Loading...
HomeMy WebLinkAboutSW6200903_2020.09.14 SIA Report_20200924STORMWATER MANAGEMENT REPORT for WINCHESTER SUBDIVISION Submittal to: Hoke County NCDOT NCDEMLR STORMWATER Prepared for: STAFFORD TURNER DEVELOPMENT, LLC. 246 VALLEYFIELD LANE SOUTHERN PINES, NC 28387 CONTACT: BOB STAFFORD PHONE: (910) 692-9800 Submittal Date: SEPTEMBER 14, 2020 Prepared by: J THOMAS ENGINEERING, INC. CIVIL ENGINEERING & PLANNING 143 Charlotte Avenue, Suite 104 Sanford, North Carolina 27330 919-777-6010 phone www.jthomasengineering.com License No. C-3389 JTE Project #: 20-010 DDS Project# 2019- 23 " Jr 111ArW 2 r* TABLE OF CONTENTS SECTION I. EXISTING CONDITIONS PAGE A. PROPERTY....................................................................................................I B. WATERSHED.................................................................................................2 C. JURISDICTIONAL WATERS............................................................................2 D. FEMA FLOOPLAIN.......................................................................................2 E. SOILS............................................................................................................2 II. AGENCY STORMWATER REQUIREMENTS A. Hoke County.............................................................................................2 B. NCDEQ.........................................................................................................3 III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION................................................................................3 B. LAND DISTURBANCE AND EROSION CONTROL.......................................3 C. IMPERVIOUS SURFACE...............................................................................3 D. DRAINAGE AND STORMWATER MANAGEMENT.......................................4 APPENDICES A. Computations Minor System Grass Conveyance Swales Erosion Control B. Maps Inlet Drainage Area Erosion Control Drainage Area C. Soil Survey Map D. FEMA FIRM Map E. USGS MAP F. SUPPLEMENT-EZ OPERATION & MAINTENANCE AGREEMENT BMP SUPPLEMENT FORMS I. EXISTING CONDITIONS A. PROPERTY The proposed project site is on o n e 30.71 AC p a rc e I (PIN# 4948-40-30- 1004) in Hoke County. The property is currently undeveloped farm land with no impervious surfaces. The following is a summary of the adjacent properties: To the north, undeveloped (zoning R-20) To the south, undeveloped (zoning R-20) To the west, undeveloped (zoning R-20) To the east, single family and undeveloped (zoning R-20) See Figure 1 below for an aerial view of the property for the proposed Winchester Subdivision project (Site). Figure 1: Aerial view of pre -developed site Stormwater Impact Analysis - Winchester Subdivision Page 1 1 4 B. WATERSHED The site is located in the Gully Branch Watershed and Cape Fear River Basin. The NCDEQ Stream Index for Gully Branch is 18-31-20.7 and Stream Classification for Gully Branch is `B'. C. JURISDICTIONAL WATERS There are no jurisdictional streams located on the site. There are no impacts proposed with this project to jurisdictional streams or wetlands. D. FEMA FLOODPLAIN There are no FEMA mapped floodplains located on the site per FIRM Panel 3710948400K, effective date Jan. 5, 2007. See Appendix D for FEMA FIRM maps. E. SOILS Refer to Appendix C for the NRCS map showing anticipated on -site soils. II. AGENCY STORMWATER REQUIREMENTS A. Hoke County Section 3.7 `Storm Drainage Not in Public Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites. Section 3.3 `Streets" of the Hoke County Subdivision Ordinance details the requirements for managing stormwater from new construction sites per NCDOT requirements. Stormwater Impact Analysis - Winchester Subdivision Page 2 1 4 B. NCDEQ Hoke County is a `tipped' county and new projects located within the county must meet NCDEQ Post Construction Stormwater Phase 2 regulations. Site requirements for stormwater control are different if the proposed development is `high density' (greater than 24% impervious) or `low density' (less than 24% impervious). III. PROPOSED IMPROVEMENTS A. PROJECT DESCRIPTION The proposed project will create thirty-three (33) single family lots (min 20,000 sf). The proposed project will add additional roads the Hoke County road system. The design follows the Preliminary Plat that was recently approved by Hoke County. As part of this project, public waterwill be extended to serve the new lots. B. LAND DISTURBANCE AND EROSION CONTROL The proposed disturbed area for the proposed project is 29.1 AC +/-. A NCDEQ Land Disturbance (Erosion Control) Permit will