HomeMy WebLinkAbout20201281 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20201281
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Heath Caldwell
heath.caldwell@wetlands-epg.com
Villages at Cramerton
VCM Bowman, LLC
Gaston
Street Address
13815 Cinnabar Place
Address Line 2
aty
Huntersville
Rbstal / Zip Code
28078
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.
The forthcoming PCN will propose a NWP #29site on +/- 41.9 acres located
south of Cramer Mountain Road near the intersection with Baltimore Road
in Cramerton, NC. The site is a proposed residential development and
consists of six streams and four wetlands. A Preliminary Jurisdictional
Determination will be submitted with the permit application. The proposed
application will include 203 If of permanent stream impacts to two streams
for road crossings.
Please give a couple of dates you are available for a meeting.
10/15/2020
Please attach the documentation you would like to have the meeting about.
Villages at Cramerton Overview.pdf 345.78KB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Oall�elll
Submittal Date 9/24/2020
Reviewer Meeting Request Decision
Is a meeting Required?* r Yes r No
FUTURE
PHASE 1
M PACT # 1
PROPOSED ROAD CROSSING
(STREAM ) ±137.7LF
DMD INVESTORS LLC.
PID: 219594
PIN# 3574770297
DB:4546 PG:1028
I M PACT #2
PROPOSED ROAD CROSSING
(STREAM) ±65 LF
n
CRAMLRMOU
8L C j�,W ROAD
BALTIMORE NEIGHBORHOOD
- - CORPORATION
MB:8 PG:35
MB:8 PG:88
/ VILL4 AT �.
�.�
MER ON MILLS -
PHA 1p
9.67 ACRES �
^ i %
YLLS REMAINDER OF
RIVER BLUFF OF C1ONLLC
E
PID: 21033
031
PIN# 358402868
_ DB:4203 FC:2131
IMPACT #1 &2
PLAN VIEW - OVERALL SITE
Villages at Cramerton Mill
TOWN OF CRAMERTON, GASTON COUNTY, NORTH CAROLINA
GRAPHIC SCALE
0 150 300 600
1 inch = 300 ft.
Engineering