HomeMy WebLinkAbout20200402 Ver 1_Pre-Filing Meeting Request_20200922ID#* 20200402 Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 9/22/2020
............................................................................................................................................................................................................................................................................
Contact Name * Joey Lawler
Contact Email Address* jlawler@smeinc.com
Project Name* Line 99 Easement Acquisition Project
Project Owner*
Project County*
Owner Address:
Piedmont Natural Gas
Brunswick
Street Address
Address Line 2
aty
Fbstal / Zip Code
Is this a transportation project? * r Yes r No
State / Province / Region
Country
Type(s) of approval sought from the DWR:
* 401 Water Quality Certification - r- 401 Water Quality Certification -
Regular Express
* Individual Permit F Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Robb Mairs
Please give a brief project description below.
Piedmont Natural Gas (PNG) is planning to acquire additional easement
along portions of their Line 99 natural gas transmission pipeline. Overall,
Line 99 originates at a station site west of Mt. Misery Road NE near Leland,
Brunswick County, NC (34.281303°N,-78.053152°W). The line then runs
generally south for approximately 28 miles, ending on the east side of the
ADM facility in South Port, NC (33.938997°N,-77.991502°W).
Line 99 was originally constructed in 1992, and a majority of the
transmission line is currently located within a 20-foot, permanently -
maintained easement. Existing land use in the vicinity of this project
includes undeveloped woodland, cleared or otherwise managed areas,
utility/railroad easements, residential development and smaller areas of
more concentrated commercial development.
For safety and system integrity purposes, PNG is planning to acquire an
additional 30 feet along the easement, so that a consistent 50-wide area
can be permanently maintained above the gas transmission line. There are
multiple areas where expansion of the existing easement from 20 feet to 50
feet will require clearing of forested land. Portions of that forested land
consist of wetlands, which were delineated in 2019 by S&ME. Acquisition of
the additional easement will result in permanent conversion of forested
wetlands to emergent wetlands, and will require pre -construction written
approval under GC 4133.
Inter -agency One -Stop scoping meeting was held on August 12, 2020.This
request is being submitted to comply with new DWR pre -filing requirements.
Please give a couple of dates you are available for a meeting.
10/23/2020
11 /6/2020
Please attach the documentation you would like to have the meeting about.
1 - Vicinity.pdf 278.45KB
Topo.2Apdf. pdf 602.54 KB
Topo.2Bpdf.pdf 624.03KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/22/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No