Loading...
HomeMy WebLinkAboutNCGNE0256_Responses to NOD_20200923September 21, 2020 Stanley E Aiken, PEGA Regional Engineer Land Quality Section NC Department of Environmental Quality RE: Notice of Deficiency (NOD-2020-PC-0434) No Exposure Certification Number NCGNE0256 Dear Stanley, Received SEP 2 3 2020 Land Quality Section Asheville Isaiah Reed visited our site on August 13, 2020 to conduct a re -inspection of the site in regards to the site's No Exposure Certification for Stormwater discharge. During the inspection Isaiah observed our fiber dumpsters uncovered which is considered a deficiency fora No Exposure Certification. We received the Notice of Deficiency on August 24, 2020. Jacob Holm Industries is committed to preventing storm water contamination and maintaining compliance with the Department of Environmental Quality's Storm Water regulations. In an effort to enhance the site's performance related to storm water protection, we have initiated the following action items to date: • Performed housekeeping around the entire exterior of the building including but not limited to the trash compactor area and buildup of waste material from the industrial process accumulated outside the building. • Initiated an ongoing periodic cleaning around the outside of the building to remove any loose materials from the ground to prevent entry into the stormwater collection system. • Covered the metal recycling dumpster with tarp. • Removed materials from past industrial activity from the outside of the building. • Attempted to use tarps to cover the dumpsters to prevent rain water from entering the dumpsters. This has not proven to be successful due to the nature of our operations and the 24 hour per day operations. As a result we are seeking other alternatives for covering the dumpsters. • Obtain permission from the industrial park's property manager to install awnings to cover the waste fiber collection dumpsters. We propose the following schedule to cover the fiber dumpsters at the site: • 12/31/20 Obtain sufficient bids from contractors to build awnings to minimize contact with rainwater to the dumpsters used to collect fiber for disposal. • 3/31/21 Obtain approval for capital spending to install awnings at the Warehouse and Line 6 waste collection area. Jacob Holm Industries (America), Inc. 1265 Sand Hill Road I Candler I NC 28715 1 USA T +1 (828) 670 00411 F +1 (828) 670 0042 www.jacob-hotm.com Sontara. SoftFlush. Softese. Softl it--. 4/30/21 If constructing awnings to cover dumpster does not prove to be successful, Jacob Holm Industries will submit a Notice of Intent for Permitting (We believe the applicable permit to be General Permit No NCG170000 Textile Mill Products as we are in SIC Major Group.) • 12/31/21 Complete installation of awnings over dumpsters on the north side and east side of the building where dumpsters are staged. We thank you for your assistance in this matter. If you have any questions, need additional information or we need to discuss this timeline you may contact Sabrina Pittillo at 828-450-7909 or myself at 828-418-2119. Regards, Maria Curran X-,A Site Director Jacob Holm Industries (America), Inc. 1265 Sand Hill Road I Candler I NC 28715 1 USA T +1 (828) 670 00411 F +1(828) 670 0042 www.jacob-hotm.com Sontara. SoftFlush. Softe,e. SoftLJte.