HomeMy WebLinkAbout20180765 Ver 5_USACE More Info Requested_20200923Strickland, Bev
From: Brown, David W CIV USARMY CESAW (USA) < David.W.Brown@usace.army.mil >
Sent: Wednesday, September 23, 2020 10:54 AM
To: Clement Riddle
Cc: Owen Schultz; Yankura, Kaylie; Homewood, Sue; Steve Beasley
Subject: [External] Request of Additional Information Sep 2020 - High Hampton
Redevelopment Permit Modification Request, SAW-2017-02281
• ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ort.s am nc. ov
ClearWater Environmental Consultants, Inc.
Asheville, NC
Clement Riddle,
The Corps has received (July 14, 2020) and reviewed your request to modify the issued standard permit for the High
Hampton Redevelopment project in Cashiers, Jackson County, North Carolina. Also, the Corps has received DWR's recent
request for additional information for this permit modification. The permittee has several times during the past 2 years
performed work for the redevelopment project without authorizations from DWR and the Corps. This request for
modification to the existing permit is another example of this conduct. The Corps fully supports DWR request for
additional information. In additional to DWR's request the Corps adds the following:
1) Submittal of a set of plans which depict the location of jurisdictional features prior to land disturbance activities
at the project site with an overlay of the current grading and construction impacts within the project area.
Please copy DWR on submittal of these plans.
2) After these plans are reviewed by the Corps an inspection of the site will be scheduled to verify the information.
As noted to permittee several times prior to this date, conducting activities in areas outside of the Corps jurisdiction or
within jurisdictional waters of the U.S. (WoUS) at the High Hampton property(s) does not imply that this office will
necessarily approve future proposed impacts to WoUS. Development activities undertaken on the property(s) to date will
not be adequate justification for authorization of unauthorized or future impacts. The Corps will examine all requests
which propose impacts to WoUS to ensure you have appropriately avoided, minimized, and/or mitigated for unavoidable
impacts.
Please provide the information requested by December 31, 2020, or your request will be withdrawn. If you have any
questions please contact me.
Sincerely,
David Brown, PG
Regulatory Specialist/Geologist
USACE Wilmington District -Asheville Regulatory Field Office
151 Patton Avenue, Room 208
Asheville, NC 28801-5006
828-271-7980, ext. 4232