Loading...
HomeMy WebLinkAboutNC0021211_Compliance Evaluation Inspection_20200923ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director City of Graham Attn: Frankie Maness, City Manager P.0 Drawer 357 Graham, NC, 27253-0357 NORTH CAROLINA Environmental Quality September 23, 2020 SUBJECT: Compliance Evaluation Inspection Graham Wastewater Treatment Plant NPDES Permit #NC0021211 Alamance County Dear Mr. Maness: Ron Boone, of the NC Division of Water Resources (DWR), Winston-Salem Regional Office (WSRO), visited the Graham wastewater treatment plant on September 15th, 2020, to perform a Compliance Evaluation Inspection (CEI). The assistance and cooperation of Crispian Routh, Operator in Responsible Charge (ORC), was greatly appreciated. Details of the inspection are recorded on the attached EPA Water Compliance Inspection Report. You're reminded that, in accordance with NC General Statute 143-215.6A, failure to comply with all conditions of the permit subjects the Town of Beech Mountain to civil penalties not to exceed $25,000.00 per violation, per day. If you have any questions or require further assistance, please contact Mr. Boone by phone at 336-776- 9690, or by email at ron.booneRncdenngov. You may also contact me by phone at 336-776-9700, or by email at lon.sniderOncdenr.gov. Sincerely, EDocuSigned by: LOw. -T 15W er 145B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Attachments: 1. EPA Water Compliance Inspection Report cc: Laserfiche North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office [ 450 West Hanes Mill Road, Suite 300 I Winston-Salem, North Carolina 27105 NOh r HCARO I. IN A p Den I, 6,1 m �ku­�I o�a� /"� 336.776.9800 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NC0021211 I11 121 20/09/15 I17 18I � I 19 I s I 201 I 211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 I 72 I ni I 71 I 74 79 I I I I I I I80 701 I 71 I LL -1 I I LJ Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES Dermit Number) 09:OOAM 20/09/15 13/07/01 Graham WWTP 1204 E Gilbreath St Exit Time/Date Permit Expiration Date Graham NC 27253 12:OOPM 20/09/15 16/05/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Crispian T. Routh/ORC/336-570-6721/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Victor Ray Quick,PO Drawer 357 Graham NC 272530357//336-570-6700/3365135502 No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Compliance Schedules Effluent/Receiving Wate 0 Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Ron Boone DWR/WSRO WQ/336-776-9690/ DocuSigned by: onaeaC Boo., 9/23/2020 Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date DocuSiiggned by: 9/23/2020 '-- 145B49E225C94EA... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NCO021211 I11 12I 20/09/15 117 18 i c i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Plant appeared to be running very well during the inspection. There were no deficiencies or violations noted during the inspection. Page# Permit: NCO021211 Owner -Facility: Graham WWTP Inspection Date: 09/15/2020 Inspection Type: Compliance Evaluation Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees ❑ ❑ ❑ Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ ❑ Comment: None Influent Sampling Yes No NA NE # Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected above side streams? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees 0 ❑ ❑ ❑ Celsius)? Is sampling performed according to the permit? M ❑ ❑ ❑ Comment: None Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, an( 0 ❑ ❑ ❑ sampling location)? Comment: None Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 ❑ ❑ ❑ application? Is the facility as described in the permit? ❑ 0 ❑ ❑ # Are there any special conditions for the permit? 0 ❑ ❑ ❑ Is access to the plant site restricted to the general public? 0 ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? 0 ❑ ❑ ❑ Comment: The plant no longer uses the sand filters or lime stabilization process for sludge. Compliance Schedules Yes No NA NE Is there a compliance schedule for this facility? 0 ❑ ❑ ❑ Page# 3 Permit: NCO021211 Owner -Facility: Graham WWTP Inspection Date: 09/15/2020 Inspection Type: Compliance Evaluation Compliance Schedules Yes No NA NE Is the facility compliant with the permit and conditions for the review period? 0 ❑ ❑ ❑ Comment: None Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? 0 ❑ ❑ ❑ Is all required information readily available, complete and current? 0 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 0 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 0 ❑ ❑ ❑ Is the chain -of -custody complete? 