HomeMy WebLinkAbout20201259 Ver 1_PreFiling Acknowledgement Email_20200928Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, September 28, 2020 8:56 AM
To: lauren.norris-heflin@timmons.com
Subject: Pre -Filing Meeting Request Acknowledgement - 401 Assemblage - 20201259 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 401 Assemblage that you
submitted on 9/22/2020. The ID number for that project is 20201259, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201259
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 9/22/2020
..........................................................................................................................................................................................................................................................
Contact Name * Lauren Norris -Heflin
Contact Email Address* lauren.norris-heflin@timmons.com
Project Name* 401 Assemblage
Project Owner* Various Owners - See attached property owner table
Project County* Wake
Owner Address: Street Address
Address Line 2
aty State / Province / Region
Fbstal / Zip Code Country
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
* 401 Water Quality Certification - r- 401 Water Quality Certification -
Regular Express
* Individual Permit F Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
This project is for the construction of residential developments in Garner,
North Carolina. Timmons Group is planning to submit a PCN on behalf of
RST Development, LLC.
The Site encompasses approximately 272.2 acres and is located in Garner,
North Carolina within Wake County (See Figure 1. Vicinity Map). The Site is
bound by residential development and mixed hardwood and pine forests to
the north, east, and south. The Site is bound to the west by Highway 401,
residential development, and mixed hardwood and pine forests. The Site is
located within the Piedmont Physiographic Province.
The Site is occupied by mixed hardwood and pine forests, cattle farming,
and silviculture land use. In addition, 24 wetland and 13 stream features
were found within the Site (See Figure 6. Preliminary Wetland and Waters
of the U.S. Delineation Map). The Site is located within the Neuse River
Basin in the Lake Benson -Swift Creek Subwatershed (030202011002).
Surface water on -Site generally drains east to north-east by unnamed
tributaries and eventually into Swift Creek. According to the FEMA FIRM
Panels #3720079000J and #3720069900J (effective date 5/2/2006) the
site is located within Zone X, which is an area of minimal flood hazard.
Impact Maps are being amended but are anticipated to involve three road
crossings which will require stream crossings as well as minor wetland
impacts for road grading.
'Discussion via email or over the phone would be fine in lieu of a meeting if
preferred.*
Please give a couple of dates you are available for a meeting.
9/23/2020
9/25/2020
9/28/2020
9/29/2020
10/1 /2020
Please attach the documentation you would like to have the meeting about.
Figure 6 - WTDM.pdf 16.91 MB
09_Property Owner Table.pdf 343.8KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
.rim rt -yy iwl
Submittal Date 9/22/2020