Loading...
HomeMy WebLinkAbout20200972 Ver 1_USACE Correspondence_20200922Strickland, Bev From: Capito, Rachel A CIV USARMY CESAW (USA) < Rachel.A.Capito@usace.army.mil > Sent: Tuesday, September 22, 2020 9:53 AM To: Bobby Billingsley Cc: johnthomas@thomasengineeringpa.com; Snider, Holley Subject: [External] RE: [Non-DoD Source] RE: Windpointe Subdivision External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Bobby, I spoke with Robb about the attached email. He was looking for the origin of the stream and was not looking at the location of the crossing that I was discussing. There is a North Carolina Stream Assessment form that uses methodology developed by the State and consulting groups on how to rate the quality and type of the stream resource. The State also has their own stream assessment forms, but what you provided is not either of those assessments. Based on the type of resource impacted (perennial stream) a conservation easement would not be adequate as you do not have additional streams onsite to preserve. Any other impacts to those streams would require a permit and thus the threat to the resource is limited. It is also out of line with our mitigation rule which is first to go to an established mitigation bank, then discuss in -lieu fee, and then conservation easement. The Corps has found that conservation easements are often violated and do not have the success rate as mitigation banks. Mitigation will be required for that crossing at a 2:1 ratio. Also please be aware that this permit is currently on hold as I have still not heard from the State Historic Preservation Office on the data point located on -site (appears to be a house). Still waiting on their concurrence and I need that information before I issue this permit. Please let me know if you have any additional questions. Thanks, Rachel From: Bobby Billingsley <bobbybiIli ngsley@thomasengineeringpa.com> Sent: Monday, September 14, 2020 1:48 PM To: Capito, Rachel A CIV USARMY CESAW (USA) <Rachel.A.Capito@usace.army.mil> Cc: johnthomas@thomasengineeringpa.com Subject: RE: [Non-DoD Source] RE: Windpointe Subdivision Rachel, the attached is all I have from Robb. Do you need more information on it? I have copied Robb on it. Robb do you have further stream data on the crossing/quality or what need be ... a "Stream Assessment Form"? Rachel also, we would likely prefer to do conservation easement instead of paid mitigation bank if possible. Thanks, Bobby Billingsley, PE BobbvBillingslev@ThomasEngineeringPA.com Thomas Engi nee ring PA.com T OMAS est 1983 ENGINEERING, PA Phs. Address: 1316-B Commerce Drive New Bern, NC 28562 Mail Address: PO Box 1309 New Bern, NC 28563 Office : 252.772.8011 Mobile: 252.671.2408 Fax: 252.636.2448 From: Capito, Rachel A CIV USARMY CESAW (USA) <Rachel.A.Capito@usace.army.mil> Sent: Monday, September 14, 2020 1:35 PM To: Bobby Billingsley<bobbybiIli ngsley@thomasengineeringpa.com> Subject: RE: [Non-DoD Source] RE: Windpointe Subdivision Hi Bobby, The Corps can require mitigation for any impacts we feel have a negative effect on the aquatic environment. We typically require mitigation for impacts over 150 linear feet, but in the case of perennial impacts mitigation can be required at any impact length. Mitigation will be required for this permit even if impacts are reduced to 149 linear feet. If you can provide an North Carolina Stream Assessment form we can discuss ratios. Thanks, Rachel From: Bobby Billingsley<bobbybillingsley@thomasengineeringpa.com> Sent: Wednesday, September 9, 2020 9:58 AM To: Capito, Rachel A CIV USARMY CESAW (USA)<Rachel.A.Capito@usace.army.mil> Subject: RE: [Non-DoD Source] RE: Windpointe Subdivision Rachel regarding the stream issue ... are you saying that greater than or equal to 150 LF requires mitigation? This is new for us ... never run into the footage being a threshold point before. If so, can we just simply reduce the impact length to 149 LF? We are trying to keep this as simple as possible for everybody... Thanks, Bobby Billingsley, PE BobbvBillingslev@ThomasEngineeringPA.com ThomasEngi neeri ngPA.com T OMAS est 1983 WF ENGINEERING, G, PA Phs. Address: 1316-B Commerce Drive New Bern, NC 28562 Mail Address: PO Box 1309 New Bern, NC 28563 Office : 252.772.8011 Mobile: 252.671.2408 Fax: 252.636.2448 From: Capito, Rachel A CIV USARMY CESAW (USA) <Rachel.A.Capito@usace.army.mil> Sent: Wednesday, September 09, 2020 8:46 AM To: Bobby Billingsley<bobbybiIli ngsley@thomasengineeringpa.com> Cc: iohnthomas@thomasengineeringpa.com Subject: RE: [Non-DoD Source] RE: Windpointe Subdivision The impacts associated with Fullard Creek are 150 linear feet long and therefore would require mitigation. Also please be reminded I have reached out to SHPO regarding the surveyed house point and cannot issue my permit until I receive concurrence from their office. Thanks, Rachel From: Bobby Billingsley<bobbybillingsley@thomasengineeringpa.com> Sent: Tuesday, September 8, 2020 7:49 AM To: Capito, Rachel A CIV USARMY CESAW (USA)<Rachel.A.Capito@usace.army.mil> Cc:johnthomas@thomasengineeringpa.com Subject: [Non-DoD Source] RE: Windpointe Subdivision Rachel I just noticed this below email that you had sent to John, but the submitted PCN was not over 150 LF of stream. Therefore mitigation wouldn't be required, right? Thanks, Bobby Billingsley, PE BobbvBillingslev@ThomasEngineeringPA.com ThomasEngi neeri ngPA.com THOMAS est 1983 WF ENGINEERING, PA Phs. Address: 1316-B Commerce Drive New Bern, NC 28562 Mail Address: PO Box 1309 New Bern, NC 28563 Office : 252.772.8011 Mobile: 252.671.2408 Fax: 252.636.2448 From: Capito, Rachel A CIV USARMY CESAW (USA)<Rachel.A.Capito@usace.army.mil> Sent: Friday, September 04, 2020 3:23 PM To: bobbybillingsley@thomasengineeringpa.com Subject: FW: Windpointe Subdivision Apologies I sent this to John earlier. Also I must hear back from SHPO before I can issue. Thanks, Rachel From: Capito, Rachel A CIV USARMY CESAW (USA) Sent: Friday, September 4, 2020 1:11 PM To: JohnThomas@ThomasEngineeringPA.com Subject: Windpointe Subdivision Hi John, The Corps requires mitigation for impacts to perennial streams over 150 linear feet. Mitigation in the form of bank credits will be required at a ratio of 2:1. Once you submit an updated mitigation proposal I can issue the permit. Thanks, Rachel Rachel Capito Regulatory Specialist U.S. Army Corps of Engineers Wilmington District Office: 910.251.4487 Cell: 910.899.6051 Virus -free. Blocked Blocked Blockedwww.avg. com