HomeMy WebLinkAbout20120164 Ver 1_Certification of Completion_20200924 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 9/24/2020 5:00:10 PM(Start)
BIMS Updated by Carpenter,Kristi 9/25/2020 8:49:04 AM(DOT Project)
• The task was assigned to Carpenter,Kristi 9/24/2020 5:00 PM
c,,.srar�
Certification of Completion �a
NORTH CAROLINA
EnrIronmental Quality
Staff Review
......................................................................................................................................................................................................................................................................................................................................................................................................
DWR Project#:* 20120164 Version:* 1
Reviewer List* Joanne Steenhuis:eads\jhsteenhuis
CERTIFICATION SUBMITTED ON 9/24/2020
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any
subsequent modifications,the applicant is required to submit it to the DWR 401 &Buffer Permitting Branch. This form
may be returned to DWR by the applicant,the applicant's authorized agent,or the project engineer. It is not necessary
to send certificates from all of these.
Is this a Public Transportation Project? rJ Yes
r No
USACE Permit# 2004 199
DWR Project#: 20120164 Version: 1
County: New Hanover
401 Water Quality Certification Issued Date:
2/28/2012
Applicant: NCDOT Division 3
Project Name: New Hanover Bridge 12(WB Drawbridge)Submarine cables
Supplemental Attachments: Click the upload button or drag and drop files here to attach docurrent
Bridge 12 on Wrightsville Beach Draw
1.17MB
Bridge_401 Completion Form.pdf
New Hanover Bridge 12_USACE 404
60.4KB
Completion Form.pdf
FM only
Who will be submitting the Certification of Completion?
r Applicant
C' Agent
f Certified Professional
Agent's Certification
I, hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules,the approved plans and specifications, and other supporting materials.
17 By checking the box and signing box below, I certify that:
o I have given true,accurate, and complete information on this form;
o I agree that submission of the"Certificate of Completion"form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the "Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
o I intend to electronically sign and submit the"Certificate of Completion"form."
Printed Name: Anneliese Westphal
Signature