Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20201253 Ver 1_Alamance Co Health Permit Set 06-19-2020_20200922
Alamance County m m -'Building Health 19 June 2024 Holland Ave. rr, a� a� a 0 2 c� McKinney St. C� SITE Vaughn Rd. cn Hilton Rd. north VICINITY MAP (NOT TO SCALE) INDEX OF DRAWINGS COVER SKEET TOPOGRAPHIC SURVEY DEMOLITION AND PRASE 1 EROSION CONTROL PLAN GRADING AND PRASE 2 EROSION CONTROL PLAN STORMWATER MANAGEMENT PRE DEVELOPED PLAN STORMWATER MANAGEMENT POST DEVELOPED PLAN SITE PLAN PLANTING PLAN UTILITY PLAN EROSION CONTROL DETAILS SITE DETAILS INDEX OF 1 DAMN S SHEET NAME C-O COVER SHEET EXISTING CONDITIONS/TOPOGRAPHIC SURVEY 01.1 DEMOLITION AND PHASE I EROSION CONTROL PLAN 01.2 GRADING AND PHASE 2 EROSION CONTROL PLAN 01.5 STORMWATER MANAGEMENT PRE DEVELOPED PLAN 01.4 STORMWATER MANAGEMENT POST DEVELOPED PLAN 01.5 SITE PLAN CI b PLANTING PLAN (NOT INCLUDED (5-1a-20 SUBMITTAL) 01.7 UTILITY PLAN C1.8 EROSION CONTROL DETAILS 01.01 SITE DETAILS 0I.10 COB DETAILS NOTE: ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF BURLINGTON SPECIFICATIONS AND DETAILS. FROJECT r7)ATA PROJECT 4 CONTACT INFORMATION NAME OF PROJECT: ALAMANOE COUNTY HEALTH BUILDING TAX MAP NUMBER: (5-46-151 SITE ACREAGE: 1O.15(LOT) 1.520STUBBED) LOCATION: PROJECT ADDRESS: 424 RUDD STREET, BURL I NGTON, NORTH CAROL I NA OWNER/DEVELOPER ALAMANCE COUNTY CONTACT: ALAMANCE COUNTY 124 W. ELM STREET GRAHAM, NC 27255 PHONE: (55(b) 228-1512 EMAIL: buddy.whitesell@olamance-nc.com ARCHITECT/PROJECT MANAGER: PETERSON GORDEN ARCHITECTS CONTACT: PERRY PETER5ON 5508 VEST MILL ROAD, #5077, W I NSTON-SALEM, NO 27105 PHONE: (55(b) 760-1411 EMAIL: PGARCH@TRIAD.TWCBC.COM PLAN PREPARER: MILLER LANDSCAPE ARCHITECTURE, PA CONTACT PERSON: JOHN L I PKA / SCOTT MILLER ADDRESS: 120 CLUB OAKS OT., STE: 100 WINSTON-SALEM, NO 27104 TELEPHONE: (33(0) 765-Ia25 FAX: (33(b) 765-5025 EMAIL: JOHN@MILLERLA.COM SURVEYOR'S CERTIFICATION I, J. Eric Miles certify that this plat was drawn under my supervision from an actual survey made under my supervision (deed description recorded in Book 961, Page 738, Book 489, Page 1033); that the boundaries not surveyed are clearly indicated as broken or dashed lines; that the ratio of precision as calculated is 1:10,000; that this plat was prepared in accordance with G.S. 47-30 as amended; that the survey is one of an existing parcel or parcels of land and does not create a new street or change an existing street; Witness my original signature, registration number and seal this 18th day of June,A.D.,2019. Professional Land Surveyor L- 4498 \\` N C A RO''%, S, S*. SEAL - L-4498 ,1� w SURVEYOR'S CERTIFICATION I, J. Eric Miles certify that this project was completed under my direct and responsible charge from an actual survey made under my supervision; that this ground survey was performed at the 95 percent confidence level; that the survey was completed on 6/12/19; that all contours shown meet the stated standard; all bearings and distances are relative to Deed Book 961, Page 738, Book 489, Page 1033 of the Alamance County Register of Deeds; all elevations are relative to NAVD (88) Witness my original signature, registration number and seal this 18th day of June,A.D.,2019. Professional Land Surveyor L- 4498 o`� E S S j • �� ': = a F 7 SEAL r L-4498 cr v SU R`I \\\: Notes: 1) No title search was performed by this firm during the course of this survey. 2) The property shown hereon is subject to all easements of record affecting some. 3) This firm makes no guarantee as to the existence or location of any burial sites, underground improvements, or utilities across this property. Any underground utilities or improvements shown hereon have been located from visible evidence and available information. 4) No internal inspection of this property was made by this firm during the course of this survey. 5) Areas are calculated by coordinate geometry. 6) All distance are horizontal distances unless otherwise noted. Vaughn Road SS MH Top: 593.05' Inv. Out: 586.78' SS MH (A) Top: 588.35' Inv. In: 584.10' (A) I Inv. In: 582.90' (8) -► I Inv. Out: 582.89' CB Gutter. 584.52' Inv. In: 581.92' Inv. Out: 581.72' F McKinney Street 50' R/W I I I I I I I I I I I I I I I I I I I I Thomas Phillip Young I I D.B. 2363 PG. 602 M&S Properties of Burlington, Oscar Armando GiMtDiMarquez ez I Thomas Phillip Young I I LLC. Marta Diaz and wife D.B. 1247 PG. 63 I D.B. 1332 PG. 54 I Tina G. Young M&S Properties of Burlington, I D.B. 986 PG. 133 I LLC. I I D.B. 1247 PG. 63 � I I I I I I ` o I ' N o a d 6 0' R /nv. Out: 580.40' Inv. In: 576.33' (A) I o Inv. In: 576.10' (B) Inv. In: 579.90' (C) I IN Inv. Out 576.10' (D) I I _ S 88'33'54" E 643.47' uutter: oits�4�- �pf- 4rif A%r 5-r2.10' Inv Out: 572.05' / / CB \ (A) i --- Gutter: 581.05' Inv In (A): 575.75' (B) Inv In (B): 575.75' Inv Out: 575.60' 30 I I I I I Legend NIP - New Iron Pipe C) EIP - Existing Iron Pipe © Water Meter O Power Pole EiCable Box v Sign ® CB - Catch Basin Light Pole ❑o Vault 'C� Fire Main ® Post Con. Concrete S/W Sidewalk ® Sewer Manhole DO Manhole FH Fire Hydrant WV H Water Valve M&S Properties of Burlington, LLC. D.B. 1247 PG. 63 GRAPHIC SCALE 15 30 60 ( IN FEET ) 1 inch = 30 ft. Holland Ave. 'o a e 0 x E o McKinney St. C c Vou a SITE Hilton Rd. ct U � O CD ' U � o ct P cit ct . h „ cit I rl / 1 / I Inv: 561.31' 1 CB I 60" Metal PIP e Gutter: 571.66' 1 I O CB 1 I Gutter: 571.95' I T I I ct SS MH ct Top: 572.15" Inv. Out: ' ' ` Inv. In: 561.721.72V / IN _-bib SS MH Top: 578.51' Inv. Out: 567.30' . n 'Ih7'\567.31' `- 579. \y� _ Sao- I I �� Mn Top: 583.40' Inv. Out: 573.15' Inv. In: 577.15' J. Eric Miles Professional Land Surveyor L-4498 120 Scale 1"=30' Drawn By. JGW Date: 06/03/19 0 Rev. Date: Job Number: 19-150-300 zi Holland Ave. 0 0 a CID E s McKinney St. c7 SITE � a "aughn Rd. OL cn Hilton Rd. north EX. SIDEWA Vicinity Map Not to scale Erosion Control Dotes I. MAINTENANCE: QUALIFIED PERSONNEL (PROVIDED BY GENERAL CONTRACTOR) SHALL INSPECT AT LEAST ONCE EVERY SEVEN DAYS AND WITHIN 24 HOURS OF THE END OF A STORM THAT 15 1.0 INCHES OR GREATER THE EROSION CONTROL STRUCTURES INSTALLED. GENERAL CONTRACTOR (G.G.) SHALL INSPECT OVERALL PERFORMANCE OF EROSION AND SEDIMENT CONTROL FACILITIES AND AREAS DOWNSTREAM. IF SILT IS APPARENT DOWNSTREAM FROM STRUCTURES, SOME FAILURE HAS OCCURRED. IF SEDIMENT 15 OBSERVED DOWNSTREAM, TAKE CORRECTIVE MEASURES AS NECESSARY. FOR MAINTENANCE OF INDIVIDUAL ER051 ON CONTROL STRUCTURES, SEE APPLICABLE DETAIL. 2. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 15 WORKING DAYS. GROUNDCOVER SHALL BE INSTALLED ON ALL EXPOSED SURFACES WITHIN 14 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. 5. SEEDED AREAS SHALL BE CHECKED REGULARLY TO ENSURE THAT A GOOD STAND 15 MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. 4. PERMANENT GROUNDCOVER MUST BE INSTALLED FOR ALL D I STURBED AREAS WI TH I N 50 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION. 5. G.G. IS RESPONSIBLE FOR ALL EROSION CONTROL PRACTICES REQUIRED TO MINIMIZE EFFECTS ON ADJACENT PROPERTIES. 6. G.G. IS RESPONSIBLE FOR COMPLYING WITH ALL COUNTY/CITY AND STATE EROSION CONTROL REOU I REMENT5. Erosion Control Notes (C.,on't) Site Information: • TOTAL LOT SIZE: 10.13 ACRES 7. IF NECESSARY, THE CONTRACTOR SHALL LOCATE A TOPSOIL STOCKPILE AREA ONSITE AND INSTALL ADDITIONAL SILT FENG I NG AROUND STOCKPILE AREA AS NECESSARY TO . D 15TURBED AREA: ± 57,700 SF (1.52 ACRES) PREVENT SILT WASH -OFF FROM THE SITE AND/OR INTO WATERWAYS. 8. ANY BORROW OR WASTE MUST BE TO AND FROM PERMITTED SITES. IF THE BORROW IS TO . BUA REMOVED: 12,0140 SF (0.50 ACRES) BE OBTAINED FROM A 51TE THAT 15 NOT PERMITTED FOR LAND D 15TURBANCE OR THE WASTE IS TO BE DUMPED AT A SITE NOT APPROVED FOR LAND DISTURBANCE, THE G.G. IS . % BUILT UPON: 0.50 ACRE5/1.52 ACRE5=22.1% RESPONSIBLE FOR OBTAINING A PERMIT FOR LAND DISTURBING ACTIVITY AT THAT SITE. Q. THE OWNER IS RESPONSIBLE FOR THE LONG TERM MAINTENANCE OF THE GROUND COVER ON THE PROPERTY. GROUND COVER MUST BE MAINTAINED TO A DEGREE THAT PREVENTS SOIL EROSION AND SEDIMENTATION AT ALL TIMES. ACCEPTANCE AND APPROVAL OF THI5 PLAN IS CONDITIONED UPON THE PROPERTY OWNERS) COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY LAWS, REGULATI ON5, AND RULES. IN ADDITION, LOCAL TOWN OR COUNTY ORDINANCES OR RULES MAY AL50 APPLY TO THIS LAND -DISTURBING ACTIVITY. THIS APPROVAL DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL. 10. FOR EROSION CONTROL DETAILS AND SEEDING SPECIFICATIONS SEE DETAIL SHEET 01.8. I Oscar Armando Giron Thomas Phillip Young M&S Properties of Burlington, LLC. Marta Diaz Marquez 1 and wife Tina G. Young 1 I M&S Properties of Burlington, LLC. I - - S 88°33'54" E 643.47' - I- -------------------- / - LIMITS OF REMOVE ±35LF _ DISTURBANCE (TYP) / CURB AND OUTER / REMOVE ±GOLF I / / \ CURB AND GUTTER REMOVE ALL GRAVEL TEMPORARY / / / / J I PARKING WITHIN 59 / / ) /I I A i CONSTRUCTION ENTRANCE, 90 " DISTURBED LIMITS I I / / 12" I I 11 I 5 MIN. 100 x 25 . G.G. TO / F i KEEP CONSTRUCTION SILT FENCE (TYP) 1 I - ' - = f GB 1.8 ENTRANCE AREA GLEAN Sutter: 588.a4' I \ OF MUD/ROGK AND � Inv. Out: 586.54' \ DEBRIS AT ALL TIMES r- 589 E'i EXISTING STORM _ _ _ _ - %J------ _ _ � PIPE (TYP) --/ a� �JREMOVE� 5a - I� \ \ ° a ° GON�RETE ANDS e - J • ° L \ GRAVEL SIB REMOVE ±30LF ( - - - CURB AND GUTTER /EMPO RY /4��� DIVER ION BERM / / Inv. In: 585.27' 586- - - - - 41 / Inv. Out 585.17' \ 48 TEMPORARY J DIVERSION BERM �ILT IFEN(�EB (TYP) 1 II 82 Inv: 5.615' / \ LIMITS OF \/ 585 r DISTURI BANCE r.Q t�v�� c�' - � - - G/LEAFAND GRUBIII 0' I1Inv: 582.Iq' 580 O�AREWfHIN 0 - , _ _ _ - _ - ✓,««««< / LIMITS OF DISTURBANGE 576 \ \\\ \ <<«««ll<«l<<lll<««< �B �\\\\ Sutter: 588.55' Inv. In: 582.65' (A) • \\\ �\� �\ \ - �� / -REMOVE ASPH�L-T, Inv. In: 585.75' (S) \ \ \ T Q I Inv. Out: 582.55'\moo '� t� t - / / / �9 " / / ±I4fCF -6U.9B 4 GUTTER FOR / \ a _ p k� ARMORIZE SPILLWAY / 5 / WITH WOVEN / / / / - / / _UTILITY INS �AtL-AT-I-ONS I V�� GEOTEXTILE FABR(G SEE SHEET G1.7 I I I I 581 - 573 0I I I I / I I I I I \ \ � / � � •SF_ YiF. _ - _ �� , 5�° 4 � � , � cv � � o� _ - \ � \ \ I / I SKIMMER BASIN 2 \ // �- ��- _ �'� 1 8 GRA-VEL OUTLET- I I / SPILLWAY EL SF �� m \ I I I I BOTTOM EL 576.0' 1 \ / / - - - - - - - - / / 5� 00, TOP DAM EL5bo I I I LIMITS OF / O N \\ L I DISTURBANCE -m 13 DN �-_ \\\ \\\ • SCOUR HOLE A (TEMP. 1.8 / / I �� / SILT FENCE (TYP)569 _ 1 TOP IN\/: 561.c5' I I I GU � ( //,i -- SIn In I S � 1 REMOVE ±15LF -CURB AND GUTTER _7 U -0 � N m \ �a � o \ \ Demolition Dotes I. PRIOR TO ANY DEMOLITION, G.G. TO COORDINATE WITH OWNER'S REPRESENTATIVES FOR ANY PHA51 NG AND/OR 5CHEDUL I NG OF DEMOLITION WORK. 2. UTILITY, TOPOGRAPHIC, AND BOUNDARY SURVEY INFORMATION PROVIDED BY BO5WELL SURVEYORS, DATED 5/51/Ia. 5. G.G. 15 RESPONSIBLE FOR ALL FEES AND PAPERWORK REQUIRED FOR PERMITS AND APPROVALS FOR DEMOLITION AND CONSTRUCTION INCLUDING LAND DISTURBANCE, BUILDING, UTILITY, 51GNAGE, DRIVEWAYS, ETC. INCLUDING PERMITS REQUIRED FOR WORK TO BE DONE WITHIN ROW, ADJACENT PROPERTIES OR WITHIN EASEMENTS. G.G. TO CHECK WITH OWNER PRIOR TO SUBMITTING FOR PERMITS TO SEE IF ANY PERMITS HAVE ALREADY BEEN OBTAINED. 