HomeMy WebLinkAbout20201287 Ver 1_Pre-Filing Meeting Request_20200924ID#* 20201287
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 9/24/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Amanda Bloom
Bloom@mcadamsco.com
Liberty Park Phase 2
Town of Mooresville
Iredell
Street Address
413 North Main Street
Address Line 2
aty
Mooresville
Rbstal / Zip Code
28115
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.
The project will involve development of a Master Plan for Phase 2 of the
park. New elements may include basketball
courts, nature play and exercise opportunities, trail connections and
access, picnic areas, an open-air pavilion, a
restroom and concessions building, an accessible playground, universal
design facilities, and associated parking. Natural channel design will be
used to stabilize the stream that runs through the park.
Please give a couple of dates you are available for a meeting.
10/9/2020
Please attach the documentation you would like to have the meeting about.
TOM19000_LibPk_Fig 1 USGS.pdf 2.13MB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/24/2020
Reviewer Meeting Request Decision
Is a meeting Required?* r Yes r No
a
Q
0
i
*,
b
Legend
= Project Area
NOTES:
1. USGS; 7.5 MINUTE, QUAD, "MOORESVILLE," NORTH CAROLINA; 2019
2. LAT: 35.582119, LONG:-80.808306
D
t
O
6
1`1
0
0 1,000 2,000
FIGURE 1. USGS TOPOGRAPHIC VICINITY MAP Feet
LIBERTY PARK PHASE 2 1 inch = 2,000 feet
MOORESVILLE, IREDELL COUNTY, NC VERSION: 1
DATE: 7/20/2020
McADAMS JOB NO: TOM-19000
DRAWN BY: pierzga