be obtained prior to beginning work. C. IMPERVIOUS SURFACE The proposed total amount of impervious surfaces for this project is 4.66 AC. This includes pavement and curb & gutters in the public R/W and driveways and rooftops on each lot. The resulting percent impervious (or built -upon) of 15.2% of the total property area. A maximum amount of 3,500 SF of impervious area is allocated to each lot. Thus, this development is classified as `low density' under NCDEQ Phase II regulations. Stormwater Impact Analysis - Winchester Subdivision Page 3 1 4 D. DRAINAGE AND STORMWATER MANAGEMENT i. Roadway Drainage - Minor System The proposed roadway will have curb and gutter. Catch basins in the gutter line will provide the roadway drainage. Catch basins were spaced based on gutter spread not exceeding one-half lane width during a 4 in/hr storm (NCDOT guidelines). The minor pipe system is sized based on 10-year storm flow and cross -pipes are sized based on 25-year storm flow not exceeding the hydraulic capacity of each pipe segment (as open channel flow, that is, non - pressure flow). ii. Grass Conveyance Swales As stated in Section III. C. above, proposed impervious is less than 24% and, therefore is classified as `Low Density' per NCDEQ regulations. Per NCDEQ guidance, Grass swales are proposed to receive runoff collected by the catch basins in the road system to help treat the runoff before being discharged to the jurisdictional waters. These swales have a longitudinal slope of 0.1 % to 0.5% that discharge into an existing drainage swale to the south. There are four (4) proposed grass swales, each with a length greater than 100 LF. iii. Methodology and computations Refer to Appendix A for storm drainage and stormwater management computations. Hydrologic computations were based on the Rational Method for storm drainage and SCS method for stormwater management. Rainfall intensity was determined based on data of the closest rainfall gauge listed on the NOAA website. Drainage areas were delineated based on a combination of field and LIDAR topography. Stormwater Impact Analysis - Winchester Subdivision Page 4 1 4 APPENDIX A cmWaymc a U) z O F- a U Q U Z OQ Uw >U) mw �F- U)H w C� Uw wQ x z z �o --90'Z QIa � o m o r r 23 0 m o N n" 2➢ :S "�6T o + � o o o r r L o a �9f T ,'q*A#I; jT`ad §off qI ap°N: n 0 � 0 m� 7o 77 on orr x�o d6 :86Y t-? ;ZRZ ;ai, 'PIN �23 08�b6T ''lzanssl� p � r r W;oq- 6T'm2g O o O N - - D N o y N o� ------------------------------------ W� Os_ U T, iz af�'ix . , , , , , 8oa� aka-k (g) u01yanal3 -- o ---------------------- 23 L8 -�6T 1z�nssI 23 l9-66T' -TU '23 08'"b6T 4zanu� - w: 00-6�T -Ti_apoff_____ -- -- -- - -- N y a � - 3 o N y ; t i 3 ---- ---- ---- ---- ----- i E- (g) UOIWAal3 E i L� Y m p V i p 0 2 c U x J —_ x 7 p W oq 9qT '�Ianul 1A 01"66T -A u __,.Tuj_QI -.v O O M 0 y cn o _ - x d 0 N R, ;23 pZ"$6T; 2z�nssk �00£$H3 I (8) UOIWAaI3 - -- - -- --- - -- --- ooysa� (II: ap?x ------------------------- ------------------- o o s N O 0 L'3 Ln = W a N U � 3 _ q1 04-96T q1 --T{I 1j 89:"ZO't -ti --'---� ---`TOb. -(rlrapax--r- T___ T___ T___ I___ orr o '13 0�"8qT luanml mFu--�-- zod (II: -Pbx �o o� err _ Q 23 b8"36T:'-A I: 23 48"86T --TU- (I[) (8) uoganaID 0 of _, L� LD m u.. o v of p V i p' - a c Ui = J6 ol -_ x 7 p a J ? 'A Coro ¢ ----W 55 'L 6T ,'23a4xf �'z3 �55"FOZ m?>I W: 0b ;L 6T 2zaessl 23 .SS"tOZ �z� oov aI IMM To # aPON O d" c� d _lo y a W N o a m y 3 � o or> I o�o - 09' 6T '�sanssl o Oofska di ap-N o c o c ry n ry ry N (8) uoiyanaI3 a¢ c x J V_ ' T 7 0 23' SS �'L6T'2z anssl 23 n o �',SS 05-4T N'�__ W: Of, -:L6T q--#-I p o r r 23 ASS "f OZ �?�I cOT"�I -P-N 0 n � m g orr c � N 0 W a a m a .� — cn � 3 o o r > J o 0 23; 09 6T ,'lz ae-I 6Obska di a&N o n n n n n (u) UOIWAaI3 EY t mo a z _'c ri=J --x�o Outlet Protection #100 New York Method 8.06.5 Manual Q= 15.56 cfs La= 8 FT Pipe Diameter 24 in W= 6 FT Velocity= 5.83 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection #200 New York Method 8.06.5 Manual Q= 36.01 cfs La= 18 FT Pipe Diameter 36 ft W= 9 FT Velocity= 5.31 ft/s d= 18 IN Zone= 2 Stone Diameter= Class B Outlet Protection #300 New York Method 8.06.5 Manual Q= 5.34 cfs La= 6 FT Pipe Diameter 18 in W= 4.5 FT Velocity= 3.52 ft/s d= 12 IN Zone= 1 Stone Diameter= Class A Outlet Protection #400 New York Method 8.06.5 Manual Q= 32.94 cfs La= 15 FT Pipe Diameter 30 in W= 7.5 FT Velocity= 6.71 ft/s d= 18 IN Zone= 2 Stone Diameter= Class B U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivison Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA #101 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 s'/2 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,410 