HomeMy WebLinkAbout20200545 Ver 1_More Info Received_20200923Strickland, Bev From: David Weikle <dweikle@shieldengineering.com> Sent: Wednesday, September 23, 2020 8:22 AM To: Annino, Amy M Cc: James Gamertsfelder; Slusser, Thomas; Keith Anthony Subject: RE: [External] RE: Bostic Landfill site Attachments: BOSTIC - STREAM.pdf • 1 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ELort.spam@nc.gov Amy, That was my oversight. How's this? David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Tuesday, September 22, 2020 5:11 PM To: David Weikle <dweikle@shieldengineering.com> Cc: James Gamertsfelder <jgamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov>; Keith Anthony <kanthony@shieldengineering.com> Subject: RE: [External] RE: Bostic Landfill site David, The Division will accept this if you add a similar composition of rip rap for channel roughness between the spring and the first stone drop. Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov D_ E Q Ewfr;-. -i Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Tuesday, September 22, 2020 3:40 PM To: Annino, Amy M <amy.annino@ncdenr.gov> Cc: James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov>; Keith Anthony <kanthonv@shieldengineering.com> Subject: FW: [External] RE: Bostic Landfill site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Amy, Have you had a chance to look at the revised drawings? David Weikle, P.E. Senior Project Engineer From: David Weikle Sent: Friday, September 18, 2020 10:46 AM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov>; Keith Anthony <kanthonv@shieldengineering.com> Subject: RE: [External] RE: Bostic Landfill site Amy, Have a look at the attached material. I think we've answered all of your concerns with these latest changes. David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Tuesday, September 15, 2020 4:14 PM To: David Weikle <dweikle@shieldengineering.com>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov>; Keith Anthony <kanthonv@shieldengineering.com> Subject: RE: [External] RE: Bostic Landfill site Hi David, Yes. Were you still planning on incorporating constructed riffles / rip rap in between the stone drop structures? If so, can you show that on the plan? Can you confirm the rock in the stone drop structures has been sized for the stream / velocity? Thanks, Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov ID7;.,. E Q� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Tuesday, September 15, 2020 11:51 AM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov>; Keith Anthony<kanthonv@shieldengineering.com> Subject: RE: [External] RE: Bostic Landfill site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Amy, Please take a look at the attached drawing. Is this what you had in mind? David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, September 9, 2020 1:17 PM To: David Weikle <dweikle@shieldengineering.com>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site David, Yes. This type of structure, if designed and installed appropriately for the stream channel (comparable to the conceptual plans attached), would be acceptable. Installing 3-4 of these structures with rip rap / constructed riffle in between the structures would be an acceptable way to increase channel roughness and provide grade control. The Division will want to see the structures and rip rap shown on the site plan. Please also include all necessary details / plans so that the contractor can successfully install this. All materials used in the channel should be sized appropriately. Coir matting and native veg seed should still be incorporated within the channel along with these new design features. Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.annino(cancdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Wednesday, September 9, 2020 12:40 PM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Would a series of 3 or 4 of these suffice? We could use some rip rap between them for the roughness issue. David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, September 9, 2020 10:03 AM To: David Weikle <dweikle@shieldengineering.com>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site David, Rock check dams are not grade control structures. A rock check dam is not appropriate in this situation. The intent of the grade control structure is to maintain design grade and prevent headcutting. A rock check dam will not perform this function. Please see the following resources