Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0038971_ROPermitFile_20200922
o-� E._��. a. ROY COOPER .x`. - Governor WILLIAM G. ROSS, JR. n Acting Secretary Water Resources ENVIRONMENTAL QUALITY 'I January 17, 2017 Ben Turnmire,Town Manager Town of Rhodhiss P.O. Box 40 Rhodhiss, NC, 28667-0400 Subject: Permit No. WQ0038971 Town of Rhodhiss System-Wide Water and Sewer Improvements Wastewater Collection System Extension Permit Burke&Caldwell County Dear Mr. Turnmire: In accordance with your application received January 4, 2017, we are forwarding herewith Permit No. WQ0038971 dated Issued January 17, 2017, to the Town of Rhodhiss (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T.0403 or any individual system-wide collection system permit issued to the Permittee. It shall be the responsibility of the Permittee to ensure that the as-constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made,this permit shall be final and binding. 2090 U.S.70 Highway,Swannanoa,NC 28778 Phone:828-296-4500\Internet:www.ncwaterguality.org An Equal Opportunity\Affirmative Action Employer—Made in part by recycled paper tl Town of Rhodhiss Permit No.WQ0038971 , If you need additional information concerning this matter, please contact Tim Heim at 82$ 296-4500 or via e-mail at tim.heim@ncdenr.gov. Sincerely, for S.Jay Zimmerman, P.G. Director, Division of Water Resources G. Landon Davidson, Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ 1 cc: Benjamin B.Thomas, P.E.—West Consultants, PLLC(electronic copy) Regional Office Files Water Resources Central Files PERCS(electronic copy) - G:\WR\WQ\Burke\Collection Systems\Rhodhiss Collection System\WQ0038971 System Wide Water&Sewer Imp.docz l II i i Page 2 of 9 fU Environmental Quality WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Rhodhiss Burke &Caldwell County for the construction and operation of approximately 4,959 linear feet of 8-inch gravity sewer to serve the Town of Rhodhiss collection system as part of the System-Wide Water and Sewer Improvements project, and the discharge of zero additional gallons per day of collected domestic and commercial wastewater into the Town of Rhodhiss's existing sewerage system, pursuant to the application received January 4, 2017 and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast- Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environmental Quality and considered a part of this permit. ' This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified conditions and limitations contained therein. for S.Jay Zimmerman, P.G. Director, Division of Water Resources By Authority of The Environmental Management Commission Permit Number: WQ0038971 Permit Issued: January 17,2017 Page 3 of 9 SUPPLEMENT TO PERMIT COVER SHEET Town of Rhodhiss is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the WWTF Owner Wastewater Treatment Facility in accordance with Permit Number NC0040797. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina-licensed Professional Engineer in the application. It shall be the Permittee's responsibility to ensure that the as-constructed project meets the appropriate design criteria and rules. Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. I. STANDARD CONDITIONS 1. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104;G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T, the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. [15A NCAC 02T.01101 3. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T.0110] 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required,the following performance criteria shall be met: [15A NCAC 02T.0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. i Page 4 of 9 c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High-priority sewer lines shall be inspected at least once per every six-months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 28.0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors,enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems,the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease-related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map,which shall be maintained for the life of the system. 5. The Permittee shall report by telephone to a water resources staff member at the Asheville Regional Office, telephone number (828) 296-4500, as soon as possible, but in no case more than 24 hours, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.;or b. Any SSO and/or spill over 1,000 gallons;or c. Any SSO and/or spill, regardless of volume,that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or (919) Page 5 of 9 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing and submitting Part I of Form CS-SSO (or the most current_Division approved form) within five_days_ following first knowledge of the occurrence. This report must outline the actions taken or proposed to be taken to ensure that the problem does not recur. Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(a1)] 6. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. [15A NCAC 02T.0108(b)] 7. Upon completion of construction and prior to operation of these permitted facilities,the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Declarations/Covenants/Restrictions, and Bylaws that have been appropriately filed with the applicable County's Register of Deeds office shall be submitted with the certification. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. Supporting documentation shall include the following: a. One copy of the project construction record drawings (plan & profile views of sewer lines & force mains) of the wastewater collection system extension. Final record drawings should be ,.; clear.oh the.plans or on digital media (CD or DVD disk) and are defined as the design drawings that are marked up or annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in force mains with a pump cycle, and downstream sewer capacity analysis. If a portable power source or pump is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes,shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be clearly identified on the record drawings,on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested Page 6 of 9 modifications or variances to the Minimum Design Criteria will be reviewed on a case-by-case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After-construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification &activation. [15A NCAC 02T.0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case-by-case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T.0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes§143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T.0104; 15A NCAC 02T.0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement ..facilities. [15A NCACO2T.0110; 15A NCAC 02T.0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal,State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 9 FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE:TOWN OF RHODHISS PERMIT#:WQ0038971 PROJECT: SYSTEM-WIDE WATER AND SEWER IMPROVEMENTS ISSUE DATE:January 17,2017 This project shall not be considered complete nor allowed to operate in accordance with Condition 7"of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name,Title Signature Date ENGINEER'S CERTIFICATION as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, ❑ weekly, ❑ full time) the construction of the System-Wide Water and Sewer Improvements and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. .................................................... North Carolina Professional Engineer's Seal w/signature &date: ❑ Final ❑ Partial (include description) ............................................................... Certification Comments/Qualifiers(attach if necessary): ..........: NC DWR—Water Quality Regional Operations Section 2090 US Hwy 70,Swannanoa, NC 28778 Asheville Regional Office Phone: (828)-296-4500 FAX:(828)-299-7043 Division of Water Resources ` Fast Track Application forfor Sewer Systems—Revie kecl�k�s Project Name: �t m.Vu'`t1[. W A4r- a Sl j4 tm e. Application Number: ,n Application Completeness Review R,,j l/$�C7 17 3fi S"11 Project is located in a County currently covered by the regional office VWGs ❑No O Application and supporting documentation submitted in duplicate? es ❑No One Original and One Copy 11 y I ( rl Correct application fee submitted? See G.S. 143-215.3D es ❑No ❑N/A Ensure that a check for$480 is submitted and made out to NC DEQ. II 5' 1 All new projects and major modifications to existing projects require licafion fee. A major modification includes any changes to permitted flow volumes, changes in pipe dia ges in pipe length greater than 10 % III,)I in of the originally permitted length, changes in operating points of a ation, etc. If unclear, contact the Central Office. Application package is complete? Current application version(See website) es No Brief project narrative(per Section B ofFTA, tions) es ❑No Certification of Public Convenience and Noce provided Yes ❑No ❑N/A (if applicable) Operational Agreements,signed and dated [—]No ❑N/A (if applicable) Flow Tracking/Acceptance Form igned and da []Yes E< ❑N/A Flow Tracking/Acceptance PI t Addend []Yes ❑No ❑N/A (if applicable) Site Map and Street Level Map(per Se F o cfions `�es ❑No PE Certification of is signed, d and C.P es ❑No Applicant Corti and dated ele rovi d) &�V—es ❑No If any portion of the ap n is not plete, or equired instruction items have been omitted, and the return of an application is ' t,the f wing steps s be taken: • C ant ( an ho email for very minor completeness deficiencies. e app' d co t)48 ho • e application p is fo be incomp uring this completeness review, fill out a checklist that r ' res the deficien d re a application to the applicant with a copy to the consultant. If the app. ' n fee has not b eposite it as well. Any projects that be returned 1 be returned prior to accepting the application (i.e., before logging in the application and dep the chec er a project has been accepted, any information that is found to be incorrect and/or lackin f be re d via an Additional Information Request in accordance with 15A NCAC 02T.0107. i Permit Information ❑New Permit ❑Permit Modification If the project is a modification to an existing permit, be sure to enter the application into BIMS as a permit modification (i.e. "renew/modify application" and not "create new project"). BIMS will pull the previous signing official and affiliations information. Modify all tabs and enter updated information. Does the project require a permit for the activity? EJVes ❑No See Permitting by Regulation(15A NCAC 02T.0303)for projects deemed permitted If No,return fee and application package Is the project eligible for the Fast Track Program? Ves ❑No Projects not permitted through the fast track program: ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C.0100; ➢ Projects that do not meet any part of the minimum design criteria(MDC)document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank-effluent pumps(STEPS)or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems(e.g.force mains); 1 ➢ Vacuum sewer systems. If No,return fee and application package and advise applicant what to do Information entered into BIMS?