Loading...
HomeMy WebLinkAbout20201254 Ver 1_Pre-Filing Meeting Request_20200922ID#* 20201254 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/22/2020 .......................................................................................................................................................................................................................... Contact Name * Larry Scott Contact Email Address* LSCOTT4@4TT.NET Project Name* Scott Lake Shore Project Owner* Larry Scott Project County* Iredell Owner Address: Street Address Address Line 2 aty State / Frovince / Region Fbstal / Zip Code Country Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - r- 401 Water Quality Certification Regular Express r- Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. Would Like to have approximately 125-130 linear feet of Class B RipRap installed on the shore of our property to stop erosion of shoreline and yard of property at 215 Riverwalk Rd. Stony Point NC 28678. Our property is located on Lake Lookout Shoals. Please give a couple of dates you are available for a meeting. 9/29/2020 10/6/2020 10/13/2020 Please attach the documentation you would like to have the meeting about. ConnectGIS Feature Report[2811] 215 162.03KB Riverwalk Rd.pdf RipRap Installation 215 Riverwalk Rd..pdf 153.77KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/22/2020 Reviewer Meeting Request Decision Is a meeting Required?* r Yes r No &CONNECTGIS WEB HOSTING Iredell Printed September 24, 2019 See Below for Disclaimer Addresses • Infrastructure 2-11 r ` NonResldentlal Use Residential Use - Streets FF Interstate Ramp ' —US Hwy 1 a " State Hwy —Main Road `r1 Loca I Road � I ,{ Residential ` }} Private Inactive Parcels Hooks Parcels El ` City Limits �kr Lake Borman Iredell Countyline I01 NC Counties ' E. L�L 1 = Feet Fhe maps prepared for this website are generated from recorded deeds, plats, and other public records. Users of these maps are hereby notified that the information Drovided herein should be verified. Iredell County assumes no legal responsibilities for any of the information contained on this site. Users are advised that the use of any of this information is at their own risk. All maps on this site were prepared using a 1000a€'" Grid based upon the North Carolina State Plane Coordinate System from :he 1983 North American Datum. The delinquent real property tax overlay is updated monthly. The information presented is not intended to be used or relied upon as Dfficial notice of tax liens. For additional information regarding delinquent taxes, contact the Iredell County Tax Collector's Office. Rwk ripr p ftefaWs Cross section N'sil lcti-We Water€eve €.akebed �. 0. liEau"n of ripr+p !7 111it11E11tull 2 x E]laXlnllElli Kxvgmg Vegetation. 1PIlAtings 1 tr Sol i c` E t Top of npr p virtu a it tlacklityLti = maximum Crx'k size 2 C.> Raui , 2-1 slope E _ j GeDtext. ie FabrIr Slope will be graded. Gass 8 RipRap will be more than one layer and will be band placed after machine placed to look even and uniform across shoreline.