Loading...
HomeMy WebLinkAboutNCC204116_NOI Application_20200928Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/17/2020 9:26:11 AM (NCG01 NOI Submission) Approve by Clark, Paul 9/18/2020 1:41:34 PM (Review- Construction NOI 31529) • Gwinn, Matt reassigned the task to Clark, Paul 9/18/2020 8:29 AM • The task was assigned to Gwinn, Matt by round robin distribution 9/17/2020 9:26 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 21, 2020 5:00 PM. The priority is: High 9/17/2020 9:26 AM Submit by Selkane, Aziza 9/28/2020 8:38:13 AM (Payment Verification for NCC204116) * Holly Niemann • Selkane, Aziza assigned the task to Selkane, Aziza 9/28/2020 8:36 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 30, 2020 5:00 PM. The priority is: High 9/18/2020 1:42 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 31407 NOI No. Prior Reviewer Paul Clark Name 1a. Project Name * Belews Creek BC-166 Service Water Line Extension 1 b. Specific Lot This field may be used to list specffc lot numbers. Numbers 2. County* Stokes 3. Highway or Street Middleton Loop Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Belews Creek 5. State * NC 6. Zip Code * 27009 7. Latitude * Enter the latitude in decimal degrees 36.2848 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.0678 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/14/2020 Estimated Construction Project Start Date 10. Date to End* 12/31/2020 Estimated Construction Project End Cute 11. SIC (Primary)* Industrial (1541) Standard Industrial aassification for Developrrent 12. Acres to be 9.83 disturbed* (including off -site borrow and waste areas) 13. Total site area 6,099.61 (acres) * 14. Post- 0.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-STOKE-2020-Belews Creek BC-166 Service Water Line Tracking ID Extension Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Belews Lake Wate rbody* N larre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 22-27-7 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Corporation It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Mehdi If Corporation, enter Faegistered Agent First %rre 3. Last Name* Maibodi It Corporation, enter Pbegistered Agent Last %rre 3b. Title General Manager CCP Project Managment 4. Permitee E-mail mehdi.maibodi@duke-energy.com Address* 5. Permittee 980-373-6616 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 1007 Address Line 2 City Charlotte Fbstal / Zip Code 28202 Check box if the F Yes street address the same as mailing address State / Frovince / i egion NC Country United States 7. Permittee Street Street Address Address* 150 Fayetteville Street, Box 1011 Address Line 2 city State / Frovince / Region Raleigh NC Fbstal / Zip Code Country 27601 United States 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Daniel Contact - First Name * 2. Primary Site Albert Contact - Last Name * 3. Title Project Manager 4. Site Contact E- daniel.albert@duke-energy.com mail Address* 5. Site Contact 336-445-0743 Telephone No. 6. Organization Duke Energy Name 7. Site Contact Street Address Mailing Address* 3191 Pine Hall Road Address Line 2 City Walnut Cove Fbstal / Zip Code 27052-6165 8. Consultant Name (Optional) Doug Carr First and Last narre 9. Consultant E-mail doug.carr@aecom.com This person will be copied on all correspondence. 10. Consultant 919-461-1230 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/04/2020 Approved * 2. E&SC Plan Project STOKE-2021-006 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan STOKE-2021-006_20200904_Approval_Express.pdf 7.35MB Approval letter or Mast beRDFfornat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. Coordinates for start of service water line, tie-in, and end. Total site acreage owned by Duke Energy is 6099.61 acres. Proposed Watermain Tie-in to Existing [where the new service water will tap into the service water line surrounding the Coal Pile area]: Northing: 923535.1994 Easting: 1685587.0274 Watermain 2 Ending [section extending west on Pine Hall Road then north on Middleton Loop Road to planned Groundwater Remediation area]: Northing: 928522.1365 Ea st i n g : 1681591.0607 Watermain 3 Ending [section extending east on Pine Hall Road to the planned Ash Basin Closure area]: Northing: 925228.1298 Easti n g : 1685293.6980 8. NOI Certification NOI certification BC 166.pdf 49.31KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Mehdi Maibodi Title General Manager CCP Project Management Organization Legally Plesponsible Entity Duke Energy Date * 09/17/2020 F. Tracking and COC Info NOI Tracking No. 31529 NC Reference No. NCG01-2020-4116 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC204116 Coverage (COC) Uses 'count number' variable (increrrented by SP) No.* Count Number 4116 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC204116-2020 Invoice Due Date 10/18/2020 Initial Fee $ 100.00 Invoice Status OPEN