0 ❑ ❑ ❑ Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc ❑ ❑ ❑ on each shift? Is the ORC visitation log available and current? ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification' ❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 0 ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? 0 ❑ ❑ ❑ Comment: None Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? 0 ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Page# 4 Permit: NCO021211 Owner -Facility: Graham WWTP Inspection Date: 09/15/2020 Inspection Type: Compliance Evaluation Bar Screens Yes No NA NE Is the unit in good condition? 0 ❑ ❑ ❑ Comment: None Grit Removal Yes No NA NE Type of grit removal a.Manual ❑ b.Mechanical Is the grit free of excessive organic matter? 0 ❑ ❑ ❑ Is the grit free of excessive odor? 0 ❑ ❑ ❑ # Is disposal of grit in compliance? 0 ❑ ❑ ❑ Comment: None Flow Measurement - Influent Yes No NA NE # Is flow meter used for reporting? ❑ ❑ ❑ ❑ Is flow meter calibrated annually? ❑ ❑ ❑ ❑ Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Is the flow meter operational? ❑ ❑ ❑ ❑ Comment: None (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ ❑ Comment: Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Is the wet well free of excessive grease? ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? ❑ 0 ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? 0 ❑ ❑ ❑ Is audible and visual alarm available and operational? 0 ❑ ❑ ❑ Comment: One pump currently down for repair. Page# 5 Permit: NCO021211 Owner -Facility: Graham WWTP Inspection Date: 09/15/2020 Inspection Type: Compliance Evaluation Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth) 0 ❑ ❑ ❑ Comment: None Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Surface Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? ❑ ❑ N ❑ Is the foam the proper color for the treatment process? N ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? 0 ❑ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) 0 ❑ ❑ ❑ Comment: None Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? 0 ❑ ❑ ❑ Is the site free of excessive buildup of solids in center well of circular clarifier? 0 ❑ ❑ ❑ Are weirs level? 0 ❑ ❑ ❑ Is the site free of weir blockage? 0 ❑ ❑ ❑ Is the site free of evidence of short-circuiting? 0 ❑ ❑ ❑ Is scum removal adequate? 0 ❑ ❑ ❑ Is the site free of excessive floating sludge? 0 ❑ ❑ ❑ Is the drive unit operational? 0 ❑ ❑ ❑ Page# 6 Permit: NC0021211 Owner -Facility: Graham WWTP Inspection Date: 09/15/2020 Inspection Type: Compliance Evaluation Secondary Clarifier Yes No NA NE Is the return rate acceptable (low turbulence)? 0 ❑ ❑ ❑ Is the overflow clear of excessive solids/pin floc? 0 ❑ ❑ ❑ Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) 0 ❑ ❑ ❑ Comment: None Pumps-RAS-WAS Yes No NA NE Are pumps in place? 0 ❑ ❑ ❑ Are pumps operational? 0 ❑ ❑ ❑ Are there adequate spare parts and supplies on site? 0 ❑ ❑ ❑ Comment: None Disinfection -Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? 0 ❑ ❑ ❑ (Sodium Hypochlorite) Is pump feed system operational? 0 ❑ ❑ ❑ Is bulk storage tank containment area adequate? (free of leaks/open drains) 0 ❑ ❑ ❑ Is the level of chlorine residual acceptable? ❑ ❑ ❑ Is the contact chamber free of growth, or sludge buildup? 0 ❑ ❑ ❑ Is there chlorine residual prior to de -chlorination? ❑ ❑ ❑ Comment: None De -chlorination Yes No NA NE Type of system ? Liquid Is the feed ratio proportional to chlorine amount (1 to 1)? ❑ 0 ❑ ❑ Is storage appropriate for cylinders? ❑ ❑ 0 ❑ # Is de -chlorination substance stored away from chlorine containers? 0 ❑ ❑ ❑ Are the tablets the proper size and type? ❑ ❑ 0 ❑ Comment: None Are tablet de -chlorinators operational? ❑ ❑ ❑ Number of tubes in use? Comment: None Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? 0 ❑ ❑ ❑ Page# 7 Permit: NCO021211 Inspection Date: 09/15/2020 Owner -Facility: Graham WWTP Inspection Type: Compliance Evaluation Effluent Pipe Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: None Flow Measurement - Effluent # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Comment: Calibrated in July 2020. Aerobic Digester Is the capacity adequate? Is the mixing adequate? Is the site free of excessive foaming in the tank? # Is the odor acceptable? # Is tankage available for properly waste sludge? Comment: None Standby Power Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Is the generator fuel level monitored? Comment: None Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ IY-Tvki[•7►/_90I:4 ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ■ Yes No NA NE ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page# 8