HomeMy WebLinkAbout20201254 Ver 1_Pre-Filing Meeting Request_20200922ID#* 20201254 Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 9/22/2020
..........................................................................................................................................................................................................................
Contact Name * Larry Scott
Contact Email Address* LSCOTT4@4TT.NET
Project Name* Scott Lake Shore
Project Owner* Larry Scott
Project County* Iredell
Owner Address: Street Address
Address Line 2
aty State / Frovince / Region
Fbstal / Zip Code Country
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - r- 401 Water Quality Certification
Regular Express
r- Individual Permit F Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.
Would Like to have approximately 125-130 linear feet of Class B RipRap
installed on the shore of our property to stop erosion of shoreline and yard
of property at 215 Riverwalk Rd. Stony Point NC 28678. Our property is
located on Lake Lookout Shoals.
Please give a couple of dates you are available for a meeting.
9/29/2020
10/6/2020
10/13/2020
Please attach the documentation you would like to have the meeting about.
ConnectGIS Feature Report[2811] 215
162.03KB
Riverwalk Rd.pdf
RipRap Installation 215 Riverwalk Rd..pdf 153.77KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/22/2020
Reviewer Meeting Request Decision
Is a meeting Required?* r Yes r No
&CONNECTGIS
WEB HOSTING
Iredell
Printed September 24, 2019
See Below for Disclaimer
Addresses
• Infrastructure
2-11
r
` NonResldentlal Use
Residential Use -
Streets
FF
Interstate
Ramp
'
—US Hwy
1
a
" State Hwy
—Main Road
`r1
Loca I Road
� I
,{
Residential
`
}}
Private
Inactive
Parcels Hooks
Parcels
El
`
City Limits
�kr
Lake Borman
Iredell Countyline
I01
NC Counties
' E.
L�L 1 = Feet
Fhe maps prepared for this website are generated from recorded deeds, plats, and other public records. Users of these maps are hereby notified that the information
Drovided herein should be verified. Iredell County assumes no legal responsibilities for any of the information contained on this site. Users are advised that the use of
any of this information is at their own risk. All maps on this site were prepared using a 1000a€'" Grid based upon the North Carolina State Plane Coordinate System from
:he 1983 North American Datum. The delinquent real property tax overlay is updated monthly. The information presented is not intended to be used or relied upon as
Dfficial notice of tax liens. For additional information regarding delinquent taxes, contact the Iredell County Tax Collector's Office.
Rwk ripr p ftefaWs
Cross section
N'sil lcti-We
Water€eve
€.akebed �.
0.
liEau"n of ripr+p !7
111it11E11tull
2 x E]laXlnllElli
Kxvgmg Vegetation. 1PIlAtings
1 tr Sol i
c`
E
t Top of npr p virtu a it
tlacklityLti = maximum
Crx'k size
2
C.> Raui , 2-1 slope
E _
j GeDtext. ie FabrIr
Slope will be graded. Gass 8 RipRap
will be more than one layer and will
be band placed after machine placed
to look even and uniform across
shoreline.