4. COORDINATE WITH ADJACENT PROPERTY OWNER FOR DEMOLITION OF ITEMS NEAR OR WITHIN ADJACENT PROPERTY PRIOR TO ANY WORK. 5. PRIOR TO ANY BIDDING AND DEMOLITION, G.G. 15 TO VI51T SITE AND FIELD VERIFY EXISTING CONDITIONS. THE G.G. IS TO BRING TO THE ATTENTION (IN WRITING) OF THE OWNER AND LANDSCAPE ARCHITECT ANY DISCREPANCIES. (b. G.G. TO VERIFY OWNERSHIP OF ALL ITEMS TO BE DEMOLISHED, REMOVED OR RELOCATED PRIOR TO ANY WORK. 7. DEMOLITION OF ITEMS SHOWN ON PLAN MAY NOT BE ALL INCLUSIVE. IN ADDITION TO THE DEMOLITION ITEMS SHOWN ON THIS PLAN, G.G. 15 TO REVIEW ALL OTHER DRAWINGS FOR ADDITIONAL ITEMS TO BE DEMOLISHED, REMOVED OR RELOCATED. 8. G.G. TO CONTACT AND COORDINATE WITH ALL APPROPRIATE G I TY, STATE AND PRIVATE UTILITY COMPANIES PRIOR TO ANY DEMOLITION OR RELOCATION OF EXISTING UTILITIES. IT IS THE G.C.'S RESPONSIBILITY TO ENSURE THAT ALL UTILITIES HAVE BEEN PROPERLY GAPPED OFF, DISCONNECTED OR RELOCATED. EXISTING UTILITIES SERVICING ADJACENT PROPERTIES AND USES MUST REMAIN FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION. q. G.G. TO COORDINATE WITH OWNER FOR ANY REFUSE OR STOCKPILING OF ITEMS TO BE REMOVED, RELOCATED OR DEMOLISHED PRIOR TO ANY WORK. 10. ALL HARD SURFACE DEMOLITION ITEMS WHICH ARE ABUTTING HARD SURFACES TO REMAIN (I.E. WALKS, CURB AND GUTTER, WALLS, ETC.) SHALL BE SAW GUT TO PREVENT DAMAGE TO ITEMS TO REMAIN. 11. G.G. TO ENSURE PROTECTION OF ALL EXISTING ITEMS TO REMAIN. 12. USE OF EXPLOSIVES OR PYROTECHNICS IS NOT PERMITTED. 15. UTILITIES SHOWN ON DEMOLITION PLAN ARE FOR REFERENCE ONLY AND MAY NOT INCLUDE ALL UTILITIES LOCATED ON SITE. CONTRACTOR TO VERIFY LOCATION AND PROTECT ALL EXISTING UTILITIES TO REMAIN PRIOR TO DEMOLITION. 14. DURING DEMOLITION AND CONSTRUCTION, PROTECT EXISTING VEGETATION TO REMAIN. 15. REMOVAL AND DISPOSAL OF ALL ASSOCIATED ITEMS TO BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 16. G.G. TO HAVE PRE -DEMOLITION MEETING WITH OWNER/OWNER'S REPRESENTATIVE PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK. Construction Sequence I. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF BURL I NGTON. 2. CONTACT ER051 ON CONTROL INSPECTOR AND G I TY OF BURL I NGTON 5TORMWATER ENGINEER TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION -----PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. 5. PHASE I - CLEAR 51TE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT B. TEMPORARY 5KIMMER/5EDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET STRUCTURES W/ SKIMMERS THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN, SHALL BE UTILILIZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENG I NG E. TEMPORARY SCOUR HOLE A SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "GLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA FOR MORE INFORMATION. 4. PHASE 2 - BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WA5TE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. PERFORM GRADING OPERATION, INSTALL STORM DRAIN SYSTEMS WITH APPROPRIATE INLET/PIPE PROTECTION. INSTALL UNDERGROUND UTILITIES. INSTALL SCOUR HOLE B PRIOR TO INSTALLATION OF UPSTREAM STORM DRAIN SYSTEM. PROVIDE PERMANENT STABILIZATION AS AREAS ARE BROUGHT TO FINISH GRADE. INSTALL EROSION CONTROL MATTING ON ALL SLOPES 5:1, OR GREATER. PROVIDE STONE BASE AT ALL PAVED AREAS AS SOON AS 5UBGRADE 15 ESTABLISHED. COMPLETED FINE GRADING AND PERFORM PAVING OPERATIONS. 5. PHASE 5 - INSTALLATION OF THE SCM's THE SKIMMER/SEDIMENT BA51N 15 TO STAY OPERATIONAL UNDER INSTALLATION OF THE SAND FILTER COMPONENT OF SGM. BEGIN INSTALLATION OF THE SAND FILTER COMPONENT OF SGM I NGLUD I NG THE WEIR WALL, UNDER DRAIN SYSTEM, SAND AND OUTLET STRUCTURE. SCOUR HOLE G IS TO BE INSTALLED PRIOR TO INSTALLATION OF 5GM OUTLET STRUCTURE. PROVIDE SILT FENCE PROTECTION AT THE TOE OF SAND FILTER SLOPE EXCAVATION TO PROTECT NEW SAND. PROVIDE SEDIMENT TUBES AT SAND FILTER WEIR WALL DRAWDOWN SLEEVES AS SKIMMER/SEDIMENT BASIN IS CONVERTED TO FOREBAY. CONVERSION OF SKIMMER/SEDIMENT BASIN TO FOREBAY SHALL OCCUR AFTER ALL SITE 5URFAGF-5 ARE STABILIZED AND AS APPROVED BY THE EROSION CONTROL INSPECTOR. 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. I. AFTER SUBSTANTIAL COMPLETION OWNER SHALL BE RESPONSIBLE FOR LONG TERM MAINTENANCE OF GROUND COVER. 10. UPON FULL STABILIZATION OF THE 51TE AND ONCE THE PERMANENT SAND FILTER 50M SYSTEMS HAVE BEEN INSTALLED AND ARE OPERATIONAL, THE CONTRACTOR 15 TO INFORM THE ENGINEER OF RECORD SO THAT HE MAY INSPECT THE SYSTEM AND PREPARE A5-BUILT DRAWINGS FOR SUBMITTAL TO THE CITY OF BURLINGTON 5TORMWATER ENGINEER. ONCE THE AS-BU I LT5 ARE SUBMITTED TO THE G I TY OF BURL I NGTON 5TORMWATER ENGINEER, THEY SHALL PERFORM OWN INSPECTION TO VERIFY THIS INFORMATION. ALL OF THIS SHOULD BE DONE BEFORE THE CONTRACTOR DEMOBILIZES FROM THE SITE SO THAT ANY DISCREPANCIES CAN BE ADDRESSED. Legend Detail �Gey EX. PROPERTY LINE B - - - - - - PROP. PROPERTY L I NE EXISTING I' CONTOUR INTERVAL SUTTER: 571.66' GB I 54 PROPOSED I' CONTOUR INTERVAL I TTER: 571.45' I II x 56.16 EXISTING SPOT GRADE I II - • - LIMITS OF DISTURBANCE ss / ss 5EE SURVEY FOR ADDITIONAL LEGEND S MH oP: 5-12.15, v. In: 561.72' v. Out: 55q.72' C I.8 TEMP. CON5T. ENTRANCE TEMP. SKIMMER BA51N �ccccccccccccccccccccccccccccccccc I.8 DIVER5TION BERM 48 GRAVEL OUTLET - SF _ SILT FENCE TREE PROT. FENCE SCOUR HOLE TEMP. SEEDING SCHEDULE 5 "BEFORE YOU DIG" LINE 0 20, 40' 60, I-800-632-4g4�f OR 8-1-1 SCALE: I" = 20' NORTH �Ltilli�rr ti7►S err. p411 -EIUGl 7k' C-:3999'*~ .ir •, U�< 511111.117 tilrt ! . r� r7 g L - € C 494 ~- D.ti r,!'11 FI 4`% 6-19-.202.0 Date: la March 2020 For Bid \ Demolition Dotes I. PRIOR TO ANY DEMOLITION, G.G. TO COORDINATE WITH OWNER'S REPRESENTATIVES FOR ANY PHA51 NG AND/OR 5CHEDUL I NG OF DEMOLITION WORK. 2. UTILITY, TOPOGRAPHIC, AND BOUNDARY SURVEY INFORMATION PROVIDED BY BO5WELL SURVEYORS, DATED 5/51/Ia. 5. G.G. 15 RESPONSIBLE FOR ALL FEES AND PAPERWORK REQUIRED FOR PERMITS AND APPROVALS FOR DEMOLITION AND CONSTRUCTION INCLUDING LAND DISTURBANCE, BUILDING, UTILITY, 51GNAGE, DRIVEWAYS, ETC. INCLUDING PERMITS REQUIRED FOR WORK TO BE DONE WITHIN ROW, ADJACENT PROPERTIES OR WITHIN EASEMENTS. G.G. TO CHECK WITH OWNER PRIOR TO SUBMITTING FOR PERMITS TO SEE IF ANY PERMITS HAVE ALREADY BEEN OBTAINED. 4. COORDINATE WITH ADJACENT PROPERTY OWNER FOR DEMOLITION OF ITEMS NEAR OR WITHIN ADJACENT PROPERTY PRIOR TO ANY WORK. 5. PRIOR TO ANY BIDDING AND DEMOLITION, G.G. 15 TO VI51T SITE AND FIELD VERIFY EXISTING CONDITIONS. THE G.G. IS TO BRING TO THE ATTENTION (IN WRITING) OF THE OWNER AND LANDSCAPE ARCHITECT ANY DISCREPANCIES. (b. G.G. TO VERIFY OWNERSHIP OF ALL ITEMS TO BE DEMOLISHED, REMOVED OR RELOCATED PRIOR TO ANY WORK. 7. DEMOLITION OF ITEMS SHOWN ON PLAN MAY NOT BE ALL INCLUSIVE. IN ADDITION TO THE DEMOLITION ITEMS SHOWN ON THIS PLAN, G.G. 15 TO REVIEW ALL OTHER DRAWINGS FOR ADDITIONAL ITEMS TO BE DEMOLISHED, REMOVED OR RELOCATED. 8. G.G. TO CONTACT AND COORDINATE WITH ALL APPROPRIATE G I TY, STATE AND PRIVATE UTILITY COMPANIES PRIOR TO ANY DEMOLITION OR RELOCATION OF EXISTING UTILITIES. IT IS THE G.C.'S RESPONSIBILITY TO ENSURE THAT ALL UTILITIES HAVE BEEN PROPERLY GAPPED OFF, DISCONNECTED OR RELOCATED. EXISTING UTILITIES SERVICING ADJACENT PROPERTIES AND USES MUST REMAIN FULLY OPERATIONAL DURING DEMOLITION AND CONSTRUCTION. q. G.G. TO COORDINATE WITH OWNER FOR ANY REFUSE OR STOCKPILING OF ITEMS TO BE REMOVED, RELOCATED OR DEMOLISHED PRIOR TO ANY WORK. 10. ALL HARD SURFACE DEMOLITION ITEMS WHICH ARE ABUTTING HARD SURFACES TO REMAIN (I.E. WALKS, CURB AND GUTTER, WALLS, ETC.) SHALL BE SAW GUT TO PREVENT DAMAGE TO ITEMS TO REMAIN. 11. G.G. TO ENSURE PROTECTION OF ALL EXISTING ITEMS TO REMAIN. 12. USE OF EXPLOSIVES OR PYROTECHNICS IS NOT PERMITTED. 15. UTILITIES SHOWN ON DEMOLITION PLAN ARE FOR REFERENCE ONLY AND MAY NOT INCLUDE ALL UTILITIES LOCATED ON SITE. CONTRACTOR TO VERIFY LOCATION AND PROTECT ALL EXISTING UTILITIES TO REMAIN PRIOR TO DEMOLITION. 14. DURING DEMOLITION AND CONSTRUCTION, PROTECT EXISTING VEGETATION TO REMAIN. 15. REMOVAL AND DISPOSAL OF ALL ASSOCIATED ITEMS TO BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS. 16. G.G. TO HAVE PRE -DEMOLITION MEETING WITH OWNER/OWNER'S REPRESENTATIVE PRIOR TO COMMENCEMENT OF ANY DEMOLITION WORK. Construction Sequence I. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF BURL I NGTON. 2. CONTACT ER051 ON CONTROL INSPECTOR AND G I TY OF BURL I NGTON 5TORMWATER ENGINEER TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. SELF INSPECTION -----PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. 5. PHASE I - CLEAR 51TE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT B. TEMPORARY 5KIMMER/5EDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET STRUCTURES W/ SKIMMERS THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN, SHALL BE UTILILIZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED. C. TEMPORARY DIVERSION BERMS D. TEMPORARY SILT FENG I NG E. TEMPORARY SCOUR HOLE A SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "GLEAN" WATER DIVERSION) UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA FOR MORE INFORMATION. 4. PHASE 2 - BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION AND DOMESTIC WA5TE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. PERFORM GRADING OPERATION, INSTALL STORM DRAIN SYSTEMS WITH APPROPRIATE INLET/PIPE PROTECTION. INSTALL UNDERGROUND UTILITIES. INSTALL SCOUR HOLE B PRIOR TO INSTALLATION OF UPSTREAM STORM DRAIN SYSTEM. PROVIDE PERMANENT STABILIZATION AS AREAS ARE BROUGHT TO FINISH GRADE. INSTALL EROSION CONTROL MATTING ON ALL SLOPES 5:1, OR GREATER. PROVIDE STONE BASE AT ALL PAVED AREAS AS SOON AS 5UBGRADE 15 ESTABLISHED. COMPLETED FINE GRADING AND PERFORM PAVING OPERATIONS. 5. PHASE 5 - INSTALLATION OF THE SCM's THE SKIMMER/SEDIMENT BA51N 15 TO STAY OPERATIONAL UNDER INSTALLATION OF THE SAND FILTER COMPONENT OF SGM. BEGIN INSTALLATION OF THE SAND FILTER COMPONENT OF SGM I NGLUD I NG THE WEIR WALL, UNDER DRAIN SYSTEM, SAND AND OUTLET STRUCTURE. SCOUR HOLE G IS TO BE INSTALLED PRIOR TO INSTALLATION OF 5GM OUTLET STRUCTURE. PROVIDE SILT FENCE PROTECTION AT THE TOE OF SAND FILTER SLOPE EXCAVATION TO PROTECT NEW SAND. PROVIDE SEDIMENT TUBES AT SAND FILTER WEIR WALL DRAWDOWN SLEEVES AS SKIMMER/SEDIMENT BASIN IS CONVERTED TO FOREBAY. CONVERSION OF SKIMMER/SEDIMENT BASIN TO FOREBAY SHALL OCCUR AFTER ALL SITE 5URFAGF-5 ARE STABILIZED AND AS APPROVED BY THE EROSION CONTROL INSPECTOR. 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. I. AFTER SUBSTANTIAL COMPLETION OWNER SHALL BE RESPONSIBLE FOR LONG TERM MAINTENANCE OF GROUND COVER. 10. UPON FULL STABILIZATION OF THE 51TE AND ONCE THE PERMANENT SAND FILTER 50M SYSTEMS HAVE BEEN INSTALLED AND ARE OPERATIONAL, THE CONTRACTOR 15 TO INFORM THE ENGINEER OF RECORD SO THAT HE MAY INSPECT THE SYSTEM AND PREPARE A5-BUILT DRAWINGS FOR SUBMITTAL TO THE CITY OF BURLINGTON 5TORMWATER ENGINEER. ONCE THE AS-BU I LT5 ARE SUBMITTED TO THE G I TY OF BURL I NGTON 5TORMWATER ENGINEER, THEY SHALL PERFORM OWN INSPECTION TO VERIFY THIS INFORMATION. ALL OF THIS SHOULD BE DONE BEFORE THE CONTRACTOR DEMOBILIZES FROM THE SITE SO THAT ANY DISCREPANCIES CAN BE ADDRESSED. Legend Detail �Gey EX. PROPERTY LINE B - - - - - - PROP. PROPERTY L I NE EXISTING I' CONTOUR INTERVAL SUTTER: 571.66' GB I 54 PROPOSED I' CONTOUR INTERVAL I TTER: 571.45' I II x 56.16 EXISTING SPOT GRADE I II - • - LIMITS OF DISTURBANCE ss / ss 5EE SURVEY FOR ADDITIONAL LEGEND S MH oP: 5-12.15, v. In: 561.72' v. Out: 55q.72' C I.8 TEMP. CON5T. ENTRANCE TEMP. SKIMMER BA51N �ccccccccccccccccccccccccccccccccc I.8 DIVER5TION BERM 48 GRAVEL OUTLET - SF _ SILT FENCE TREE PROT. FENCE SCOUR HOLE TEMP. SEEDING SCHEDULE 5 "BEFORE YOU DIG" LINE 0 20, 40' 60, I-800-632-4g4�f OR 8-1-1 SCALE: I" = 20' NORTH �Ltilli�rr ti7►S err. p411 -EIUGl 7k' C-:3999'*~ .ir •, U�< 511111.117 tilrt ! . r� r7 g L - € C 494 ~- D.ti r,!'11 FI 4`% 6-19-.202.0 Date: la March 2020 For Bid Revisions. 