Loading...
HomeMy WebLinkAbout20201284 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20201284 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/24/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jeff Van Dyke unipresser@hotmail.com rip rap on MIL point Jeff Van Dyke Mecklenburg Street Address 12757 Overlook Mountain Drive Address Line 2 aty Charlotte Rbstal / Zip Code 28216 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below. This project affects 120 feet of shoreline on a point of Mountain Island Lake that is being eroded and undermined by waves. The contractor, Lyfe Marine, will will remove debris, several stumps and two damaged pine trees; shape the bank, install Geo-technical fabric and install Class "B" rip rap. Please give a couple of dates you are available for a meeting. 10/15/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/24/2020 Reviewer Meeting Request Decision Is a meeting Required?* r Yes r No