeting about. Figures_Combined_StrawberryHill.pdf 14.64MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature I" &r"4ul Submittal Date 9/24/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No pale�a 8rog e Green Chapel Missionary Baptist Church =J C=====3 Stevens Sausage Co., Inc IQ 2-- F� gro9de, Rd r Project Coordintates: 35.469579,-78.323896 o "; Chapel Nils � Raleigh ° Zr�s W i Legend Strawberry Hill Proposed Easement '`",�yeHd Mitigation Project Polecat Mitigation Site 14213 Neuse River Basin - 03020201 421 l I TLW - 03020201140010 401 " Figure 1 - Project Vicinity Date: 6/23/2020 Strawberry Hill Drawn by: SCF res 0 50 s Mitigation Project Checked by: JRM 0 1.000 Feet Johnston County, North Carolina 1 inch = 11000 feet 01 Legend Proposed Easement Project Parcels Parcels rr�' :iinlrr�►�►��til ► :�i1 �i J����f �� William Christian Carpenter,: 2602110f36'4710 Jan Penny Hill Jan Penny,Hill " Figure 3 - Landowner Parcels w E Strawberry Hill 5 Mitigation Project 250 500 FP� Johnston County, North Carolina Date: 6/11/2020 Drawn by: MDD rps Checked by: JRM 1 inch = 500 feet 10 I— �' kw y a 6 g� 4 Legend Proposed Easement ® Drainage Area Land -use Agriculture (55%) - Forest (21 %) Brush (11%) - Residential (6%) i Racetrack (3%) Impervious (2%) Industrial (1%) - Open Water (1%) N w E _ s 0 500 1,000 Feet A, S ti y d'p �1« ITV�.z x �= f Figure 4 - Land -use Strawberry Hill Mitigation Project Johnston County, North Carolina Date: 6/11/2020 Drawn by: SCF Checked by: JRM 1 inch= 1,000 feet we I VVU Existing Culvert LJ HI -A Crossing -M Fire Hydrant Fire Hydrant PUB,Hx .... .. Existing Pond Existing Culvert Crossing PUBI-Ii JH2 Legend Proposed Easement RUBH x Existing Wetland Exposed Irrigation Pipe NWI Wetlands (USFWS 10/09/2019) (Abandoned) Existing Pond FEIVIA Zone AE (None) 'Fal- Existing Intermittent Stream PUBHX Existing Ditch Existing Swale X Utilities PF04A T Overhead Power Line Sewer Line v. Water Line PUBHh N Figure 7 - Existing Conditions Date 7/23/2020 w+- F Strawberry Hill Drawn by: MDD res 49W 0 25sO 500 Mitigation Project Checked by: JRM 10 Feet Johnston County, North Carolina 1 inch = 500 feet e' w v , ' w. + • Y Replace Culvert 4' y " Tie yard swale to JH1-B Tie field ditch to JH1-A JH1-A Fill Ditch u r P AX :v � � z Legend Proposed Easement (22.12 ac) Stream Mitigation Approach Restoration -- No Credit Ditch Swale N w e 5 0 250 500 Feet I Oe Strawberry Hill Project Stream Credits Reach Mitigation Type Proposed Length (LF) Mitiation Ratio SMUs i JH1-A Restoration 1,007 1:1 1,007.000 � JH1-B Restoration 1,054 1:1 1,054.000 ; Restoration 1,658 1:1 1,658.000 Totals 13,719 3,719.000 Figure 8 - Stream Mitigation Conceptual Date: 7/23/2020 Strawberry Hill Drawn by: MDD rps Mitigation Project Checked by: JRM Johnston County, North Carolina 1 inch =500 feet ti " ktx . " ktx . h r�wt. ,Vh , 2 �s , , • �,, �H3 h Legend Proposed Easement (22.12 ac) Planting Area Fixed Vegetation Plots Stream and Buffer r� 77 - Buffer Only Stage Recorder'`` 6' Flow Gauge r00 , 47 Cross Section. Stream Mitigation Approach Fixed image locations will exist at each cross section, each Restoration vegetation plot, each stage recorder, and each flow gauge. -- No Credit In addition to the 7 fixed vegetation plots there will be 4��� random vegetation plots, for a total of 11 plots utilized for — Ditch stream vegetative success. The random plots will only be r placed in the northern easement section but will vary in Swale location from year-to-year. " Figure 9 - Stream Monitoring Plan Date: 7/23/2020 Strawberry Hill Drawn by MDD res s Mitigation Project Checked by: JRM 0 250 500 Feet Johnston County, North Carolina 1 inch = 500 feet