(Project details, affiliations,etc) Yes ❑No Applicant(Owner/Permittee)signature meets requirement of 15A NCAC.0106(b)? Q/es If No,request revised application with an appropriate official,or a letter from an ,j appropriate official that indicates the person in question is delegated to sign the application on the applicant's behalf. If a new delegated signing official is listed, add the person to BIMS Is the applicant is a public entity(county,city,sanitary district,etc.)? e 'n Vs ❑No If Yes,move to Wastewater Flow Information Section N Is the applicant is a private entity and intends to retain ownership(store, church,etc.)? ❑Yes ❑No If Yes,move to Wastewater Flow Information Section 1 Is the applicant is a private entity(private utility)? ❑Yes ❑No If Yes,Applicant has been designated as a public utility by the NC Utilities Commission ❑Yes []No Has submitted a Certificate of Public Convenience and Necessity(CPCN) or Letter from the Public Staff of the NC Utilities Commission(contact Central Office) The project name on the application and CPCN must match ❑Yes ❑No Is the applicant is a private entity(Developer)that will be selling units? ❑Yes ❑No If Yes,Applicant has submitted an executed Operational Agreement(DEV) ❑Yes ❑No A developer may be responsible for the system for an interim period until the HOA is forme , at which time a name change/change of ownership form is required to transfer the permit to the HOA The operational agreement should be attached to the permit and incorporated into the langua a of the permit. Is the applicant is a Homeowner's or Property Owner's Association selling units? ❑Yes ❑No If Yes,Applicant has submitted an executed Operational Agreement(HOA) ❑Yes ❑No and,Copy of the Articles of Incorporation,Declarations and By-laws ❑Yes ❑No The operational agreement should be attached to the permit and incorporated into the language of the permit. 2 Wastewater Flow Information Has submitted Flow Tracking/Acceptance Form(FTSE Form) ❑Yes ❑No NKIA Ensure form is complete with all required information and that the owner L 0 DIX U11-0 has accepted the entire volume of flow listed L Proper certification per 15A NCAC 02T .0106(b) ❑Yes ❑No Form is dated within one year of receipt of application package ❑Yes ❑No Is FTSE Planning Assessment Addendum Required? ❑Yes []No BN/A Required only for projects where available pump station capacity is<0. (Contact Central Office if needed) Additional forms(FTSE 06-13)required? ❑Yes ❑No I /A Required only if the owner of downstream sewer different then owner of W WTF Receiving W WTF and downstream sewers have adequate capacity ❑Yes [:]No Ensure no compliance issues(SSOs or W WTF compliance issues) Wastewater domestic in nature Yes ❑No If item B.6 indicates industrial wastewater,notify the regional pretreatment coordinator or contact the Central Office to determine if a pretreatment permit is needed or if it is in place and compliant, Has the wastewater flow volume been calculated correctly(section 11.7 of FTA)? 2Qrt []Yes ❑No�1'(�/�dt Flow is calculated per 15A NCAC 02T.0114 or If daily design flow is not based on regulations ensure that the applicant has an approved flow reduction of daily design flow rate on file with the Division. or If other than 2T.0114,values must be supported with flow data per 15A NCAC 02T.0114(f) (Contact Central Office if this is the case) Design Information Adequate information related to sewer lines(Section VII of FTA) E/es ❑No ❑N/A Note that per the 2T and MDC,there is a minimum 8"for public gravity or minimum 6"for private gravity Adequate information related to pump stations(Section VIII of FTA) ❑Yes ❑No N /A Ensure power reliability option is selected(see 15A NCAC 02T.0305(h)) Has Setbacks&Separations Section been completed? es ❑No [-]N/A Required if any portion of project is within 100 feet of any surface water or wetlands Note, 15A NCAC 02T.0305(f)contains minimum separations required for sewer A variance is required if minimum separations cannot be attained(see below) Is Project design is in accordance with(see section X of FTA) L�Wes ❑No 15A NCAC 02T Qy , Gravity Sewer Minimum Design Criteria(latest version) Minimum Design Criteria for Permitting,of PLuno Stations and Force Mains(latest version) If no,a variance approval is required per the requirements of 15A NCAC 02T.0105(b) • Applicant must submit TWO copies of the plans,specifications,and calculations • Contact the Central Office to discuss the variance request to determine a course of action. The central office will review the variance request, and if approvable, specific language regarding the variance will be forwarded to the Regional Office reviewer to incorporate into the permit. A copy of the variance letter(or email correspondence)should be kept with the application file. Project contains high priority lines(15A NCAC 02T.0402(2)) ❑Yes �o If Yes,insure that the permit contains the necessary condition related to high priority lines 15A NCAC 02T.0403 (a)(5) 3 Application Certification Has a N.C.PE stamped,signed,and dated the application? �L�� e []No PE with active license in North Carolina? des ❑No- Check the NCBELS to ensure Engineer is currently registered to practice NCBELS License Lookup If the owner is a corporation,is the corporation registered in N.C.? Dyes ❑No N.C. Secretary of State(Corporation Search) Applicant should be registered to conduct business as a corporation in NC(Private Owners,Developers,HOAs,etc.) If No,see return application guidance Issuing a Permit Most current version of the Fast-Track permit shell used? ❑Yes ❑No Special conditions utilized within permit? ❑Yes ❑No ❑N/A High Priority Lines(Aerials) Variance Language(Approved by the Central Office) Regional Conditions(i.e. Stormwater Plans for Coastal Counties) Construction Only Language("Dry Lines") Other instances(contact the central office if required) If permit modification: ❑Yes ❑No ❑N/A Include Permit History Void Previously Issued Permit in language Permit signed only by those delegated to sign for the Director ❑Yes ❑No Permit distributed as follows: []Yes ❑No • Original to Permittee • Copy to Consulting Engineer • Copy to County Health Department(if applicable) • Copy to Mecklenburg County Department of Environmental Protections (Only for projects located in Mecklenburg County) • Copy to the applicable Building Inspections Authority(if applicable) • Copy(ies)to the owner of the W WTF and owner of the downstream sewers (Only if different than the Permittee) • Copy to Regional Office Files • Copy to Water Quality Central Files(see Central Files Permit Package below) • Electronic copy to PERCS unit Electronic version shall preferably a signed,scanned copy of the permit in pdf format. If not,the electronic version can be a final version of the permit in word format. Regardless, the permit should follow the naming convention of WQOO)D=-YY.MM.DD. Electronic copies should be forwarded to the PERCS unit contact on a frequent basis(once a month is fine). • Signed Operational Agreements should be distributed with the permit(if applicable) Finalizing BIMS Permit issued in BIMS? ❑Yes ❑No All relevant Event Dates Entered? []Yes ❑No (add info request,add info received,variance granted,variance denied,etc) Central Files Permit Package Complete package forwarded to Central Files ❑Yes ❑No • Finalized Tracking Slip(BIMS Report) • Copy of signed,issued permit(with operational agreements,if applicable) • Copy of permit application package(application,supporting documentation,etc.) • Review comments, calculations,notes,review checklist, etc. • All other correspondence(email,phone logs, cover sheets,etc.) All material in the permit package should be stapled together. Plans and specifications should not be included in the permit package sent to central files. 4 WEST CONSULTANTS, PLLC LETTER OF Consulting Engineers and Surveyors 4 South Sterling Street TRANSMITTAL Morganton, North Carolina 28655 Phone (828) 433.5661 Fax (828) 433.5662 TO NCDEQ - Div. Of Water Resources (Ashe JO@pllyd9ERWHONE l %E30/ZO16 2090 US Highway 70 A1TT6EN.TIO/N Swannanoa .NO 28778 RE: Town of Rhodhiss - System-Wide Water & Sewer Improvements Caldwell County Portion WE ARE SENDING YOU Attached Under separate cover via the following items. Shop drawings Prints Plans Specifications Samples Copy of letter Change order Other: - COPIES DATE NUMBER DESCRIPTION 2 Fast Track Application (FTA 04-16) (1 Original, 1 Copy) .1 12/28/16 119 Permit Application Fee ($400) Paid By Town Of Rhodhiss RECEIVED Division of Water Resources - JAN - 4 2017 Water Ousfity Regional Operations Asheville,R-r.ional Office � THESE ARE TRANSMITTED as checked below: X For your.approval Approved as submitted Resubmit copies for approval For your use Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment Other FOR BIDS DUE/DATE: 12/30/2016 PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO SIGNED If enclosures are not as noted,please notify us at once. - PROOUCT13127G USE WrH 771C ENVELOPE Deluxe For Business 1-800-225-6380 or www.nebs.com PRINTED IN U.SA. A .I A FN;CAC IVED State of North Carolina DWR Department of Environmental Quality 4 2017 Division of Water Resources 300—FAST TRA K SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16& SUPPORTING DOCUMENTATION alclnal Ottice This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans,specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T.0300, Division policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted(do not require a permit from the Division)are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process(must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C .0100; ➢ Projects that do not meet any part of the minimum design criteria(MDC)document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank-effluent pumps(STEPS)or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems(e.g.force mains); ➢ Vacuum sewer systems. General—When submitting an application,please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted,the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter(Required for All Application Packages): ® List all items included in the application package,as well as a brief description of the requested permitting action. ➢ Be specific as to the system type,number of homes served, flow allocation required,etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee(All New and Major Modification Application Packages): ® Submit a check or money order in the amount of$480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality(NCDEQ) D. Fast Track(Form: FTA 04-16)Application(Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements,etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En ig neer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T.0106(b). INSTRUCTIONS FOR FORM: FTA 04-16& SUPPORTING DOCUMENTATION Page 1 of 3 Flow Tracking/Acceptance Form (Form: FTSE 04-16)(If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67 a . ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific FTSE. F. Site Maps(All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project(gravity sewer, pump stations&force main) ➢ Downstream connection points and permit number(if known)for the receiving sewer ® Include a street level map showing general project area. G. Existing Permit(All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification(i.e.,permit description,flow allocation,treatment facility,etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T.0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant(see 15A NCAC 02T .0106(b)) or proposed contractor,stating that"the portable power generation unit or portable,independently-powered pumping units,associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes,shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity(All Application Packages for Privately-Owned Pubic Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension,or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements(Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c),submit the properly executed Operational Agreement(FORM:HOA). ❑ Per 15A NCAC 02T .0115(c),submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b),submit the properly executed Operational Agreement(FORM: DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: ETA 04-16&SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828)296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828)299-7043 Fax Rutherford, Swain,Transylvania,Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910)433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba,Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704)663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax,Johnston, Lee, Nash, (919)791-4200 Northampton, Orange, Person,Vance,Wake, (919) 788-7159 Fax Warren,Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252)946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252)975-3716 Fax Perquimans, Pitt,Tyrrell,Washington,Wayne Wilminaton Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Fender (910)796-7215 (910)350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance,Alleghany,Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry,Watauga,Wilkes,Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: FTA 04-16&SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300—FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources 'w/ _ FT 04-16&SUPPORTING DOCUMENTATION Application Number:`ram �A � (to be completed by DWR) 384 71 All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1.Applicant's name: Town of Rhodhiss(company,municipality,HOA,utility,etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑Privately-Owned Public Utility ❑ Federal ❑ State/County ®Municipal ❑ Other 3.Signature authority's name: Ben Turnmire per 15A NCAC 02T.0106(b) Title:Town Manager Xmail.co ECEIVE 4.Applicant's mailing address:PO Box 40 n of Water Resources City: Rhodhiss State:NC Zip:28667-0040 5. Applicant's contact information: N — 4 2017 Phone number:(8�396-8400 Email Address:townofrhodhissnllty Regional Opemftne II. PROJECT INFORMATION: ille Regional Office 1. Project name: System-Wide Water and Sewer Improvements 2. Application/Project status: ®Proposed(New Permit) ❑ Existing Permit/Project If a modification,provide the existing permit number: W000 and issued date: If new construction but part of a master plan,provide the existing permit number: WQOo_ 3. County where project is located: Burke and Caldwell 4. Approximate Coordinates(Decimal Degrees): Latitude: 35.824°Longitude:-81.484' 5. Parcel ID(if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Benjamin B.Thomas,P.E. License Number: 20757 Firm:West Consultants,PLLC Mailing address:405 S. Sterling St City:Morganton State: nc Zip:28655- Phone number:(828)522-4728 Email Address:bthomas@west-consultants.com IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION: 1. Facility Name:Henry Fork W WTP Permit Number:NCO040797 Owner Name: City of Hickory V. RECEIVING DOWNSTREAM SEWER INFORMATION(if different than WWTF): 1. Permit Number(s): WQ Downstream(Receiving) Sewer Size: _inch System Wide Collection System Permit Number(s)(if applicable): WQCS_ Owner Name(s): FORM: FTA 04-16 Pagel of 5 V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? ❑Yes ❑No ❑N/A 2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Aereement(FORM DEV)been attached? ❑Yes ❑No ❑N/A 3. If the Applicant is a Home/Property Owners'Association.has an Operational Aereement(FORM:HOA)been attached? ❑Yes ❑No ❑N/A 4. Origin of wastewater:(check all that apply): ®Residential Owned ❑Retail(stores, centers,malls) ❑ Car Wash ❑Residential Leased ❑Retail with food preparation/service ❑ Hotel and/or Motels ❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse ❑Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment) 5. Nature of wastewater: 100%Domestic/Commercial %Commercial %Industrial(See 15A NCAC 02T.0103(20)) l•Is there a Pretreatment Program in effect? ❑ Yes ❑No 6. Hasa flow reduction been approved under 15A NCAC 02T.0114(fl? ❑ Yes ❑No ➢ If yes,provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(f)) Daily Design Flow a.b No.of Units Flow gal/ 0 GPD gaU GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 0 GPD a See 15A NCAC 02T .0114(b),(d). (e)(1) and(e)(2)for caveats to wastewater design flow rates (i.e., minimum flow per dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified [in table 15A NCAC 02T.0114]shall be determined using available flow data,water using fixtures, occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 0 GPD(per 15A NCAC 02T.0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ® Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other(Explain): FORM:FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC(Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material 8 4,959 PVC ➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates(Decimal Degrees):Latitude: Longitude:- ° 3. Design flow of the pump station: millions gallons per day(firm capacity) 4. Operational point(s)of the pump(s): gallons per minute at feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B),. ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick-connection receptacle and telemetry- 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry- 15A NCAC 02T.0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant(draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS& SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f)&(a) ® Yes ❑No ➢ 15A NCAC 02T.0305(f)contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 24 inches Water mains(vertical-water over sewer including in benched trenches) 18 inches Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells,WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V),B, SA,ORW,HOW, or SB from normal high water or tide elevation)and wetlands(see item IX.2) 50 feet **Any other stream,lake,impoundment,or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth Uade(vertical) 36 inches ➢ 15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage ➢ If noncompliance with 02T.0305(f)or M,see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes ❑No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ®Yes ❑No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes [:]No ➢ Wetland-related permits shall be requested,obtained,and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 &Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ® Yes ❑No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans,stormwater management plans,etc.). 6. Does this project include any sewer collection lines that are deemed"high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑Yes ®No ➢ If yes, include an attachment with details for each line, including type(aerial line, size,material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permitee's individual System-Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains(latest version), and the Gravity Sewer Minimum Design Criteria(latest version)as applicable? ®Yes ❑No If No,complete and submit the Variance/Alternative Design Request application(VADC 10-14)and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, e K wu _ 7Lt pWcwS attest that this application for (Professional Engineer's name from Application Item I11.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers(latest version), and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000, as well as civil penalties up to$25,000 per violation. ..................