Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0000884_Monitoring - 08-2020_20200924
Monitoring Report Submittal ............................................................................................................................................ Permit Number #* WQ0000884 Name of Facility:* Butterball, LLC Month:* August Report Information Type * NDMR, NDAR-1, NDAR-2, NDMLR Confirmation Email Address:* Name of Submitter:* Signature: Date of submittal: Initial Review Year:* 2020 Upload Document* augustDMR.pdf 3.77MB FDF Cnly Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-t, NDAR-2, NDMLR, GW-59). jbatchelor@butterball.com Joshua Batchelor i'?, c a".?� f Reviewer: Williams, Kendall 9/24/2020 This will be filled in automatically Is the project number correct? * WQ0000884 Is the monitoring report r Yes r No accepted?* Regional Office * Wilmington Accepted Date: 9/24/2020 FORM: NDMR 03-12 NON -DISCHARGE. MONITORING REPORT (NDMR) Page of Sampling Persons) Certified Laboratories Name: Jefferson Foy Name: Environmental Chemist Name: Josh Batchelor Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? R1 compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reasons) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, SI Phone Number: 919-658-6743 ext 2291 Signing Officials Title: Plant Manager Has the ORC changed since the previous NDMR? ❑ Yes [] No Phone Number- 919-658-6743 ext 2267 Permit Expiration: 9/30/2022 `\-2z��o'� Z Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Did the application rates exceed the limits in Attachment B of your permit? ❑� Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? p Compliant ❑ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ❑✓ Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? Q Compliant ❑ Non-Comps€ant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? 21Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Falk Certification No.: 991798, 987940 Signing Official: Jeff Shamblin Grade: WWIV, S[ Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant manager Facilities/Wastewater Has the ORC changed since the previous NDA]l ❑ Yes 0 No Phone Number: 919-658-6743 ext 2267 Permit Exp.: 9/30/22 TAT Signature ate Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under per I of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system desig d to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and bellef, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, inducting the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Did the mass loading rates exceed the limits in Attachment B of your permit? 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the feason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification Number: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, SI Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDi ❑ ves F1 No Phone li 919-658-6743 ext 2267 Permit Exp.: 9130/22 f f Ct.I 7 ' Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty f aw, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NIIAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 Field Name 01A'. Field Name: 01B Field Name 01C Field Name: 02A Did irrigation occur Area (acres}. 26 75 Area (acres) 74.59 Area (acres) 11 48 Area (acres) 18.61 at this facility? Cover.Crop: Goasfal Cover Crop: Goasfal Cover Crop Coastal,. Cover Crop. Coastal.... [] YES ❑ No Hourly Rate (m) Hourly Rate (in): Hourly. Rate (in.)..:Hourly Rate (in): Annual Rate (m} 50 .; Annual Rate (in): 50 Annual Rate (in) 50 Annual Rate (in}: 50 Weather Freeboard Field Irrigated? ❑ YES::: ❑ No ': Field Irrigated? [] YES ❑ r�o Field Irrigated? YES ❑ No Field irrigated? ❑ YES ❑� No E10 w o E T m tm F T ma c m a E.2 >(4i pT Vy�aL o . E a ( s E E � G aE rn vc acm o d C � J JE > Q > Jrnro =?^JXoo .: °F in ft ft gal. min in in gal min in in gal min in m gal min in in 1 C 97 0.54 72 130,11.5 491 0.42 0.05 2 C 95 D 74 181,525 685. 0,;58 0.05 3 CL 86 1.06 80 38,160 144 0:12 0.05..: 4 PC 91 0.841 76 72,345'; 273. 0:23 .0.05 ; 5 C 89 0 70 6 PC 87 0,02 68 94,870,:. 358 0.30 0.05. 7 EL 92 4.87 68 14.177.5 535 D.45. 0.05 8 R 92 0.62 56 9 C 95 0.05 52 10 PC 95 0.15 51 98,580.; 372 032 0.05 11 PC 94 4A3 52 109,445. , 41.3 0.36 0.05 12 R 90 0.25 53 87,715 331 13 PC 89 0.01 51 122,430 462 039 D.DS 14 PC 88 0 50 109,180 41.2 035 0.05 >' 15 R 89 1.2 48 16 R 76 0.2 46 87,185; 329 0.28 0.05 17 C 87 0.01 46 89,835. 339 D:29 18 C 90 0 46 165,89.0 626 0 53 0.05 ..: 19 PC 83 0 49 126,670 478 0;41 0.05 20 C 83 0 49 86,377 478 028 0.03 21 PC 87 0 48 118,720 44i3 0:'38 0.05 22 PC 85 0 50 90,365 341 0 29 0,05 23 PC 85 0 52 90,895' 343 D29 0.05 24 CAM 84 0,03 58 139,050 6.18 0.19 0.02 160,855 607... 0 52 0.05 25 PC 87 0 59 155,700 692 0.21 0102 54,720 228 0.03 0.01 8%W5. 337 0 29.0.05:.::. 26 C 90 0 60 149,850 666 0.21 0.02 160,080 667 0,08 0.01 91,955. 