4/21/20 For TRC 5/21/20 Per Comments 6/la/20 Stormwater/ Erosion Control Review Drawn By JDL Checked By JDL Project # Sheet Title DEMOLITION I$ PHA5E I EROSION CONTROL PLAN Sheet Ce of 10 Holland Ave. ca Q) 0 2 E s McKinney St. C7 SITE � Vaughn Rd. cn Hilton Rd. north Alamance Co. Health Building Storm Schedule Rudd Street, Burlington, NC 3/ 12/ 2020 Revised: 6/ 11/2020 InletlD Line ID Line Length Line Size Line Slope Invert Dn InvertUp Rim Elev Up JunctType (ft) (in) (%) (ft) (ft) (ft) -1 101..........1. 29.0 ................................... .............15........... 1.72...... ..._--- 576.50.. 577.00 --- -586.0 -- -MH -- --- 2 102 ............................. 75.1 15 1.07 581.20 .............................. 582.00 ............................. 587.6 D Grate p 3 103 .................13...1........ ,.................................. ,.................................. 31.8 15 ,............................... 1.26 .........1.53................582.80...........583.00.... 582.20 582.60 587.8 Dp-Grate 4 104 ............................. 15.......... .............................. ............................. 588.2 Comb. 5 105 ............................. ,.................................. ,.................................. 56.0 ................................... .................................. 15 ,............................... 1.25 ,............................... 583.20 ............................. 583.90 ............................. 587.0 Dp-Grate 6 106 ............................ Z0.5 15 4.88 577.00 .............................. 578.00 ............................. 582.5 MH 7 107 ........ ¢..................................¢.................................. 1 64.2' .........53.0........ 15 ,............................... 2.34 .........1.13................579.90..........580.50.... 578.20 579.70 585.0 MH 8 108 ............................. 15.......... .................... ... .................................................... 584.0 Comb. 10 110 ¢..................................¢.................................. 4Z.0 6 ,.............. 1.20 572.50 573.00 578.3 :Outlet Structure Site Information: Notes Keged to Plan: C rad ing Notes: • TOTAL LOT SIZE: 10.15 ACRES I. REFER TO SURVEY, BOSWELL 6/3/Ia FOR EXISTING GRADES, UTILITIES AND CONDITIONS ON SITE. A O WIRE � GRAVEL INLET PROTECTION. SEE DETAIL SHEET G6.3. CONVERT TO SILT SACK, SEE GENERAL CONTRACTOR TO REPORT TO MLA DESIGN GROUP OR GOODWILL OF ANY • DISTURBED AREA: t 57,700 SF (1.32 ACRES) KEY TAGS B D. DISCREPANCIES ENCOUNTERED. OB PRE -CAST CONCRETE CATCH BASIN. SEE NGDOT STANDARD 540.05 AND 540.04. PROVIDE 2. GENERAL CONTRACTOR TO VERIFY PROPERTY BOUNDARIES PRIOR TO BEGINNING CONSTRUCTION. • BUA REMOVED: 2q,135 SF (0.67 ACRES) 3 -O x2 -2 x2 -O AGF ENVIRONMENTAL TYPE B SILT SACK UPON STONE PLACEMENT FOR 3. G.G. IS RESPONSIBLE FOR LOCATING AND AVOIDING ALL EXISTING UNDERGROUND UTILITIES. PAVEMENT AND PRIOR TO CURB t GUTTER INSTALLATION. SEE DETAIL SHEET C6.3. 4. G.G. TO ENSURE THAT ALL UTILITIES TO ADJACENT PROPERTIES/USES ARE TO REMAIN • % BUILT UPON: 0.67 ACRES/1.32 ACRE5=50.5% OPERATIONAL DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION. OPRE -CAST CONCRETE STORM MANHOLE. SEE NGDOT STANDARD 840.52 $ 840.54. 5. G.G. TO VERIFY PROPER COVER OVER ALL EXISTING AND PROPOSED UTILITIES AND OTHER UNDERGROUND STRUCTURES. O PRE -CAST CONCRETE DROP INLET. SEE NGDOT STANDARD 840.14 AND a40.16. PROVIDE 6. A LICENSED SURVEYOR SHALL STAKE OUT ALL PROPOSED SPOT ELEVATIONS TO THE NEAREST 3'-O"x2'-O"x2'-O" AGF ENVIRONMENTAL TYPE A SILT SACK UPON STONE PLACEMENT IN 1/10 OF A FOOT. PAVEMENT AREAS. SEE DETAIL SHEET 01.5 7. G.G. TO ENSURE THAT NO PONDING IS TO OCCUR ON ANY PAVED SURFACE. 8. G.G. TO SECURE ALL APPROPRIATE GRADING/EROSION CONTROL PERMITS AND/OR APPROVALS OE CONCRETE WASH (APPROX. LOCATION), FINAL LOCATION TO BE SET BY CONTRACTOR IN THE PRIOR TO ANY GRADING. FIELD. a. DISPOSAL OR BURNING OF DEBRIS ON SITE IS PROHIBITED. 10. G.G. TO MONITOR STORM WATER RUNOFF DURING AND AFTER CONSTRUCTION TO ENSURE PROPER O STABILIZE ALL SLOPES STEEPER THAN 3:1 WITH NORTH AMERIGAN GREEN 575G BLANKET DRAINAGE AWAY FROM PROPOSED BUILDING, PARKING AREAS AND ALL ADJACENT PROPERTY PROTECTION. IMPROVEMENTS. 1. SYSTEMS SIZED FOR 25YR DESIGD STORM, 1[7.68 (25yr, 5 min). GO NYLOPLAST In,, YARD DRAIN BASIN OR APPROVED EQUAL. PROVIDE INLET PROTECTION AS 11. ALL GRADES SHOWN ON PLANS TO BE FIELD -VERIFIED BY THE CONTRACTOR PRIOR TO \ / y�� 2. PRIVATE STORM PIPE TO BE ADS®d2 WT IB PIPE PER AASHTO SPECIFICATIO-S. NEEDED CONSTRUCTION. SHOULD ANY DISCREPANCIES EXIST, CONTRACTOR SHALL NOTIFY OWNER'S Y IC In ItU I' ICip 3. IF REQUIRED, PUBLIC STORM PIPE (ID R.O.W.) TO BE TOEGE ADD GROOVE -01-T RCP CLASS III CO�FORMI-G TO ASTM SPECIFICATIO- C76. REPRESENTATIVE/MLR FOR ANY PLAN OR GRADE CHANGES PRIOR TO CONSTRUCTION. Not to scale H PROVIDE ADDITIONAL SILT FENCE PROTECTION AT TOE OF SAND FILTER EXCAVATION TO 12. ALL PAVED SURFACES SHALL HAVE A MINIMUM SLOPE OF 2% UNLESS OTHERWISE NOTED. PROTECT NEW OPEN SURFACE SAND. 15. GROSS SLOPES ON SIDEWALKS SHALL NOT EXCEED 2%. 14. G.G. TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDING AT ALL LOCATIONS. Oscar Armando Giron Thomas Phillip Young PROVIDE SEDIMENT TUBE PROTECTION AT WEIR WALL DRAWDOWN SLEEVES AS SKIMMER 15. G.G. TO TIE IN ALL ROOF DRAIN LEADERS AND DOWNSPOUTS TO NEAREST STORM INLET. ROOF Marta Diaz Marquez and wife M&S Properties of Burlington, LLC. 1 q I BASIN IS CONVERTED TO SAND FILTER FOREBAY. LEADERS RUNNING UNDER PAVEMENT AND UNDER TURF TO BE 8" SGH 40 PVC. ALL ROOF DRAIN Tina G. Young LEADERS AND DOWNSPOUTS TO THE PROPOSED CURB INLET/DROP INLET BOXES TO BE V, SGH 1 ®STORM DRAINAGE STRUCTURE DESIGNATION. 40 PVC WITH GROUTED CONNECTION AT THE CURB INLET BOX. MAINTAIN 1% MIN. SLOPE AND MINIMUM COVER OF 12" - - - - - - - I LIMITS OF 16. SPOT GRADES SHOWN ALONG CURB AND GUTTER INDICATES THE BOTTOM AND TOP OF CURB S 88`33'54" E 643.47' DISTURBANCE (TYP) ELEVATION UNLESS OTHERWISE NOTED. - - - - - - - - I 17. CURB INLET GRATE INFORMATION REFLECTS THE ELEVATION OF THE GRATE AT FACE OF CURB. L \ 15. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF -SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE own= 590 ' � AFFECTED PROPERTY OWNERS. Ici. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. 588 20. PRIOR TO CONSTRUCTION, GENERAL CONTRACTOR TO OBTAIN COPY OF SOILS COMPACTION/CEO TECH REPORT FROM OWNER IN ORDER TO VERIFY THAT FILL MATERIAL ON SITE HAS BEEN PROPERLY COMPACTED AND IS SUITABLE FOR CONSTRUCTION. G.G. TO NOTIFY OWNER'S 5g1 ❑ I ❑� 00 REPRESENTATIVE IF ANY SOILS FOUND ON -SITE ARE UNSUITABLE FOR CONSTRUCTION OR HAVE NOT BEEN PROPERLY COMPACTED. G.G. ALSO TO VERIFY WITH THE GEOTECHNICAL REPORT THE RECOMMENDATIONS FOR FOUNDATION AND PAVING STANDARDS. • $ / MATCH EX 4> 21. G.G. TO USE ALL EFFORTS AND METHODS NECESSARY TO ENSURE THAT ALL SEDIMENT AND �g0 5$ / GRADE RUNOFF IS CONFINED ON SITE. / MATCH EX GRADE \ 587.4 / 1/ 22. G.G. TO ENSURE/VERIFY ALL PROPOSED UNDERGROUND UTILITY LINE INTERFACES WITH EXISTING IGB EX. SIDEW 12" Gutter: 588.84' Inv. Out: 586.54' / saa SSq.I 587.8 • � N \ 587.8 I Z / -- 56UTILITIES PRIOR TO ANY CONSTRUCTION. G.G. TO COORDINATE WITH MLA DESIGN GROUP FOR \ 587.0 4A) `b / h -- FIELD VERIFICATION PRIOR TO ANY CONSTRUCTION OF THE PROPOSED STORM DRAINAGE AND 58 .3 587.0 586,3 / ``'� 8 A B / ° UTILITY LINES. 5aa. 5b8.0 5 A D I T Construction Sequence 4 B L1 58'L55 / I. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM THE CITY OF ° 587.E a 587.35 / / / BURLINGTON. 2. CONTACT EROSION CONTROL INSPECTOR AND G I TY OF BURL I NGTON STORMWATER ENGINEER TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. >11 + _ _ i' i o / SELF INSPECTION -----PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ° o ° ° +588.5587.a a 5 50.b 587:0 � ono / / / � ACRE, MUST I N5PEGT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE 5� (103) INSPECTION IN WRITING. �\✓ 582 � l F- = 3. PHASE I - CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES AS FOLLOWS: A D I / 1 A. TEMPORARY CONSTRUCTION ENTRANCE/EXIT \ a 3 _ 5a B. TEMPORARY SKIMMER/SEDIMENT BASINS. FOR SITES OVER ONE (1) ACRE, OUTLET 588 7 STRUCTURES W/ SKIMMERS THAT ONLY WITHDRAW WATER FROM THE SURFACE OF THE BASIN, SHALL BE UTI L I L I ZED. NO SEDIMENT TRAPS OR ROCK DAMS ALLOWED. BUILDING HEIGHT / \ C. TEMPORARY DIVERSION BERMS / \ i D. TEMPORARY SILT FENCING 22.0 FT. MAX / / E. TEMPORARY SCOUR HOLE A 5 7� / •/ / \ SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES (INCLUDING "GLEAN" WATER DIVERSION) 587 - - _ O UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA FOR MORE SOCIAL OPEN DOOR CLINIC ADULT DAY SERVICES o INFORMATION. 1 ° \ SERVICES 5,IbOt SF 5,540t SF OB _ _ ' \ 2pbOt SF FFE=588.1'7 FFE=5615 I a / / 4. PHASE 2_ BEGIN CLEARING, GRUBBING, AND STRIPPING OF SITE AS REQUIRED. / Gutter: 585.52 F,060:t .I"I I - EARTHEN MATERIAL STOCKPILES ON SITE FOR LATER DISTRIBUTION AND/OR REMOVAL, AREAS Inv. In: 583.27' 586- DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS, CONSTRUCTION / Inv. Out 583.I1' / o AND DOMESTIC WASTE, AND HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 • _ - - I $ / FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS (UNLESS IT CAN BE SHOWN THAT -,.M.,. I NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE), AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. ° I / PERFORM GRADING OPERATION, INSTALL STORM DRAIN SYSTEMS WITH APPROPRIATE INLET/PIPE (A) SF� - ° _ - �/ PROTECTION. INSTALL UNDERGROUND UTILITIES. INSTALL SCOUR HOLE B PRIOR TO -1 - - I a I - 6. a°� � -° a �. II I °° I / / INSTALLATION OF UPSTREAM STORM DRAIN SYSTEM. PROVIDE PERMANENT STABILIZATION AS (B) / III Ini: 582.45' �'O 2,°58g ° AREAS ARE BROUGHT TO FINISH GRADE. INSTALL EROSION CONTROL MATTING ON ALL SLOPES 5: 1, OR GREATER. PROVIDE STONE BASE AT ALL PAVED AREAS AS SOON AS 5U55RADE IS ESTABLISHED. COMPLETED FINE GRADING AND PERFORM PAVING OPERATIONS. �YCt��i ' / ` \ Inv: 582 \\ �I I III I \ \�� J�� 0ry / y J - - - - 5. PHASE 3 - INSTALLATION OF THE SGM s _ _ _ _ / / / THE SKIMMER/SEDIMENT BASIN IS TO STAY OPERATIONAL UNDER INSTALLATION OF THE SAND 0� qM - - - - - - 579 - FILTER GOMPONENT OF SGM. BEGIN INSTALLATION OF THE SAND FILTER COMPONENT OF SGM 578 / / / 51`' INCLUDING THE WEIR WALL, UNDER DRAIN SYSTEM, SAND AND OUTLET STRUCTURE. SCOUR HOLE -V I 577 g / / \ G IS TO BE INSTALLED PRIOR TO INSTALLATION OF SGM OUTLET STRUCTURE. PROVIDE SILT 44�2�I I / �' - -576 - - - - - i 5� ,/ / / FENCE PROTECTION AT THE TOE OF SAND FILTER SLOPE EXCAVATION TO PROTECT NEW SAND. Gutter: 588.35' I \\�\ \\ \" JJ I l / - - �' �\ / `� I PROVIDE SEDIMENT TUBES AT SAND FILTER WEIR WALL DRAWDOWN SLEEVES AS Inv. In: 582.65' (A) / 578- - - - - _ / I / / SKIMMER/SEDIMENT BASIN IS CONVERTED TO FOREBAY. CONVERSION OF SKIMMER/SEDIMENT Inv. In: 585.75' (B) Q V i Inv. Out: 582.55' I I \l/\ \�\oo - �j 4,V 0k \ FO%'EBA-Y - - - - - - - ` , ` I 3-:BASIN TO FOREBAY SHALL OCCUR AFTER ALL SITE SURFACES ARE STABILIZED AND AS a APPROVED BY THE EROSION CONTROL INSPECTOR. Oc ` �N� F� , SCOUR i \ ��D --HOLE-B - / \ 3: 8. