Permit # GP 14-27
Revision #38
Permit for a Land Disturbing Activity
New Hanover County
Department of Engineering
230 Government Center Drive - Suite 160
Wilmington, North Carolina 28403
(910) 798-7139
As authorized by the New Hanover County Erosion and Sedimentation Control Ordinance
This permit issued to Seventy West Builders, Inc. authorizes the development of 5.23 acres of land in River Lights
Conventional Phase III & IV for the Lots Listed Below in New Hanover County with performance reservations and
modifications. This permit issued on June 20, 2018 is subject to compliance with the application and site drawings, all
applicable regulations and special conditions and notes set forth below. Any plan modifications must be approved by
this office prior to field changes.
It is understood by the applicant that a representative of New Hanover County's Engineering Department may
inspect the site at any time following the issuance of this Permit. A copy of the approved Soil Erosion Control Plan, this
permit, a rain gauge and copies of the Combined Self -Monitoring and Self Inspection Reports must be available at all
times at the site.
Failure to execute the provisions of this permit and the approved Soil Erosion Plan, or any other provisions of the
New Hanover County Soil Erosion and Sedimentation Control Ordinance, may result in immediate legal action by the
County to the limits prescribed by the Ordinance. If the measures outlined on the approved Soil Erosion Control Plan
and this Permit prove insufficient, additional Erosion Control measures can and will be required which in turn will be
considered provisions of this Permit. This Permit does not preclude any other permits or approvals necessary for
beginning or completing this development. Approval of an erosion control plan is conditioned on the applicant's
compliance with Federal and State laws, regulations and rules. It is the Permittee's responsibility to obtain all necessary
permits and approvals.
SPECIAL CONDITIONS
(THESE CONDITIONS MIDST BE FOLLOWED IN ADDITION TO THE PLANS AND SPECIFICATIONS)
*All the soil erosion control measures will be installed as the site is cleared and maintained throughout construction.
These include Revision 45 for 0.85 acres approved 6/20/18 includes construction entrances, silt fences, inlet protection
and concrete washouts on Lots 286, 298, 299, 300, 374, 375 & 376 in River Lights Conventional Phase Ill.
Revision #6 for 0.26 acres approved 6/23/18 includes construction entrances, silt fences, inlet protection and concrete
washouts on Lots 301 & 302 in River Lights Conventional Phase III.
(Continued) e Page Two Permit # GP 14-17
Revision #38
Revision #8 for 0.37 acres approved 8/16/18 includes construction entrances, silt fences, inlet protection and concrete
washouts on Lots 282, 355 & 377 in River Lights Conventional Phase III.
Revision #9 for 0.13 acres approved 9/22/18 includes a construction entrance, silt fences, inlet protection and concrete
washouts on Lot 285 in River Lights Conventional Phase Ili.
"Revision #10 for 0.11 acres approved 11/6/18 includes a construction entrance, silt fences, inlet protection and
concrete washouts on Lot 380 in River Lights Conventional Phase III.
"Revision #12 for 0.53 acres approved 12/21/18 includes construction entrances, silt fences, inlet protection and
concrete washouts on Lots 249 & 284 in River Lights Conventional Phase III.
"Revision #15 for 0.14 acres approved 3/29/19 includes a construction entrance, silt fences, inlet protection and
concrete washouts on lot 283 in River Lights Conventional Phase 111.
Revision #16 for 0.32 acres approved 3/29/19 includes construction entrances, silt fences, inlet protection and concrete
washouts on lots 250 & 254 in River Lights Conventional Phase Ill.
NOTE: Revisions 5, 6, 8, 9, 10, 12, 15 & 16 were previously approved under separate special conditions prior to the
NCG01 April 1, 2019 deadline.
Revision #17 for 0.22 acres approved 5/6/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 303 & 356 in River Lights Conventional Phase III.
Revision #18 for 0.27 acres approved 5/23/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 357, 378 & 379 in River Lights Conventional Phase III.
Revision #19 for 0.26 acres approved 6/4/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 253 & 304 in River Lights Conventional Phase Ili.
Revision #21 for 0.20 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 358 & 361 in River Lights Conventional Phase Ill.
Revision #26 for 0.16 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lot 346 in River Lights Conventional Phase 111,
Revision #28 for 0.13 acres approved 8/21/19 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lot 345 in River Lights Conventional Phase III.
Revision #30 for 0.34 acres approved 2/12/20 includes construction entrances, silt fences, inlet protection and concrete
washouts for Lots 343, 344 & 360 in River Lights Conventional Phase III.
Revision #33 for 0.12 acres approved 4/23/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lot 409 in River Lights Conventional Phase IV.
Revision #34 for 0.5 acres approved 5/11/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lots 251. 252. 359 & 415 in River Lights Conventional Phase Ill & IV.