��J",@ tAS@ndgpg+�'.......................... North Carolina Professional Engineer's seal,signature,and date: pme Q�kA UIR0,0;?z,, �:4EAL ° 20757 t 3. Applicant's Certification per 15A NCAC 02TT..0106(b): 1, ��1 /6, rflmtye /�1� /'cG tee" attest that this application for (Signature Authority's name&title from A lication Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non- discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation. RECEIVED Division of Water Resources / Signature: JAN - 4 2017 Water Ouslity Reglonal Operations j Asheville Rpdonal Office FORM: FTA 04-16 Page 5 of 5 Town of Rhodhiss System-Wide Water and Sewer Improvements: This is a CDGB-I funded project(CDGB-1 NO. 13-1-2634& 13-1-2635)that consists primarily of addressing pipe defects and deterioration of 6"VCP sewers within the collection system by replacement (in place) with 8" PVC piping. However,due to sewer lines having been added on to the Rhodhiss collection system with no systematic planning and that the land has been developed over the years, has resulted in some sewer lines now being located under structures (garages, houses,trailers),orjust feet from existing structures. Therefore, relocating lines to the street,or away from existing structures if a street is not an option, is the best option for addressing the issue with replacing these deteriorated lines, as well as being a better option for accessing and maintaining the gravity line. The new 8" lines shown on the enclosed map are to replace existing 6" lines that are under, or near existing structures, but no new flow is being added. Since no new flow is being added, a USE form was not completed. r � ! a . 10 BA DON/ !I 7 ; ' y S If h / F Nr; B`� GRAVITY �� A A DON v ' SAM�4TRIVCH �1ISS i ;?TQ REPLACE ALDWEL� OUNY 1 �r ( / 6'' LINE (TYO) h�odh " SS BURKE�COUNTY 1�1 �C4TAWB� - J` •--� -__ RIVE �B NOD ,r cP vE a. ABA .:"" �1��� � :�I it j � -� � � � ' r/�/ ✓Y - _ If I If ti , -- � JL s i AB ONIf i 1„ � , �- SCALE: =600' °�� 0 U W Uv A 7 S` O 2 co s .� o Q F �IPA '7-/I O DUKE PpWER RD �! C Mtn mr —N— o LAKE RHODHISS CALDWELL COUNTY I MAGNOLIA WAY co TOWN OF RHODHISS BURKE COUNTY I C � A711�qB OlRO<byq m Arq�Bq qR�F� 10 g �OP v75�9 �Z� �Q- �P A E DR MOR ' P � � DOGWOOD DR __ -� i i i v O� HOWELL ST JU9TIC � p o i o0 r U� �� AIR R��RNOD 2� m A PORT RHODHISS RD Hiss RD _ TO HICKORY O - °vo c O m 6 O= F_ y\/1r r F '� apt o °� State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300—FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 04-16&SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans,specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T.0300,Division Policies and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted(do not require a permit from the Division)are explained in 15A NCAC 02T.0303. Projects not eligible for review via the fast track process(must be submitted for full technical review): ➢ Projects that require an environmental assessment in accordance with 15A NCAC 1C.0100; ➢ Projects that do not meet any part of the minimum design criteria(MDC)document; ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; ➢ Pressure sewer systems utilizing septic tank-effluent pumps(STEPS)or simplex grinder pumps; ➢ STEP or simplex grinder pumps connecting to pressurized systems(e.g.force mains); ➢ Vacuum sewer systems. General—When submitting an application,please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time,and may result in return of the application. Unless otherwise noted,the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter(Required for All Application Packages): ® List all items included in the application package,as well as a brief description of the requested permitting action. ➢ Be specific as to the system type,number of homes served,flow allocation required,etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee(All New and Major Modification Application Packages): ® Submit a check or money order in the amount of$480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality(NCDEQ) D. Fast Track(Form: FTA 04-16)Application(Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters,agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T.0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T.0106(b). INSTRUCTIONS FOR FORM: FTA 04-16&SUPPORTING DOCUMENTATION Page 1 of 3 E. Flow Tracking/Acceptance Form(Form: FTSE 04-16)(If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific FTSE. F;Site Maps(All Application Packages): ® Submit an 8.5-inch x 11-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. ➢ Location of the project(gravity sewer, pump stations&force main) ➢ Downstream connection points and permit number(if known)for the receiving sewer ® Include a street level map showing general project area. G. Existing Permit(All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification(i.e.,permit description,flow allocation,treatment facility, etc.). H. Power Reliability Plan(Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T.0305(h)(1), submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor,stating that"the portable power generation unit or portable,independently-powered pumping units,associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity(All Application Packages for Privately-Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension,or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements(Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement(FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation,Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement(FORM:DEV). For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16&SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson,Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828)299-7043 Fax Rutherford,Swain,Transylvania,Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, ` (910)433-3300 Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704)663-1699 Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax,Johnston, Lee, Nash, (919)791-4200 Northampton, Orange, Person,Vance,Wake, (919)788-7159 Fax Warren,Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252)946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252)975-3716 Fax Perquimans, Pitt,Tyrrell,Washington,Wayne Wilmington Reaional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover,Onslow, Pander (910)796-7215 (910) 350-2004 Fax Winston-Salem Reaional Office 450 W. Hanes Mill Road Alamance,Alleghany,Ashe,Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry,Watauga,Wilkes,Yadkin (336)776-9800 INSTRUCTIONS FOR FORM: FTA 04-16&SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality DER Division of Water Resources 15A NCAC 02T.0300—FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16&SUPPORTING DOCUMENTATION Application Number: (to be completed by DwR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1.Applicant's name: Town of Rhodhiss(company,municipality,HOA,utility,etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately-Owned Public Utility ❑Federal ❑ State/County ®Municipal ❑ Other 3.Signature authority's name:Ben Turnmire per 15A NCAC 02T.0106(b) Title:Town Manager 4.Applicant's mailing address: PO Box 40 RECEIVED Division of Water Resource9 City:Rhodhiss State:NC Zip:28667-0040 5. Applicant's contact information: JAN — 4 2017 Phone number:(828)396-8400 Email Address:townofrhodhissnc@gmail.com II. PROJECT INFORMATION: Water Quality Reglonal Operdons Ashev618 Reeion_al Offl„�_._ 1. Project name: System-Wide Water and Sewer Improvements 2. Application/Project status: ®Proposed(New Permit) ❑ Existing Permit/Project If a modification,provide the existing permit number: W000 and issued date: If new construction but part of a master plan,provide the existing permit number: WQ00_ 3. County where project is located:Burke and Caldwell 4. Approximate Coordinates(Decimal Degrees): Latitude: 35.824°Longitude: -81.484' 5. Parcel ID(if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: I. Professional Engineer: Benjamin B. Thomas, P.E. License Number:20757 Firm:West Consultants,PLLC Mailing address:405 S. Sterling St City:Mor ag nton State:ne Zip: 28655- Phone number: 828 522-4728 Email Address:bthomas(a-),west-consultants.com IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION: 1. Facility Name:Henry Fork W WTP Permit Number:NCO040797 Owner Name: City of Hickory V. RECEIVING DOWNSTREAM SEWER INFORMATION(if different than WWTF): 1. Permit Number(s): WQ_ Downstream(Receiving) Sewer Size: _inch System Wide Collection System Permit Number(s)(if applicable): WQCS_ Owner Name(s): FORM: FTA 04-16 Pagel of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ❑N/A 2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM'DEV)been attached? ❑Yes [:]No ❑N/A 3. If the Applicant is a Home/Property Owners'Association.has an Operational Agreement(FORM HOA)been attached? ❑Yes ❑No ❑N/A 4. Origin of wastewater:(check all that apply): ®Residential Owned ❑Retail(stores,centers,malls) ❑ Car Wash ❑Residential Leased ❑Retail with food preparation/service ❑ Hotel and/or Motels ❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse ❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash ❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment) 5. Nature of wastewater: 100%Domestic/Commercial %Commercial %Industrial(See 15A NCAC 02T.0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ❑No 6. Has a flow reduction been approved under 15A NCAC 02T.0114(f)? ❑Yes ❑No ➢ If yes,urovide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(f)) Daily Design Flow s,b No.of Units Flow gal/ 0 GPD gall GPD gall GPD gal/ GPD gal/ GPD gal/ GPD Total 0 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and(e)(2)for caveats to wastewater design flow rates (i.e., minimum flow per dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G,S.42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01147 shall be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 0 GPD(per 15A NCAC 02T.0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ® Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other(Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC(Gravity Sewers): I. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material 8 4,959 PVC ➢ Section II &III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name:_ 2. Approximate Coordinates(Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day(firm capacity) 4. Operational point(s)of the pump(s): _gallons per minute at_feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B).* ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick-connection receptacle and telemetry- 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry- 15A NCAC 02T.0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant(draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS& SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f)&(g) ® Yes ❑No ➢ 15A NCAC 02T.0305( contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 24 inches Water mains(vertical-water over sewer including in benched trenches) 18 inches Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet **Any private or public water supply source,including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS(except WS-I or WS-V),B, SA,ORW,HQW, or SB from normal high water(or tide elevation)and wetlands(see item IX.2) 50 feet **Any other stream,lake, impoundment,or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet An swimming pools 10 feet Final earth grade(vertical) 36 inches ➢ 15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webnage ➢ If noncompliance with 02T.0305(f)or(g),see Section X of this application 2. Does the project comply with separation requirements for wetlands?(50 feet of separation) ®Yes ❑No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ®Yes ❑No ➢ Wetland-related permits shall be requested,obtained,and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 &Buffer Permittine Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared,have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans,stormwater management plans,etc.). 6. Does this project include any sewer collection lines that are deemed"high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ®No ➢ If yes, include an attachment with details for each line, including type(aerial line, size,material,and location). High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permitee's individual System-Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains(latest version), and the Gravity Sewer Minimum Design Criteria(latest version)as applicable? ® Yes ❑No If No,complete and submit the Variance/Altemative Design Request application(VADC 10-14)and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, Cw1AaMil1 _S 7(tayvawS attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers(latest version), and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation. ......_.............._ asaann.. North Carolina Professional Engineer's seal,signature,and date: peRe�®��� �pU+�A+Ryt�+), SEAL S , g 20757 �I {iI NYC, .,®®ro r 3. Applicant's Certification per 15A NCAC 0 '2TT.0106(b): 1, Pr/1 �(vc_ /n In m�, �� attest that this application for (Signature Authority's name&title from A lication Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non- discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation. Signature: ��„u c Date: FORM: FTA 04-16 Page 5 of 5 Town of Rhodhiss System-Wide Water and Sewer Improvements: This is a CDGB-I funded project(CDGB-1 NO. 13-1-2634& 13-1-2635)that consists primarily of addressing pipe defects and deterioration of 6" VCP sewers within the collection system by replacement (in place)with 8" PVC piping. However, due to sewer lines having been added on to the Rhodhiss collection system with no systematic planning and that the land has been developed over the years, has resulted in some sewer lines now being located under structures(garages, houses,trailers),or just feet from existing structures. Therefore, relocating lines to the street, or away from existing structures if a street is not an option, is the best option for addressing the issue with replacing these deteriorated lines, as well as being a better option for accessing and maintaining the gravity line. The new 8" lines shown on the enclosed map are to replace existing 6" lines that are under, or near existing structures, but no new flow is being added. Since no new flow is being added, a FTSE form was not completed. r -- 3 \S y 1, 1 1Nl ofli��s�i fr � ar O a n "1 �U\ Vk� �\�^ F� � •'i5j5 G r R x * n Qp F� l � W nc la S •�r� �� �° r ix �ka+�� tQ m ,� • �E l4 pM� pr �t ed. 5 I l• . m S 'l" s 'lot {+jt 1 11 3 I g9 I 6 NCDENR North Carolina Department of Environment aftd'Natural Resources. Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins f Dee Freeman it Governor Director �) (J i� Secretanj August 26, 2009 Ms. Barbara Harmon Vn- r —Al R Town of Rhodhiss I c r9 P.O. Box 40 _.r Rhodhiss, North Carolina 28667 SUBJECT: Town of Rhodhiss Sanitary Sewer System Rehabilitation Project No. 2W370737-01 Change Order No: 1 Contract No. 1 Locke-Lane Construction Dear Ms. Harmon: The Construction Grants &Loans Section of the North Carolina Division of Water Quality has concluded the review of the subject change order and supporting documents. Therefore, the following determination has been made: Change Order No. 1 Contract No. 1 Total Change: $8,296.10 STAG Eligible Part: $8,296.10 New Total Contract: $153,885.10 Total Eligible Contract Participation: $153,885.10 This change order covers the cost of additional erosion control, fill dirt and ductile iron pipe and unexpected conditions. There was no contract time extension associated with this change order. This change order with related procurement documentation has been found to be in compliance with applicable ARRA regulations- However, it should be understood that this approval is administrative only and does not relieve the recipient of the responsibility to ensure the validity of the supporting documentation including the corresponding cost and pricing data. Accordingly, this approval is without prejudice to a redetermination of allowable/unallowable costs should a post approval review or audit disclose facts not now discernible. Mailing Address Phone(919)733-6900 Location NorthCarolirtu 1633 Mail Service Center - Fax (919)733-6229 2728 Capital Blvd. Natm-allb Raleigh,NC 27699-1617 Raleigh,NC 27604 Internet: wa,w.ncc^_6nel Customer Service 1.877-6234748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Ms. Barbara Harmon Aug 26, 2009 Page 2 This document should be filed with the other ARRA project documents in your possession. If you should have any questions, please contact Antonio Evans at(919)715-6220. Sincerely, Mark L. Hubbard,P.E., Assistant Chief Project Management Branch I' AVE/sd cc: West Consultants, PLLC j Asheville Regional Office Leslie Rogers CIG—Antonio Evans ARRA i 1 I I I i R°. NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H.Sullins Dee Freeman Governor Director Secretary July 13, 2009 Ms. Barbara Harmon Town of Rhodhiss P.O. Box 40 Rhodhiss,North Carolina 28667 SUBJECT: Town of Rhodhiss Sanitary Sewer System Rehabilitation Project No. 2W370737-01 Preconstrucdon Conference Dear Ms. Harmon: A preconstruction conference was held on July 2, 2009 for the subject project. Attached is the agenda presented by the Construction Grants &Loans Section representative. Please review and file in your records. If you and/or your engineer have any questions regarding this inspection, please contact me at (919) 715-6220. Sincerely, Antonio V. Evans,P.E. Environmental Engineer Construction Inspection Group AVE/sd Attachments cc: West Consultants, PLLC ARO w/a w/a CIG w CIG /a—Antonio Evans JI JUL 16 2009 WATER QUALITY SECTION Construction Grants and Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 TOne 1 Phone:919-733-6900/FAX:919-715-6229/Internet:www;nccgi.net """ v. �y�Q//}J"h;/ y+ ollina An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper f •"� m Q`•y Page I of 6 (Attachment A) LIST OF ATTENDEES NAME REPRESENTING PHONE# FAX# EMAIL Antonio Evans DENR-DWQ-CG&L 919-715-6220 919-715-6229 tony.evans@ncdenr.gov Ron Lynn West Consultants 828-433-5661 John Abernethy West Consultants 828-413-7383 Benjie Thomas West Consultants 828-433-5661 III Rick Justice Town of Rhodhiss 828-396-8400 Drew Sherill Locke-Lane Construction 704-902-9083 Henry Pitts Locke-Lane Construction 828-238-8756 Barbra Harmon Town of Rhodhiss 828-396-8400 i i 1 Page 2 of 6 (Attachment B) NCDENR/DWQ STATE REVOLVING LOAN/GRANT PROGRAM CONSTRUCTION INSPECTION GROUP PRECONSTRUCTION CONFERENCE REPORT Name of Project: Sanitary Sewer System Rehabilitation Project Number: 2W370737-01 Grant Recipient: Town of Rhodhiss Description of Work: Eligible Sewer rehabilitation consisting of replacement of approximately 350 linear feet of 8-inch gravity sewer, and rehabilitation of approximately 95 manholes, and reconnection of service laterals within and up to the existing right-of-way. Non Eligible Any installation of sewer service laterals outside the right-of-way. Authorized Representatives: 1. Grant Recipient: Ms. Barbara Marmon,Town Administrator 2. State: Daniel Blaisdale,P.E./Mark L.Hubbard,P.E. 3. Consulting Engineer: West Consultants 4. A/E Inspector: John Abernethy Date and Time of Conference: July 2, 2009 9:00 AM at Rhodhiss Town Hall CONSTRUCTION CONTRACT NO. I Contractor Name—Locke-Lane Construction, Inc. Address—2508 South Chipley Ford Road,Statesville NC 28625 Contract Amount-$145,589.00 Eligible Contract Amount - $145,589.00 Contract Description -General Construction Superintendent at Site—Henry Pitts Date of Notice To Proceed—07/13/09 Contract Time- 120 calendar days Completion Date— 11/10/09 Liquidated Damages $500 per day until final completion ROLE OF THE CONSTRUCTION INSPECTION GROUP (CIG) 1. Conduct periodic inspections of the project. 2. Review change orders for necessity and reasonableness to determine eligibility for funding. Page 3 of 6 a. To assure that the overall objectives of the ARRA Funds (Funds) are realized. b. To assure that the Funds and project will be administered in accordance with Federal Laws regulations. C. To advise and offer assistance to the Owner, hereafter referred to as Recipient. d. To ensure contract compliance and construction in accordance with the approved contract documents. CIG INSPECTIONS 1. Prior notice will be given; however, unannounced inspections will also be conducted. 2. Inspections will be conducted in two phases: P a. Fund Administration b. Project Construction 3. During inspections, CIG will usually review at the job site for completeness and accuracy all shop drawings,submittals, inspector's field reports, as-built drawings, revised construction schedules and records of testing of materials and equipment, and discuss pending or executed change orders. 4. All equipment and materials on job site are requested to be properly stored, stockpiled, and protected. The job site is to be maintained in an acceptable manner. 