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN 5 ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION 581 - -575 - _ - - - �� CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. I ' cf. AFTER SUBSTANTIAL COMPLETION OWNER SHALL BE RESPONSIBLE FOR LONG TERM i o I / . MAINTENANCE OF GROUND COVER. , 5�6 /; _ _N o s= _ cn \ .9�Pf o� - - _ - - \ \ \ / 10. UPON FULL STABILIZATION OF THE SITE AND ONCE THE PERMANENT SAND FILTER SGM SYSTEMS 8 SF ��•s� _ \/ m \ HAVE BEEN INSTALLED AND ARE OPERATIONAL, THE CONTRACTOR IS TO INFORM THE ENGINEER \ OF RECORD SO THAT HE MAY INSPECT THE SYSTEM AND PREPARE AS BUILT DRAWINGS FOR SEGMENTAL BLOCK _ - \ \ \ \ \ ��' SUBMITTAL TO THE G I TY OF BURL I NGTON STORMWATER ENGINEER. ONCE THE AS-BU I LTS ARE RETA(NINO-WAL-L, -SE-E - - 5� - - - - - \ \ \ SUBMITTED TO THE G I TY OF BURL I NGTON STORMWATER ENGINEER, THEY SHALL PERFORM OWN NOTES ON SITE PLAN �� ' Z q \ ` \ / I INSPECTION TO VERIFY THIS INFORMATION. ALL OF THIS SHOULD BE DONE BEFORE THE TOP OF WAIL �&5-O- 18 SCOUR 6 L - " \ ' I CONTRACTOR DEMOBILIZES FROM THE SITE SO THAT ANY DISCREPANCIES CAN BE ADDRESSED. --- / HOLE G p � o �' Legend Detail �Geu INV,,,6UT: ar13.� M N \ \ J LIMITS OF --569 DISTURBANCE (TYP) O_F BANK SILT FENCE i_ - I N\k 561.cl \\ \� / I i�� %= _ =-1 /T ZZ pgr-T bo„ PROPERTY LINE 58 II SF SILT FENCE GB 800 EXISTING CONTOUR GUTTER: 5�1.66' I IS • CI PROPOSED JUNCTION BOX 500- - PROPOSED CONTOUR 5UTTER: 5-7I .G5' '> I 11 I + 800 PROPOSED SPOT GRADE pppppp 16a PROPOSED CURB INLET EXISTING STORM DRAIN SYSTEM 17 ® PROPOSED DROP INLET Sf ss' I PROPOSED STORM DRAIN SYSTEM SS/ SS MH - PROPOSED 8" 5OH40 ROOF DRAINS NOTE: ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF Top: 5-72.15' BURLINGTON SPECIFICATIONS AND DETAILS. Inv. In: 561.72' PROPOSED LIMITS OF DISTURBANCE Inv. Out: 5511.72' "BEFORE YOU D I C " LINE 0 20' 40' 50' I-800-632-4�i4q OR B-I-I SCALE: I" = 20' NORTH y��tilil�ii�r♦#fr #:w C-3999...*� r rar f rG N G'?I �r11111111i17S1 �,lryri�rrrr f 01. i..� n ! II 5 L - 0 .94 D; lr 10 6--19-20.20 Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/la/20 5tormwater/ Erosion Control Review Drawn By JDL Checked By JDL Project # Sheet Title C RAD I NO PHASE 2 EROSION CONTROL PLAN Sheet c, .2 of 10 Holland Ave. 0 2 E s McKinney St. C7 SITE � CL Vaughn Rd. CL cn Hilton Rd. north Vicinity Map Not to scale EXISTING IMPERVIOUS SURFACE DATA: EXISTING IMPERVIOUS SURFACE WITHIN PARCEL 1.32 ACRE DISTURBED AREA = 0.30 AC (22.7% BUA) EXISTING IMPERVIOUS SURFACE TO BE DEMOLISHED/REMOVED = 0.30 AC Oscar Armando Giron I Thomas Phillip Young M&S Properties of Burlington, LLC. Marta Diaz Marquez and wife BEGIN SHEET FLOW A Tina G. Young FLOW LENGTH = 20 FT. WATERCOURSE SLOPE = 5% I I M&S Properties of Burlington, LLC. LIMITS OF 1 -� M�` -1 — �L-I'54" E 643.47' — — DISTURBANCE (TYP) I— II/ Isnow -- -- 592— --————----——— — — I�I� / _J / 5g BEGIN SHEET FLOW B FLOW LENGTH = 65 FT. / WATERCOURSE SLOPE = 4% / Ali o, -GRAVEL AREA Sutter: 588.84' I� , / I / / /■ Inv. Out: 586.54' \ — - 5O0 74 BEGIN SHEET FLOW C \ / / / FLOW LENGTH = 85 FT. • WATERCOURSE SLOPE = 7% •I / g4� 58971 A/ 1.11 - - - - - - - — — _ __ _ _ — I — CONCRETE PAD I / / / / BEGIN SHALLOW CONCENTRATED FLOW A /I FLOW LENGTH = 85 FT. I Sa — I ■ J —� — — _j ` / / WATERCOURSE SLOPE = 5% WB: H'�rlD Soi)ll r - /r `/I oup D - 587 \ cB \ / Sutter: 585.52' Inv. In: 583.27' 386— 41 Inv. Out 585.17' bbb I (B) I I I Inv: 582.g5' — — \ \ ♦♦ / III i t Ur : H)1'n Soil ♦ -r III. ,— � rDU D 0 / — \\a / I p �Y ��t ry y\ — — — — — PRE -DEVELOPED AREA 1 I \ \Q Jk �■ — — — — DRAINAGE AREA = 1.49 AC / Inv: 582.IG' �I I I OPEN AREA =1.19AC ti0 ■ / \ — — IMPERVIOUS SURFACE = 0.30 AC \ Sutter: 588.35' iI I l — / �'\■` / / \ J / / / / / / / — — / / / I / Inv. In: 582.65' (A) \ \ \\ "`�— _ — — \ C Inv. In: 583.75'(B) \\\\\ ��\\\ r— \ Inv. Out: 582.55' BEGIN SHALLOW CONCENTRATED FLOW B \ I I I \\\�� \ \\ c- — Q J� ♦� \ , — J / / FLOW LENGTH = 75 FT. — — — i / < 0� WATERCOURSE SLOPE = 20% 581 4),2 _ _ -573 _ / p15— < 578- i / _ \ 4 \ --• / ,5 �5 •ice \\C� < !, , �'N\_ 44'! LIMITS OF _--569 — --- \ ( \\ < /DISTURBANCE (TYP) TOP OF BANK 1� \ I < woo �Y� PO" OF STUDIO — /j % IN 88/11010\�//,— I 1 INTHECOJECT STUDY APE FEAR RIVER EBASIN WITHIN / S THE JORDAN LAKE WATERSHED-01 Stormwater Legend: m o m o m m o m m o m PROJECT DRAINAGE DELINEATION LINE E I I M I I M I I E SOILS DELINEATION LINE — > — A EXISTING TIME OF CONCENTRATION TRAVEL PATH I 7 M!\ I \\ 4 � \ ✓ 5a2 _ \ iIt � O 5 �U � oJ0 \ +r \ �U _C�' 0378 -0 ��Lo - \ 3.>_ / / I I � / I n�, �775 ' 'W GUTTER: 5�66 1.' OU I ;B BUTTER: � I I` I > I / SS 56_ SS III 55 M 572.15' 0 20' 40' 80' Inv. In: 561.72' Inv. Out: 5511.72 SCALE: I" = 20' NORTH y+'Sts►tllLllryl�rf. a ;r0 i O+' y1 ,`rtit1LllN G Llllt�tti` �5511111IJ� .•'� CA S L _ 0.. 494 lflji5, 05 t5ti Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/I(1/20 5tormwater/ Erosion Control Review Drawn By JDL Checked By JDL Project # Sheet Title STORMWATER MANAGEMENT PRE - DEVELOPED PLAN Sheet of 10 o Holland Ave. E McKinney St. C9 SITE � CL 11aughn Rd. CL cn Hilton Rd. north \/icinit Ma y p Not to scale PROPOSED CAST IN PLACE WALL W/ STONE VENEER, BY OTHERS. WALL SHALL BE KEYED INTO 3:1 SLOPE A DISTANCE 5' EACH SIDE. 14111 Alamance Co. Health Building Storm Schedule Rudd Street, Burlington, NC 3/12/2020 Revised: 6/11/2020 InletlD Drainage Area Total Area Inlet Time Tc ilnlet iSys Runoff Coeff IncrQ. Total Runoff Flow Rate Capacity Full Vel Ave Line ID Line Length Line Size Line Slope Invert Dn InvertUp HGL Dn HGL Up Rim Elev Up JunctType (ac) (acj (min] (min) (in/hr) (in/hr) (C) (cfs) (cfs) (cfs) (cfsj (ft/s) (ft) (in) (%] (ft) (ft) (ft) (ft] (ft) 1 ...................... 0.00 ........................................r......................------- 0.26 0.0 ----------------------------- 7.5 - ---------'----------------------'---.................. ------------ - -- 0 € 7.53 ....... 0 ............................. ...,... 1.4 ..................... ...,... 1.7 .............................. 3.1 ......................... 9.2 .............................. 4.3 .................... 101 ............... 29.0 ...................-------- 15 ------------------------ 1.72 ----------------------- 576.50 -----------......... 577.00 .................... 577.20 .................... 577.70 .................... 586.0 ------------------------------ MH --------------- --------------- 2 0.02 0.26 5.0 6.7 8.25 7.76 0.85 0.1 1.7 1.7 7.2 3.5 102 75.1 15 1.07 581.20 582.00 581.72 582.52 587.6 Dp-Grate 3 0.02 ........................................... 0.24 ...................................................................,.....................¢................. 5.0 6.3 8.25 7.87 0.85 0.1 1.6 1.6 7.8 3.4 .................... 103 ............... 31.8 .......................... 15 ........................ 1.26 ....................... 582.20 .................... 582.60 ..................................................... 582.71 583.11 587.8 Dp Grate 4 0.07 0.22 5.0 6.1 8.25 7.92 0.85 0.5 :...................................:..............................:................................ 1.5 1.5 8.7 3.4 104 13.1 15 1.53 582.80 583.00 583.29 583.49 588.2 Comb. 5 ---- -- 0.15 ......... ......... 0.15 5.0 --- --- 5.0 ---- 8.25 --- 8.25 ...... ......... 0.85 1.1 1.1 1.1 7.8 3.0 105 56.0 15 ---- - 1.25 --- 583.20 ---- 583.90 ....... 583.61 ....... 584.31 .......................................---------- 587.0 D -Grate pMH 6 0.00 ......................................................................................................................................¢............................................................,..........................¢...................................,...............................¢...................................¢.........................................................................................................................................................................:...........................:..................................................... 0.17 0.0 7.2 0 7.60 0 1.4 1.0 2.4 15.5 4.0 106 20.5 15 4.88 577.00 578.00 577.62 578.62 582.5 7 0.00 0.17 1 0.0 6.0 0 1 7.94 0 0.0 1.0 1.0 1 10.7 2.9 107 64.2 15 2.34 578.20 579.70 '', 578.62 580.11 585.0 MH 8 ...................... 0.17 ........................................a......................------ 0.17 5.0 ........... -------.......... 5.0 -------------------------+--------------------- 8.25 1 i---.........................................................;........................ 8.25 0.77 1.1 ...;... 1.1 .............................. ...... 1.1 ......................... ...... 7.4 .............................. ...... 3.0 .................... ....... 108 ............... ....... 53.0 ...................-------- --- 15 ------------------ ------- 1.13 ----------------------- 579.90 -----------......... 580.50 .................... 580.32 .................... 580.92 .................... 584.0 ----------------------------------- Comb. ............-------------------------------- 10 NA NA NA NA NA NA NA NA NA NA NA NA 110 42.0 6 1.20 572.50 573.00 NA NA 578.3 :Outlet Structure 1. SYSTEMS SIZED FOR 25 YR DESIGN STORM, 1=7.68 (25yr, 5 min). 2. PRIVATE STORM PIPE TO BE ADS-N-12 WT IB PIPE PER AASHTO SPECIFICATIONS. 3. IF REQUIRED, PUBLIC STORM PIPE (IN R.O.W.) TO BE TONGE AND GROOVE JOINT RCP CLASS III CONFORMING TO ASTM SPECIFICATION C-76. Oscar Armando Giron I Thomas Phillip Young I M&S Properties of Burlington, LLC. Marta Diaz Marquez and wife Tina G. Young I I - - - - - - I LIMITS OF I S 88°33'54" E 643.47' DISTURBANCE (TYP) --_ 4#0000 MONO ■■■ - - m ----- - - - - - - / EX. SI SLEEVES T O.C. (TYP OF 4) & WIDE x 8" THK RIVER JACK STONE AND LANDSCAPE BOULDERS I M&S Properties of Burlington, LLC. PROPOSED SLAB TOP INLET #504 (NCDOT 840.04 - OPEN ALL SIDES) TOP 578.3± DD(-1D()CCr) T(-1D 2" #57 GRAVEL LAYER (TYPICAL OVER SAND PORTION OF DEVICE) 574_0 - • • • --'- -- ---------- -- -- ---a __-_------- zem- -- - 5oZ5bo�� = Oo0 0077 IN( W-.001 42 LF OF 6" HDPE ---- - --- _ ---____- - rn s oio - --------------____= SLOP E ° EL.573.0 4" PERF. SCH 40 PERMEABLE NON -WOVEN UNDERDRAINS 10' O.C. itrl�ilr�rrj FILTER FABRIC LINER ABOVE SLOPE @ 0.50% W/ 1'-0" (MIN.) ,.. a 4 �( CARO r AND BELOW UNDERDRAINS #57 STONE ENCASEMENT BOTTOM AS • � r . ` j1..Elll{,+• �`�,r (SLOPE �'Q y REQUIRED) 5k 0 S.H.W.T. ELEV. < 570.0 -� -z: - :w C-3 999. Open Surface Sand Filter Detail nts ' Y R. THE DESIGN OF ALL STORMWATER MANAGEMENT FACILITIES AND PRACTICES WILL CONTROL AND TREAT THE ''0F1 "' 'Q4`''�` TOP OF STRUCTURE: 578.3± 0 100 YR. ELEV 578.22 RUNOFF FROM THE FIRST ONE INCH OF RAIN OVER THE ,4r++r' 0 50 YR. ELEV 578.05 PROJECTS' PROPOSED ADDITIONAL BUILT UPON AREA 0 25 YR. ELEV 577.73 (BUA). THE DESIGN AND PLANS ARE SUFFICIENT TO WEIR CREST: 577.5 0 10 YR. ELEV 577.56 COMPLY WITH APPLICABLE STANDARDS AND POLICIES .%,%, C+A ! •' 2 YR. ELEV 577.08 FOUND IN THE NCDEQ STORMWATER DESIGN MANUAL AND- 0 1 R. ELEV 576.81 ANY CITY OF BURLINGTON SUPPLEMENTS TO THE s EL. 576.5 WQV ELEV 576.50 STORMWATER DESIGN MANUAL AND THE DESIGNS AND 9 L - PLANS ARE COMPLIANT WITH THE CITY'S PHASE II 0. 