for grade control structures: https://www.bae.ncsu.edu/extension/srp/technical-resources/ https://www.bae.ncsu.edu/wp-content/uploads/2017/07/sr guidebook.pdf - Structures are discussed in CH 8, and Vanes are discussed in 8.2 http://www.hydrology.bee.cornelI.edu/BEE4730Handouts/Rosgen Vanes.pdf https://www.nres.usda.gov/wps/portal/nres/detail/national/ndcsmc/?cid=nres143 009158 Grade Control is discussed in the Treatment and Practices table if you scroll halfway down the webpage. Item IPhotographs (JPG) (JPG; 679 KB) (JPG; 501 KB) (JPG; 563 KB) (JPG; 596 KB) Grade IStone Drop construction (JPG; 621 KB) control Stone Drop Structure (JPG; 816 KB) (JPG; 667 KB) (JPG; 166 KB) Conceptual Plans (PDF) [Conceptual Plans (DWG) Cross Vane (PDF; 119 KB) Log Check (PDF; 124 KB) Rock Chute (PDF; 200 KB) Sheet Pile Weir (PDF; 110 KB) Step Pool Rock Structure (PDF; 195 KB) Step Pool Rock Chute (PDF; 156 KB) Stone Drop (PDF; 116 KB) e (DWG; 240 KB) (DWG; 374 KB) e (DWG; 349 KB) Weir (DWG; 193 KB) Rock (DWG; 195 KB) Step Pool Rock Chute (DWG; 164 KB) Stone Drop (DWG; 149 KB) Will channel roughness also be addressed? DWR believes increasing channel roughness will also be an important component of maintaining stability in the channel bed. Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov 4 rt A4 y 5 D7w llk�we� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to 5 appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Tuesday, September 8, 2020 4:03 PM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Subject: FW: [External] RE: Bostic Landfill site I External email. Do not click links or open attachments unless you veri report.spam@nc.gov Sorry about that. Here's the attachment. David Weikle, P.E. Senior Project Engineer From: David Weikle Sent: Tuesday, September 8, 2020 3:58 PM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site Amy, I've clouded the additions to the drawings for your review. Let me know what you think? David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, September 2, 2020 5:22 PM To: David Weikle <dweikle@shieldengineering.com>; James Gamertsfelder<jamertsfelder@shieldengineering.com>; Slusser, Thomas <thomas.slusser@ncdenr.gov> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site Mr. Weikle, Thank you for your reply. Please see the NC Erosion and Sediment Control Planning and Design Manual, Chapter 8 - Appendices: https://files.nc.gov/ncdeg/Energy%20Mineral%20and%2OLand%2OResources/Land%2OResources/Land%2OQuality/Erosi on%20and%20Sediment%20Control%20Planning%20and%20Design%20Manual/Chapter%208/Chapter%208 rev%20Ma y%202013.pdf In Table 8.05d (on Page 8.05.9) for Maximum Permissible Velocities for Unprotected Soils in Existing Channels, the maximum permissible velocity for ordinary firm loam is listed as 3.5 fps. The velocity you have calculated for the proposed ditch is 4.89 fps. In light of this, the Division is concerned that erosion will occur in the ditch as it is currently designed and transport sediment into downstream surface waters, thereby causing water quality violations downstream. The Division will not issue a certification for a project that will cause downstream surface water quality violations. The Division would like to sees changes made to the proposed S1 impact to prevent this from happening. This could include placing the S1 stream in a culvert. Alternatively, it could include making changes to the S1 stream channel bottom (adding imported rock to create roughness and habitat while reducing velocity and erosion) and adding grade control throughout the channel with —2 permanent structures. You might consider these as possible changes to create greater stability in the stream channel and prevent erosion into downstream waters. I spoke with Thomas Slusser today about my concerns and he has arranged a phone call tomorrow at 9am. I look forward to discussing this with all involved. Amy Annino Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov D7w = E Am Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle[mailto:dweikle@shieldengineering.com] Sent: Tuesday, September 1, 2020 3:49 PM To: Annino, Amy M <amy.annino@ncdenr.gov>; James Gamertsfelder<Ogamertsfelder@shieldengineering.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site • External email. Do not click lin chments unless you verify. Send all suspi L an e Amy, Please see below. Also, revised plans are going out in the mail tomorrow for both Mike and Amy. David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Friday, August 28, 2020 3:02 PM To: David Weikle <dweikle@shieldengineering.