0.050 3.8 0.10 + 6.0 9.0 0.7 0.005 0.03 2.7 209 0.02 + ........................................................... hr 0.27 0.27= 16.2 mins Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA #207 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 s'/2 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr WOODS,FIEL[b 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,142 0.050 3.8 0.08 + 3.0 12.0 0.3 0.005 0.03 1.4 295 0.06 + ........................................................... hr 0.29 0.29= 17.4 mins Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA #402 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 s'/2 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,137 0.050 3.8 0.08 + 1 8.5 12.1 0.7 0.005 0.02 3.8 321 0.02 + ........................................................... hr 0.25 0.25= 15.0 mins Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA #403 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 S11 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,295 0.050 3.8 0.09 + Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA #404 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r 213S11 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,193 0.050 3.8 0.09 + Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) Permanent Channel # 1 => DA # PD 1 Calculate Flow - Rational Method 25-YrStorm Q25 = CIA Q25+FES100+= 21.63 FLUME 1 &2 Channel Slope=r 0.50 Channel Depth= 2.00 Side Slopes= 4.00 Velocity= 3.60 Soil Type @ sandy loam Channel Lining Shear Calculation T=yds C= 0.33 1= 8.90 in/hr A= 1.70 ac Slopes= 0-10% T= 0.430561bs/ft2 Temporary= NAG S75BN Permanent= Fescue Permanent Channel# 2 Calculate Flow - Rational Method 25-YrStorm Q25 = CIA Q25 = 15.56 Channel Slope= 0.50 Channel Depth= 1.00 Side Slopes= 3.00 Velocity= 3.32 Soil Type @ sandy loam Channel Linin Shear Calculation y= 62.4 Ibs dwater ft s= ft/ft 1 => DA # C= 0.30 1= 5.86 in/hr A= 8.85 ac Slopes= 0-10% CA LC Tc T=yds y= 62.4lbs dwate MftT= 0.391bs/ft2 s=ft/ft Temporary= NAG S75BN Permanent= Fescue Permanent Channel # 3 => DA # PD 3 Calculate Flow - Rational Method 25-VrStorm Qzs = CIA Qzs + FES 200= 51.57 Channel Slope= 0.10 Channel Depth= 2.00 Channel Bottom Width= 6.00 Side Slopes= 4.00 Veloci = 2.29 Soil Type @ andy loam Channel Lining Shear Calculation T=yds y= 62.4 Ibs dwater- ft T= 0.1085761bs/ft2 5= ft/ft Temporary= NAG S75BN Permanent= Fescue Permanent Channel # 4 => DA# POWN Calculate Flow - Rational Method 25-VrStorm Q2s = CIA Q25 + FES 300= 8.07 Channel Slope= 0.10 Channel Depth= 3.00 Channel Bottom Width= 6.00 Side Slopes= 4.00 Veloci = 1.36 Soil Type @ I.ndy loam Channel Lining Shear Calculation T=yds T= 0.424321bs/ft' Temporary= NAG S75BN Permanent= Fescue C= 0.33 1= 8.90 in/hr A= 5.22 ac Slopes= 0-10% C= 0.33 1= 8.90 in/hr A= 0.93 ac Slopes= 0-10% y= 62.4 Ibs dwaef s=Mft ft/ft Permanent Channel # 5 => DA # PD 5 Calculate Flow - Rational Method 25-VrStorm Qzs = CIA Qzs + FES 200= 57.39 Channel Slope= 0.60 Channel Depth= 3.00 Channel Bottom Width= 3.00 Side Slopes= 4.00 Veloci = 4.33 Soil Type @ [andy loam Channel Lining Shear Calculation T=yds y= 62.4 Ibs dwater- ft T= 0.6814081bs/ft2 5= ft/ft Temporary= NAG S75BN Permanent= Fescue Permanent Channel # 6 => DA# - Calculate Flow - Rational Method 25-VrStorm Q2s = CIA Qzs= 31.89 Channel Slope= 0.50 Channel Depth=rdy 1.50 Channel Bottom Width=2.00 Side Slopes=4.00 Veloci =3.92 Soil Type @ loam Channel Lining Shear Calculation T=yds T= 0.380641bs/ft' Temporary= NAG S75BN Permanent= Fescue C= 0.33 1= 8.89 in/hr A= 8.27 ac Slopes= 0-10% C= 0.33 1= 4.78 in/hr A= 16.83 ac Slopes= 0-10% CA LC TC y= 62.4 Ibs dwaef s=Mft ft/ft Sediment Basin # 1 Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.30 Q25 = CIA I*= 5.20 Q10 = 39.78 A= 25.50 Q25 = 44.37 2-Yr Storm Q2 = CIA C= 0.30 I*= 3.98 *Intensity per Tc Q2 = 30.45 A= 25.50 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10 = 39.78 SA= 12928.50 ft2 Side Slopes = 3.00 :1 Pond Depth= 4.00 ft Basin Dims (Per SA) Top = 70.00 x 210.00 = 14700 ft2 Bottom = 46 x 186 = 8556 ft2 Volume Required VR=Ax1800 cf/ac A= 25.50 ac VR= 45900.00 ft3 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 14700.00 sf Bottom= 8556.00 sf VP= 46512.00 ft3 D= 4.00 ft Skimmer Sizing Calculate Dewater Time Qd=V/Td V= 46512.00 ft3 C= 0.30 I*= 5.80 A= 25.50 Td= 5 3-5 days typ Qd= 9302.40 cfs Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 9302.40 h= 0.33 D= 2.65 Use 6 " Skimmer w/ 2.65 " Orifice Principle Spillway Sizing L=QZ/(cH"') L= ? ft H= 1.50 ft c= 3.10 L= 5.35 ft Riser Sizing C=pi X D C= 5.35 ft pi= 3.14 D= 20.43 in D= ? ft Material= CMP