494 - STORMWATER ORDINANCE. PVC STUBBED OUT OF }4,1�'1D 01? _TRUCTURE W/ 4" 90° PVC BEND r''iIhirr %10' 20 Q AND 4" PVC CAP. CONTRACTOR SHALL DRILL 2" 0 HOLE IN 4" CAP. SEAL 4" PENETRATION WITH EPDXY DRAWDOWN ORIFICE NOTE: THE UNDERDRAIN COLLECTION SYSTEM SHALL BE ° ■ �$$ ���� / - SandFilter Underdra in Sc edu I e EQUIPPED WITH A PERFORATED PVC PIPE (SEE \ 9 POST -DEVELOPED AREA 1 b ' 'Wo / DRAINAGE AREA = 0.61 AC OPEN AREA = 0.23 AC 8-1.0 58'I 3 �� I �o / �4'� ' / • ° 588 71/ ASSUME 5 MIN. INLET CAPTURE BEGIN CHANNEL FLOW A J 586�. / I / \ / 5$6 FLOW LENGTH = 220 FT. SEE STORM SCHEDULE A 30 LF OF 4" PERF. PVC PIPE @ 0.50% SLOPE (MAX.) B 30 LF OF 4" PERF. PVC PIPE @ 0.50% SLOPE (MAX.) 60 LF (PROPOSED) IMPERVIOUS SURFACE = 0.38 AC \ + 58 586.5 / �' \ + / GB I-� 588.0 / ■ // // 5 4.4 �� Gutter: 588.84' \ / Inv. Out: 586.54'- 4 ° ° ° �1 587.E ` / 587.55 87.55 / ASSUME 5 MIN. INLET CAPTURE BEGIN CHANNEL FLOW A FLOW LENGTH = 90 FT. \ SEE STORM SCHEDULE o +SSS.SSS�.�f 587.8 587:0 a / - 589 - - F- ° - ■ / / / I 587.8 588 ■ 7 / / - ■ / I - - - - - - - BUILDING IWEIGHT / 5gS iv I 22.0 FTMAX I ---587 - ■ ° 0 ' a 50GIAL OPEN DOOR GLINt ADULT DAY SERVICES I o 1 5,160t SF 5,540t 5F / U SERVICES FFE=588.1-i ■ FFE=58-i.5- 11 / Ouutter: 585.52' \ ` - ° F 06588 1 ■ I _- Inv. In: 585.2-7' -586- a Inv. Out 5a5.17' ■ I // -0 o ,a LO ■ I , 5� r (A) - \\ . 12" RGP 1 \ I I / - - _ a -� - Z� a - 6,. a -° -E0 I (B) / i I I Inv- 582.G5' \ \ .� \ _ - 2 588 ° y 1�129' 6 ���� / / - 584 - 5 7. a 587° a UNDERDRAIN CHART) WITHIN GRAVEL LAYER. THE PIPE SHOULD HAVE 3/8" PERFORATIONS, SPACED ON 6-INCH CENTERS WITH A MAXIMUM OF 3 HOLES PER ROW. THE PIPE SHALL BE SPACED AT MAXIMUM OF 10 FT. ON CENTER AN A MINIMUM OF 0.5% SLOPE SHALL BE MAINTAINED. A PERMEABLE FILTER FABRIC IS PLACED BETWEEN THE SAND MEDIA AND THE GRAVEL LAYER. PROPOSED IMPERVIOUS SURFACE DATA: PROPOSED IMPERVIOUS SURFACE IN 1.24 AC DISTURBED AREA = .67 AC (54.0% BUA) Stormwater Legend: PROJECT DRAINAGE DELINEATION LINE SOILS DELINEATION LINE - + PROPOSED TIME OF CONCENTRATION TRAVEL PATH C enera I Notes: LO 0f ry ■\�11 11 1. STORMWATER TREATMENT FOR ALL ADDDITIONAL IMPERVIOUS AREA CREATED AFTER o / Inv: 5a2.19' �I I I I I Q��k`� 9- JULY1,20071SREQUIRED. \\ I II ti ■ M �- 579 �5a 578 SCOUR HOLE B / 2. AS-BUILTS OF THE STRUCTURAL STORMWATER CONTROL MEASURES SHALL BE ��/ I l I l _ _ 577 - - - - SEE DETAIL SHEET C1.8 PROVIDED TO THE CITY OF BURLINGTON. �� �� \J % / 1 / tq / / BEGIN SHALLOW CONCENTRATED FLOW A 576 _ /� -' FLOW LENGTH = 50 FT. _ \ WATERCOURSE SLOPE = 13% Inv. In: 582.65' (A) �� �� `` - _ _ I / , 578- - - - - - - - - / 3. RUNOFF FROM ALL PERVIOUS AREAS OF THE DEVELOPMENT MUST BE TREATED TO THE \ Inv. In: 585.75' (B)\� �� \� �� -T Q MAXIMUM EXTENT PRACTICABLE. � ' � S ND FILI'EF�FOREBAII_ � \ Inv. Out: 5a2.55' I l `� ���oo �ryj t� t A - - - - - _ - - �� / POST -DEVELOPED AREA 1a S+c ` \ , DRAINAGE AREA = 0.88 AC q lvt)At OPEN AREA = 0.59 AC �r N IMPERVIOUS SURFACE = 0.29 AC 1 / �• PROVIDE 20' ACCESS EASEMENT FROM 581 �� / i _ PUBLIC ROW AND 1U PERIMETER ACCESS - - - - - - - 1 & MAINTENANCE EASEMENT AROUND PROVIDE 20' ACCESS EASEMENT FROM ' �� s�9 i11Q� _ �'�- _ o BMP PERIMETER / PUBLIC ROW AND ACCESS& �.~■■■■■■■■■■■■� / - __/ I / MAINTENANCE EASEMENT AROUND BMP _ / 573- p PERIMETER , C 78 W�,�- N_ - BEGIN SHALLOW CONCENTRATED FLOW B I I I I I I I I \\ / / �\ _ ,579 / - / • IX - \/ FLOW LENGTH = 40 FT. WATERCOURSE SLOPE = 25% L\ SCOUR HOLE C SEE DETAIL SHEET C1.8 �p N 568 561 \ LIMITS OF --569- --- \ ( _ \ I 6o°M� DISTURBANCE (TYP) - ' TOP o = BANK I \ 1 I I \ \ \ \ ✓ ( IF� \•� - - i' I / �� _ _ _ _ _ - - - --we ■ GUTTER: 5-71.66' �\ i ��■ _ to� - _- � - - IN\/:561.45 j / I I GUTTER: 57I.G5' I \ I / FPO&7TOF STUDI?' ° s�, ��� is is/at �/�!\ ==- I \i ///\/ /�� SS THE PROJECT STUDY AREA IS LOCATED // / I SSA IN THE CAPE FEAR RIVER BASIN WITH IN / S I TSS MH op:: 572.15' THE JORDAN LAKE WATERSHED ,/ / To \ / Inv. In: � ' Inv. Out:: 55559.72' NOTE: ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF BURLINGTON SPECIFICATIONS AND DETAILS. 0 20' 40' 80' SCALE: I" = 20' NORTH Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/Ia/20 5tormwater/ Erosion Control Review Drawn By JDL Checked By JDL Project # Sheet Title STORMWATER MANAC EMENT POST DEVELOPED PLAN Sheet G 1.4of 10 Holland Ave. Q_ ca a) 0- 0 r ca s McKinney St. c� SITE � "'aughn Rd. cn Hilton Rd. north Vicinitu Map Not to scale Oscar Armando Giron Thomas Phillip Young Marta Diaz Marquez and wife Tina G. Young - - - - - - I - - S 88°33'54" E 643.47' LIGHT DUTY 10' BUFFERYARD- ASPHALT (TYP) SIDEWALK NEW CONCRETE M&S Properties of Burlington, LLC. 105.Q' 41.6 41.6 M&S Properties of Burlington, LLC. 2 PROPOSED b' HT. HEAVY DUTY WOODEN PRI VAC Y - ASPHALT (TYP) - I - SEE NOTES 3 _4FENOE. THIS SHEET. PROPOSED SPILL -TYPE ICURB AND CUTTER O DUMPSTER o PAINTED ARROW (TYP) 8 g R 9 a 9 to 11 rj-A -0 5 R ADA RAMP/ SIGN AND _ ADA PARKING (TYP) 8.0' S' 8.0' 8.0' (V COVERED I r11� ILI �.. �.,�, ��.�G 2.5R cV 3O'R DROP-OFF R �4'-0" CLEAR HEIGH I 'N (A 6 ° 20'R �0 a a ° U) ° a ° � as m ° 5'R in 5'R 5'R 5 R ° Ib ROLLTYPE CURB AND GUTTER Hl< WHEEL STOP I i a ° a ° CONCRETE WALK 5 6 7 (WIDTH VARI E5) PROPOSED CURB AND GUTTER TIE IN TO EXISTING CURB AND GUTTER AT THIS LOCATION CONCRETE WALK (WIDTH VARIES) BUILDING HEIGHT 22.0 FT. MAX 5' SOCIAL OPEN DOOR CLINIC SERVICES 5,160t 5F 2,060t SF FFE=588.17 °a FFE=588.1-I a ° a ° a � a ° a as ° SITE RETAINING -` ° WALL 5'R o. r��9_ PROPOSED CATCH -TYPE CURB AND 55GRUTTER 5'R a 5 6 a ° a � ° ADULT DAY SERVICES 5,540t 5F FFE=587.5 IQ.O' I CONCRETE WALK (WIDTH VAI IE ) I I 5' S' a °A ° a ° m ° ° CONCRETE PATIO ARCHITECTURAL RETAINING Y WALL, COORDINATE WITH U BUILDING PLANS. co RETAINING WALL SHALL BE w PERMITTED WITH BUILDING C0 INSPECTIONS. w SEGMENTAL BLOCK RETAINING WALL, SEE C0 NOTES ON THIS SHEET. wp RETAINING WALL U) SHALL BE PERMITTED in WITH BUILDING `N INSPECTIONS. 20.0' } w w o' H co Cn INSTALL GATE AT THIS LOCATION LIGHT DUTY ASPHALT (TYP) 2 HEAVY DUTY ASPHALT (TYP) III TIE IN TO EXISTING CURB AND GUTTER AT THIS LOCATION GONG. APRON PER CITY OF BURLINGTON STANDARDS R-15, SEE DETAIL SHEET 2' WIDE STOP BAR INSTALL ASPHALT, CURB AND GUTTER PER CITY OF BURLINGTON STANDARDS AND SPECIFICATIONS DEMOLISHED FOR UTILITY INSTALLATION I 01 0 N 0 cTi m cn TIE IN TO EXISTING CURB AND GUTTER 6 AT THIS LOCATION O (U (D J U) D o LO 0 20, 40' 80' 50ALE: I" = 20' m is Site Information 1. OWNER/DEVELOPER: ALAMANCE COUNTY, NO. 124 W. ELM STREET GRAHAM, NO 27255 2 • LANDSCAPE ARCHITECT. MLA DESIGN GROUP ADDRESS: 120 CLUB OAK5 COURT, SUITE 100, WINSTON-5ALEM, NO 27104 CONTACT/PHONE NUMBER: JOHN LIPKA, (55(b) 765-11125 5. PROPERTY LOCATION 4 ZONING: PROPERTY ADDRESS: RUDD 5T., BURLINCTON, NO THE CODE OF "CITY OF BURLINOTON" GOVERNS THE ZONING RESTRICTIONS PARCEL ID: 147811 EXISTING ZONING: IP ADJACENT ZONING: RESIDENTIAL 4 BUILDING SETBACKS: FRONT SETBACK: 50', SIDE SETBACK ABUTTING STREET: 25', REAR: 50', 51 DE: 10' 5 LANDSCAPE SETBACKS: 5TREETYARD: 5' WIDE BUFFERYARD REQUIREMENTS: 10' TO ADJACENT RESIDENTIAL ZONING INFRASTRUCTURE: 6 WATER: PUBLIC SEWER: PUBLIC 7. SITE SIZE AND COVERAGE: TOTAL LOT SIZE: 10.15 ACRES TOTAL DISTURBED AREA: t 55,a50 S.F. (1.24 ACRES) TOTAL IMPERVIOUS SURFACE : EX. IMPERVIOUS AREA REMOVED WITHIN DISTURBED AREA: 12,650 S.F. (0.50 ACRES) - 24.2% PROPOSED NEW BUILDING S.F.: t 12,760 S.F. (0.2a ACRES) - 25.4% OTHER IMPERVIOUS S.F.: 16,440 5.F. (0.55 ACRE5) - 50.6% TOTAL PROPOSED IMPERVIOUS AREA: 2a,200 S.F. (0.67 ACRES) - 54.0% NET CHANGE IN IMPERVIOUS AREA: + 16,260 S.F. 8. OFF-STREET PARKING 4 LOADING: PROPOSED USE: MEDICAL / OFFICE PARKING REOU I RED (PUBL I G) : 1 51". PER PER 200 5F NON PUBLIC 15P. PER 600 SF 12,760 SF / 200 = 64 SPACES PARKING PROVIDED: 22 NEW + 401 EXISTING = 71 SPACES Site Man Dotes I. GENERAL CONTRACTOR (0.0) 15 RESPONSIBLE FOR VERIFYING THAT ALL APPLICABLE PERMITS AND APPROVALS HAVE BEEN OBTAINED PRIOR TO ANY WORK. 2. UTILITY, TOPOGRAPHIC, AND BOUNDARY INFORMATION PROVIDED BY BOSWELL SURVEYORS, DATED 5/51/Ia. 5. G.G. TO VISIT SITE AND ACCEPT THE SITE CONDITIONS AFTER REVIEWING SITE WORK CONSTRUCTION DOCUMENTS AND PRIOR TO BIDDING, DEMOLITION OR CONSTRUCTION. 4. G.G. 15 RESPONSIBLE FOR CHECKING ALL DIMENSIONS AND "VERIFY" DIMENSIONS NOTED ON PLANS. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE IN WRITING PRIOR TO ANY FURTHER CONSTRUCTION. 5. G.G. TO ENSURE THAT PROPOSED BUILDING AND PARKING MEET APPROPRIATE SETBACK REOU I REMENT5. 6. A LICENSED SURVEYOR SHALL STAKE OUT ALL PARKING, CURBING, ETC., AND SHALL BE REVIEWED BY THE OWNER'S REPRESENTATIVE PRIOR TO ANY CONSTRUCTION. 7. ALL DIMENSIONS SHOWN ON PLAN ARE FROM OUTSIDE FACE OF BUILDING, FACE OF CURB, OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED. 8. G.G. IS RESPONSIBLE FOR OBTAINING PROPER APPROVALS AND/OR PERMITS FOR WORK DONE IN PUBLIC RIGHT-OF-WAYS, PRIVATE PROPERTY OR PRI VATS/PUBL I C EASEMENTS. a. G.G. IS RESPONSIBLE FOR LOCATING AND AVOIDING ALL UNDERGROUND UTILITIES. UTILITIES SHOWN ON 51TE PLAN ARE BASED ON THE PLANS PROVIDED BY RED ROCK DEVELOPMENTS AND MAY NOT BE ALL INCLUSIVE. CONTACT APPROPRIATE UTILITY LOCATION SERVICE FOR UTILITY IDENTIFICATION PRIOR TO ANY WORK. 10. G.G. 15 RESPONSIBLE FOR KEEPING ALL PLANTING AREAS FREE OF CONSTRUCTION DEBRIS, STONES, CONCRETE, ETC.. 11. G.G. TO SAW GUT AND PATCH/REPAIR ALL EXISTING PAVEMENT AFTER 51TE IMPROVEMENTS. 12. SEE DETAIL SHEET, G I .a FOR SITE PLAN DETAILS. 15. G.G. TO USE SPILL TYPE OR CATCH TYPE CURB AND GUTTER WHERE APPROPRIATE TO ENSURE POSITIVE DRAINAGE. 14. ALL LOT STRIPING, STOP BARS, AND DIRECTIONAL ARROWS TO BE WHITE LIQUID THERMOPLASTIC TRAFF I G MARKING PAINT AND SHALL BE APPLIED PER MANUFACTURER'S SPECIFICATIONS. PARKING LOT STRIPES TO BE 4'' WIDE. 15. CONSTRUCTION EQUIPMENT AND/OR MATERIALS SHALL NOT BE STORED/PARKED WITHIN THE R.O.W. 16. HEAVY DUTY ASPHALT TO BE USED IN ALL PROPOSED ASPHALT AREAS EXCEPT PARKING STALLS (L 15HT DUTY), OR PERMEABLE PAVER AREAS (5EE 51TE PLAN). 17. G.G. TO COORDINATE WITH PLUMBING AND ELECTRICAL CONTRACTOR FOR UTILITIES INSTALLATION, MATERIALS, AND ANY PERMITS OR APPROVALS. 15. G.G. TO OBTAIN ANY APPROVALS BY JURISDICTIONAL AUTHORITIES NECESSARY FOR MODIFICATIONS TO APPROVED PLANS. 101. G.G. OR LANDSCAPE CONTRACTOR TO REFER TO LANDSCAPE PLAN FOR PLANT SCHEDULE, PLANTING NOTES AND PLANTING DETAILS. 20. IMPORTANT: ALL UTILITIES TO ADJACENT PROPERTIE5/U5E5 TO REMAIN OPERATIONAL DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION. 21. G.G. TO PROVIDE ENO I NEERED SHOP DRAWI NG5 FOR PROPOSED 5EGMENTAL BLOCK RETAINING WALL a BMP FOR OWNER REVIEW AND APPROVAL. 5.0. TO SUBMIT COLOR AND BLOCK FACING SAMPLES FOR OWNER APPROVAL PRIOR TO INSTALLATION. SEGMENTAL BLOCK SHALL BE FROM VERSA -BLOCK, BELCARD, APPROVED EQUAL. 22. G.G. SHALL INSTALL A 6' HEIGHT PRIVACY FENCE IN LOCATION SHOWN. G.G. TO COORDINATE WITH OWNER ON FENCE TYPE, PRIOR TO CONSTRUCTION. G.G. TO OBTAIN OWNER APPROVAL ON FENCE TYPE, FINISH, AND COLOR PRIOR TO INSTALLATION. Legend Detail KOH SETBACK / BUFFERYARD I L I OHT-DUTY I . ASPHALT PAVING PROPERTY LINE 2 HEAVY-DUTY I . ASPHALT PAV I N5 CONCRETE WALK1. 5 CURB 8 GUTTER (SPILL) HANDICAP PARKIN5 RAMP `� CURB $ GUTTER (CATCH) HANDICAP SIGN I . 5 6 7 CONCRETE WALK I. CAP PARKING RAMP PAINTED TRAFF I G ARROWS f' D TRAFFIC EXISTING CURB $ GUTTER WS HANDICAP SIGN FA PROPOSED CURB GUTTER ETE WHEEL STOP ETE PAD NOTE: ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF BURLINGTON SPECIFICATIONS AND DETAILS. Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments b/Ia/20 5tormwater/ Erosion Control Review Drawn By JDL Checked By PF Project # Sheet Title SITE PLAN Sheet G5of 10 NORTH d Holland Ave. ca a 0 E McKinney St. C9 SITE � Vaughn Rd. cn Hilton Rd. north Vicinity Map Not to scale Oscar Armando Giron I Thomas Phillip Young I M&S Properties of Burlington, LLC. Marta Diaz Marquez and wife Tina G. Young I — — — — — — I LIMITS OF I S 88°33'54" E 643.47' DISTURBANCE (TYP) --- ----------------- / / / 5g1 ❑ l / / / I/ i I I EX. S / V i .z ° I � M&S Properties of Burlington, LLC. � 5S6 / � 7 a I a----587 _ I \ T 0 OPEN DOOR CLINIC ADULT DAY SERVICES o IY \ SOCIAL \ SERVICES 5,160t 5F 5,54 t 5F / � _ _ • FFE=588.1"i FFE=.5 // � 1\ / CID Gutter: 5a5.52' \ FFE6588.1-i — / / I / Inv. In: 585.27' 586- �a = / =) -07 ) I Inv. Out 583.17' / / O "h I _ i LO • I H 5�i a �c� ( (A) \\ ir 12" RGP \ 1 \ I Ili 1 — — ° _ — Q a ° 4 ` 6,, a a -W a I I ° / • I (B) / I III Ilnia 582.G5' _ \ \ O - - 2,a588 �`� ` % 129� al 12" / I / iW / - 584 /'°W- F 4 /LL— — • G 0 / B / • —--- 579 = G \\� �� 578 1 \\\x \\ \�`\`%/i� Lam/ I ha'� 577 \ Gutter: 5aa.35' I �/ II I I / — — i\ I \ / — • Inv. In: 5a2.65' (A) \\ \ \\ '7 \ Inv. In: 5a3.75'(B) \�\\\ \�\�-T--- 0 a I -- � / / 578—= ---= - _—� / // U) \ Inv. Out: 582.55' o�oJ \ 4NoP�/` 581`�''`/ �— —' `oCn / (7 70) --------- --• 5�j� • �' _------- i \\\\ can • �� /c \ �� o — 56$ MN \ \ LIMITS OF---569 — --- \ \ \h\ �O /DISTURBANCE (Ty P) TOP OF BANK 1 \ I I [r ° �1v I C % '- a _ y BUILDING HE16HT 22.0 FT. MAX °—L as / / r' / / / moo I� a \ 5aQ GB GUTTER: 571.66' _ INV:561.G5/' I GUTTER: 571.95' I L SS, SI \ / ,� I /�/� / /�/ / / S 55 MH � Top: 572.15' 1 _ _ Inv. In: 561.72' ? / Inv. Out 55G.72' INv IN-s68.ot � Utility Key Notes O CONTRACTOR SHALL PROVIDE 6" X 6" TAPPING SLEEVE AND VALVE FOR TIE IN TO EXISTING WATERLINE FOR 6" FIRE LINE. CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION OF EXISTING WATER LINE PRIOR TO PROPOSED WATER LINE CONSTRUCTION. COORD I NATE ALL WORK W I TH THE G I TY OF BURLINOTON. ALL PAVEMENT REPAIR PER THE G I TY OF BURLINOTON STANDARDS AND SPEC I F I GAT I ON5. O A NORTH CAROL I NA LICENSED UTILITY CONTRACTOR SHALL INSTALL THE 6" FIRE LINE WITH 6" ABOVE GROUND DOUBLE DETECTOR CHECK ASSEMBLY TO CITY OF BURLINOTON STANDARDS AND SPECIFICATIONS . ASSEMBLY SHALL INCLUDE CONCRETE PAD, PROVISION FOR 110 AC, APPROVED HEAT SOURCE, TAMPER SWITCH WIRING FROM BUILDING TO ENCLOSURE, AND A55E 1060 CERTIFIED ENCLOSURE. ASSEMBLY SHALL ALSO HAVE 4" FDG PER CITY OF BURLINOTON STANDARDS AND SPECIFICATIONS. ALL PIPING SHALL BE DUCTILE IRON MECHANICAL JOINT WITH MEGA LUGS FROM THE CONNECTION AT THE MAIN TO A POINT OF AT LEAST 5-FT PAST THE OUTLET VALVE. O 6" DIP FIRE PROTECTION LINE TO BUILDING FIRE SUPPRESSION SYSTEM. OFIRE DEPARTMENT CONNECTION (FDG) MOUNTED EXTERIOR OF VAULT ON BUILDING SIDE OF BACKFLOW. FDG TO HAVE 2-2.5" NST CONNECTION. O6"X6" TEE, 6" GATE VALVE, GONG. BLOCKING AND FIRE HYDRANT TO CITY OF BURLINOTON STANDARDS AND SPEC I F I GAT I ON5. O4" OR 6" SCH. 40 PVG (A5 LABELED) SANITARY SEWER SERVICE a 1.04% MINIMUM GRADE IN ACCORDANCE WITH THE NORTH CAROLINA PLUMBING CODE TO A POINT 5'-0" FROM BUILDING. COORDINATE WITH ARCHITECTURAL/PLUMBING PLANS FOR EXACT SIZE AND LOCATIONS. OG 2" SDR 21 PVC DOMESTIC WATER SERVICE TO INDIVIDUAL SERVICE TEE. SERVICE LINE TO A POINT 5'-0" FROM BU I LD I N5. COORDINATE WITH ARCH I TECTURAL/PLUMB I N5 PLANS FOR EXACT SIZE AND LOCATIONS OF SERVICES. O 2" DOMESTIC WATER METER / SERVICE. PROVIDE 2" TAPPING SADDLE IN ACCORDANCE WITH THE CITY OF BURLINOTON STANDARDS AND SPECIFICATIONS. (2" TYPE K COPPER LINE FROM TAP TO BACKFLOW PREVENTOR, 2" SDR 21 SERVICE LINE TO BUILDING). ALL PAVEMENT REPAIR PER G I TY OF BURL I NOTON STANDARDS AND SPEC I F I GATI ON5. O2" RPZ BACKFLOW PREVENTION ASSEMBLY INSTALLED ABOVE GROUND WITHIN INSULATED ENCLOSURE PER G I TY OF BURLINOTON STANDARDS AND SPEG I F I GATI ON5. O 4" CAST IRON GLEAN OUT, SEE DETAIL THIS SHEET. OPROPOSED PUBLIC SANITARY SEWER SYSTEM. ALL MATERIALS AND INSTALLATION TO G I TY OF BURLINOTON STANDARDS AND SPEG I F I GAT I ON5. OPROVIDE 8" DUCTILE IRON OUTSIDE DROP TO CITY OF BURLINOTON STANDARDS AND SPECIFICATIONS. plater/Sewer I. ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF BURLINOTON SPECIFICATIONS AND DETAILS. 2. ACCEPTABLE WORKING CONDITIONS OF SANITARY SEWER STRUCTURES AND PIPING SHALL BE VERIFIED BY THE CONTRACTOR AND ALL CONDITIONS FOUND TO BE UNACCEPTABLE SHALL BE REPORTED TO UTILITIES CONSTRUCTION AND MAINTENANCE PRIOR TO ANY CONNECTIONS, EXTENSIONS, OR STRUCTURES BEING INSTALLED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AND REPAIR OF UNACCEPTABLE CONDITIONS THAT RESULT FROM FAILURE TO REPORT SUCH CONDITIONS PRIOR TO COMMENC I NO WORK OR THAT RESULT FROM WORK BEING PERFORMED. 5. SANITARY SEWER CONNECTIONS SHALL BE SERVICE WE 15HT CAST IRON SOIL PIPE WITH 4-INCH CLEANOUTS AND SHALL MEET CITY OF BURLINOTON SPECIFICATIONS. 4. PROPOSED PUBLIC OR PRIVATE HYDRANTS INSTALLED OR RELOCATED SHALL MEET OR EXCEED G I TY OF BURL I NOTON'S SPECIFICATIONS TO INCLUDE HYDRANT TEE, VALVE, AND THREADS. 5. DENSITY TESTS BY AN INDEPENDENT TE5TI N5 LAB ARE TO BE MADE AS DIRECTED BY THE CITY INSPECTOR AT THE OWNER'S EXPENSE. 6. PUBLIC SEWER IN RUDD STREET REQUIRES INFRASTRUCTURE PLANS TO BE APPROVED BY GOB ENGINEERING DEPARTMENT AND NCDEO SEWER EXTENSION PERMIT PRIOR TO BUILDING PERMIT ISSUANCE. 7. UTILITY CONNECTIONS REQUIRE GOB UTILITY SERVICE REQUEST TO BE SUBMITTED TO AND APPROVED BY GOB ENGINEERING DEPARTMENT PRIOR TO COMMENCEMENT OF WORK. 8. PRIOR TO ANY WORK WITHIN THE ROW, CONTRACTOR SHALL SUBMIT A ROW USE APPLICATION TO GOB ENGINEERING DEPARTMENT FOR APPROVAL. CLEANOUT SHALL BE "JOSAM" #56044 CAST IRON IN 12" X 12" X 6" GONG. PAD � 1=� 1111-1111-1111 I/8 BEND PVC. PIP COVER CLEANOUT PLUG CLEANOUT BOX 12" X 12" X 6" GONG. PAD I I I I=11 I I I=11 I I I=11 I I CLEANOUT TO BE TRAFFIC BEARING TYPE (TYP.) CLEANOUT DETAIL NOT TO SCALE VARIES UNDERGROUND PIPING NOTE: ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF CITY OF BURLINGTON SPECIFICATIONS AND DETAILS. "BEFORE YOU DIG" LINE I-800-632-4g4q OR B-I-I 0 20' 40' 80' SCALE: I" = 20' NORTH Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/la/20 5tormwater/ Erosion Control Review Drawn By JDL Checked By JDL Project # Sheet Title UTILITY PLAN Sheet Ce of 10 Pion Vi915 Inflow �OHM .l Arernge ._ Area • Width W L * Area of bnsm water surfaca at Baffte5 top of print pol spillway elemtion Inflow 9uf{les structure Sediment T Cross -Section storage Zone View CONSTRUCTION SPECIFICATIONS: I d 1= Y sr 9 r Skimmer dewatering device Emergency ""ay l lway I' Freeboard r 6" min- E m ban kment ergtncy Arm Assembly 9- "C" Enclosure Water Entry PERSPECTIVE VIEW Unit PVC End PVC Elbow PVC Vent PiSchedule 40 Cap Pe PVC Pipe Water Surface AALJ AV PVC p End Schedule 40 PVC Tee PVC Pipe PVC Pipe \ z" Holes in y PVC Tee Orifice Underside Flexible Plate Hose o Bottom Surface END VIEW FRONT VIEW MAINTENANCE: I . CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION ROOTS AND OTHER 1. INSPECT SKIMMER SEDIMENT BA51N AT LEAST WEEKLY AND OB.JECTI ONABLE MATERIAL AND PROPERLY GRADE AREA. PLACE FILL IN AFTER EACH 510NI F I CANT 0/2" OR GREATER) RAINFALL EVENT LIFTS NOT TO EXCEED ClAND MACHINE COMPACT. OVERFILL THE EMBANKMENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE 6" TO ALLOW FOR SETTLEMENT. THE BA51N TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT 2. SHAPE BASIN TO SPECIFIED DIMENSIONS. PREVENT SKIMMING DEVICE FROM ACCUMULATES TO ONE HALF HEIGHT OF FIRST BAFFLE. PULL THE SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER SKIMMER TO ONE SIDE TO EXCAVATE SEDIMENT UNDERNEATH. OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. EXCAVATE SEDIMENT FROM ENTIRE BASIN. ENSURE ANY 5. PLACE THE BARREL (4" 5GH40 PVC. PIPE) ON A FIRM, SMOOTH FOUNDATION OF VEGETATION GROWING IN BOTTOM OF TRAP DOES NOT HOLD IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL AS BAGKFILL AROUND THE DOWN THE SKIMMER. PIPE. PLACE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4" LAYERS AND 2. REPAIR BAFFLES IF DAMAGED. RE -ANCHOR BAFFLES IF WATER COMPACT TO THE SAME DENSITY AS THE EMBANKMENT. PLACE MINIMUM OF 2 15 FLOWINO UNDER OR AROUND THEM. FEET COMPACTED BAGKFILL OVER PIPE SPILLWAY BEFORE GROSSING WITH 3. IF SKIMMER 15 CLOOOED WITH TRASH AND WATER 15 IN BASIN, CONSTRUCTION EQUIPMENT. DO NOT OUT A TRENCH THROUGH EMBANKMENT TO JERK ROPE TO DI5LODOE TRASH FROM SKIMMER. IF THI5 INSTALL SPILLWAY PIPE. DOESN'T WORK, PULL SKIMMER TO SIDE AND CLEAR DEBRIS. 4. ASSEMBLE THE SKIMMER FOLLOWING THE MAUFACTURER5 INSTRUCTIONS. LAY ALSO CHECK ORIFICE BEFORE REPOSITIONING SKIMMER. IF ASSEMBLED SKIMMER ON BOTTOM OF BA51N AND ATTACH FLEXIBLE JOINT TO SKIMMER ARM OR BARREL 15 CLOGGED, REMOVE ORIFICE AND THE BARREL PIPE AND POSITION SKIMMER OVER EXCAVATED PIT OR SUPPORT. CLEAR OBSTRUCTION WITH PLUMBERS SNAKE OR FLUSH WITH ATTACH ROPE TO SKIMMER AND ANCHOR TO THE SIDE OF THE BASIN FOR AID WATER. REPLACE ORIFICE PLATE ONCE CLEAR. IN MAINTENANCE. 4. CHECK FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE 5. EARTHEN SPILLWAY: INSTALL IN UNDISTURBED SOIL TO THE GREATEST EXTENT REQUIRED REPAIRS WITH FABRIC THAT SPANS FULL WIDTH OF POSSIBLE. LINE THE SPILLWAY WITH LAMINATED PLASTIC OR IMPEARMEABLE SPILLWAY. CHECK EMBANKMENTS, SPILLWAYS, AND OUTLETS GEOTEXTILE FABRIC. SECURE THE EDGES WITH 8 INCH STAPLES. THE FABRIC FOR EROSION DAMAGE AND INSPECT EMBANKMENT FOR PIPING MUST EXTEND DOWN TO THE SLOPE AND EXIT ON STABLE GROUND. THE WIDTH AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS OF FABRIC MUST BE ONE PIECE, THE LENGTH MAY BE MULTIPLE PIECES WITH THE IMMEDIATELY. REMOVE ALL TRASH AND DEBRIS FROM SKIMMER UPPER SECTION OVERLAPPING THE LOWER. AND POOL AREAS. 6. INLETS: DISCHARGE WATER INTO BA51N IN A MANNER TO PREVENT EROSION. 5. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE BASIN. TO PREVENT THE SKIMMER FROM PLUGGING WITH IGE. 7. INSTALL POROUS BAFFLES AS SPECIFIED. 8. AFTER THE SEDIMENT PRODUG I NG AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH ADJO I N I NO AREAS AND STABILIZE PROPERLY. O2 SKIMMER SED I MENT E3A51 N N.T.S. STEEL Pr'GT WOVEN F FABRIC STEEL POST v FILTER FABRIC J FL � N L FLOW -ll FILL II �IIIII�I' SLOPE IITIIIIII 311-III-III= III=111�illlll 111-III-III- =III=III = ?ANCHOR SKIRT (a" MIN.) GENERAL NOTE5: I. FILTER FABRIG FENCE SHALL BE A MINIMUM OF 52" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE HIRES WITH 12" STAY SPACING. 2. HOVEN FILTER FABRIG BE USED WHERE SILT FENCE 15 TO REMAIN FOR A PERIOD OF MORE THAN 50 DAYS. MAINTENANCE NOTES: I. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY 5. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. RESPONSIBLE PARTY OR H15 AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY 4. TURN SILT FENCE UP SLOPE AT ENDS. REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 5. ORANGE SAFETY FENCE 15 REQUIRED AT BACK OF SILT FENCE WHEN 6RADIN6 15 ADJACENT TO SHIM BUFFERS, 2. SHOULD THE FABRIG DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO STREAMS OR HETLAND5 (REFER TO SWIM BUFFER 6UIDELINE5). THE COLOR ORANGE 15 RESERVED FOR VISUAL THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL 15 IDENTIFICATION OF ENVIRONMENTALLY SENSITIVE AREAS. NECESSARY, THE FABRIG SHALL BE REPLACED PROMPTLY. 