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site Mr. Weikle, Thank you for providing the Division with the revised drawings, calculations, and response letter. After speaking with Mike Smith (DEMLR), I understand that you have provided DEMLR with revisions to the plan and associated calculations. Please see my comments below: • Please provide the Division with the most recent revised project plans. [15A NCAC 02H .0502 (b)(3)] SHIELD IS MORE THAN HAPPY TO PROVIDE DWR WITH THE LATEST APPROVED DRAWINGS. • Please provide calculations showing that all stormwater entering jurisdictional waters at station 0+60 will be at non -erosive velocities (2.5 ft/second) for the 10 year storm event. SHIELD HAS ATTACHED CALCUATIONS SHOWING THE PRE- OF POST -PROJECT FLOWS AT STATION 0+30. A ROUGHNESS COEFFICIENT OF 0.035 WAS USED (OPEN CHANNELS— EARTH FAIRLY UNIFORM —SIDES CLEAN, COBBLE BOTTOM) FOR BOTH THE BEFORE AND AFTER CONSTRUCTION. AS CAN BE SEEN, THE VELOCITY ACTUALLY DECREASES FROM 6.32 TO 4.89 DUE TO THE PROPOSED WIDENING OF THE CHANNEL. IT SHOULD ALSO BE NOTED THAT BASED ON THE NATURAL SLOPE OF THE CHANNEL AND THE ACTUAL DRAINAGE AREA FEEDING THE CHANNEL, A VELOCITY OF 2.5 FPS IS IMPOSSIBLE TO PROVIDE. Impact S1: Provide justification for the proposed stream channel dimensions based on reference reach information or stable dimensions upstream and downstream of the impact area. Size the channel appropriately to prevent future channel aggradation or degradation. [15A NCAC 02H .0506 (b)] THE CHANNEL WAS SIZED TO GRADUALLY NARROW/TRANSITION FROM OUR UPPER DITCH WIDTH OF 10' TO THE NATURAL WIDTH OF THE CHANNELATTHE PROPERTY LINE. Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received by September 28, 2020, the Division will be unable to approve the application and it will be returned. Amy Annino Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Thursday, July 2, 2020 12:14 PM To: Annino, Amy M <amy.annino@ncdenr.gov> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: [External] RE: Bostic Landfill site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Amy/Mike, Attached you will find the revised drawings, ditch calculations, and a comment response letter. Please let me know if either of you need anything else. Have a nice Holiday. David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Thursday, July 2, 2020 8:26 AM To: David Weikle <dweikle@shieldengineering.com> Subject: RE: [External] RE: Bostic Landfill site Hi David, You can send me electronic revisions via email if the file isn't too large. Paper copies to the Swannanoa address are also acceptable. Thank you, Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov D; E Q: V., 0 +hµ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: David Weikle [mailto:dweikle@shieldengineering.com] Sent: Wednesday, July 1, 2020 12:26 PM To: Annino, Amy M <amy.annino@ncdenr.gov> Subject: [External] RE: Bostic Landfill site External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Amy, I'll work on addressing the comments. In the meantime, where should I submit the new drawings? Do they need to be paper copies sent to the address in Swannanoa? David Weikle, P.E. Senior Project Engineer From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Wednesday, July 1, 2020 7:21 AM To: David Weikle <dweikle@shieldengineering.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: Bostic Landfill site On April 15, 2020, the Division of Water Resources (Division) received your application dated April 8, 2020 requesting a 401 Water Quality Certification from the Division for the subject project. On April 15, 2020, the application was placed on hold while the Division determined whether an application fee was required. On May 8, 2020, the Division determined that an application fee was not necessary. After initial review of the application, the Division has determined that your application is incomplete and cannot be processed. The application is on hold until the following items are addressed: 1. The plan proposes to excavate landfill material from within and below an existing intermittent stream. After excavation is complete, a 10 foot wide ditch with a 5.2% slope will be graded to provide a channel for the intermittent stream below an existing spring head (to remain undisturbed). The new ditch will be stabilized with seed, straw, and