HomeMy WebLinkAbout420011_Compliance Evaluation Inspection_20200921Facility Number - 0
LirDivision of Water Resources
0 Division of Soil and Water Conservation
0 Other Agency
of Visit: om lance Inspection Operation Review Q Structure Evaluation Q Technical Assistance
in for Visit: Routine O Complaint O Follow-up 0 Referral 0 Emergency O Other 0 Denied Access
Date of Visit: ~.21 Arrival Time: I A4V0___jDeparture Time:j County:
Farm Name:�Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Phone:
Title: Phone:
Onsite Representative: Dzey d�c
Certified Operator: 5,q W% [ 1 ,r' Pt o
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
arrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Integrator:
Certification Number:
Certification Number:
Latitude: Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -Layer
Pullets
Other
Poults
Design Current
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Region:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non-Dai
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes No ❑ NA ❑ NE
❑ Yes N NA ❑ NE
b, Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ YesFNA
❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facili Number: - ( Date of Inspection: — X-1—
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? [3 Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): Z
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a [:]Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental eat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ YesrN
❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes No NA ❑ NE
maintenance or improvement?
1 I . Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): 13 2 r �+� d /� , Sr" ci �'rtt f� S
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
VN5c�, ❑ NA
❑ NE
I6. Did the facility fail to secure and/or operate per the irrigation design or wettable
[] Yes
[ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ NA
jNo
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes o ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes RNo ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes 6 No ❑ NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis [:]Soil Analysis ❑ Waste Transfe ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspection ElSludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - S Date of Inspection:
-� /-
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? Ifyes, check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey 0 Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26, Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes:No
No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29, At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface the drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0 No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE
Rev ieweri Inspector Name: Phone: 6J z0b
Reviewer., Inspector Signature: ! 3Gr S low Date: Cj
Page 3 of 3 511212020