Use 24.00 "CMP Riser Barrel Sizing QZ= CA X sgrt(2gh) C= 0.60 A= ? sf A= 2.70 Q2= 30.45 cfs h= 5.50 ft A=pi X rZ g= 32.20 ft/s A= 22.24 in Material= CMP Use 18.00 "CMP Barrel Size Riser/Barrel Base Calculate Bouyance Force on Riser Cross -sectional area A=(pi x r2) x 2 r= 0.85 A= 4.55 sf Riser Volume V=A x L A= 4.55 L= 4.00 V= 18.21 Bouyance Force FB=qV q= 62.40lbs V= 18.21 ft' FB= 1136.00lbs/cf Concrete Base Sizing (Concrete = 120 Ibs/cf) - (weight of water = 62.4 Ibs/cf) == 57.6 Ibs/cf Base Volume 19.72 cf Base Dims = 4.44 ft x 4.44 ft x Weir Sizing Per AutoCad Hydraflow Software L= 35.00 ft D= 1.80 ft dwater 0.50 ft Q25= 44.37 cfs Velocity= 2.31 ft/s Weir Lining Shear Calculation T=yds y= 62.4 lbs dwater 0.5 ft T= 0.312 Ibs/ft2 s= 0.01 ft/ft Required Liner= Class A Rip Rap Proposed Liner= Class A Rip Rap 1.00 ft Barrel Outlet Protection New York Method 8.06.5 Manual Diameter of Barrel = Velocity= Zone= 18.00 " La= 9 ft 9.6 ft/s W= 4.5 ft 2 Stone Diameter= Class B Stone d= 18 in Skimmer Basin # 2 Calculate Flow - Rational Method 10-Yr Storm 25-Yr Storm Q10 = CIA C= 0.5 Q25 = CIA C= 0.5 1= 7.98 1= 8.89 Q10 = 21.945 A= 5.5 Q25 = 24.4475 A= 5.5 Calculate Required Surface Area SA=Q10 x 325 sf/cfs Q10 = 24.4475 cfs SA= 7945.438 Side Slopes = 3 :1 Pond Depth= 3 ft Basin Dims Top = 64 x 128 = 8192 sf Bottom = 46 x 110 = 5060 sf Volume Required VR=Ax1800 cf/ac A= 5.5 VR= 9900 Volume Proposed VP=((Top Area + Bottom Area)/2)xD Top= 8192 Bottom= 5060 VP= 19878 D= 3 OK Weir Sizing Per AutoCad Hydraflow Software L= 15 ft D= 2 ft dwater= 0.64 ft Q25= 24.4475 cfs Velocity= 2.45 ft/s Weir Lining Shear Calculation T=yds y= 62.4lbs dwater= 0.64 ft T= 0.39936 Ibs/ft' s= 0.01 ft/ft Use Class A Rip Rap Skimmer Sizing Calculate Dewater Time Qd=V/Td V= 9900 Td= 3 2-5 days typ Qd= 3300 Calculate Orifice Diameter D=sgrt((Qd/(2310sgrt(h))) Qd= 3300 h= 1.75 D= 1.374708 Use 4 "Skimmer v 1.4 Orifice Skimmer Outlet Protection #7 New York Method 8.06.5 Manual Diameter of Barrel = 4.00 " La= 1.32 Use 7.5 ft Velocity= 2.36 ft/s W= 1 Use 3.0 ft Zone= 1 Stone Diameter= Class A Temporary Diversion/Berm # 1 => DA # TD1 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 I*= 5.37 in/hr Q25 = 48.76 A= 22.70 ac Channel Slope= 0.50 Channel Depth= 2.50 *Intensity per Tc Side Slopes= 3.00 Velocity= 4.42 Soil Type Cry clay Slopes= 0-10% ' Channel Linine Shear Calculation T=yds y= 62.4lbs d—te, Mft T= 0.59281bs/ft2 s= ft/ft Temporary= NAG S75BN ' Permanent= NAG S75BN Temporary Diversion/Berm # 2 => DA # mp—TD-2-' Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 1= 8.89 in/hr Q25 = 4.27 A= 1.20 ac Channel Slope= 0.50 Channel Depth= 1.50 Side Slopes= 3.00 Velocity= 2.42 Soil Type 61) clay Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4lbs d—te Mft T= 0.234lbs/ft2 s=ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Temporary Diversion/Berm # 3 => DA # TD3 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 1= 8.89 in/hr Q25 = 7.47 A= 2.10 ac Channel Slope= 0.60 Channel Depth= 1.50 Side Slopes= 3.00 Velocity= 2.78 Soil Type @ clay Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4 Ibs dWd1ef 0.93 ft T= 0.29016 Ibs/ft2 s= 0.005 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Temporary Diversion/Berm # 4 => DA # TD4 Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 1= 8.89 in/hr Q25 = 8.89 A= 2.50 ac Channel Slope= 0.60 Channel Depth= 1.50 Side Slopes= 3.00 Velocity= 3.11 Soil Type @ clay Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4 Ibs dwace 0.96 ft T= 0.359424 Ibs/ft2 s= 0.006 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Temporary Diversion/Berm # 5 => DA # TD5 (CLEANWATER) Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 1= 6.05 in/hr Q25 = 56.31 A= 23.27 ac Channel Slope= 0.50 *Intensity per Tc Channel Depth= 2.50 Side Slopes= 3.00 Velocity= 4.49 Soil Type @ clay Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4 Ibs dWd1ef 2 ft T= 0.624 Ibs/ft2 s= 0.005 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN Temporary Diversion/Berm # 6 => DA # TD6 (CLEANWATER) Calculate Flow - Rational Method 25-Yr Storm Q25 = CIA C= 0.40 1= 6.51 in/hr Q25 = 20.57 A= 7.90 ac Channel Slope= 0.50 *Intensity per Tc Channel Depth= 2.00 Side Slopes= 3.00 Velocity= 3.57 Soil Type @ clay Slopes= 0-10% Channel Linine Shear Calculation T=yds y= 62.4 Ibs dwace 1.37 ft T= 0.42744 Ibs/ft2 s= 0.005 ft/ft Temporary= NAG S75BN Permanent= NAG S75BN U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA SIB #1 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 S11 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 . ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,868 0.050 3.8 0.14 + Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA TD #5 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 S11 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 . ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 1,335 0.050 3.8 0.10 + Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) U.S. Department of Agriculture Natural Resources Conservation Service FL-ENG-21 B 06/04 TR 55 Worksheet 3: Time of Concentration (Tc) or Travel Time (Tt) Project: Winchester Subdivision Designed By: MTB Date: Location: Hoke County, NC Check one: y( Present Developed Check one: y( T, Tt Checked By: JRT through subarea DA TD#6 Date: NOTES: Space for as many as two segments per flow type can be used for each worksheet. Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to T, only) 1. Surface description (Table 3-1) ................ 2. Manning's roughness coeff., n (Table 3-1) 3. Flow length, L (total L < 100 ft) ................. 4. Two-year 24-hour rainfall, P2..................... 5. Land slope, s............................................ 6. Tt = 0.007 (nL) 0.8 Compute Tt P2 0.5 S0.4 Shallow Concetrated Flow 7. Surface description (paved or unpaved) ..... 8. Flow length, L.............................................. 9. Watercourse slope, s.................................. 10. Average velocity, V (Figure 3-1) ................. 11. Tt = L Compute Tt 3600 V Channel Flow 12. Cross sectional flow area, a ....................... 13. Wetted perimeter, PW................................. 14. Hydraulic radius, r = a Compute r ........... PW 15. Channel Slope, s........................................ 16. Manning's Roughness Coeff., n ................. 17. V = 1.49 r2/3 S11 Compute V n 18. Flow length, L................................ 19. Tt = L Compute Tt Segment ID 1 1 ........................ ft ........................ in ...................... ft/ft ...................... hr FIELDS 0.03 100 0.1 0.050 0.14 + Segment ID 1 2 .ft ft/ft ft/s hr Segment ID ................. ft2 ................. ft ................ ft .............. ft/ft ..................... ................ ft/s ................. ft ................ hr snuu v 20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19 UNPAVED 879 0.050 3.8 0.06 + Chapter 3 Time of Concentration and Travel Time Technical Release 55 Urban Hydrology for Small Watersheds Figure 3-1 Average velocities for estimating travel time for shallow- concentrated flow .50 20 10 .02 MI .005 L 1 ;3-2 2 4 6 10 20 3.8 Average velocity (ftlsec) (210-V1-TR-55, Second Ed., dune 1986) s m o 9 8 dVW VIdV 3JVNIVdG 131NI 2131VMMO1S _ _11 o VNII0MV:3 HIMON 'A1NnO:) 3)1OH - _ ; 7 ¢gym „ w N w aVOM HSLDOOMZO - V = V P NOISIAMans 1131S3H:)NIM of f o eF NORTH 5 i / I / r NORTH 5 §g\ s m o 9 dtlW tl3iltl 3JtlNItli14 1Oi11NOJ NOISOi13 tlNl101itlJ H11iON 'A1Nf10J 3)IOH „ w Z - Z OOZZL8£ 006ZL8£ OOOZL8£ O066L8£ 0096L8£ 00L6L8£ 0096L8£ 0096L8£ OOb6L8£ 00£6L8£ 00Z6L8£ M „85 ,£ o6L OOZZL8£ 006ZL8£ OOOZL8£ O066L8£ 0096L8£ 00L6L8£ 0096L8£ 0096L8£ OOb6L8£ 00£6L8£ 00Z6L8£ z z m O (h N w M „45 ,Z o6L O O N N 0) 8 ro d tb T N U � U o � = m () Q O 8 Lf) O U O O �O z p g � 8 W V Ln> QQ 25 W > X Q p 8 O � V N +• O O L L � � N zQ C ZU Z O CQ G O LL Z Ca G 0 Z /W V W J CL O O � 7 U O O U O O 0)E E U m m Q (u —_ Q m N U m C E C y E m y tl) o) O O O EL 3: .' U) m m O- O � U m a) = y E y > L O O a) C > Q O a) 0 > O Q 6 > w m m cn E E o o a) m m m O C m N y U (i) N E o) C rn E a) (U ' m y E m 3 o 2 6 o y a) o m w E U vo) O O m m N U U) y -IOU N 7 a) -O CLU U 0 a) O 00 C a)O ._ m E O �.N�E '6 U) w '6 -E toll O E = U >a) — N m 6 a) CL m N — U m O O LO °' U) a U m E y-0 0 a) m 00 0 t m Q Z E O C 7 m a) U N y Z m N in L Ern o U m o a m y m Q U NN O a) L 0 m E U w m a) m Q� U) U L v m N 2 U N m D O C a) m . in � O- Q >+ O 0 N mU aa) c Oa) N U o -0 T Cr, Q U) o O (u QE E -2!,m u) O O a) '� m m E O O; Q N m E a) 7 u) U O N U Q w '6 a) U O N m� a) m o y a) .o N .y a) 0 a) a) a) 30 -0 3 J� m� (0) fmA O' C O Q n = i N U) t C 2 No a) Z E rm m aaci m m arn o -0 ° >a) i EO _Lm Tj C ya) a) -E U) O '6 m 0- oT°) U, g mm,CQ m .o m c s. ma) lu EOaEcm a) _ U 0 a) N m0L > Q CL 0m mE o O v) 000 U-2 rn U c N a? CL a) U a) m 0 E C y mv) Q m a) a) O O a) O CL a) m O y L 0 7 o O N ?00O m mm a) E s FL E U U U 2 o_70 Q m H o U U U H O .E y y � y Q 4 Li O U R L r Q >. a) R 2 y O a -yo O L a) CLO Q U) > CL Z U) ° J m E N m y o m O a ° O a R a m o O U) cn N > L_ O cn aR y cn � o a N U S a Q * R N R � C � R 4 R5 F R m y C O y 0 .