34.7 0;;30 i0 05 27 C 93 0 60 153,450 682 0.21 0,02 163,200 680 0,08 0.01 88,775 335 0.28 0.05 :. 28 C 92 0 60 1460 . 95 649.2 0.20 0.02 ' 153,736 639 0.08 0.01 87,348 329,4 0.2.8. 0...0.5.. f; 29 PC 88 0,05 60 148 050 ti58 `'0.20 0,02. 157,920 658 0.08 0.01 90,63Q..... 342 ....0.29.. 0 05 'i 30 C 93 0 62 157;950 702 0.22 0.02 150,720 628 0.07 0.01 .35,150 51.0 .0.43 0 05 31 PC 89 0A4 68 152A74 677.4 ... 0,21 0.02 163,50$ 679.8 0.08 0.01 90,873 343.2 .0 29 0. 05 Monthly Loading: 1,202 619` 1 66 = 1,003,884 0.50 2 875.9813, 9 23 0 0.00 12 Month Floating Total (in): 20 26 15.16 28.65 16.84 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility Did irrigation occur Field Name 02B: Field Name: 02C Area (acres), 12 01 Area (acres) 9.16 at tillsaCl�lty? CoverGrap: Coastal Cover Crop: Coastal [� YES ❑ NO Hourly Rate:(in); Hourly Rate (in): Anneal Rate'(in)- 86.8. Annual Rate (in): 50 Weather Freeboard Field Irrigated? EYES, j] No ;. Field Irrigated? YES ❑ NO m o a :4 rnn du E d cu br A� E �u� � C m E a1 •a d ;; of ?, C E �rn a` c m o 1° Q to �n a E �� Eaa' asp roa Ear 7 � OF in ft ft gal min in in gal min in in 1 C 97 0,54 72 103,668 480 i:0 32 0 04 63,570 326 0.26 0.05 21 C 95 0 74 106,212 501 0 33 D 0.4 61,620 316 0.25 0.05 3 CL 86 1.06 80 30,740 145 0 09 D,04 41 PC 1 91 0.84 76 5 C 89 0 70 41,976 198 0 13 i 0 04 .: 6 PC 87 0.02 68 7 CL 92 4.87 68 119,568 564 0 37 0.04 8 R 92 0.62 56 9 C 95 0.05 52 10 PC 95 0.15 51 59,360 280 0,18 6,04. 11 PC 94 0.03 52 86,708 409 0,27 .0.04. ,':' 31,395 161 0.13 0.05 121 R 1 90 0.25 53 18,232 86 0.06 0.04 61,035 313 0.25 0.05 131 PC 1 89 0.01 51 81,408 384 0.25 0.04 14 PC 88 0 50 79 076 373 0 24 0 04 37,830 194 0.15 0.05 15 R 89 1.2 48 16 R 76 0.2 46 69,748 329 0.21 0 04 '? 17 C 87 0.01 46 76,532 361 i.23 0 04 60,450 310 0,24 0.05 18 C 90 0 46 124,444 587 0,38 i 0.04 57,720 296 0.23 0.05 19 PC 83 0 49 76,956 363 .0.24 .0 04 20 C 83 0 49 76,956 2178b.. 21 PC 87 0 48 99,M 468 0.30 D D4 55,575 285 0.22 0.05 22 PC 85 0 50 91,796 433 0.28 0.04 23 PC 85 0 52 72,716 343 0.22 .0.04 40,950 210 0,16 0.05 24 CL 84 0.03 58 1411828 669 0.43 D 04 25 PC 87 0 59 77,380 365 0,24 0 04 ` 61,620 316 0,25 0.05 26 C 90 0 60 73,352 3.46 0.22 -0 04 27 C 93 0 60 70,596 333 0.22 0.04 38,415 197 0.15 0.05 28 C 92 0 60 78,016 ..368 0.24 .U4 `. 49,335 253 0.20 0.05 291 PC 1 88 0.05 60 6.0,420 285 .0;19 0.04 128,115 657 0.52 0.05 301 C 1 93 0 62 94,976 448 0,29.. 0.04 63,765 327 0.26 0,05 311 PC 89 0.04 68 79,712 376. 0.24 0.04 ". Monthly Loading: 2,091592. 6.41 811,395 3.26 12 Month Floating Total (in), .56.63'`' 25,05 County: Duplin I Month: August Year: 2020 Field Name: 05 Area (acres) 18.63 Cover Crop Coastal Hourly Rate (in): Annual Rate (in): 68.8 Field Irrigated? ❑ YES 0 NO 0) "0 E N a 0 Q •o U E� ~ w a c "a l0 J E Tm a i r- Eao x O @ J gal min in in FORM: NEAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility Did irrigation occur Field Name. 07 - Field Name. 07A Area (acres) 14 89 Area (acres): 6,12 at this facility? Cover Crop: Coastal Cover Crop: Coastal Ej YES ❑ NO Hourly Rate (in): Hourly Rate (in): Annual Rate..(in 70,7. Annual Rate (in): Weather Freeboard Field Irrigated? YES ONO: > Field Irrigated? ❑ YES ❑� No zs y E rn' v a d rn E sn L) w ftM 0 Q. f6 LL1 7� G 7 i G ' N Q7 y 7n c T C E go ❑ a « �2 o m s o xQ oo i y E _ a 1 d � � � OF in ft ft gal.....:.m.in in in gal min in in 1 C 97 0.54 72 30,000 125 0.07 0.04.:' 2 C 95 0 74 1041880 437 0.26 0.04 3 CL 86 1.06 80 35,280 147 0,09 0,04 4 PC 91 0,84 76 5 C 89 0 70 86,400 360 0 21 .. 0.04...' 6 PC 87 0.02 68 76,560 319 q.19 .. ;i; 0,04 7 CL 92 4.87 68 112,800 470 0.28 0.04 8 R 92 0.62 56 9 C 95 0.05 52 10 PC 95 0.15 51 66,480 277 0.16 0.04 11 PC 94 0.03 52 65;620 273 .0.16 0.04 '. 12 R 90 0.25 53 78,240 326 0.19. 0,04 13 PC 89 0.01 51 70,800 295 O. 0.04 14 PC 1 88 0 50 65,760 274 0.16 0.04 15 R 89 1.2 48 16 R 76 0.2 1 46 17 C 87 0.01 46 76,800 320 0.19 0..04 r 18 C 90 0 46 108A80 452 0.27 ;'.0.04 19 PC 83 0 49 46,560 194 0.12 0.04 20 C 83 0 49 45,560 1.93.E 0.11 0.03 21 PC 87 0 48 107,520 448 0.27 0.04 f' 22 PC 85 0 50 83,280 347 0.21 0.04 23 PC 85 0 52 75,840 31.6 0.19 i 0.04 24 CL 1 84 0.03 58 25 PC 87 0 59 26 G 90 0 60 27 C 93 0 60 28 C 92 0 60 29 PC 88 0.05 60 30 C 93 0 62 31 PC 89 0.04 68 Monthly Loading: 11336;760 3,31 12 Month Floating Total (in): 37.g$ : 3.64 County: Duplin Month: August Year: 2020 Field Name:08A Field Name: 08B Area (acres). 30.38 Area (acres): 34.84 Cover Crop: Coastal Cover Crop: Coastal. Hourly Rate (in):Hourly Rate (in): Annual Rate (in). 111.3 Annual Rate (in): 72.2 Field. Irrigated? 1 YES ❑ Nb . Field Irrigated? ❑ YES ❑ No ca E: 0) m o v ar E rn o f is E; n a E rro `n E 0 CL _ min...in in gal min in in 360, 947 491.65 0.38 0.05 159,06 362 0,19 0.03 501,779 682.28 0.53 0.05 34,287: 124, 0.04... 0.02 ? 100,784 137.05 0.11 0.05 89,087 167 0.11 0,04 439,413 1 597.28 0.46 0.05 279,045 689 0 34 0,03 .... 