5. Safe working conditions should be maintained at all times. The CIG will discuss safety violations which are potentially life endangering or threatening serious injury. If necessary, the CIG will take prompt action to notify State and OSHA regional representatives of any noted conditions. 6. Results of the inspection will be discussed at the job site upon completion of the inspection. 7. Formal copies of the inspection report will be sent to the Recipient, A/E and other parties, if so desired. 1 8. In order to avoid the situation where the contractor is provided a final punch list of deficiencies by both A/E and CIG,CIG will accompany the ME on his final punch list inspection. CHANGE ORDERS 1. Recipient should notify DENR-DWQ prior to commencement of any change order work, except for emergency situations, that change the scope of the project. 2. Recipient must obtain prior DENR-DWQ approval for any change orders in excess of $100,000 or any change orders that would necessitate an increase in the Fund amount. 3. Recipient should submit two (2)properly executed copies of change orders to DENR- DWQ. Change order forms should indicate the Federal project number, the correct change order number, name of contractor, contract number, and the date the change order was signed by all parties. 4. A complete detailed justification and clear description must be submitted with each change order to identify the need for the change. This submittal shall include justification and proper documentation for any requested time extensions. 5. Copies of new or revised contract drawings and/or specifications must be submitted with each change order. Page 4 of 6 6. Unless previously agreed unit prices are used, complete records of price negotiations shall be submitted with each change order. This should include such items as: a copy of the engineer's independent cost estimate, the construction contractor's cost breakdown, and the basis for the final negotiated settlement which would be a Memorandum of Negotiation. 7. The change order checklist should be completed and submitted with each change order. A copy has been included at the end of this report. 8. Change orders will be disapproved until the above backup documentation is submitted. Work in place required by a non-State approved change order shall not be included in a contractor's partial payment request until the change order is approved. 9. Once the Recipient signs a change order, he obligates himself to the Contractor. The State is not obligated to approve the change order or reimburse the Recipient. The CIG will perform preliminary reviews of unexecuted change orders and provide preliminary eligibility determinations upon 'request. RECIPIENT &A/E RESPONSIBILITY 1. The Recipient and A/E should become familiar with their responsibilities as defined by 40 CFR. 2. Fund conditions must be met and Fund objectives achieved including but not limited to: a. Display Davis Bacon wage Yates in an area accessible to contractor employees. b. Provide certified payrolls with each pay request. c. Provide documentation on file verifying that"Buy American"requirements are met. d. Provide job creation numbers as wells as job loss prevention numbers when and/or if asked for them. RECIPIENT PAYMENT REQUEST 1. Recipient should submit all payment requests (SF271) to the State with backup documentation when requested, 2. Fund Agreement/Amendments and all conditions placed on them, if applicable, must be satisfied prior to payment of funds. ENVIRONMENTAL PROTECTIOII The Recipient was advised that the protection of the environment is a Fund requirement. It is necessary to comply with all environmental pollution control programs established by the city, State, and EPA. This includes, but is not limited to: 1. Protection of existing trees, shrubs, and grass. 2. Dust control of haul roads, excavation, work areas, and borrow areas. 3. Conformance with an approved erosion control plan. 4. Required treatment of Recipient's water during construction. VARIOUS ITEMS 1. The approved set of contract drawings should be furnished to the Recipient, A/E inspector, and to each contractor's supervisor or foreman. These drawings are to be Page 5 of 6 -- --------mar-ked-up-as-author-ized-changes-occur-and-are-to-be-used-in-preparing-as-built(record) - - — drawings. These marked-up drawings shall be maintained and made available for review by State inspectors. 2. Prior to commencement of work, each contractor shall submit a "Construction Progress Schedule" (i.e. Bargraph,CPM, etc.) showing a breakdown of the principal features of construction with the contract costs. The schedule shall be prepared in such a way that the percentage of work completed and the work scheduled for completion at any given date may be determined. Also at the same time,each contractor shall submit an itemized breakdown that shall be the basis on which the contractor's monthly estimates and progress payments will be made. This office is requesting copies of these submittals upon authorization of the Recipient's engineer. 3. The Recipient and A/E should confirm that all required permits and encroachment agreements have been obtained, including COE 464 Wetlands Permit,COE Section 10 Navigable Waterways Permit, DENR Erosion Control Permit, DWQ Water Quality Certification, NCDOT and Railroad Encroachment Agreements, etc. 4. The Recipient and A/E should confirm that all addenda have been submitted for approval. 5. Addenda Approval: Addendum Number Date Received Date Approved 1 --------- 4/29/09 2 5/14/09 5/15/09 3 --------- 5/18/09 i Page 6 of 6 CONSTRUCTION GRANTS & LOANS CHANGE ORDER CHECKLIST The following checklist must be completed and all information must be submitted prior to approval. Incomplete submittals will not be reviewed. Owner Project Name Project No. Change Order No. Contract No. Contractor Change Order Documents Two (2) copies of the properly executed change order(an unexecuted copy may be submitted for a preliminary review, however all supporting documentation must be included); Federal and/or State Project number(s) shown on the change order; Clear description of each change; Detailed justification to identify the need for each change; Justification and documentation for any contract time extensions (Time extensions for weather should be for above average precipitation. The average number of days with precipitation greater than 0.10" for each month can be obtained from NOAA Report No. 20.) Copies of new or revised contract drawings and/or specifications for the change; Cost Documentation: The degree of cost documentation required is directly proportional to the cost of the change. However, each of the following items should be addressed regardless of the cost: Engineer's independent cost estimate; Contractor's detailed cost breakdown for labor, material, equipment, tax, overhead, and profit; Copies of suppliers' invoices for major items; Memorandum of negotiation which documents the negotiation process and the basis for the final negotiated settlement r4iLA NCD NR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman--- Governor Director Secretary May 15, 2009 Ms. Barbara Harmon Town Administrator 11 �I i MAY 1 9 2009 Town of Rhodhiss �__._...___.._-._.._..... ..._.,..._.J Post Office Box 40 vd.ATGn(--Al CE holy Rhodhiss,North Carolina 28667 SUBJECT: Town of Rhodhiss Sanitary Sewer System Rehabilitation Approval of Addendum No. 2 American Recovery and Reinvestment Act of 2009 Project No. 2W370737-01 Dear Ms. Harmon: Reference is made to Addendum No. 2, received May 14, 2009, from the engineer for revisions to the subject project. The proposed addendum, as described in the attachment, has been reviewed by this office, and is hereby approved, and eligible for funding in accordance with the loan offer and conditions thereof. The approval of this addendum does not constitute any change in the amount of your loan for this project. It is the responsibility of the recipient and the consulting engineer to insure that the project plan documents are in compliance with Amended N.C.G.S. 133-3 (ratified July 13, 1993). The administrative review and approval of addenda do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Adequate time must be allowed for the potential bidders and this office to receive and act on addenda prior to the receipt of bids for subject project. A copy of the approved addendum is attached for your files, and one (1) copy retained for our files. 1633 Mail Service Center,Raleigh,North Carolina 27699-1633 One 1 Location:2728 Capital Blvd.Raleigh,North Carolina 27604 NOrtflCarOhna Phone:919-733-69001 FAX:919-715-62291 Customer Service:1877-623.6748 Internet:www.ncwaterquahty.org �QturQ{// [1/ An Equal Opportunity\Affirmative Action Employer ,/ Ms. Barbara Hannon, Town Administrator Page 2 May 15, 2009 Should you have any questions regarding this matter,please do not hesitate to contact Ken Pohlig, P.E. at(919) 715-6221. Sincerely, e'�'"" �� Seth Robertson, P.E., Supervisor Design Management Unit Construction Grants & Loans Section kp/sr Attachment cc: Benjamin B. Thomas, P.E., West Consultants, PLLC, Morganton,NC DWQ Asheville Regional Office Mark Hubbard, P.E. Ken Pohlig, P.E. ARRA File l 1 i I WEST405 South Sterling Street,Morganton NC 28655 . CONSULTANTS Pac 828 433 5661 / fa.828 433 5662 / westcons@bellsouth.net aY MAY 14 2009 ADDENDUM NO. 2 OWN L �nt71{� This ADDENDUM NO. 2 is being issued May 8,2009,to all parties who hold a set of CONTRACT DOCUMENTS on the project entitled: TOWN OF R}IODHISS SANITARY SEWER REHABILITATION AMERICAN REINVESTMENT&RECOVERY ACT FUNDING BURKE COUNTY,NORTH CAROLINA This ADDENDUM NO.2 shall become part of the CONTRACT DOCUMENTS and its receipt acknowledged on the BID DOCUMENTS at the time of bidding. 1. Water will be available for product application at no charge from fire hydrants on the Owner's system. Contractor must provide and use backflow preventer. 2. Section 07310 Protective Coating and Lining for Manholes: a. Technical Specification Section 07310.7 shall allow microsilicate. b. Technical Specification Section 073 10.1 I —Corrosion protection shall be epoxy and shall be 100%solids, The epoxy shall have the following properties:compressive strength of 8800 psi,flexural strength of 12,400 psi,and tensile strength of 7700 psi. The epoxy coating shall be Madewell Mainstay DS-5,Tnemec equal,Sherwin Williams equal, Sprayroq equal,or other approved equal. 