Loading...
HomeMy WebLinkAboutSW6191001_Supplement-EZ Form_20200928DRAINAGE AREAS ............................................................................................................................................................................................................................................................................ 1 Is this a hi h density rgject? Yes 2 If so number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No F EMS I..ED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Sand Filter 5 Total BUA in project (sq ft) 1 72000 sf„ New BUA on subdivided lots (subject to 6 permitting) „(sq ft) New BUA outside of subdivided lots (subject to 7 ermitting) (sp 72000 sf 8 Offsite - total areas ft 9 Offsite BUA (sq ft) 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft) 24600 sf Sidewalk (sq ft).... Roof (sq 1) Roadway (sq 1) 47400 sf Future.(sq ft) .... Other, please specify in the comment box below N ft 45650 sf New infiltrating permeable pavement on 11 subdivided lots (sq ft) New infiltrating permeable pavement outside of 12 subdivided lots s ft Exisitng BUA that will remain (not subject to 13 permitting) „(sq ft) 14 Existing BUA that is already permitted (sq ft) 15 Existing BUA that will be removed (sq ft) 16 Percent BUA 75% 17 Design storm (inches) 1 in 18 Design volume of SCM (cu ft) 4344 cf Simple Method for 19 Calculation method for design volume Runoff Volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the p p Y 20 drainage area(s): All parking aisle will be covered with gravel 2017 rules Design storm (inch ....................................................................... .995....ru rules ........................... H 2006-246 2008 rules rules ........................... Breakdown of new Parking„ (sq ft) Sidewalk (sq ft) Roof (sq ft) Future (sq ft) Other, please specify in the comment box below...(sq..ft)..................................................................................................................... New infiltrating permeable pavement on New infiltrating permeable pavement outside of 14 subdivided lots (sa ft) remain (not su Existing BUA that will be removed (sq Percent BUA Design volume of SCM (cu ft) Calculation method for desian volume Please use this space to provide any additional 21 information about the drainage area(s):