505,043 687.33 0,53 0.05 251,505 621: 030 003 .ti 451,175 614,07 0,48 0.05 271,755 671 033 0.03 479,781 653,87 0,51 0.05 271,755.. 661. .033 0,03 .: 501,180 681 0,53 0.05 1.66,050 4.10 020 0.03 300,712 1 444,13 0.32 0.04 204,1.20 504 025 0,03..... 495,278 673.32 0.52 0.05 480,585 653.68 0.51 0.05 132,030 326 016 0.03 :> 239,784 325.93 0.25 0.05 273,780 676. 0:33 0.03. 468,854 638.37 0.50 0.05 2811475 695 0:34 0.03 511,006 696 0,54 0.05 91,079. 3642 0'11 0.02 483,993 658.88 0.51 0.05 86,204 345 0.10 0 02 .: 491,650 669,32 0.52 0.05 181,845, 44.9. 0.22:..0.03.::. 477,975 650.53 0.51 0.05 136,4.85 337 017 0 03 131,625 325 016 0.03. `' 486,005 661.55 0.51 0.05 338,188 460.6 0.36 0.05 234,783 320,75 0.25 0.05 488,872 665.22 0,52 0.05 319,989 435.43 0.34 0.05 216,713 294.02 0.23 0.05 430,092 586.57 0.45 0.05 483,331 657.38 0.51 0.05 500,459 680.82 0.53 0.05 3,041543 369 11.40 12.98 59.89 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt, Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 Did irrigation occur Field Name: 1013 Field Name: 10C Field Name. 11 Field Name: 12 -- Area (acres) 31,42 Area (acres) 19.8 Area (acres). 26.13 Area (acres). 17.78 at this facility? Cover Cro P Coastal Cover Cra p• Gaastal Cover Gro P _' Coastal. Dover Cro P Coastal 0 YES ❑ NO Hourly Rate'(m) Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate:;(m). 30 Annual Rate (in): 35 Annual Rate (in). 32.36• Annual Rate (in): 6.42 Weather Freeboard Field irrigated? .F]YES )] NO Field Irrigated? Cf YES ❑ No Field lrrigateV NO Field Irrigated? ❑ YEs ❑ NO o ° w mo v o� E dv rn Earn tea' v :rn Eaai do w Earn a U m ;° a m E °? co �' :01 E: ? c: c Env E ,�' °: E+� a c L c E m m} E.� > c c Emu E m E+� Ego W p- Q 'rj �� a a: a O 0 : K p � O 0. i-^ ,�� Q 0 _c'0 x 0 0 �� 0 O... H �.'v L1 O R O 40 : �� O D. j- � �°a A x O �9 �y Cn A Q Q ,.L -. J J Q % J J i Q W J...Y J: > Q 0 J h LA OF in ft ft gal' min in in gal min in in gal..: min in an... `. gal min in in 1 C 97 0.54 72 125,591. 492.43 0.15 0.02 `' 131,409 438.43 0.24 0.03 24,978 ` 438.6 0,04 0,00.: 2 C 95 0 74 116,977 444.83 0.14 0.02 30.198; 443 21 0 04 . . 'f0.01 3 CI_ 86 1.06 80 32.573 137..98 0,04 0.02 39,762 138.07 0,07 0.03 5,825" 115.8 0 01 0.00. 4 PC 91 0.84 76 5 C 89 0 70 78,559 207.33 OA5 0.04 23,138i 4374 003 0.00 6 PC 87 0,02 68 99,964 33T62 0.12 0.02 c 250,304 686.82 0.47 0.04 33,765 687 0.05 0.00 7 CI. 92 4.87 68 15%037 54.3 45 0.19 0.02 ..', 197,912 549.88 0.37 0.04 29,619 549.E 0.04:.. 6.00 8 R 92 0.62 56 9 C 95 0.05 52 10 PC 95 0.15 51 215,239 617.12 0.40 0.04 35,751:. 613.2 0.05 0.00 11 PC 94 0.03 52 120,149 321.03 0.22 0.04 48,840` 68. 007 0,01 12 R 90 0.25 53 27,575 111.55 0.05 0.03 36,61.9.` A45..8 005 fi,01 36,619 445.8 0.08 0.01 13 PC 89 0.01 51 118,804 347.97 0.22 0.04 62,044` 671 4 0;09 0 01 62,044 671.4 0.13 0.01 14 PC 88 0 50 134,789 355.02 0.25 0.04 58,435' 534 0.08 0.01 58,435 534 0.12 0.01 15 R 89 1.2 48 16 R 76 0.2 46 97,4.10 325.95 0.11 0.02 :: 120,742 326.03 0,22 0.04 17 C 87 0.01 46 118,727 314.88 0.22 0.04 53,107.. 638.4 0.07 0.01 53,107 638.4 0.11 0.01 18 C 90 0 46 100,646 357.28 0.12. ' 0.02... 160,767 457.62 0.30 0.04 58,816 696 ..0.08 0.01 ' 58,816 696 0.12 0A1 19 PC 83 0 49 246,200 657.1 0.46 1 0.04 27,880 657. 004 0.00 'i 27,880 657 0.06 0.01 20 C 83 0 49 131,055 343.62 0.24 0.04 41,295` 661 006 0.01 `. 41,295 661 0.09 0.01 21 PC 87 0 48 100,624.. 336.45. 0.12 0.02 ` 164,868 448.82 0.31 0.04 62,046 662 0.09 .0.01 22 PC 85 D 50 59,076. 654 0.08 0,61 231 PC 1 85 0 52 110;053 344.92 ti0.13. 0.02 100,954 269.08 0,19 0.04 40,768 438 0.07 0,01 24 CI. 84 0,03 58 45,028 141A7 0.05 0.02 :` 261,988 675.85 0.49 0.04 41,003, 675.E 0.06 0.01.... 25 PC 87 0 59 104220 331.07 0.12 0.02 122,565 329.05 0.23 0.04 52,692 .568.8 .0i07 0.01 . 26 C 90 0 60 1051503 346.67 0.12 0.02 ` 128,220 343.4 0.24 0.04 56,144 5628 008 .0.01 27 C 93 0 60 74,502 240.38 0.09 0.02 125,720 330.37 0.23 0.04 57,544' 480 0.08 U1 '. 28 C 92 0 60 105j69 .333.65 012 0,02 125,558 333.43 0,23 0.04 45,049 333.6 0.06 0.01 q29 PC 88 0.05 60 93,920 273.22 0.11 0,02 144,003 374.32 0,27 0.04 42,744 375 0.06 0.01 30 C 93 0 62 135 750 409,28 0.16 0.02 56,406: 4614 0.08. 0.01 311 PCJ 89 0.04 68 148,625 447.$$ 017 .0.02. 141,310 372.78 0.26 0.04 62,988 583.2 .0,09. 0.01 Monthly Loading: 1;755;092 206:; 3,407,179WIM 6.34 1,154771.' 1i63 '` 338,196 D.70 12 Month Floating Total (in): 16 21 : ` 29.DD 26.44 6.09 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: FieId'Name: 13 : Field Name: 14 Field`.t Did irrigation Occur Area (acres}: 31.42 Area (acres): 12.07 Area (a at tI11S facility? Gover Crop: Coastal Cover Crop: Coastal Cover Hourly. Rate (in) hourly Rate (in): Hourly Rat [] YES ❑ NO Annual Rate in 31.42 Annual Rate (in): 78.02 Annual Rat Weather Freeboard Field Irrigated? .I] YES ❑ No Field Irrigated? YES ❑ NO Feld laic Y E a c a� �` u�i m c' E y N y �'Q E �v E a a 3 F- 4. OF in ft � ft gal: min 'in ` In gal min in in 1 C 97 0.54 72 24,978 438.6 0.0.3 0 00 `:` 105,577. 