Loading...
HomeMy WebLinkAboutSW6200903_2020.09.14-SuppEZ-2018-Version-2.1.1-2_20200924SUPPLEMENT-EZ COVER PAGE FORMS LOADED INFORMATION ect Name Winchester Subdivision 3 lCoastal Wetland Area ac 4 Surface Water Area ac 0 5 Ils this project High or Low Density? Low 6 Does this Droiect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of ve etated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (IS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jeremy Thomas, PE. - President 28 Organization: J Thomas Engineering, Inc. 29 Street address: 143 Charlotte Avenue, Suite 104 30 City, State, Zip: Sanford, NC 27330 31 Phone numbers : 919 777-6010 32 Email: jthomas@jthomasengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer �e s� Seal ` Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 4 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 1TvDe of SCM 5 Total BUA in pro ect (sq ft 203039 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 115500 sf 7 New BUA outside of subdivided lots (subject to ermittina) (sfi 104039 sf 8 Offsite - total area (sq ft sf 9 Offsite BUA (sq ft sf 10 Breakdown of new BUA outside subdivided lots Parking (sq ft Sidewalk (sq ft 8149 sf Roof (sq ft) Roadway s ft 79390 sf Future (sq ft Other, please specify in the comment box belo (sq ft 11 New infiltrating permeable pavement on subdivide lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 13permitting) Exisitng BUA that will remain (not subject to s ft 14 Existing BUA that is already permitted (sq ft) 15 Existina BUA that will be removed (sq ft 16 Percent BUA 15% 17 Design storm inches 18 Design volume of SCM cu ft 19 ICalculation method for design volume ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 7 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 1 Breakdown of new BUA: Parking (sq ft Sidewalk (sq ft Roof (sq ft Roadway (sq ft) Future (sq ft Other, please specify in the commen4bbelo (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19 DE n volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION 21 1 Please use this space to provide any additional information about the drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-1.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 4TO1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 1% 8 Bottom width of curb outlet swale(s) (feet) 2 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 4:1 10 Minimum length of curb outlet swale(s) (feet) 290 ft 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? No 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 iPlease use this space to provide any additional information about this low density project: Flow depth (ft) ©aaa�aaaa