6. DRAINAGE AREA GAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. 5. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS T SLOPE LENGTHS GAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT REMAINING IN PLACE AFTER THE SILT FENCE 15 REMOVED SHALL BE CONTROL PLANNING AND DESIGN MANUAL. DRESSED TO CONFORM TO THE EXI5TIN6 GRADE, PREPARED AND SEEDED. 8. DO NOT INSTALL SEDIMENT FENCE AGR055 STREAMS, DITCHES, WATERWAYS OR OTHER AREAS OF CONCENTRATED FLOW. 0 TEMPORARY SILT FENCE NOT TO SCALE 1� �1 li--mil � • • - � • .• •- ...V,, A1..w.w.w.w.w.w.w.w.w.w.w.w • • ....w.w.w.w.w.w.w.w.w.....w. F kVArAVuo+0000VAVAVA.ui ...... , .00000000w.00w.. ....�. .000000000000t. So a ANWRA0MAWAVA 0000VA \ .ao...w...w.w...w.w...w.w.ow.. .o..a........o..........o...I • �i "ooAI\000aaaaooaooa •l viaaw.w.w.ow.w.w.w.w.w.w.w.wA • •• k K \ VAVAVAVAVAVA .Aw0 k k' r,4t 5:�•L!w LFAMMAMA\oow.0000000a .w!•>K .{.....:•,.. roa:��ow�.rooc•�000000000w� �.J..rr.•..::.:..:.•- I�IIi ill ■MM 1 - ��• • Skimmer Basin "A" Okay 1.5 Disturbed Area (Acres) 4 6 Peak Flow from 10-year Storm (cfs) 2340 Required Volume it' 1405 Required Surface Area lt� 2537 Actual Vol urn@ it} Okay 573 1544 Actual Surface Area ft2 Okay 678 list 10 Weii Length rt 0 5 Depth of Flew ft 10 6 Spillway Capacity cis Okay +4 SkimmerSizo (irbehe9) .5kimm@r$Iz 0 333 Head on Skinimer (feet) Onchesj 0.75 Orike Size (114 Inch increments) 1 5 3.12 Dewste6rkg lirrle (days) 2 Suggest about 3 stays 2.5 3 4 6 CONSTRUCTION SPECIFICATIONS: I • STONE - USE COARSE AGGREGATE (2 - 5 INCH STONE) 2. LENGTH - AS EFFECTIVE, BUT NOT LESS THAN 100 FEET. 5. THICKNESS - NOT LE55 THAN EIGHT (8) INCHES. 4. WIDTH - NOT LE55 THAN FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS (25' MINIMUM). 5. WASHING - WHEN NECESSARY, WHEELS SHALL BE GLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R/W. WHEN WASHI NO 15 REOU I RED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED 5ED I MENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH THE USE OF SAND BA05, ORAVEL, BOARDS OR OTHER APPROVED METHODS. 6. MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THI5 MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE A5 CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC R/W MUST BE REMOVED IMMEDIATELY. Initial Site Grading 05TONEDralrCONSTRUCTION ENTRANCE ra�e Area to Basin 3 Acres � I for 10 yr storm 5 min Tc 04 inJhr Q-CIA 16 CFC DE-I-ITIO--A temporary ridge or channel or com-ination ridge and channel acro ❑oping land on a predetermined grade. P-RPOSE-To protect ❑or❑❑areaaom updope runoEEand to divert ediment7aden -ater to trap- or EtaEie outletE CO❑STR❑CTIO❑ SPECI-ICATIO-S❑ Remove and properly digpoe oEall tree E❑CruEh113ump--and other o-�ectionaEle material. Provide EU:1Clent room around diverEJon❑to permit regrading and cleanout. Vegetate the ridge immediately. MAI❑TE❑A❑CE❑ InEpect once a ❑ee❑and aier evey rain -all. Immediately remove ediment Tom the [It)[] area and repair the diverdon ridge. Care-ully chec-outlet-and mae timely repair -a- needed. ❑ hen the area protected i❑permanently Eta Eilied-remove the ridge and the channel to -lend ❑ith the natural ground level and appropriately Eta-ili e it. COMPACTED SOIL ❑❑ MI❑ STEEP C-T OR -ILL ��oo SLOPE o I -III III -III I I IIII IIIIIIIIIIIIII ❑EESLOPE OR LESS ❑1TYPI CAL 0 TE:MFCP AR--,r D I VER51 ON BERM ❑.T.S. NOT TO SCALE NOTES: PROVIDE WEATHERPROOF TREE PROTECTION. PLACE SIGNS NO GREATER THAN 200' ON CENTER. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. b FT. METAL T-POST �r i i �1nv ORANGE HIGH TD PLASTIC kDE 0 TRF-F- FROTECTION fF-NCE NOT TO SCALE Silt Sack - Type A Silt Sack - Type B Curb Opening Insert 1"Rebar For v' Curb Deflector Optional Overflow _ ` Bag Removal From Inlet ~� ---�� Insert F Rebar For (Rebar Not Included) Optional Overflow- Bag Removal From Inlet (Rebar Not Included) Silt Sack Silt Sack DEPTH = D LENGTH = L SIZE 3'-O"X 2'-0" X 2'-0" Dump Loops DEPTH = D (Rebar Not Included) Dump Loops (Rebar Not Included) WIDTH = L -__- .' WIDTH = L Expansion Expansion Restraint 4LENGTH = L _ _ �l Restraint 1 SIZE 3'-011X 2'-2" X 2'-0" TOP OF SILT FENCE #57 WASHED STONE MUST BE AT LEAST ABOVE THE TOP OF STEEL POSTS THE WASHED STONE 12" 1.5' 24" TO TOP GLASS B RIPRAP OF FABRI L _ 12" FLOW =I IF, I I II II III III I f STEELDRI VEN o4T -1 2 1 �" INTO GROUND z ? EXISTING PAVEMENT EXISTING FILTER GROUND CLOTH S 1 DE ELEYAT I ON 100' MIN. OR 4X CIRCUMFERENCE OF LARGEST TIRE, WHICHEVER 15 GREATER ELEVATION FRONT O GRAVEL OUTLET SILT FENCE Figure 4-2. Plan view: typical preformed scour hole layout and components Figure 4-3. Profile view: preformed scour hole cross section SIZING SCHEDULE DE50. INLET PIPE BASE WIDTH DEPTH SCOUR HOLE A 4" 3.0' 1' SCOUR HOLE B SCOUR 15" 2' SCOUR HOLE C. 6" 4.5' 2' OSCOUR HOLE NOT TO SCALE • - 1 _ W ` • --:7 STEEL P05T 0 2' OG 0 OUTLET �B'IC 1E5H tti�Sttlilll►j�f�,., C.4f 0 �yyL.EIV�! f4- � r :tj U-3999. •r��f 111115{tli�3 •%' S L 0 .94 l,..tiff Date: la March 2020 For Bid Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/Ia/20 Stormwater/ Erosion Control Review Drawn By JDL Checked By PF Project # Sheet Title Erosion Control Details Sheet of 10 NOTE: PAVING MATERIALS SHALL BE IN ACCORDANCE WITH NGDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. LIGHT DUTY ASPHALT PAVING TO BE USED IN ALL PARK I NO SPACES. F— (6") COMPACTED AGGREGATE BASE COURSE (2") 5ci.55 ASPHALT 0 o°OO ovo�o OnO�ovo�0o0 0 0 Oo0 p° 0 Oo O Goo po 0 8 Oo O Goo p0 0 Oho o Oho o 00 00 00 000000 00O OooO o00 00O O OooOooO o0D COMPACTED 5UBGRADE MINIMUM 1518% STANDARD PROCTOR 8 MINIMUM 100% STANDARD PROCTOR IN THE UPPER 12" VERIFY WITH MINIMUM 501L AND PAVEMENT RECOMMENDATIONS PER OEOTECHNICAL REPORT. (D L 1 C HT DUTY ASPHALT PAY I NO NTS NOTE: PAVING MATERIALS SHALL BE IN ACCORDANCE WITH NGDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. HEAVY DUTY ASPHALT PAV I NO TO BE USED THROUGHOUT ALL DRIVE AREAS. (19 5a.5B ASPHALT (2 ") 1 I a.OB I NTERMED I ATE ASPHALT COURSE I r (8 ") COMPACTED AGGREGATE BASE COURSE 0 Gb 0 OO 0 D0 Gb 0 OO Oo �J 01 0 C O Oo0 00 0 �o Oo O Oo0 Op 0 co Oo O 0,0 pp ° 00�0 �0`z,000��°�`�000 0o Goo °o oa Goo °o o O o� oo Goa °o 0 COMPACTED 5UBGRADE MINIMUM a8% STANDARD PROCTOR ,$ MINIMUM 100% STANDARD PROCTOR IN THE UPPER 12" VERIFY WITH MINIMUM 501L AND PAVEMENT RECOMMENDATIONS PER GEOTECHNICAL REPORT. 0 HF—AY`I' DUTY ASPHALT PAVINO NTS NOTES: 4" THICK GONG. ON 4" THICK COMPACTED AGGREGATE BASE. Q11 ruii.e wei L' =,nnn SCORE WALKS WITH CONSTRUCTION JOINTS IN EOUAL INCREMENTS. USE 1/2" BITUMINOUS EXPANSION JOINT A MAX. OF 20' O.G. AND WHENEVER CONCRETE WALK MEETS FIXED OBJECTS (I.E. CURBS, BLDO., ETC..) EG2. Ea. DIMENSIONS VARY- SEE PLAN 6 w w CONSTRUCTION JOINTS (TYP) BROOM FIN15H PERPENDICULAR TO DIRECTION OF WALK PLAN VI EVS OCONCRETE WALK (PLAN V l Ekq) N.T.5. NET SET REPLACEABLE ADA TILE CHART PART# 51ZE COLOR DOME SPACE RAMP WIDTH QUANTITY 2456REP 24"x56" YELLOW 2.55" 4 FEET - 2448REP 24"x45" YELLOW 2.55" 5 FEET - 2460REP 24"x60" YELLOW 2.55" 6 FEET - 5648iREP 56"x48" YELLOW 2.55" 5 FEET - 5660REP 56"x60" YELLOW 2.55" 6 FEET - NOTE: INSTALL ADA TILE PER MANUFACTURERS SPECIFICATIONS P� ADA RAMP ROUND PRE-CA5T— CONCRETE / CORBELLED BRICK FINISHED ORADE— COMPACTED NVE:RT IN411 — $� O RAMP SHOULD HAVE A TEXTURED, NONSLIP SURFACE TYP. WET SET REPLACEABLE ADA TILE BY ADA SOLUTIONS, INC. I-800-572-051 � (SEE CHART) 4" CONCRETE SLAB a Op 6 �/ II CONCRETE CURB Cl CONCRETE SIDEWALK N.T FRAME $ COVER BY U.5.FOUNDRY CORP. (USF 6(ba-KL) HEAVY DUTY ALL CATCH BASINS OVER 5'-6" IN DEPTH TO BE PROVIDED WITH STEPS 1'-2" O.G. STEPS SHALL BE IN ACCORDANCE W/ "U.S. FOUNDRY CORP." CAST IRON MANHOLE STEPS SPECS. 11=III=III=III SECURE FRAME TO M.H. III-111-III W/ MORTAR 5/4" CEMENT PAROE ON ALL MA50NARY IN51DE AND OUT I N1'JERT SLOPE CONCRETE FILL OUT TO OUTLET 5000 P51 CONCRETE FOOTING #5 BARS a 8" O.G. EACH DIRECTION COMPACTED 5UBGRADE 15 STORM MANHOLE N.T.5. NOTES: USE SPILL TYPE OR CATCH TYPE GUTTER WHERE APPROPRIATE FOR POSITIVE DRAINAGE. CONTRACTION JOINTS TO BE PLACED 10' O.G., EXPANSION JOINTS TO BE PLACED 40' O.G.. GUTTER WIDTH TO REMAIN IS" THROUGHOUT. FLARE OUTS AT CURB INLETS WILL NOT BE PERMITTED. VERIFY INLET GRATE WIDTH PRIOR TO CONSTRUCTION. 5'R (TYP). SLOPE GUTTER FINISHED AWAY FROM FACE OF GRADE CURB 1/4'' PER FOOT 6" I'-6" ASPHALT (SEE J• 51 TE PLAN FOR ° o TYPE). SEE o DETAILS THIS 1/4" PER FOOT SHEET. vv D — p D v° D° v p OD p p � v � D � ga *_ Qo 00 000 DD DO 'Il 111 111 ��� 2'-0 11 AGGREGATE BASE COURSE. SEE PAVEMENT DETAILS THI5 SHEET COMPACTED 5UBGRADE cis% STANDARD PROCTOR 4 cf e>% STANDARD PROCTOR IN THE UPPER 12" 0 CURB I$ OUTTER (SPILL T`rPF—) N.T.5. I/JIAIr GCAI AAIr C/10 //'JAI/OCTC OA\/IAIr — AG AA AAII ICA/TI IOCT••J C2�/ i17, BLDO FACE 51ON v a > o a o D o� (�'Z� O O III III- -IV/V VVI"II TJV ILL .JVLVI\TJLL IN UPPER 12" TYP. CONTROL JT. TYP. EXPAN ION JT. E.J. A7 N4LL 0 CONCRETE WALK EXPAN51 ON JO I NT N.T.5. 1211 VAN ACCESSIBLE 51ON ABOVE (METAL) VAN 5/8" WHITE BORDER WITH A 5/8" GREEN ACCESSIBLE BORDER, LEGEND IN GREEN, 51ON TO MEET CITY 5TANDARD5.BACKOROUND- WHITE SIGN: R7-8(NO ARROW) METAL RESERVED LEGEND/BORDER-GREEN PARKING WHITE SYMBOL ON BLUE BACKGROUND BACKGROUND -WHITE, SIGN TO MEET CITY — STANDARDS. PENALTY 51ON BELOW #5520-57.6 (METAL) 5/8' WHITE BORDER WITH A 5/8" GREEN BORDER, LEGEND IN GREEN, SIGN TO MEET CITY STANDARDS. BACKGROUND- WHITE MAXIMUM PENALTY PLACE SIGN ON POST WITH 5' MIN. $250.00 CLEARANCE FROM BOTTOM OF RESERVED PARKING 51ON TO FIN 15HED GRADE. - P05T MUST BE SET IN CONCRETE O DIRECTLY BEHIND BACK OF SIDEWALK. STEEL TUBE P05T TO BE PAINTED BLACK. USE 2x2 STEEL TUBE SECTION FOR SIGN P05T PAINTED BLACK AND ATTACHED W/RUSTPROOF HARDWARE. as FINISHED GRADE I I HAND I CAPPED PARK I NO 51ON — VAN NT5 1211 RESERVED PARKING MAXI MUM ly PENALTY $250.00 51ON: R7-8 (NO ARROW) METAL LEGEND/BORDER-GREEN WHITE SYMBOL ON BLUE BACKGROUND BACKGROUND -WHITE, SIGN TO MEET G I TY STANDARDS. PENALTY SIGN BELOW #5520-57.6 (METAL) 5/8" WHITE BORDER WITH A 5/8" GREEN BORDER, LEGEND IN GREEN, SIGN TO MEET G I TY STANDARDS. BACKGROUND- WHITE PLACE SIGN ON P05T WITH 7' MIN. CLEARANCE FROM BOTTOM OF 51ON TO FINISHED GRADE. P05T MUST BE SET IN GONG. DIRECTLY BEHIND BACK OF WALK. STEEL TUBE P05T TO BE PAINTED BLACK. USE 2x2 STEEL TUBE SECTION FOR 51ON POST PAINTED BLACK AND ATTACHED W/RUSTPROOF HARDWARE. EMBED POST 24" IN GONG. ° 6" WIDE x 2'-6" DEPTH, 5000 PSI a CONCRETE FOOTING (TYP BOTH HANDICAP SIGNS) 12 HAND I CAPPED PARK I NO S I O N NTS NOTE: ORATE AND FRAME BY U.S. FOUNDRY CORP. All catch basins over 5'6" (USF 5150- 6168) HEAVY DUTY PRE -CAST GONG In depth to be provided with INSTALLED PER MANUFACTURER'S OR CORBELLED steps 1-2' o.c. steps shall BRICK p p INSTRUCTIONS. ALL GRATES AND FRAMES be in accordance w/ U.S. TO BE PAINTED BLACK. FINISHED GRADE FOUNDRY CORP. cast- iron steps specs. 1811 COMPACTED 5UBGRADE oo�0000 opaopo 0 0� 0 00 0 0yz 11=1 I 1=1 I 1=1 '11111111 1111111111 -III=III=III 111=II11111I ' 1=1 I 1=1 11=III 11=1 INVERT IN I6 OURB INLET DETAIL SECURE GRATE TO G.I. W I TH MORTAR PRE -CAST GONG. OR CORBELLED BRICK 5/4" CEMENT PAROE ON ALL MASONRY (INSIDE 4 OUTSIDE) INVERT OUT 5000 P51 CONCRETE FOOTING e� COMPACTED SUBORADE II III— #5 BARS AT 8" O.G. EACH DIRECTION N.T.S. 5RATE BY EAST JORDAN IRON WORKS * V-5600 FRAME AND ORATE OR APPROVED EQUAL �LL CATCH BASINS OVER 5'-6" IN DEPTH TO BE PROVIDED WITH STEPS '-2" O.G. STEPS SHALL BE IN �CCORDANGE W/ EAST .JORDAN IRON WORKS :AST IRON MANHOLE STEPS SPECS. 