4 2 C 95 0 74 30.198 443.21 0 04 0.00 94,851. 3 CL 86 1.06 80 5;825 115.8 0 01 0 00 11,403 106.3 0,03 0.02 29,924 9 4 PC 91 0.84 76V. 5 C 89 0 70 23,138 4 437 0.03 0.00 6 PC 87 0.02 68 33,165 687 0.04 0.00 31,684' 1 Duplin 7 CI. 92 4,87 68 29,6'19 549.E 0 03 0 00 ` 88,444: 407:1 8 9 R C 92 95 0.62 0.05 56 52 10 PC 95 0.15 0,03 51 52 35,751 48,840 613.2 681 0,04. Q 06 0.00 0.01 ' 70,970 46,567 0.22 0.22 521682 91,855 < 11 PC 94 12 R 90 0.25 53 46,639 303.33 0.14 0.03 171608. 13 PC 89 0.01 51 79,970 480.75 0.24 0.03 a4,228 14 15 PC R 86 89 0 1.2 50 48 70,410 574.38 0.21 0.02 114 393 16 R 76 0.2 46 65,810 17 C 87 0.01 46 67,380V12. 0.21 0.16 74,670 1$ C 90 0 46 74,922 0.23 0.02 93.693 19 PC 83 0 49 27,880 657 0.03 0 00 .: 141,233 20 C 83 0 49 36,314 0.110.03 144,750 21 PC $7 0 48 62,046 662 0.07 0 01 .: 62332 0.19 0,06 96,158... 22 PC 85 0 50 59,076 654 0.07 0.01 23 PC 85 0 52 48,768 438 0.06 0.01 65,157 535.87 0,20 0.02 73,522 24 CL 84 OA3 58 41;003.. 675 6 . 0.05 0,00 145,010 25 26 PC C 87 90 0 0 59 60 52692 56,'144 568.8 ..562.8 0.06 0.07 0.01 0.01 '. 61,657 67,777 277.7 562.52 0.19 0.21 0.04 0.02 74;91.8 711996 27 C 93 0 60 57,544 . 480 .. 0.07 0 0 i 66,140 479.93 D.20 q.03 66,507 28 29 C PC 92 88 0 0.05 60 60 45;049 42,744 333.6 375 0.05 0.05 0.01 0.01 29,439 30,045 251.6 253.97 0.09 0.09 0.02 0.02 58,622 ;::: 124,705 30 C 93 0 62 .561.406 461A 0.07 0.01 71,399 570.67 0.22 0.02 911324 31 PC 89 0.04 68 82,988 583.2 :0.07 0.61 77,858 582.95 0.24 0.02 73,198 Monthly Loading: 844;455`: 9.9977 989,812 M 3.02 7113;262 12 Month Floating Total (in): 18 27 39.32 Month: i67 U.U4 . U.U3 12 .0.17 <i0.03 85 .0.23 0.03 .77 .:0,13. .. 0.03 . ' 98 0:15', V.1:.7 .0.15 0.03 .0.14 0.14 :.' 0.12 0.02 0.25 0.02.' MMMY Page of August Year: 2020 Field Name: 16 Area (acres). 12.95 Cover Crop: Coastal Hourly Rate (in): Annual Rate (in): 65,38 Field Irrigated? ❑ YES NO w V of rn E y rn 3 _ a = > Q = J J aal I min in in FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 Field Name: 01A Field Name: 0113 Field Name: 01C Field Name. 02A Field Name: 02B Area (acres): 26.75 Area (acres}. 74.59 Area (acres): 11.48 Area (acres). 18 61 Area (acres): 10.94 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop. Coastal...... Cover Crop: Coastal Load Type: PAN Load Type PAN Load Type: PAN Lgad Type: PAN Load Type: PAN El YES ❑ No Field Loaded? F±1 YES ❑ NO: Field Loaded? EYES ❑ NO Field Loaded? ❑YES M NO. Field Loaded? [] YES ❑ NO Field Loaded? a a ° z dz ° z Q y pC zC7 z ¢N m a vJ m z z a a 0. Qi�L . ( ¢ CL 05 Uf T (6 J N6 . 7 oO C a of C 7 Q CA.: ] U a N ]° 7 U n 7 .0 a° ° U a o ] ¢ U O 0.. U o ].'�O: ¢ U j d ¢ cs 0 ¢0 o > mgfL lbsfac Ibslac gal. ' MglL Ebsfac lb lac gal mglL ibslac Ibslac gal mglL Ibslac Ibslac gal mgft lbslac Ebslac Month gal 2,833,950 60.22 53.2 53.2 5,017,825 6D.22 33.8 33.8 1,923,756 60.22 84.2 84.2 1,894,482 60,22 51.1 51,1 : 1,254,961 60.22 57.6 57.6 September 5,816,343 62,92 114.1 167.3 `41155.700 62.92 29 2 63,0..: 946,248 62.92 43.3 127.4 0 62.92 0.O. 51.1 ` 871,099 62.92 41.8 99.4 October ember 1,031,783 50.4 16.2 183.5 i1,631,867 50.4 9.2 72.2 1,227,039 50.4 44.9 172.3 0 50k..0,0. 51.1 ,. 1,703,076 50.4 65.4 164.8 ember 0 1 fl7.49 0.0 1$3.5 2;613,E'>fl0 107.49 31.4 103.6 0 107.49 0.0 172.3 0 107149 0.0; 51 A 1,872,157 107.49 153.4 318.2 !February D 48.36 0.0 183.5 `3,690300 48r36 20;� 123:6; 0 48.36 0.0 172.3 0 48.36 0.0, 51.1 2,007,004 48.36 74.0 392.2 nuary 0 49.87 0.0 183.5 2;980,800 49.87 16,6 140.;2t' 0 49.87 0.0 172.3 0 4987 1,576,644 49.87 59.9 452.2 March 110,926 50.89 1.8 185.3 :1,600495 60.89 9.f 149.3.'i 71,815 50.89 2.7 175.0 0 :. 50.89 0.0, 51:1 '. 1,296,942 50.89 50.3 5D2.5 April 1,256,175 65.23 25.5 210.8 2,963,040 6523 216 170.9,: 1,011,240 65.23 47.9 222.9 1,638,430 6523 47.9 99.0 i 589,784 65.23 29.3 531.8 May 348,075 50.83 5.5 216.3 '2,725,540 50.83 155 186.4' 323,300 50.83 11.9 234.9 2721375 50:83 62:9 1610' 1,889,983 50.83 73.2 605.1 June 2,491,391 54.32 42.2 258.5 4,615,920 54.32 28.0 214.4:.. 1,470,485 54.32 58.0 292.9 2,978;025 54'32 72.5 233.5`. 2,442,060 54.32 101.1 706.2 July 2,455,660 42.51 32.5 291.1 2 706,480 42 51 12.9 227.3' 1,001,435 42.51 30.9 323.8 1,171,150 42i51 22 3 255:8. 2,130,597 42.51 775.2 August 1,202,619 31.37 Load 11.8 302.8 302.8 1,003,884 31:37 3:5 230,8 234:8 2,876,968 31.37 65.6 389.4 389A 0 3137 0.0.. 2558 255.8 2,091,592 31.37 0.0 5 0A 825.2 825.2 12 Month Floating PAN (lbslaclyr): Annual PAN Load Limit 11 F.cf�rlur5• - FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: W00000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 Field Name: 02C Field Name 03 Field Name: 05 Field Name: 07 Field Name: 07A Area (acres): 9.16 Area (acres). 15.66 Area (acres): 18.03 Area (acres): 9..57. Area (acres): 6.12 Cover Crop: Coastal cover..Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN Load Type: PAN Load Type. PAN load Type: PAN Field Loaded? ❑ YES ❑ NO Field Loaded? 1A YES ❑ No Field Loaded? ❑ YES No Field Loaded? El YES. ❑ NO. Field Loaded? ❑ Yes ❑ NO a zo z ¢ > zQm z Z z i L ? a m a o y rL � ° T� o CDz 0,� o M �0 ro m o: z ° z o z F a Z j O � Fo `me > O Q0noIL Ui ., > > ° Ua > o o Qv g p U0 v ¢ � Ibslac gal mg1L_. lbslac Ibslac gal mg/L Ibslac lbslac gal mg1L lbslac lbslac gal mglL Ibslac Ibslac Month gal mglL lbslac 779,607 60.22 42.7 42.7 2,622,077 6o.22 84::1 841.:' 2,043,214 60.22 56.9 56.9 1,532,047 60.22 80.4 80.4. 0 60.22 0.0 0.0 September October 813,090 62.92 46.6 89.3 11666,298 62 92 5519 140.0.i 1,193,211 62.92 34.7 91.6 i60,243 62;92 8.8': 89,2 155,314 62.92 13.3 13.3 November 392,175 50.4 18.0 107.3 1,972,208 50.4 52.9 192.9', 1,958,230 50A 45.7 137.3 1,132,379 50.4 49.7 138.9' 49,033 50.4 3.4 16.7 [ December 555,473 107.49 54.4 161.7 :11980,635 107.49 113.4 306.3. 2,047,872 107.49 101.8 239.1 1,496,957 107,49 140.2 279,2 0 107.49 0.0 16.7 January 444,600 48.36 19.6 181,3 1,560 380 48,36 40.2 346 5 2,558,380 48.36 57.2 296.3 11954,080 48.36 82.4 361.5 0 48.36 0.0 16.7 February 557,650 49,87 25.3 206.6 11529,850 49.87 40.6 3871 2,101,900 49.87 48.5 344.8 1,379,960 49.87 60.0 421;5: 0 49.87 0.0 16.7 March 650,448 50.89 30.1 236.7 1,752 274 5.0 89 47,5 434 6. 2,926,820 50.89 68.9 413.7 '1,715,760 50.89 76.1. .497.6 0 50.89 0.0 16.7 April 748,725 65.23 44.5 281.2 11607 550 65.23 55.8 490 5 504,920 65.23 15.2 429.0 1,788,720 65.23 101:7 599.3 0 65.23 0.0 167 May 592,605 54.83 27.4 308.6 199,675 50 83 5:4 495;9 2,059,460 50.83 48A 477.4 180,960 50..83 8.0 60713 325,650 50.83 22,6 39.2 June 150,930 54.32 7.5 316.1 1,817;900 54r32 52;6 548.6 3,443,700 54.32 86.5 563.9 1,972,M0 54.32 93:4 700.6` 0 54.32 0.0 39.2 July 512.850 42.51 19.8 335.9 2,396,130 42:51 54.2 .602.7. 2,659,800 42.51 52.3 616.2 2,238,960 42:51 82r9 783.E 75,600 42.51 4.4 43.6 August 811,395 31.37 23.2 359.1 2,415,217 31,37 .40.4 643.0,`. 0 31,37 0.0 616.2 '1,336,760 .3137 36.5 820.1 0 31.37 0.0 43.6 Floating PAN Load 359 1 643:0 616.2 820.1 43.6 12 Month (lbslaclyr): Annual PAN Load Limit .. 110.cl�rhrl• FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility county: Duplin Month: August Year: 2020 Field Name: OSA Field Name: 0813 Field Name: OSC Field Name 09A Field Name: 0913-A1 Area (acres): 30,38 Area (acres) 34.84 Area (acres): 10,75 Area (acres): 30.38 Area (acres): 4.25 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Load Type: PAN Load Type PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? YES ❑ NO Field Loaded? Q YES ❑ NO Field Loaded? 21 YES ❑ NO Field Loaded? 0 YES ❑ NO; Field loaded? YES ❑ NO z °i z o z m °' z o z �� �, C a� a ' �� d ';�, Z c a° Z a ;� z� 'Q ¢° a. m ¢ a :� a n a w Q a s ro a o a ,La a ,� o ro: a a a� y a a y o r Q ¢ a «. } m O ro o '3 a N :.� CO. C v .ro O o 16 a 3- ¢ N !ti N ? m �a a Z a Q1 w �;.c N r o J Z ¢ m rn c �%, U m o •+ a E Z (YO f� E L c -� a E 12 u a c ¢ E ro c c a ' � o.,n,, 0 c o � � > c a ca 0. a �, c o U a > n U a a > O aU o c3 a > o ¢U U a o a ¢ U a'� > ¢ Month Ibslac Ibslac gal.; mg/L..Ibslac Ibslac' gal mgll Ibslac lbslac gal .' mg/L Ibslac lbslae gal mgll Ibslac Ibslac gal mglL September 3,332,336 60.22 55.1 55.1 743,079 .6022 10.7 10..7 1,065,926 60.22 49.8 49.8 639,797 60.22 10.6 10.6 ` 0 60.22 D.0 O D October 725,355 62.92 12.5 67.6 3,750,244 62.92 50.5 67:2 1,619,376 62.92 79.0 128.8 21948,859 :62.92 50.9 61.5 298,758 62,92 36.9 36.9 November 0 50.4 0.0 67.6 2;218 595 "50.4 26.8 94.0 1. 1,660,057 50.4 64.9 193.8 2,764 262 50.4 38.2 99.7 0 50.4 0.0 36.9 December 0 107.49 0.0 67.6 1;830,295 107,49 471 141.1` 1,565,870 107.49 130.6 324.3 2,299,618 10749 67;9 167;6 ` 0 107.49 0.0 36.9 0 48.36 0.0 67.6 ::2,008,559 48.36 23,3...164.3; 1,179,725 48.36 44.3 368.6 2.214 985 48,36 29.4 19T.0.' 0 48.36 0.0 36.9 January February 2,078,865 49.87 28.5 96A ,4,28911.19 49.87 51 2 215.5` 1,248,425 49.87 48.3 416.9 896;630 49 87 12.3 209.2 D 49.87 0.0 36.9 March 2,706,800 50,89 37.8 133.9 61785,200 50 89 82.7 298.2. 1,332,651 50.89 52.6 469.5 2 318 4.71 50.89 32.4 241 6 0 50.89 0.0 36.9 2,166,732 65.23 38.8 172.7 5,479200 55.23 85:6 383.7 2,147,861 65.23 108.7 578.2 1,218;283 65:23 21:8 263:4 299,685 65.23 38.4 75.2 April 0 50.83 D.D 172J 6,19T;`178 50'83 754 45.9.1. 1,854,607 50.83 73.1 651.3 2,934' 50.83 4:i] 263:5` 232,5DD 5D.83 23.2 98.4 May 0 54.32 0.0 172.7 '2,344;674 5432 305 489.6r 0 54.32 0.0 651.3 0 54:32 0.0 263.5' 189,116 54.32 20.2 118.6 June July 0 42.51 0.0 172.7 10;986,654 42r51 111.8 601.4` 1,918,132 42.51 63.3 714.6 2,723,917 42 51 31.6 295.0.. 1,052,923 42.51 87.8 206.4 August 3,041,543 31.37 26.2 198.9 198.9 ':10,788,371 31,37 810 682 4:;. 682.4 2,019,952 31.37 49.2 763.8 763.8 1,253,111 31`37 10:8 305.8 305.8' 410,375 31.