HomeMy WebLinkAbout20201220 Ver 1_PreFiling Acknowledgement Email_20200925Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Wednesday, September 23, 2020 4:58 PM
To: burdette@mcadamsco.com
Subject: Acknowledgement for Pre -Filing Meeting Request - Project Flash
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form
for Project Flash that you submitted on 9/18/2020. The ID number for that project is 20201220,
Version 1.
Reviewer Contact Information:
Reviewer:
Reviewer Email:
Reviewing Office: Raleigh Regional Office - (919) 791-4200
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day
clock has been reached and you are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
1
ID#* 20201220 Version* 1
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 9/18/2020
Contact Name*
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jennifer Burdette
burdette@mcadamsco.com
Project Flash
Merck & Co, Inc.
Durham
Street Address
Address Line 2
city
Fbstal / Zip Code
State / Province / Pegion
Country
Is this a transportation project?* C Yes (-- No
Type(s) of approval sought from the DWR:
I;W 401 Water Quality 1— 401 Water Quality
Certification - Regular Certification - Express
I— Individual Permit I— Modification
I— Shoreline Stabilization
Does this project have an existing project ID#?*
(-- Yes C No
Please list all existing project ID's associated with this projects.*
2004-0446
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below.*
Project Flash involves construction of a new manufacturing facility
south of the existing Merck facility in the Treyburn Business
Campus. The manufacturing facility will include two buildings along
with associated parking lots, sidewalks/trails, stormwater control
measures and utility connections. A linear wetland separates the
project area from the existing facility requiring a road and a
sanitary sewer crossing. A temporary power line will be installed
within the fill slope of the proposed road crossing until a future
distribution power line is planned and designed. Additional detail
regarding the future distribution power line is provided under the
Future Phases section below. The project will result in 0.098 acre
of permanent wetland loss, 0.087 acre of temporary wetland
impacts that will be permanently converted to herbaceous
wetlands and 0.053 acre of temporary wetland impacts.
Please give a couple of dates you are available for a meeting.
9/21 /2020
9/22/2020
9/23/2020
9/24/2020
9/25/2020
Please attach the documentation you would like to have the meeting about.
06-SPEC20097-Impact Maps.pdf 2.52MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water
Act Section 401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section
401 Certification Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -
filing meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding
meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has
expired, and you can submit an application.
Signature
Submittal Date 9/18/2020