Loading...
HomeMy WebLinkAbout20201240 Ver 1_Pre-Filing Meeting Request_20200922ID#* 20201240 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Andrew Moore Pre -Filing Meeting Request submitted 9/22/2020 Contact Name * Andrew Bick Contact Email Address* andrew@headwaters-eng.com Project Name* Big Lost Cove Bank Stabilization Project Owner* Candie Smith Project County* Yancey Owner Address: Street Address Address Line 2 oty State / Frovince / Region Fbstal / Zip Code Country Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - r- 401 Water Quality Certification Regular Express * Individual Permit F Modification F- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below. The purpose of this project is to stabilize about 60 linear feet of Big Lost Cove Creek where bank erosion is threatening an existing cabin. Bioengineering and a boulder vane are proposed for stabilization measures, as shown on the attached preliminary plans. The site is located on the right bank of the creek at 2026 South Toe River Road in southern Yancey County. The creek is classified as C, Trout and ORW and we understand that written approval is required for ORW waters even though the Corps has indicated no PCN is required. Please give a couple of dates you are available for a meeting. 9/30/2020 10/6/2020 Please attach the documentation you would like to have the meeting about. big lost cove stabilization prelim plans 1.27MB 091720.pdf pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 0 *1Ae1wffl�16 Submittal Date 9/22/2020 Reviewer Meeting Request Decision Is a meeting Required?* r Yes r No CONSTRUCTION PLANS BANK STABILIZATION AT 2026 SOUTH TOE RIVER ROAD BIG LOST COVE CREEK YANCEY COUNTY, NORTH CAROLINA PRELIMINARY PLANS NOT FOR CONSTRUCTION a a Q Lu U) o z 0 o a w U ry U) w 0 _ U Q _ ; y N eo 0 :_ Lo Lu� a� wz 0)U � o z ` a lzu J f6 J Z 70 f �— iJJ W cu w (D m PROJECT SITE ,� z LIST OF SHEETS 1. TITLE 2. PLAN 3. GEOLIFT DETAILS 4. SEEDING AND VANE DETAILS PLAN NTS 0 a Z W0 ll� U o w ry z �w aL)>� fVwFyZ J > w ::) H O O OU c w Z OJ 0 z m} c�°a mom N O N DATE: SEPT.2020 SCALE: ASS TITLE SHEET 1 OF 4 ill p-Appd- �!i a * Q I CONSTRUCTION EQUIPMENT ���1V Q U) ACCESS, LIMIT CLEARING TO Z O SMALL TREES AND SHRUBS; zo PROTECT MATURE TREES W 1 O ui w • i � A Q co U • , • �����,,,,,,, to • U,� co Q Ix a • ' o� ixtq Y U lu z a) 0 Q °' z N _U • ` - 1 J 06❑o U) az J uu w ami m � � U I I lwl� z _REMOVE THREE STUMPS ! / AND REMAINS OF LOG CRIBBING INSTALL BOULDER VANE Y 0 ZWO�U Ow0�Z NW U � H _WIZ REMOVE LEANING BUCKEYE J D +�. I 1 a0o0 W Z U)a mom} o cV DATE: SEPT.2020 ` PRELIMINARY PLANS SCALE: AS SHOWN NOT FOR CONSTRUCTION ' PLAN ,I _ SHEET 2 OF 4 PRELIMINARY PLANS a_ Q NOT FOR CONSTRUCTION w Q Cf) 0 z o O APPROX. CREEKSIDE a_ LIJ WALL OF CABIN w 0 m 0 Q 780 G/M' COIR MATTING 12 DIAM. COIR LOG (TYP) : '; �, = a=u Z=Q C�N =o - -- DORMANT SHRUB CUTTINGS (TYP) EXISTING GROUND; � "V" """ ' HEADWATERS ENG. SURVEY 9/8/20 NO WORK LEFT BANK y o 1.5 �.. 