3. BID FORM: The BID FORM has been revised to add a separate item for the epoxy corrosion protection. Bid Item No. 3 shall not include the corrosion protection. Bid Item No.4 shall be for epoxy corrosion protection of manholes that are relined. No manholes are to be coated with epoxy that are not also relined. However,the Owner may elect to omit epoxy corrosion protection from some relined manholes. 4. SRF Standard Conditions: The Office of Economic Recovery and Investment has requested that additional provisions be included in projects funded by the American Reinvestment&Recovery Act Funding of 2009 to clarify the process required to meet the requirements of the DBE Program. These Conditions shall replace the existing SRF Special Conditions issued with the Contract Documents. ADDENDUM NO.2 ` yyfr S l zy F; Issued this 8 a day of May,2009 q SEAL `g 210757 m E.• •e� s �a$A.' aeewepe m$. Benjamin B. Thomas,PE �d'a®ap� BNaiCb�b$`4ae West Consultants,PLLC Morganton,North Carolina /kj Page 1 of 1 Addendum No.2,dated May 8,2008 BID FORM Bid Submilled by (Insert Company Name) TOWN OF RHODHISS SANITARY SEWER SYSTEM REHABILITATION BURKE COUNTY,NORTH CAROLINA West Consultants,PLLC Project No. 08151 TABLE OF ARTICLES Page 1 Article I—Bid Recipient......................................................................................................................................................................2 Article 2—Bidder's Acknowledgements..............................................................................................................................................2 Article3—Bidder's Representations....................................................................................................................................................2 Article4—Further Representations......................................................................................................................................................3 Article5—Basis of Bid.........................................................................................................................................................................4 Article6—Time of Completion............................................................................................................................................................4 Article7—Attachments To This Bid....................................................................................................................................................4 Article8—Defined Terms....................................................................................................................................................................5 Aticle9—Bid Submittal......................................................................................................................................................................6 EJCDC C-410 Suggested Bid Form for Construction Contracts Copyright C 2002 National Society orProfessionat Engineers for EJCDC.all rights reserved. 00410-1 yl Addendum No.2,doted May 8,2008 ARTICLE 1—BID RECIPIENT 1.o 1 This Bid is submitted to: Town of Rhodhiss PO Box 40 200 Burke Sheet Rhodhiss,NC 28667-0040 1.02 The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents. ARTICLE 2—BEDDER'S ACKNOWLEDGEMENTS 2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders,including without limitation those dealing with the disposition of Bid security.This Bid will remain subject to acceptance for 60 days after the Bid opening,or for such longer period of time that Bidder may agree to in writing upon request of Owner. ARTICLE 3—BIDDER'S REPRESENTATIONS 3.01 in submitting this Bid,Bidder represents that: A. Bidder has examined and carefully studied the Bidding Documents,the other related data identified in the Bidding Documents,and the following Addenda,receipt of which is hereby acknowledged. Addendum No. Addendum Date 1 04/29/09 B. Bidder has visited the Site and become familiar with and is satisfied as to the general,local and Site conditions that may affect cost,progress,and performance of the Work. C. Bidder is familiar with and is satisfied as to all federal,state and local Laws and Regulations that may affect cost, progress and performance of the Work. D. Bidder has carefully studied all: (1)reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site(except Underground Facilities)which have been identified in SC-4.02,if any,and(2)reports and drawings of Hazardous Environmental Conditions that have been identified in SC4.06,if any. E. Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities)at or contiguous to the Site which may affect cost,progress,or performance of the Work or which relate to any aspect of the means, imethods, techniques, sequences, and procedures of construction to be employed by Bidder,including applying the specific means,methods,techniques,sequences,and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto. F. Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s)bid and within the times and in accordance with the other terms and conditions of the Bidding Documents. EJCDC C-410 Suggested Bid Form for Construction Contracts Copyright®2002 National Society of Professional Engineers for HJCDC.All rights reserved. 00410-2 Addendum No.2,dared May 8,1008 G. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations,tests,studies,and data with the Bidding Documents. 1. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents,and the written resolution thereof by Engineer is acceptable to Bidder. J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted. I K. Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution ofthe Agreement. ARTICLE 4—FURTHER REPRESENTATIONS 4.01 Bidder further represents that: A. this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group,association,organization or corporation; B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; C. Bidder has not solicited or induced any individual or entity to refrain from bidding;and I D. Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner. I EJCDC C410 Suggested Bid Form for Construction Contracts Copyright®2002 National Society of Professional Engineers for EJCDC.All rights reseed. 00410-3 Atldendunt No.2,dated May 8,2008 ARTICLE 5—BASIS OF BID 5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s): Item Quantity Unit Unit Price Total Bid 1. Reseal Manhole Frame 33 EA $ $ 2. New Frame&Cover It EA $ $ 3. Reline Manhole-Cementitious 494 VF $ $ 4. Conosion Protection-Epoxy Coating 494 VF $ $ 5. Riser Addition or Replacement 8 VF $ $ 6 Replace 8"Gravity Line* 350 LF $ $ 7. Reconnect Existing Services to New Gravity Line(Item#5),include New Wye,4"Pipe and Fittings,and Cleanout 4 EA $ S S. Project Sign(See SRF Attachment No.8) 1 EA $ $ TOTAL BID $ *NOTE: Costs for all mobilization,fertilizing,seeding,and rmdching,landscaping,culvert and fence replacements, and stone foundation conditioning,ifany,shall be included in the various bid items. No separate payment will be made for these items. Unit Prices have been computed in accordance with Paragraph 11.03.13 of the General Conditions. Bidder acknowledges that estimated quantities are not guaranteed,and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities,determined as provided in the Contract Documents. ARTICLE 6—TIME OF COMPLETION 6.01 Bidder agrees that the Work will be substantially complete within 90 calendar days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions,and will be completed and ready for final payment in accordance with Paragraph 14.07.E of the General Conditions within 120 calendar days after the date when the Contract Times commence to run. 6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Tunes. ARTICLE 7—ATTACHMENTS TO THIS BID 7.01 The following documents are attached to and made a condition of this Bid: A. Required Bid security. EJCDC C-410 Suggested Bid Form for Construction Contracts Copyright®2002 National Society of Professional Engineers for EJCDC.All rights reserved 00410-4 Addendum No.2,dated May 8,2008 B. "Affidavit A—Listing of Good Faith Efforts"or"Affidavit B—Intent to Perform Contract with Own Workforce" I C. Identification of Minority Business Participation,if applicable. D. For building contracts: A list of proposed Subcontractors for Heating,Ventilating,and Air Conditioning;Plumbing;and Electrical. E. For any Subcontractors proposed to perform more than 25%of the total work,provide a list of such Subcontractors with the following information as a minimum: Name, address, telephone number, license type and number, five references, experience history, and a list of current projects. ARTICLE 8—DEFINED TERMS 8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders,the General Conditions,and the Supplementary Conditions. i i EJCDC C410 Suggested Bid Form for Construction Contracts Copyright®2002 National Society of Prorenionat Engineers far EJCDC.All rights reserved. 00410-5 J Addendum No.2,dated May 8,2008 ARTICLE 9—BID SUBMITTAL 9.01 This Bid submitted by: If Bidder is: An Individual Name(typed or printed): By: (SEAL) (Individual's signature) Doing business as: A Partnershin { Partnership Name: (SEAL) By: (Signature ofgeneral partner—attach evidence of authority to sign) Name(typed or printed): A Comoration Corporation Name: (SEAL) State of Incorporation: Type(General Business,Professional,Service,Limited Liability): By: (Signature—attach evidence of authority to sign) Name(typed or printed): Title: (CORPORATE SEAL) Attest: (Signature of Corporate Secretary) Date of Qualification to do business in [State Where Project is Located]is_\ \� EJCDC C410 Suggested Bid Form for Construction Contracts Copyright 0 2002 National Society of Professional Engineers for FJCDC..All rights reserved. 00410-6 Addendurn No.2,dated May 8,2008 A Joint Venture Name of Joint Venturer: First Joint Venturer Name: (SEAL) By: (Signature offrrst joint venture partner—attach evidence of authoritY to sign) Name(typed or printed): Title: Second Joint Venturer Name: (SEAL) By: ' (Signature ofsecond joint venture partner—attach evidence ofauthority to sign) -�, Name(typed or printed): Title: (Each joint venturer must sign.The manner of signing for each individual,partnership,and corporation that is a party to the joint venture should be in the manner indicated above.) I Bidder's Business address: Phone: Facsimile: Submitted on 120 . State Contractor License No. (If applicable) 1 EJCDC C410 Suggested Bid Form for Construction Contracts Copyrights)2002 National Society of Professional Engineers for EJCDC.All rights reserved. 