� O Q U) a° a° N E N a Q a U a o C C > > CL CL R R C > R a) y C) 3 Q o -a w Q U) = 3 y 0 0`o a R O o > > O` w O o CL 0 CL ° w o Q _ o o `o co — 3 O T w > > a R a o co) o Y o a y Q o 0 cn cn 0 cn p o m o R m U O U (7 (7 J 'm R J E y A N a O a m cn R cn o ca) a o in in cn w a ` 11F U) Q y T a) U m Z Soil Map —Hoke County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Blaney loamy sand, 2 to 8 8.9 3.3% percent slopes BaD Blaney loamy sand, 8 to 15 9.4 3.5% percent slopes CaB Candor sand, 1 to 8 percent 29.7 11.0% slopes GoA Goldsboro loamy sand, 0 to 2 16.9 6.2% percent slopes, Southern Coastal Plain LaB Lakeland sand, 1 to 8 percent 15.3 5.6% slopes NoA Norfolk loamy sand, 0 to 2 64.9 23.9% percent slopes NoB Norfolk loamy sand, 2 to 6 7.9 2.9% percent slopes Ra Rains sandy loam, 0 to 2 6.9 2.6% percent slopes WaB Wagram loamy sand, 0 to 6 110.7 40.9% percent slopes Wo Woodington loamy sand 0.4 0.1 % Totals for Area of Interest 270.9 100.0% USDA Natural Resources Web Soil Survey 7/15/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 p • ,�- A �w ti o,EET IEET 7 r I _ � a . � x , d� ♦ �Y.s .. - aqt:' I ae 1+4Ce►s D ,. GF g so �, Z NE AT 8s r H r l { ANDFo Tit A"V SITE HOLE co � LIT CORPORaTED .xRE.4S GFFrJ 1 _ �_.. ice.". ,.r..e� �. ��o, ► fii 7� �.., • s 1` h, 7— — ZON FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEER REPORTFORZONEDESCRIPRONSANDINDUMAP THE INFORMATION DEPI CFED ON THIS MAP AND SUPPORTING m e DOCUMENTATION AREALSO AVAIIABLE IN DIGITAL FORMATAT xm rvnw ,ma n� HTTP://FRIS.NC.GOV/FRIS �tl F�qµ,@ m-. aF�+em.M�=�»Po.•m.���••, �,m.,.-.._�+��. ilnch - SOU tot 1:6,000 Withoot Bases ootl Devotion (BFE) -Wth a,anrixn, ium.ms ee 0 250 500 Feet BFEorDepth—lEAO.AH. vEAR euam gemm emem u. rem iuiees.�sc..m,,ue..,m SPECIAL FLOOD HATARDAREAS R IIIIIIIII■ egulotory Flootlway mm�m•. mm.aro„u,.,..a®.u�®uu. x.m..i 0 15 150 300 —0.2%An nu.IChanceFlood H—R!,Ames oft% Annual Chanm FlootlwhA mg ,��,.,.,.....�.u. PANEL LOCATOR Depth Less Than One Foctor WthD ag A", Less Than One Sgoam M I cf — Fo[um Contl [ oas 1%Annual xeaxmmumr Chanm Flood Hared u,�,m OTHERAREASOF— Amawith Retlomtl Flootl Rism kdto Levee m Nmasmu FLOOD HAZARD See Notes zone OTHER — Amas DMen mdt,b,O000dctho AREAS 0.2%Annual Chance Floodplain zonex awem imio.mu.ia..m„e.s.uo„wr.u,s.eu.az,o,w�.=.re,e. svw.m,aseue,me ------------- Channel, Culvert, or Storm Sewer um » Ammtlitetl or Prnm... llyAmmtlitetl GENERAL Ieree, Diluq or Flootlwall STRUCTURES ...........NO.-ammtlitetl Leveg Diluq or Flootlxall Nod, Carolina Geotlotic Survey benchmark .,n.,,�..,n.vEzm.. "'�`�"""vEze�-..a e.mnm�•�uiu,mu, m. Du m, bUmitcf ® Notional Gmdotic Sorveybench mark 5 10 Contractor Est NCFMPSorveybenchmark Motlemte Ware ARion(LiMWA) a a¢— Cross Sectionswih1%Annual Ch... TEM(CBRS)NOTE Woter Sod,mEM o ion(BFE) 0-----Coas[alTmasect s. r,n.mwm..m., ,-moa.wiTn. ,.m, m. c smruxomu ----- - Con-IT—dBaseline ® CBRSArea Othemise Pmtectetl Anna -- Profile Baseline RydrogmpHc Foot— ® ® arsoxmumv OTHER Umit of Study FFANRES Jorio,idion Boo idsry C NOUHCMOLIMROODPWNMAPPINGPROGRAM NAOONAL FLOOD INSURANCE PROGRAM F LOOO INEUMANCE RATE MAP nA NORTH CAROLINA 0 PANasasa � � WU E���; cc I Go nt-, COMMUNITY CID SUFFIX fA or xorcE couxry mm� was a 0 _G LL 7E i 0 cc z MAP NUM.ER A 3]10998900N O3 OB/O] ,r r•: �s •tj cc a-- 1 pie 0-10 r- ) Ch. OCR° e70H APPENDIX SUPPLEAM M/QM4EHMC0 ZWOQMEME 4 SUPPLEMEHU SUPPLEMENT-EZ COVER PAGE FORMS LOADED INFORMATION ect Name Glen Meadow Subdivision - Phase 2 Wetland Area (ac; Water Area (ac) this project High or Low Density? )es this Droiect use an off -site SCM? Low No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (IS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Jeremy Thomas, PE. - President 28 Organization: J Thomas Engineering, Inc. 29 Street address: 143 Charlotte Avenue, Suite 104 30 City, State, Zip: Sanford, NC 27330 31 Phone numbers : 919 777-6010 32 Email: jthomas@jthomasengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 4 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 1TvDe of SCM 5 Total BUA in pro ect (sq ft 203039 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft 115500 sf 7 New BUA outside of subdivided lots (subject to ermittina) (sfi 104039 sf 8 Offsite - total area (sq ft sf 9 Offsite BUA (sq ft sf 10 Breakdown of new BUA outside subdivided lots Parking (sq ft Sidewalk (sq ft 8149 sf Roof (sq ft) Roadway s ft 79390 sf Future (sq ft Other, please specify in the comment box belo (sq ft 11 New infiltrating permeable pavement on subdivide lots (sq ft 12 New infiltrating permeable pavement outside of subdivided lots (sq ft 13permitting) Exisitng BUA that will remain (not subject to s ft 14 Existing BUA that is already permitted (sq ft) 15 Existina BUA that will be removed (sq ft 16 Percent BUA 15% 17 Design