11=III=III=III SECURE FRAME TO M.H. 111-111-11I W/ MORTAR T 5/4" CEMENT PAROE ON ALL MA50NARY INSIDE AND OUT IT SLOPE CONCRETE FILL TO OUTLET 5000 P51 CONCRETE FOOTING #5 BARS a 8" O.G. EACH DIRECTION COMPACTED SUBORADE I� `rARD I NLET N.T.5. NOTES: USE SPILL TYPE OR CATCH TYPE GUTTER WHERE APPROPRIATE FOR POSITIVE DRAINAGE. CONTRACTION JOINTS TO BE PLACED EXPANSION JOINT5 TO BE PLACED 40' O.G.. GUTTER WIDTH TO REMAIN 18" THROUGHOUT. FLARE OUTS AT CURB INLETS WILL NOT BE PERMITTED. VERIFY INLET GRATE WIDTH PRIOR TO CONSTRUCTION. 5'R (TYP). SLOPE GUTTER TOWARD FACE OF CURB FINISHED 1/4'' PER FOOT GRADE 6"/ZI'-6" ASPHALT (SEE 51 TE PLAN FOR TYPE). SEE ° p DETAILS THI5 1/4'' PER FOOT SHEET. � � 4 _ v v v D � 4 o QD �� D - � D � ° v ° � 0 0� ° 4 v ° ° v D �� 0000� DO 4 D ICI ��� III III III III III I 2'-O I1 AGGREGATE BASE COURSE. SEE PAVEMENT DETAILS THIS SHEET COMPACTED 5UBGRADE G5% STANDARD PROCTOR AND c15% STANDARD PROCTOR IN THE UPPER 12" 0 CURB I$ OUTTER (CATCH T`rPF—) N.T.S. PAINTED SOLID WHITE WITH LIQUID THERMOPLASTIC TRAFF I G MARK I NC PAINT J NOTES: MIRRORING OF DETAIL MAY N BE REQUIRE. ALL PARKING LOT STRIPING, TRAFFIC ARROWS AND STOP BAR5 SHALL BE PAINTED SOLID u� WHITE WITH LIQUID THERMOPLASTIC O TRAFFIC MARKING PAINT. + cm 1211 011 011 ¢,11 211-6 11 5'-611 1'-611 4 1—/ 11 PAINTED SOLID WHITE WITH LIQUID THERMOPLASTIC TRAFFIC MARKING PAINT 0 TYP I OAL TRAFF I O AP P OWS N.T.5. 2'-611 811 6 LONG CURB PRECAST CONCRETE ASPHALT o PAVING 5/411 X 2411 GALVANIZED STEEL ANCHOR ROD5, TWO PER CONCRETE UNIT 13 CONCRETE WHEEL STOP N.T.5. 1/2'' PREMOLDED BITUMINOUS EXPANSION JOINT STANDARD 24" CURB AND GUTTER 4 TH I GK 5000 PSI CONCRETE WALK ASPHALT PAV I NO - TYPE SITE PLAN FOR L'v I I PE D o �po o d'o DP �Illiiill ��Illiiil °IIIII°°D ° o� ��000 4" COMPACTED AGGREGATE BASE COURSE - COMPACTED 5UBGRADE, qS�O STANDARD PROCTOR AND 515% STANDARD PROCTOR IN THE UPPER 12" 0 CONCRETE WALK ® CURB/OUTTER N.T.S. NOTE: ALL STRIPING SHALL BE PAINTED SOLID WHITE WITH LIQUID THERMOPLASTIC TRAFF I G MARKING PAINT EDGE OF PAVEMENT/CONCRETE HANDICAP SIGN (TYP) CONCRETE WALK EDGE OF CONCRETE WALK jASPHALT PVMT. PAINTED SYMBOL FOR HAND I GAPPED ACCESS (WHITE) 4" WIDE PAINTED ` 4" WIDE PAINTED WHITE PARKING WHITE STRIPES 0 SPACE LINES (TYP) 45 ° ANGLE 0 H.G. PARiQNO SPACE N.T.S. 5" ASPHALT r-- CONCRETE PAVINO APRON OR PAD D p ° a o T� _cin ql u O� n 0 nN CONCRETE PAD NOTE: PORTLAND CEMENT CONCRETE TO HAVE A 28-DAY 5TRENOTH OF 4500 PSI. b X 6 WWF ((b GAUGE) 6" THICK FOR APRONS 8" THICK FOR DUMP5TER PAD 6" COMPACTED AGGREGATE BASE COURSE COMPACTED 5U55RA0)E Q5% STANDARD PROCTOR $ 100% STANDARD PROCTOR IN THE UPPER 12." RJti+IIIYlf7!!7f w C-399 9 lriJ OD IR ���Sll iFlJl s L 0- 494 - D: r�flJJl,� .�'��JJJ b6-19— 20.2C Date: I6 March 2020 For Review Revisions: 4/21/20 For TRG 5/21/20 Per Comments 6/Ia/20 Stormwater/ Erosion Control Review Drawn By PF Checked By GSM Project # Sheet Title SITE DETAILS Sheet op 10 Detail for Commercial Drive Turnout 4ta7T�ad'd il4 � � 30" C&C Pttbi#a Street µ, �, t':� : 'r r^- �-?: 3 kti. h .. -•.. •. ty C. ,'�' � rr y-. � wTga `fix, - . �,:� C�tst' • sA;afo�': - .tia Y; st tt� _ --'- 1_,. ' _. H'rt' : �;� ,r:'x� , f ,$ _}�:. ir. � �;� _ - s- : •�._. . a �4s fir ,.'LC`' + 4�i�h' ..„__ •�'•-... - - T..L J9. =-fi+ �'eti #;.J.r,� i+. r . _ .'•' r4 s'-� 'ifir" r: - ii ry ,It - r i. Y- _f` Y'4'- -p - a.� •'�4 � � ti -. •+�� r. -� ,ram. •*. s•;,•-' t I•'E.�l. ,�„ ; 4- -•� `'tip- �, a• `` +] ,, s o�a`�'.: 4'n•• L - ,..�,.-�- - tea• -#.tr .'L-j,;�# _-a. �• „ #. .w -.; ¢da tt; r 617:'I t. , I•rMLL'!'BfB� ft)d -of-Way Dei'ectcable N'c�bacg S¢crface Q��• NOTES: Farce of ~' 1, B" Curb Mrns Doom to P&wh with, S deuwcak in 2' Transition, _ 2, Radians = 25'; or = Shown on Float TrwbsittiM Curb 3. Refer to My of Burlingltwz � er as Standard Details R-4 & R-S Specified by Site for -Wheetahair Ramp Detailt, Dasignwr 4. Where no tFt>Rty strip Exgsts, Taper S4dewadk to Back of stamp. 6, 11 GUs Recomwnended SECTION CTION A —A egwace of constrrsct{a'rA_ Detecta W Warning Surface Rdghi�vf I3'ug1 8' C&ncrefig I �•f Sfandard- 30" Drop Cdl;G SECTION B—B e Pad (8' Ahab } t E.J, = RxparastAm Joint Control Jcdnfs as Necessary 6" Varies 4 ,1 i [s - - a - - - - - - -- - - - - - - - - - R.J $" CoTtcrata E.J. (min kTE D WALE 1/31/0711 7/ 7/08 I I NOT TO SCALE COMMERCIAL DRIVL TURNOUT CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT 6" cort&m e 0 . J Public ?40TE5: +4YDRANTS, VALVES AND THEIR ACCESSORIES ARE TO BE FURNISHM AS SPECIFIED IN SECTION 'A' OF THE ENGINEERING SPECIRCATIOH OF THE CITY OF BURUNOTON, N. C. RE�'TRWNEA JOINT RETAINER GLM4DS ARE REOUIRE;D ON ANY JOINTS BETWEEN THE VALVE AND HMRANT . V-O" FROI.1 a> ER UNE OF MRAAAT TO WK OF CUR13 s" R W VALVE BURY LINE RESTMNED HWRAHT TEE TAPPING SLEE4E AN VALVE. 8' MIN. NORMALLY 4-t/2' BOLTS, NUTS AND DRpFd POFaS TO BE FRFE OF CONCRETE I NO. 67 CLEAN STONE T RESTRAINED JOINT— RETAJNER GLANDS COPiWM tFiKMT 4A� w1_L I 13E DESIGNED BY THE ENQNEER PRIOR TO CONSTRUCTION. # FIELD CONDMN": SFNLL d DETFRIINE ITS DE&GM NO A STONE DR BACKFlLLINC ON 4 _ 711R24 � OM FOR AT A }.11NTMUM RF 6' Of CONCRETE WILL 13F PLACED I,INDET2 THE EASE_ DATE REVESED SCALE DETAIL ; 1+_ 8/16/0- 8/18/0+ NOT To SCALE �j� HYDRANT AND VALVE INSTALLATION CITY OF BURLINGTON, NORTH CAROUNA ENGINEERING DEPARTMENT NEW S9.5B ASPHALT PAVEMENT, 1-MIN. NEW 119.00 ASPHALT BASE, 3" MIN. PA'VLMENT TO BE NEA7LY SAW CUT PERPENDICULAR TC SURF'AOE E}gSTING PAVEMENT EWTING BASE NEW BASE DEPTH 6" MIN 36" [srllNIM 12' SUBGRrADE BACKALL (SEE NOTE) )NDISTUIRSED SCIL '1PE STCNE STABILIZATION ;IF REQUIRED BY THE EMGINEER) NOTE The backfil shall be mode to 6" layers ana sftall be compccled to at least 95% of slondord denally (AA5HO Method 7-99). Each layer must be thoroughly tamped by a mechanical tamp before the next layer is ploc>ed. All asphalt pavement replaced shall be In accordarTce >fth We most currant NCDOT Standard SpecificaUerm. Rose course density and subgrade density shall he 1001. DATE a/ 16 f C4 I I 9 /1$ I I NW TO SCAU I I SCALE OETAfL ASPHALT PAVEMENT REPAR DETAIL CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT VMHOLE TO CONFORM TD Orly STANDARD QuAJLS FOR 4• AND/OR 5• PRECAST CONCRETE OR BRICk MANHOLES. CONCRETE TROUGH TO BE RVII_T TO DIRF7 FLOW FROM 6" CGNNEC70N TO EFFLUENT PIPE, JOINTS $HALL Br= RUBBER CASKET DATt R $ SEA 04 SQkH DETAIL NOT TO SCALE CS 6" SANITAFZY SEWER SERVICE CONNECTION CITY Of BURLINGTON. NORTH CAROLINA ENGINEERING DEPARTMENT L REDUCED PRESSURE BACKFLOW OR x o DOUBLE CHECK VALVE AS REQUIRES BY THE CITY OF BURDNGTON W W� NM N Z'QJ 0Cl� z M CJ tY Z 0.` Z m� m� 0 or 0 0 Lj nrn m a ENCLOSURE SHALL BE O SECURELY ANCHORED TO A THE CONCRETE BASE "HEAT SOURCE RECOMMENDED" �2" BRASS RISER TYP .� r 7x{� 1 " 4k'-red CONCRETE BASE . SLEEVE 2 TIMES DIA OF CARRIER PIPE (TYPE COPPER REQUIRED FROM DITCH MUST REMAIN ❑PEN UNTIL BACKFL❑UM OF z' OF COPPER METER TO BACKFLOW IS INSPECTED BY CITY OF 3URLINGT❑N ON OUTLET SIDE OF BACKFLOW COPPER TQ IRON PIPE THREAD COUPLING OW) 1, THE BACKFL❑W DEVICE SHALL BE WITHIN 10' ❑F AND ❑N THE PROPERTY SIDE OF THE METER. ENCLOSURE SHALL NOT OBSTRUCT SITE DISTANCE AT ROAD CR❑SSINGS. 2, ALL BACKFL❑W DEVICES SHALL BE INSTALLED ABOVE GROUND IN A HORIZONTAL P❑SITI❑N UNLESS OTHERWISE PREAPPR❑VED BY THE CITY OF BURLINGTON. 3• SHUT OFF VALVES SHALL BE FULL PORT, LINE SIZE, LEVERTYPE, AND TURN BRONZE BALL VALVES, 4• DEVICES SHALL HAVE TWO RESILIENT SEAT BRONZE UNI❑NS BETWEEN THE SHUT OFF VALVES FOR REMOVAL OF THE DEVICE. 5. APPROVED ABOVE GROUND ENCL❑SUREST "HOT BOX', HYDR❑C❑WL, OR SMI MODEL # B-30-SZD, 341-SZD, B51-SZD), ENCLOSURE MUST HAVE A DRAIN 6. TANDEM BACKFL❑WS REQUIRED IF SERVING MULTIPLE USERS UR SERVICE CANNOT BE INTERRUPTED 7. BY-PASS OF BLACKFL❑W DEVICE, TEMPORARY OR PERMENENT, WILL NOT BE ACCEPTABLE 0SCALE 9/16/041 I ATER 6/223/D5I I NOT TO WALE I IEMSED LiETAIL C _ 40 ABOVE GRADE BACKFLOW PREVENTER, 3f4" - 2" CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT NOTE: 1- SEF I)ETA L, SC-20 FOR 1 1/2' A 2' DIETER BOX 2. SEE a rTY OF 5URUNGTON DUAV FOR 3/4"- 2" WKFLOW DEVICES 3, FOLLOWING PAYMENT OF APPUC.ABLE FEE, THE M WILL INSTALL ZHE WATER METER 4, CONTRACTOR SHALL LEAVE AN IDLP IN YOKE IN PLACE OF METER TO M&JNTAJN DIMENSIONS 12" MIN CLR, 12 CLEM STONE 7)-n- 7 3/8 2 5 3f4 7 1/$ 5 1/4 CROP LID 8 7/5 - 7 5/8 - 7 3/8 6 1/4 VARIABLE n r� 13 1/2 9 1J2 TOP SECTION EhIBEb INTO CONCRETE SLAB, 4" ALUMINUM NUMBERS AND TICK MARKS INDICATING SIZE DF VALVE AND DIRECTION OF PIPELINE. TWO-PIECE VALVE BOX, ASSEMBLED CAST IRON VALVE BOX ACCOMMODATES 4" THROUGH 12" VALVES 5 1/4-INCH SHAFTS, SLIP -TYPE 17' FOR 2' CONNECTION 4 13" FOR 1 1/2' CONNECTION ' • COMPOunb OR 1UR♦3INE MVR TYPE METER A5 REQUIRED BY CrTY OF BURLINGTON [tea 3 fn i 43 12' FROM TOP' OF METER TO TOP OF Eff METER BOX METER W a a, z 0 2 3 uj a a �r NOTE; NIPPLES -BRASS ONLY gj ELEVATION SE17-ER TO BE 1 1/2' OR 2' CUSTOM SETTER WITH BYPASS AND FLANGED VALVE ON MIT AND OUTLET. 8CALE /16/04 aJ 2/q5 S FAUT TO 5CN.F DETAIL S C ' �L2] 1 1/2-" & 2" WATER CONNECTION CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTIVENT 24" 0" EXTENSION FIELD CUT IF T REQUIRED SHALL BE CAST T IRON OR DUCTILE IRON, 24" BASE NOTES: VALVE BOX WILL CONFORW TO ASW A 48 CLASS 309 MINIMkJM WEIGHTS COVER 13 L85 TOP SECTION BOTTOM sECTION TOTAL Las IiE+115ED SCALE DETAIL k �} 8/18/Q4 NOT TO SCALE r Y — L CAST IRON VALVE BOX CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT 'HEAT SOURCE RECOMMENDED" REDUCED PRESSURE BACKFLOW OR DOUBLE CHECK VALVE AS REQUIRED BY THE OFTY OF BURUNGTON� CONCRETE BASE DITCH MUST REMAIN OPEN UNTIL 3ACKf-L0W IS INSPECTED BY CITY OF BURLINGTON MINIMUM OF 2' D.I.I=. M.I.P. REQUIRED FROM METER TO BACKFLOW ON QUTLE7 SIDE OF BACKFLOW 1, THE BACKFLOW DEVICE SHALL BE WITHIN 10' ❑F ANC ❑N THE PROPERTY SIDE [IF THE METER. ENrLOSURE SHALL NOT ❑BSTRUCT SITE DISTANCE AT READ CROSSINGS. ALL BACKFLOW DEVICES SHALL BE INSTALLED ABOVE GROUND IN A HURIZ❑NTAL. PQSITI❑N UNLESS ❑THERWISE PREAPPR❑VED BY THE CITY OF BUR LI NUT ❑ N. 3, SHUT OFF VALVES SHALL BE RESILIENT SEAT WITH FLANGED EMI] AND ❑.SAY HAND WHEELS. 4, ALL INTERI❑R AND EXTERI❑R IRON SURFACES SHALL HAVE EXPDXY COATINGS TO CONFORM T❑ ANSI/AWWA C55C ❑R MANUFACTURED OF STAINLESS STEEL. S, APPR❑VED ABOVE GR❑UNB ENCL❑SUREST 'HOT BOX', HYDROCOWL, SMI MODEL # b68-EHPZD, B80-EHP7D, B11G-EHP7D) CIR BFP 0$640-IPD, 800-1PD, 950-APD ❑R 115M-APD, ENCLOSURE MUST HAVE A DRAIN 6. TANDEM BACKFL❑WS REQUIRED IF SERVING MULTIPLE USERS OR SERVICE CANNOT BE INTERRUPTED 7, DETECT❑R DOUBLE CHECK VALVE, ASSEMBLY SMALL BE INSTALLED IN SIMILA€2 ENCL❑SURE, 8, PIPE & FITTINGS BELOW GRADE TO BE M.J. WITH RETAINER GLANDS, 9, BY-PASS OF BLACKFL❑W IIEVIGE, TEMPORARY OR PEIRMENENT, WILL NOT BE ACCEPTABLE PATE REVISED SCALE DETAJL B/16/D4 8/18/- MDT TO SCALE ABOVE GRADE RACKrLOW PREVENTER, 3" ANp GREATER CITY OF BURLINGTON, NORTH CAROLINA ENGINEERING DEPARTMENT Date: 16 March 2020 rar ReVIeW Revisions: 4/21/20 rar TRG 5421/20 For Comments 6/Ig120 Stormwaterl Erosion Control review Drawn By PF Checked 5y 55M Project # Sheet Title GOB DDT I L s,ee. G I . 10