Revision #35 for 0.2 acres approved 7/11/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lots 490 & 491 in River Lights Conventional Phase III & IV.
Revision #38 for 0.12 acres approved 9/4/20 includes a construction entrance, silt fence, inlet protection and concrete
washouts for lots 338 in River Lights Conventional Phase III.
Continued) .- Page Three Permit # GP 14-17
Revision #38
*Tree Removal Permits and/or Approvals are required from the City of Wilmington and/or New Hanover County prior to
clearing the site.
*Silt fence stakes must be steel and will be placed six feet apart without wire reinforcement or eight feet apart with
wire reinforcement. Silt fence is not allowed as inlet protection.
*This permit does not preclude any permits or approvals which may be necessary such as the City of Wilmington or New
Hanover County Stormwater, Planning or Zoning, NCDEQ Stormwater, Water Resources or Waste Management,
C.A.M.A., The US Army Corps. of Engineers or any other agencies.
*No sediment shall leave the site.
*If plan revisions are necessary you must submit a copy to this office for approval prior to any field changes.
*If soil is brought onto this site or removed from this site, it must come from or be taken to an approved or permitted
site to be identified to this office prlflr to being brought onsite or removal from the site.
*All City and/or County and State drainage and stormwater requirements will be adhered to.
*If these measures fail to adequately control erosion, more restrictive measures will be required.
*if any phase of grading ceases for more than 15 working days, the site will be temporarily stabilized.
*All slopes must be stabilized within 21 calendar days of any phase of activity.
The approval of an erosion control plan is conditioned on the applicant's compliance with Federal and State Water
Quality laws, regulations and rules.
*Note the required rates for seed, lime, fertilizer and mulch in your seeding specifications.
*Enclosed is a Combined Self -Monitoring and Self -Inspection Form that meets the requirements of both the NPDES
Stormwater Permit for Construction Activities, NCG 010000 reporting and the Land Resources Self Inspection Program
that satisfies the requirements of the Sedimentation Pollution Control Act. These are mentioned below with specific
requirements for each program. These reports are the responsibility of the property owner. They require a rain gauge
onsite, inspections and reporting every 7 calendar days and within 24 hours of every 1.0 inch rain per 24-hour period
and at specific phases of construction. Additional copies of this Combined Construction Inspection Report can be
found at http://portal.ncdenr.org/web/Ir/erosion . Reports must be available onsite at all times. If you have
questions, please contact New Hanover County Engineering (910) 798-7139 or the Land Quality Section at the
NCDEMLR Regional office at (910) 796-7215.
*Note the NPDES information from the State for sites disturbing 1 acre or more and the reporting requirements. All
projects must include the following surface water withdrawal locations and stabilization requirement designations on
the plan in order to qualify for coverage under the most recent NPDES Construction General Permit. All settling basins
must have outlet structures that withdraw water from the surface, with the exception of basins or traps that have a
drainage area of less than 1 acre. The NPDES permit also requires ground cover within 14 calendar days on disturbed flat
areas and ground cover within 7 calendar days on all areas within HQW Zones, perimeter dikes, swales, ditches,
perimeter slopes and all slopes steeper than 3:1. Exceptions include slopes that are 10 feet or less in length and not
steeper than 2:1 which must be stabilized within 14 calendar days and slopes greater than 50 feet which must be
Continued) — Page Four Permit # GP 14-17
Revision #38
stabilized within 7 calendar days. It requires inspections of all erosion control measures and reporting every 7 days and
within 24 hours of every 1.0-inch rain event in a 24-hour period. This permit also includes other new requirements which
are listed in the text of the NPDES Stormwater Discharge Permit for Construction Activities, which is included with the
original copy of each land disturbing permit.
*Note the Land Resources Self Inspection Program Requirements. This program is separate from the NPDES reporting
and requires inspection and documentation after each phase of construction. These phases include: Installation of
perimeter erosion control measures, Clearing and grubbing of existing ground cover, Completion of any phase of
grading of slopes or fills, Installation of storm drainage facilities, Completion of construction or development,
Establishment of permanent ground cover sufficient to restrain erosion and any Deviation from the approved plan.
*Pre -construction meetings are optional. Contact Beth E. Wetherill at (910) 798-7139 to set up a meeting prior to
land disturbing activity onsite. If you do not choose to have a preconstruction meeting prior to starting work on site,
you need to contact us when activity begins and again when the initial measures have been installed.
This Permit will expire one year from date of issue
if no construction activity begins on site. This permit
may_not be amended or transferred to another party
without approval of this office,.
-Z +t' WAIL
Beth E. Wetherill, C.P.E.S.C.
Soil Erosion Specialist/New Hanover County