1 o o � �z 0) SAND/CLAYlTOPSOIL MIX WITH 5% ORGANICS MODERATELY . ° aW z �' �z BASE �,J �� — . COMPACTED IN 12 LIFTS; ON -SITE 0 U) COBBLE CAN BE USED BEHIND FRONT 12" Lu w m co = - U 3 + - IMPORTED BOULDERS AND ON -SITE COBBLE z WITH LIMBS AND LOGS EXTENDING INTO WATER 1.5' MIN. BELOW BED p a O 0' 5' 10' 15' Z W 0 U Ow0�Z 1 GEOLIFT BANK STABILIZATION F (X w > NwEz 3 1"=5' J > W O O O NOTES: Q 1. REMOVE STUMPS AND DEBRIS FROM AREA TO RECEIVE GEOLIFTS. RE -USE WOOD DEBRIS IF SUITABLE FOR FOUNDATION; } DISPOSE OF UNSUITABLE DEBRIS OFF -SITE. U) U) W 2. REMOVE SLUMPED AND LOOSE SOIL AND OVEREXCAVATE FOR STONE FOUNDATION. Z 0 Z 3. PLACE ENTIRE LENGTH OF STONE FOUNDATION, FILLING VOIDS BETWEEN RIPRAP WITH ON -SITE GRAVELAND COBBLE. Q Q 4. ROLL COIR MATTING LENGTHWISE ALONG BANK, LEAVING 2' OF 6.5' ROLL WIDTH OVER STONE FOUNDATION AND EXTENDING FLAP 00 m cD } OF REMAINING COIR MATTING OVER THE SLOPE. N 5. PLACE COIR LOGS ON TOP OF COIR MATTING AND ANCHOR TO SUBGRADE WITH 12" MIN. WOODEN STAKES EVERY 3'. N 6. PLACE AND COMPACT 12" LIFT OF CLEAN SOIL OVER COIR AND AGAINST COIR LOG. DATE: SEPT 2020 7. APPLY TEMPORARY AND PERMANENT SEED MIX AND STRAW MULCH ON FLAT, EXPOSED PORTION OF THE LIFT. SCALE: AS SHOWN 8. WRAP REMAINDER OF COIR ROLL WIDTH UP AND OVER COIR LOG AND STAKE COIR MATTING WITH WOODEN STAKES EVERY 3'. 9. PLACE 2" LAYER OF TOPSOIL OVER FIRST LIFT AND INSTALL DORMANT CUTTINGS OF SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY AND/OR NINEBARKAT 12" SPACING IN TOPSOIL. 10. REPEAT STEPS 4 THROUGH 9 TO REACH THE TOP OF BANK. DETAILS 4 SHEET 3 OF RIPARIAN SEED MIX Seeding Rate = 20 lb/acre Mulching: wheat or oat straw mulch applied at 2 tons/acre Common Name Scientific Name Percentage Indiangrass Sorghastrum nutans 20 Fowl Bluegrass Poa palustris 20 Virginia Wildrye Elymus virginicus 20 Soft Rush Juncus effusus 20 Beaked Panicgrass Panicum anceps 20 EXISTING BED TEMPORARY SEED MIX Rate (lb/acre) Rate (lb/acre) Applied Application Dates Common Name Scientific Name Applied w/ Riparian Mix Separately August 15 to May 1 Rye Grain Secale cereale 120 60 May 1 to August 15 Pearl Millet Pennisetum glaucum 40 20 1 SEEDING 4 NTS n w Q 0� U=� ' 2r FLOW NOTES O 1. BOULDERS SHALL BE HARD, DURABLE ROCK WITH o mQ Eo U') 0 MINIMUM DIMENSIONS OF 4'X2'X2'. FLAT, STACKABLE rn BOULDERS ARE PREFERRED. z 0 0 2. SET NEW HEADER BOULDERS ABOVE AND ROUGHLY 2' o �O UPSTREAM OF EXISTING ROW OF FOOTER BOULDERS. Q w z a 3. ADDITIONAL BUTTRESS OR FOOTER BOULDERS MAY BE Z 60 }? J 22 REQUIRED DEPENDING ON SITE CONDITIONS a z J BACKFILL WITH ON -SITE ENCOUNTERED DURING CONSTRUCTION. iu w m COBBLE AND GRAVEL = s U HEADER BOULDER (TYP) z TOP OF BANK 5% SLOPE SEE NOTE 3 FOOTER BOULDER PROFILE A -A' PLAN STING FOOTER BOULDER (TYP) HEADER BOULDER NON -WOVEN FILTER FABRIC 2' MIN. 2' MIN. BACKFILL W/ ON -SITE "" RIVER BED COBBLE AND GRAVEL t!`OOTER VARIES BOULDER SECTION B-B' 2 BOULDER VANE 4 NTS PRELIMINARY PLANS NOT FOR CONSTRUCTION_] r) a ZWO 0YU Owryz (Ifw aC)>� N w E Z J > w D ~000 U) U) W Z 0 � m�oZ Q in cD } N O N DATE: SEPT 2020 SCALE: AS SHOWN DETAILS SHEET 4 OF 4