-- 25.3 231.7 231.7 12 Month Floating PAN Load (lbslaclyr): WZA Annual PAN Load Limit FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: Facility Name: Mt Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 WQ0000884 Field Name 096-131 Field Name: 09B-82 Field Name: 09C Field Name: 10A Field Name: 0913-A2 Area (acres) 1 75 Area (acres): 11.01 Area (acres): 21 48 Area (acres): 15.19 Area (acres): 3.85 Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Cover CroW Coastal Cover Crop: Coastal Load Type: PAN Load Type PAN Load Type: PAN Load Type; PAN Load Type: PAN [ 1 YES ❑ NO Field Loaded? 0 YES ❑ NO Field Loaded? ❑ YES, ❑ NO;: Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES NO Field Loaded? z N.. LD zo z �,� °1 a°' a - a z aw z a ;0 z� z zQ<. ° oam ate a ai6 a �>-o a na% ago o aro a� as N CL Ul to c �. 10 J a en M. o m tP C c a 7 z m ro m „C O. ;, Z' N L a +� i z N @ Uf Y f Z M s a+ ..A C G: S:. U '� rC Q L (� ,.,.� :: a N U Q a E � o a > ;o: ° U aQ ? > o o cj ° o' ate' U a o ¢ V U a� a�.: >° a� > mglL Ibslac Ibslac gal mglL Ibslac Ibslac' gal mg1L Ibslac lbslac gal mglL. Ibslac lbslac. gal mglL Ibslac lbslac { Month gal 0 60,22 0.0 0.0 40.411 60.22 116 116: 40,411 60.22 1.8 1.8 1,394,975 .60.22 32.6 32.6.' 2,025,126 60.22 67.0 67.0 € September 62.92 0.0 0.0 .220 363 62.92 66.:1 77.7 ' 258,341 62.92 12.3 14.2 93,019 62.92 2.3 34....,; 69,807 62.92 2.4 9.4 6.. October 0 0 50.4 0.0 77,7.. 0 50.4 0.0 14.2 1,634,789 50.4' 32.0 66.9. , 606,254 50.4 16.8 86.1 I November D 50.4 0.0 0.0 0.0 0.0 128,531 107.49 65.8 143.5 264,584 107.49 21.5 35.7 1.472,174 107.49 61.4' 128,3 275,126 1D7.49 16.2 102.4 December 0 107.49 0 48,36 0;0. 143.5'. 0 48,36 0.0 35.7 659,289 48.36 12.4. 1407,' 39B4O6D 48.36 10.6 113.0 j January 0 48.36 0.0 0.0 0 49'87 O.D.: 143:5 0 49.87 0.0 35.7 1,696,653 49.87 30.9 171.6i 82,564 49.87 2.3 115.2 February 0 49.87 0.0 0.0 0 50:89 0.0.::143,5 0 50.89 0.0 35.7 635,618 .50.89 12.6 1$4:2; 968,980 50.89 27.1 142.3 March 0 107,280 50.89 65.23 0.0 15.2 0 0 15.2 . 422;76D 65,23 1314 274.9`. 610,290 65.23 30.2 65.9 D 65'23 0.0' 184:2 134,588 65.23 4.8 147.1 April 541,740 50,83 59.7 74.8 '€49,535 .50;83 36 2 311.2 192,330 50.83 7.4 73.3 2,635,062 50 83 52.D 236:2 : 81,900 50.83 2.3 149.4 May 178,610 54.32 21.0 95.8 125,652 54:32 825 343:7:: 651,887 54.32 26.8 100.1 2293,938 5432 48.4 284;6 2,522,637 54.32 75.2 224.E June 372,173 42.51 34.3 130.1 501;206 42 51 101`.5 445 2 769,804 42.51 24.8 124.9 906,868 42.51 16.0. 299,51 778,314 42.51 18.2 242.8 July 0 31.37 0.0 13D.1 166,035 31 37 24 8 4701 614,741 31.37 14.6 139.5 1;022;645 31'37 12.5 .312 0 0 31.37 0.0 242.8 August 12 Month i loating PAN Load 130.10 139.5 312 0 242.8 (lbslaclyr): PAN Load Limit Annual {Ibslaclvr): FORM: NOMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 108 Field Name. 10C Field Name: 11 Field Name: 12 Field Name: 13 Field Name: 31.42 Area (acres): 19.8 Area (acres): 26.13 Area (acres): 17,78 Area (acres): 23.26 Area (acres): Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal Cover Crop: Coastal Coastal Cover Crop; Load Type: PAN Load Type: PAN Load Type: PAN Load Type: PAN Load Typo: PAN Field Loaded? 0 YES ❑ NO Field Loaded? 0 YES ❑ NO Field Loaded? ❑ YES ❑ NO Field. Loaded? 0 YES ❑ NO Field Loaded? M YES ❑ No ¢ a N ¢a a >� a N Z� 'Z >� t7 W n Z O: Z. a N 'i'S . � m Z O Q Z Q m 9 a C ¢° a o ; o CL a a.` o v o Q ° an nQ ° a m > ro y@ m ': ¢ a m 0. �, f0 Q d) C v t p 7 6I.0 7 m O - Z ¢ N m W L O Z E Q� w �:. N N �,� Z.. : rn� fL0 CO] ° a'�... _j C E Z Q E {mod v .,.t C Z' j Q 1= E y :.� ram.+ j E :Q :. a �- U U1 ° a Q E N c G O :Q .. U 0.-.; 3 �, ] O O Z d U U� 4. U� Q U > Q L) > � U j Q Ibslac Ibslac mg1L:::Ibslac. Ibslac > gal mg1L Ibslac Ibslac gal..:: mg1L lbslac Ibslac` gal mglL Ibslac Ibslac Month gal 1,132,940 mglL 60.22 18.1 18.1 gal 389,363 60.22 9.9: 9.9 ` 2,563,002 60.22 49.3 49.3 75 600 : 60.22 2.1 2.1 1 2,390,047 60.22 51.6 51.6 September October 1,954,266 62.92 32.6 50.7 2,852,050 82,92 75.6 85.5 2,372,560 62.92 47.6 96.9 13fi,835' 62.92 4.t7 fi.2 :,' 1,511,675 62.92 34.1 85.7 November 1,043,902 50.4 14.0 64.7 955,486 : 50A 20.3 105.7. 2,428,134 50.4 39.1 136.0 0 50.4. 0 0:. 6.2, : 2,128,680 50.4 38.5 124.2 December 1,461,962 107.49 41.7 106.4 990,392 ` 10Z:49 44:8 150;6' 2,036,274 107.49 69.9 205.8 0 7.49 �48.36 0.0. 6.2 2,036,274 107.49 78.5 202.7 January 1,458,509 48,36 18.7 125.1 927 540 48.36 18:9 169.5. 2,533,103 48.36 39.1 244.9 564,522 12.8. 19,0 1,274,276 48.36 22.1 224.8 February 501,565 49.87 6.6 131.8 1;651 438 49.87 34.7 204.2 ` 1,796,092 49.87 28.6 273.5 >211.417r 49.87 4.9' 23.9 ! 2,084,207 49.87 37.3 262.0 March 1,564,540 50.89 21.1 152.9 2,160,550 60.89 46.3 250.5' 1,148,562 50.89 18.7 292.2 901687< 50.89 21;5. 45.4 1,667,972 50.89 30.4 292.5 April 2,437,448 65.23 42.2 195.1 177;837 65.23 3.2. 253.7 ` 924,754 65.23 19.3 311.4 617,913 5523 18,9 64A : 268,842 65.23 6.3 298.7 900, 227 50.83 12.1 207.3 1,236,465 >50.83 26 5 280.2. 