HomeMy WebLinkAbout20201284 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20201284
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jeff Van Dyke
unipresser@hotmail.com
rip rap on MIL point
Jeff Van Dyke
Mecklenburg
Street Address
12757 Overlook Mountain Drive
Address Line 2
aty
Charlotte
Rbstal / Zip Code
28216
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
no
Please give a brief project description below.
This project affects 120 feet of shoreline on a point of Mountain Island
Lake
that is being eroded and undermined by waves. The contractor, Lyfe
Marine, will will remove debris, several stumps and two damaged pine
trees; shape the bank, install Geo-technical fabric and install Class "B" rip
rap.
Please give a couple of dates you are available for a meeting.
10/15/2020
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/24/2020
Reviewer Meeting Request Decision
Is a meeting Required?* r Yes r No