coir matting. No grade control within the proposed ditch has been proposed. a. The Division is concerned about stream channel stability within the proposed 10 foot wide, 5.2% slope ditch. Please provide calculations showing that streamflow and stormwater flow will not degrade the restored channel or downstream waters. [15A NCAC 02H .0506(b)(2) and (b)(3)] 2. Wattles are specified as 'Excelsior Wattle' in the drawing within the Sediment Wattle detail on sheet 9. All wattles specified for placement in jurisdictional waters should be either a coir log or coir wattle and contain no plastic netting or mesh. Please provide a specification sheet on selected product and update the plan accordingly. a. What is the timeline for maintaining and removing wattles from the stream after the project has concluded? The wattles should not be left permanently. 10 b. Any sediment removed from behind wattles in the stream should be performed by hand with shovel and bucket and spoils should be stabilized at least 30 feet from surface waters. Please provide a location on the plan for spoils to be deposited and stabilized. 3. Is application of PAM proposed for all wattles? Use of PAM is not allowable on wattles in jurisdictional waters. Please indicate this in the plan set. 4. The plan shows a silt fence outlet to be installed at the LOD within the channel of the intermittent stream. a. This Office believes that the silt fence outlet can be revised to avoid and minimize the impacts to the stream. Please provide an alternative to installing a silt fence outlet within the channel of the intermittent stream. [15A NCAC 02H .0506(f) and (g)] 5. At what station do you expect to begin the pump around sequence? Please provide more detail on where / how you intend to pump spring flow and stream flow (as well as any groundwater seepage) around the work area to protect downstream waters. Pursuant to Title 15A NCAC 02H .0502(c), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received by August 1, 2020, the Division will be unable to approve the application and it will be returned. Amy Annino Environmental Specialist —Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.anninoa-ncdenr.gov fD7;., = E Q _ •� 5 y Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. 11 870 :•1 85C 84C 83C 82C 810 0+00 a w Z J w 0- 0- u S + 0 fn x w U_ LL 0 Z Z U 0 Z 0 O a J� 0 00w Of 0-0 Qco �0 + � on. Z O _ 0 O J J O 0 0 0W 0Ow �Z Of �0 0-0 Q� Qco Il o0 �0 + Of + O CD 0- ow U J x Of o GRAPHIC SCALE 10 0 5 10 20 Layout Fill all voids around boulders with graded gravel Flow 1.5' Wrap lower rock level with geotextile Section A —A I 1.5' to 2' Varies I 0.3' + 1.5IC7 S\ ' Min l�3' Min. Typical Rock Dimensions and Placement (stone size to be stable at highest design discharge) (IN FEET) 1 "=10' Stone Drop L-30- 45• Flow 4 Adjust position and alignment of structure to guide flows through the turn B� r-y A weir stone A Varies 4'-8' Plan weir stone a -- a oa oa 00 Section B—B Key in 2' 870 :.e B50 B40 B30 B20 810 0+75 Seed and mat embankments per Landscaping Plan (Drawing #8) IN ' W E LIMITS OF ; WASTE , W, W SEE NOTE #1 BELOW �PRiNG PROP. ST lo� DROPS (TYP) -� GRAPHIC SCALE 20 0 10 20 40 (IN FEET) 1 "=20' NOTES: 80 1. TO PROVIDE A'NATURAL' STREAM BOTTOM, COVER APPROXIMATELY 25% OF STREAM IN BETWEEN THE STONE DROPS WITH PIECES OF CLASS 'B' RIP RAP. THEY SHOULD BE PLACED ON COIR FABRIC WITH OTHER VARYING SIZED COBBLESTONES. 2. BASED ON THE INITIAL GROUND -PENETRATING SURVEY, EDGE OF WASTE MATERIAL STARTS AT STREAM CENTERLINE STATION 0+25. EXCAVATION OUTSIDE THE ACTUAL WASTE MATERIAL FOUND SHOULD NOT BE CARRIED OUT AND EXISTING FEATURES SHOULD BE LEFT AS IS. W v1C�0'�o W N A N 0 W N 00 Q o O d LU w �!!rr l l l t111�� o 0 o Y O 00 = D m Q w H a � o F- m m w U Z Z > o a a a a o 0 o a Uo Z Q _ 00 ;_ N tM Co r n Y oo Y, co t� v w N (0 � z LuU44 UZCOCY) �w44 Qo o 7 C� 0 '0 Zco 3 M WIt Notes: The rocks should be rectangluar or nearly so at the rock to rock contact. The rock to rock contact should be solid. If rocks are not perfectly flat, the thicker end should be placed downstream. Fill gaps with smaller stones. Z J w � N.T.S. � UU Q File Name cn J Date Small Stream.dwg Z 0 O — Designed Fripp, Weber 06/07 U Q N RCSStone Drop Drawn J. Renteria 06/07 Drawing Name 0 < Small Stream Small Stream J � � Checked w U Natural Resources Conservation Service 06/18/07 w United Stales Department of Agriculture Approved = = J Sheet of , U F w V)�0 O Z V_ � M � V) 0 m