1,414,392 50.83 22.9 334.4 0 50.83 0,0 64.4 1,272,503 50.83 23.2 321.9 May 54.32 0.0 207.3 0 `' :5432 0,0. 2801. .. 1,978,671 54.32 34.3 368.7 '132,605 54.32 3... 677' 1,432,406 54.32 27.9 349.8 June 0 42.51 8.3 215.6 1,285,011 42:51 23.0 303.2, 976,955 42.51 13.3 381.9 31,574` 42.51 0.6.; 68.4 1,060,776 42.51 16.2 366.0 July 735,342 August 1,755,092 Floating PAN 31.37 Load 14.6 230.2 230.2 3,407179 =`31:37 45.0 348.2': 348:2 1,154,771 31.37 11.6 393.5 393.5 ' 388,196 3137 5.7' 74.1 ` 74.1 844,455 --------------------- 31.37 9.5 375.5 375.5 12 Month (I bslaclyr): Annual PAN Load Limit (lbslaclyr): FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 Field Name: 14 Field Name 15c Field Name: 16 1=ield Name: 1$ Field Name: Area (acres): 12.07 Area (acres.): 18.03 Area (acres): 12,95 Area (acres): 2.25 Area (acres): Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crop; Coastal Cover Crop: Load Type: PAN Load Type PAN Load Type: PAN Load Type: PAN Load Type: Field Loaded? R YES ❑ NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YES ❑ NO Field Loaded? ❑ YE$: ❑ NO.: Field Loaded? ❑ YES ❑ NO m Z c z z Z Z 0 Z Z. p: Z °� o aCL am;a? 0.� cim a aoa ro w a , ro J p :r . tea' c � a o © U °a'�a �,� a �, a ��' Month gal 1,869,724 mg1L Ibslac Ibslac gal_.,.' mg/L... .ibslac Ibslac gal mg1L Ibslac Ibslac gMi mg1L Ibslac Ibslac gal mglL Ibslac Ibslac September 60.22 77.8 77.8 1,521,871 .60.22 42.4 42 4 :; 2,094,184 60.22 $1,2 81.2 310,06V: 60.22 .69.2 69.2 October 1,572,684 62.92 68.4 146.2 ` 835,873 . '62 92 24 3. 66.7 ` 377,977 62.92 15.3 96.5 334,061 : '62.92 77.9. 147.1`: November 0 50.4 0.0 146.2 2,496,932 50.4 58.2 124.9 ' 2,449,878 50.4 79.5 176.1 339,610 50:4 63.4. 210,E December 2,147,145 107.49 159.5 305.6 2,574,600 1.07.49 128.0 252,9.: 2,126,995 107.49 147.2 323.3 338 622. 107 49 134.9 345.6 January 1,572,356 48.36 52.5 358.2 `1672,046 48.36 37.4. 2903.:: 1,792,955 48.36 55.8 379.1 333,920` 48:36 59.9 405,3 February 1,287,744 49.87 44.4 402.6 1,813,314 49.87 418 332.2 2,031,548 49.87 65.2 444.4P2727 49.87 55,7i 4610' March 1,360,514 50.89 47.8 450.4 1,708,893 `''-50.89 40.2 3724 2,228,069 50.89 73.0 517A 50.89 64.0, 525.0. April 1,437,286 65.23 64.8 515.2 1,184,33.1 65,23 35.7. 408;1;' 2,164,398 65.23 90.9 608.3 65:23 75.7r 600.7, May 683,689 50.83 24.0 539.2 790,000 50,83 18.6. 426.7' 1,439,250 50,83 47.1 655.4 50 83 52.5 653.3June 645,258 54.32 24.2 563.4 1,093,156 54:32 27:5 454.2' 1,372,952 54.32 48.0 703.5 54 32 87.7 7410July 1,187,904 42.51 34.9 598.3 `'514,569 42.61 10.1 464 3.. 2,101,600 42.51 57.5 761.0 42 51 32:i 773.2 August 989,812 31.37 21.5 619.8 2,113,262 '31.37 30.7 495.0 ' 0 31.37 0.0 761.0 420,538 31.37 48.9 `8221' 12 Month Floating PAN Load 619.8 495.) 761.0 822.1 0.0 (I bslaclyr): Annual PAN Load Limit lEhdaclvrh• .. _ FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of 4Q]IIIIIIIIIIIIIIIII Facility Name: Mt. Olive Turkey Processing Facility County: Duplin 1 Month: August 1 1. 1/ • 1 _ . Average: •. li /. FORM: NOMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility PPk 002 Flow Measuring Point: 0 influent ❑ Fffluent ❑ No flow generated Parameter Code - s .'50050 c O m _ P U) O O 24-hr hrs :GPD :. 1 :240,000 z o 3 06:00 9 110,000 A 07:00 8.5 200,000.'.' 5 07:00 8.5 0 6 07:00 8.5 .15,000 7 07:00 8.5 135,o00 8 06:00 7 0 9 320.0001 10 07:00 8.5 330 000` m# 11 i�ir 111 - ® m i. 1 1#1 Daily# Sampling Type:... Monthly Limit: Daily Limit: F•Fmclency� County: Duplin Month: August Year: 2020 Parameter Monitoring Point: ❑ Influent ❑ Effluent ❑ Groundwater Lowering ❑ Surface Water FORM: N€]MR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August Year: 2020 PPI: 003 Flow Measuring Point: ❑ influent ❑ Fffluent ❑ No now generated Parameter Monitoring Point: [I influent ❑Effluent ❑Groundwater Lowering ❑surface Water Parameter Code — ► 50050 iu 7 O a Q E � i fl3 0 u. 0 24-hr hrs GPD 1 0 2 0 3 06:00 9 0 4 07:00 8.5 5 07:00 8.15 0 6 07:00 8.5 120,000'': 7 07:00 8.5 ;191,000 8 06:00 7 71000 g .0 10 07:00 8.5 0 11 0700 8.5 0 12 07:00 8.5 0 13 07:00 8.5 125,000..' 14 07:00 8.5 .0. 15 06:00 6 0 16 0 17 07:00 8.5 .0 18 07:00 8.5 .`90,000 19 07:00 8.5 .226,000' 20 07:00 8.5 60,000 2 0700 8.5 '0 22 07:00 8.5 0 23 1,000 ' 24 07:00 8.5 0... 25 0700 8.5 0 26 07:00 8.5 0 27 07:00 8.5 0. 28 07A0 8.5 0 29 06:00 6.5 0 30 0 31 07:00 8.5 0 Average: 26,452 Daily Maximum: .226,000 :.. Daily Minimum: 0 Sampling Type: :Estimate Monthly Limit: Daily Limit: Sample Frequency: ' Monthly FORM: NDMR03-12 NON -DISCHARGE MONITORING REPORT {NDMR} Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility PPI: 004 Flow Measuring Point: ❑ Influent ❑� Effluent ❑ No flow generated Parameter Code o 50050 ': 00310 00916 ' 00680 00940 i` . 50060 31616:' e u O LO 03 o 0 p u; p o o m o rV o V F... i= cq ALL � � ; u m .