storm inches 18 Design volume of SCM cu ft 19 ICalculation method for design volume ADDITIONAL INFORMATION 20 Please use this space to provide any additional information about the drainage area(s): DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM N/A 5 Total BUA from project (sq ft) 6 1995 rules SL 2006-246 2008 rules 2017 rules New BUA on subdivided lots (subject to permitting) (sq ft) 1995 rules SL 2006-246 7 2008 rules 2017 rules 8 New BUA outside of subdivided lots (subject to permitting) (sf) 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite - total area (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA (sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm (inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 1 Breakdown of new BUA: Parking (sq ft Sidewalk (sq ft Roof (sq ft Roadway (sq ft) Future (sq ft Other, please specify in the commen4bbelo (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement outside of subdivided lots (sq ft 15 Exisitng BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 19 DE n volume of SCM cu ft 20 Calculation method for design volume ADDITIONAL INFORMATION 21 1 Please use this space to provide any additional information about the drainage area(s): LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-1.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 5TO1 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 6 Are curb outlet swales proposed? Yes 7 Maximum longitudinal slope of curb outlet swale(s) (%) 0% 8 Bottom width of curb outlet swale(s) (feet) 2 ft 9 Maximum side slope of curb outlet swale(s) (H:V) 5:1 10 Minimum length of curb outlet swale(s) (feet) 290 ft 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? No 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 JAre variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 iPlease use this space to provide any additional information about this low density project: Flow depth (ft) ©aaa�aaaa Operation & Maintenance Agreement Project Name: Project Location: Winchester Subdivision Hoke County, NC Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced alateiy. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that apply & corres Bioretention Cell Quantity: Dry Detention Basin Quantity: Grassed Swale Quantity: Green Roof Quantity: Infiltration Basin Quantity: Infiltration Trench Quantity: Level Spreader/VFS Quantity: Permeable Pavement Quantity: Proprietary System Quantity: Rainwater Harvesting Quantity: Sand Filter Quantity: Stormwater Wetland Quantity: Wet Detention Basin Quantity: Disconnected Impervious Area Present: P User Defined BMP Present: P g O&M tables will be added automatically): Location(s): Location(s): Location(s): South Side of Development Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. * Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Stafford Turner Development Partnership - Robert Stafford Owner/Developer 246 Valleyfield Lane Southern Pines, NC 28387 (910) 692-9800 stafflandl@earthlink.net Signature: A&jtxE!�i�Date: I, SKY mL-\ .9, i? )pu' a Notary Public for the State of Mi(TV% (t4c ►ram County of r 11" do hearby certify that Qwbtf(� Q. • S*6 S personally appeared before me this 1 ► day of $w\A IM-0 and acknowledge the due execution of the Operations and Maintenance Agreement. Witness my hand and official seal, ,���\\\\\\\\\O A B LA Notary Public Lee = county AR �� STOZ ��1111111\� Version 1 A My commission expires t I rm `runs 10/16/2019 Page 1 of 3 Grassed Swale Maintenance Requirements Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How to remediate the problem: The perimeter of the BMP Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then plant a erosive gullies have formed. ground cover and water until it is established. Provide lime and a one- time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to remove the gully, and then re -sod (or erosive gullies have formed. plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an area that will not impact streams the bottom of the swale. or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of approximately six inches. long. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Department of Environment and Natural damage have occurred at the Resources Regional Office. outlet. STORM-EZ 10/16/2019 Version 1.4 O&M Manual Page 3 of 3 Permit Number: (to be provided by DWQ) Qp W A TF9 r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. I. PROJECT INFORMATION Project name Winchester Subdivision Contact name J Thomas Engineering, Inc - Michael Blakley Phone number (919) 499-8759 Date July 15, 2020 Drainage area number PD 1 II. DESIGN INFORMATION Site Characteristics Drainage area 413,384.00 f? Impervious area 7,200.00 f? Percent impervious 1.7% % Design rainfall depth 3.04 inch Peak Flow Calculations 10-yr storm runoff depth 5.44 in 10-yr storm intensity 5.26 in/hr Post -development 10-yr storm peak flow 14.97 fe/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 4.50 ft/sec Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue X Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Y (Y or N) Maximum velocity 3.60 Side slopes 4.00 :1 Swale length 240.00 ft Option 2: Swale Seeking Pollutant Credit ("For -Credit" Swale): (Y or N) Maximum velocity for 10-yr storm ft/sec Side slopes :1 Swale length ft Co719 Insufficient side slopes. Max is 5:1. OK Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the Swale Width of the top of the Swale Additional Information Is the Swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the Swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the Swale? What is the depth of freeboard? 1:1 Y (Y or N) OK Y (Y or N) OK 1.00 ft OK 200.00 fmsl 197.00 fmsl 196.00 fmsl 0.50 % OK 0.62 ft OK Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Qp W A TF9 r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. I. PROJECT INFORMATION Project name Winchester Subdivision Contact name J Thomas Engineering, Inc - Michael Blakley Phone number (919) 499-8759 Date July 15, 2020 Drainage area number PD 3 II. DESIGN INFORMATION Site Characteristics Drainage area 1,055,023.00 f? Impervious area 101,228.00 f? Percent impervious 9.6% % Design rainfall depth 3.04 inch Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Side slopes Swale length Option 2: Swale Seekina Pollutant Credit ("For -Credit" Swale): Maximum velocity for 10-yr storm Side slopes Swale length 5.44 In 5.26 in/hr 36.83 fe/sec 4.50 ft/sec X X Y (YorN) 2.29 OK 5.00 :1 OK 480.00 ft OK (Y or N) ft/sec :1 ft Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the Swale Width of the top of the Swale Additional Information Is the Swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the Swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the Swale? What is the depth of freeboard? Y (Y or N) OK Y (Y or N) OK 2.00 ft OK 198.00 fmsl 195.00 fmsl 193.00 fmsl 0.10 % OK 0.26 ft OK Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Qp W A TF9 r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. I. PROJECT INFORMATION Project name Winchester Subdivision Contact name J Thomas Engineering, Inc - Michael Blakley Phone number (919) 499-8759 Date July 15, 2020 Drainage area number PD 4 II. DESIGN INFORMATION Site Characteristics Drainage area 105,850.00 f? Impervious area 24,983.00 f? Percent impervious 23.6% % Design rainfall depth 3.04 inch Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Side slopes Swale length Option 2: Swale Seekina Pollutant Credit ("For -Credit" Swale): Maximum velocity for 10-yr storm Side slopes Swale length 5.44 In 5.26 in/hr 36.83 fe/sec 4.50 ft/sec X X Y (YorN) 1.36 OK 5.00 :1 OK 290.00 ft OK (Y or N) ft/sec :1 ft Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the Swale Width of the top of the Swale Additional Information Is the Swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the Swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the Swale? What is the depth of freeboard? Y (Y or N) OK Y (Y or N) OK 1.50 ft OK 198.50 fmsl 195.00 fmsl 193.50 fmsl 0.10 % OK 2.32 ft OK Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Qp W A TF9 r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. I. PROJECT INFORMATION Project name Winchester Subdivision Contact name J Thomas Engineering, Inc - Michael Blakley Phone number (919) 499-8759 Date July 15, 2020 Drainage area number PD 4 II. DESIGN INFORMATION Site Characteristics Drainage area 1,281,099.00 f? Impervious area 56,992.00 f? Percent impervious 4.4% % Design rainfall depth 3.04 inch Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Side slopes Swale length Option 2: Swale Seekina Pollutant Credit ("For -Credit" Swale): Maximum velocity for 10-yr storm Side slopes Swale length 5.44 In 5.26 in/hr 57.39 fe/sec 4.50 ft/sec X X Y (YorN) 4.33 OK 5.00 :1 OK 550.00 ft OK (Y or N) ft/sec :1 ft Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the Swale Width of the top of the Swale Additional Information Is the Swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the Swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the Swale? What is the depth of freeboard? Y (Y or N) OK Y (Y or N) OK 1.50 ft OK 197.50 fmsl 194.00 fmsl 192.50 fmsl 0.60 % OK 1.18 ft OK Form SW401-Grassed Swale-Rev.4 Parts I and 11. Project Design Summary, Page 2 of 2