� }- Qf .0 LLp O O o� F 24-hr hrs GPD mg1L ..mglL mg1L mg/L! mglL #1100 hit 1 1 840,000 0.15 2,218,000 0.38 :00 $40 9 wioo0 0.34 7:0 88.5 0 County: Duplin Month: August Year: 2020 arameter Monitoring Point: ❑ Influent Q Effluent ❑ Groundwater Lowering ❑ Surface Water 00927 00630 0061D 00625'`' 00620 0055. 00400 WQD9C: 00931 p L 6f N ` e o rn ) tl7 Y. a ro CMa eE ca z az z o F .` o Df h mg1L mg1L :. mglL mg1L c> mg1L mglL su mg1L ': Ratio 7.62 7.73 7.64 6 07:00 8.5 11613,000 150 '€1:1 ', 56.5 0.66 1 <20 : 5.54 u,ut3 4Z.13 ov.z , 'u.u/ -a.V 7 07:00 8.5 1;704000 1.17 7.74 8 0600 7 0.. 9 0 10 07:00 8.5 1,862,000 0.48 7.52 11 07:00 &5 1814;000.. 0.51 7.51 12 07:00 8.5 1.;052,00o. 0.53 7.56 13 07:00 8.5 1612,000 0.85 7.55 14 07:00 8.5 1;491.1000 0.05 7.58 15 06:00 6 D 16 855,000 0.46 7.69 17 07:00 8.5 1653,000 0.65 7.67 18 07:00 8.5 2,006,000.. 79 1D.5..`; 78 0,51 46 5.04 0.18 54.8 77.9. 0.14 s5.D 7.73 34.51 9.65 19 07:00 8.5 1,685,000 0.39 7.7 20 07:00 8.5 1,466,000 1.01 7.71 21 D7:00 8.5 1,74T000 0.69 774 22 07:00 8.5 1,505.000 0.89 7.69 23 1,511,000 : 1.19 7.65 24 07:00 8.5 1,432,000 0.45 7.68 25 0700 8.5 1,422,000 0.58 7.64 26 07:00 &5 11499,000.. 0.33 7.65 27 07:00 8.5 1,510,000. 0.84 7.69 28 07:00 8.5 1,431000 0.39 7.62 29 06:00 6.5 1575,000. 0.43 7.68 30 1.;715,000.: 0.71 7.75 31 07:00 8.5 1689,000 Average: '1 347,710 114.50 10;80 67.25 0.59 6.78 5.29 0.12 48.70 64.05. 0.07 ..' 0.00 ..31.37 10.43 Daily Maximum: 2;218,000, 150.00 1110 78.00 1.19 46.00.'': 5.54 0.18 54.80 77.90 0.14 5.00 .'' 7.82 34:51 :` 11.20 Daily Minimum: 0 ....': 79.00 10.50 56.50 0.05 20.00`' : 5.04 .0.06 = 42.60 60.20 0.02 5.00 ;1' 7.51 28.23 9.65 Sampling Type: 'Recorder Grab Grab : Grab Grab. Grab ' Grab Grab Grab :` Grab Grab Grab Grab Grab Calculated Calculated Monthly Limit: Daily Limit Sample Frequency: :Continuous 2 x Month 2 x Month' 2 x Month 3 x Year. 5 x Week 2 x Month 2 x Month 2 x Month : 2 x Month 2 x Month 2 x Month 2 x Month . 5 x Week 2 x Month 2 x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility PF'k 004 Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated Parameter Cade ► .00929 : ` 70300 00530 00600 00665 . � O D -E N V N N D � Z t 24-hr hrs "mg/L ': mg1L :mg/L '' mglL mgrL 1 2 3 0600 9 4 07:00E8. 5 07:006 07:Oq 183 212 60.3 21.97 07:008 06:00 9 10 07:00 8.5 11 07:00 8.5 12 07:00 8.5 13 07:00 8.5 14 07:00 8.5 15 06:00 6 16 17 07:00 8.5 18 6700 8.5 .:152 .200 78 23.8 19 07:00 8.5 20 07:00 8.5 21 07:00 8.5 22 g7:00 8.5 23 24 07:00 8.5 25 07:00 8.5 26 07:00 8.5 27 0700 8.5 28 07:00 8.5 29 6600 6.5 E31 LO7:00 8.5 Average: 167.50.'.` 206,00 69.15 22.85..:'; Daily Maximum: 183.60 212M.:: 78,00 23,80 Daily Minimum: 152.00 200.00 ` 60.30 21.90.. Sampling Type: Grab Grab 'Grab Grab Grab:'.. Monthly Limit: Daily Limit: Sample Frequency:1 2 x Month ` 3 x Year 2 x Month County: Duplin Month: August Year: 2020 Parameter Monitoring Point: ❑ influent 0 Effluent ❑ Groundwater Lowering ❑ Surface Water FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility game: Mt. Olive Turkey Processing Facility PPI; 005 Flow Measuring Point: ❑ Influent ❑ Effluent ❑ No flow generated Parameter Code --► 60680.. 31616 006.10 .`, 00625 40620.. 00400 7 Q •N C 6C1 w 11k ¢ E E O a m o Y o Z Z. L 24-hr hrs mg/L #1100 mL mg/L mg1L mg1L: su 1 2 3 0600 9 4 07:00 8.5 5 07:00 8.5 6 07:00 8.5 7.1 55 s0.2... 1.3 0.3 5.$ 7 07:00 8.5 8 06:00 7 9 10 07:00 8.5 11 07:00 8.5 12 07:00 8.5 13 07:00 8.5 14 07:00 8.5 15 06:OD 6 16 17 07:00 8.5 18 07:00 8.5 19 07:00 8.5 20 07:00 8.5 21 07:00 8.5 22 07:00 8.5 23 24 0TOO 8.6 25 07:00 8.5 26 07:00 8.5 27 07:00 8.5 28 07:00 8.5 29 06:00 6.5 30 31 07:00 8.6 Average. 7.10 ...: 55.00 0.00 1.30 D.30 Daily Maximum .7 10 '` 55.00 0'2D 1.30 0.30 :: 5.80 Daily Minimum: 7.10..'' 55,00 0.20 1.30 0,30 '`: 5.80 Sampling Type: Grab..: Grab Grab Grab Grab '. Grab Monthly Limit: Daily Limit. sample Frequency: Monthly `` Monthly Monthly Monthly Monthly. Monthly County: Duplin Month: August Year: 2020 Parameter Monitoring Point: ❑ Influent Effluent ❑ Groundwater Lowering Surface Water FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT" (NDMR) Page of Permit No.:•1111.8 Olive Turkey Processing Facility County:• . August I 1 Parameter Monitoring Point: L] Influent M Effluent [I Groundwater Lowering surface Water -i^ •.- il,:l ® 11. 1 11. 11. 1 It.11 M s MOM MIMMIMMIM _ -MIM_MOM MOM -_MOM MOM -_MIM -_ �_ -_ MME MIM__ MOM 1 11 MEM 1. 11 13 ® 1 IIMOM MIMMIM /. 11 MIMMIM m1 11 MEMMIMMIM ® 1 11 1 11 1 11 1 11MOM MIMMIMMIM r. 1 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.:ili/iiii' Olive Turkey Processing Facility County:Duplin Month:August 1 / Parameter••- • . 11 ff 11 f 1 11 • •i Daily Maximum: Daily Minimum: FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: VVQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August • a m ! ff+ Daily Maximum: �Mffffllr, lz�� 1 •1 �M f 1 li f •��. ,.. .. FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: August • ..• :. 11.:1 11. 1 11. 11. 1 11•#1 • y al k 1• {1 1 tl m Daily•1 • 11 1 1 '