09410-7 AZ NC ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins pee Freeman Governor Director — Secret ry May 7, 2009 .I `f Il MAY 1 2 2009 l i I ' Ms. Barbara Harmon, Town Administrator ---� Town of Rhodhiss _ f Post Office Box 40 - V'A1 eh C!-I=,LlTr sec rich Rhodhiss,North Carolina 28667 A I, . " `-` ` 1Ori�' o ImE— SUBJECT: Town of Rhodhiss Sanitary Sewer System Rehabilitation Approval of the Funding Application for American Recovery and Reinvestment Act of 2009 Project No.2W370737-01 Dear Ms. Harmon: The subject project was submitted for funding under the American Recovery and Reinvestment Act of 2009 (ARRA). Some ARRA conditions are different than base Clean Water State Revolving Fund(CWSRF)projects—please carefully read this entire letter. The review for completeness and adequacy of the funding application including the project engineering report and construction documents has been concluded by the Construction Grants & Loans Section(Section) of the North Carolina Division of Water Quality. This includes Addendum No. 1,received April 29, 2009, submitted for consideration of funding under the ARRA. Therefore, said documents are hereby approved. A Determination of Minor Construction Activities for the project is attached for your files. A loan offer will be transmitted to you separately, contingent upon approval by the Local Government Commission at their May 5, 2009 or May 14, 2009 meetings. Eligibility for Revolving Loan funding is determined as follows: Eli ible Sewer rehabilitation consisting of replacement of approximately 350 linear feet of 8-inch gravity sewer, and rehabilitation of approximately 95 manholes, and reconnection of service laterals within and up to the existing right-of-way. Non Eligible Any installation of sewer service laterals outside the right-of-way. 1633 Mail Service Center,Raleigh,North Carolina 27699-1633 OaC Location:2728 Capital Blvd.Raleigh,North Carolina 27604 NorthCarolina Phone:919-733-6900q FAX:919-715-62291 Customer Service:1-877-623-6748 �ry��N���� Internet:www.nnity XA Affirmative c {,L An Equal Opportunity 1 Affirmative Action Employer Ms. Barbara Harmon, Town Administrator May 7, 2009 --Page-T-wo—-. --- In the event that received bids exceed the amount established through the funding offer, and local funds are not adequate to award contract(s), it will be necessary to consider all alternatives including redesign, re-advertising, and rebidding. Please note that the specifications must include the special provisions of the ARRA(i.e., buy American.Davis-Bacon wage requirements,job reporting) in addition to the regularly required SRF Special Conditions. Job reporting requirements have not been established by the US EPA at this time, but will likely include jobs created or retained,hours worked, type of jobs, etc. Attached is one(1)copy of the Project Bid Information(Authority to Award)which is to be completed after bids have been received, and submitted to Mr. Mark Hubbard,P.E., Assistant Section Chief,Construction Grants and Loans Section by June 10`h for review. Upon review and approval of this information,the Section will authorize the Recipient to award contracts. All elements required for a complete Bid Information package must be submitted to ensure a timely review by the Section. In accordance with a goal of the ARRA, contracts are expected to be executed by June 17`h. If these dates cannot be met,you must contact the Section with a detailed explanation and proposed alternative deadlines. Upon execution of contracts and issuance of Notice to Proceed, a bound set of contract documents must be submitted to the Section for approval. Funds cannot be dispersed until executed contracts are approved. While rejection of all bids is possible, such action may be taken only with prior Section concurrence, and only for good cause. In the event that progress on the approved ARRA CWSRF project is not made in accordance with the loan agreement, construction contracts,or other pertinent requirements reimbursements may be withheld or suspended indefinitely. Funds not requested for reimbursement in a timely manner may also be reallocated to other ARRA ready-to-go projects on the final State project list. Once the project costs are established, final awards may be adjusted downward in the case of low bids. Five percent contingency is included in the final amount to accommodate change orders and amendments to the engineering contract. In no case will awards be increased. Neither the State nor Federal Government, nor any of its departments, agencies or employees is or will be a party to the invitation to bids, addenda, any resulting contracts or contract negotiations/changes. Your project is subject to the one-year performance certification requirements. By this, you are required on the date one year after the completion of construction and initial operation of the subject treatment facilities,to certify, based on your consulting engineer's advisement, whether or not such treatment works meet the design performance, specifications and the permit conditions and effluent limitations. In accordance with the Federal Regulations, the Recipient is required to assure compliance with the OSHA safety regulations on the subject project. In complying with this regulatory responsibility, the Recipient should, by letter, invite the Bureau Chief, Education Training and Ms. Barbara Harmon, Town Administrator May 7, 2009 Page Three Technical Assistance Unit, NC OSHA Division, 1101 Mail Service Center, Raleigh,NC 27699- 1101 at(919) 807-2890, to participate in the Preconstruction Conference to assure that proper emphasis is given on understanding and adhering to the OSHA regulations. It is the responsibility of the Recipient and the Consulting Engineer to insure that the project plan documents are in compliance with Amended N. C. G. S. 133-3 (ratified July 13, 1993). The administrative review and approval of these plans and specifications, and any subsequent addenda or change order,do not imply approval of a restrictive specification for bidding purposes; nor is it an authorization for noncompetitive procurement actions. Any addenda to be issued for subject project plans and specifications must be submitted by the Recipient for review/approval action by the Section. It is mandatory for project facilities to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable,the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors'responsibilities shall be in complying with these Acts. A goal of 8%of the contract price is established for Minority Business Enterprise (MBE) participation in this project, and a goal of 5% of the contract price is established for Women's Business Enterprise (WBE)participation in this project. The Recipient and Bidders shall make a good faith effort to assure that MBE's and WBE's are utilized, when possible, as sources of goods and services. The good faith effort must include the following affirmative steps: (a) including small, minority, and women's businesses on solicitation lists; (b)assuring that small, minority, and women's businesses are solicited whenever they are potential sources; (c) dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation by small, minority, and women's businesses; (d) establishing delivery schedules, and (e)using the services of the Small Business Administration and the Minority Business Development Agency of the U.S. Department of Commerce. Please note that the solicitation efforts should include documentable follow-up phone calls. The Recipient shall comply with the provisions of 40 CFR, Part 7, Subpart C - Discrimination Prohibited on the Basis of Handicap. Two (2) copies of any change order must be promptly submitted by the Recipient to the Section. If additional information is requested by the Section, a response is required within two (2) weeks, or the change order will be returned without further or final action. One (1) set of plans and specifications identical to the approved set must be available at the project site at all times. Upon completion of the project construction, the Recipient shall submit a letter confirming that the project has been constructed in accordance with the plans and specifications approved by the Section. "As-built" plans will need to be submitted with any changes clearly documented on the plans if the above confirmation cannot be made. Ms. Barbara Harmon, Town Administrator May 7,2009 — --Page Four--- — — If there are any questions concerning this matter,please do not hesitate to contact Kim H. Colson, P.E. at(919) 715-6212 or Mark Hubbard, P.E. at(919) 715-6224. Sincerely Daniel M. Blaisdell, P.E., Section Chief Construction Grants & Loans Section Attachments: Determination of Minimum Construction Activity Bid Information Form { Addendum No. 1 KHC:KOP cc: Benjamin B. Thomas, P.E., West Consultants, PLLC, Morganton,NC OSHA Bureau Chief, Wanda Lagoe DWQ Asheville Regional Office Daniel Blaisdell, P.E. Mark Hubbard, P.E. Jennifer Haynie CIG SRF 1 Determination of Minor Construction Activity North Carolina Division of Water Quality Construction Grants and Loans Section Project Applicant: Town of Rhodhiss Date: April 29, 2009 Project Number: 2W370737-01 Estimated Project Cost: $ 188,764 Estimated Funding Amount: $ 188,764 Project Description: The proposed project consists of sewer rehabilitation including the replacement of approximately 350 linear feet of 8-inch gravity sewer, and rehabilitation of approximately 95 manholes. The above named applicant intends to apply for assistance from the State Revolving Fund program associated with the American Recovery and Reinvestment Act of 2009 to construct the wastewater facilities described above. The North Carolina Division of Water Quality (DWQ)has conducted a review of the project in accordance with the procedures (NCAC 15A Subchapter 1C) for conformance with the North Carolina Environmental Policy Act. The DWQ has determined that this project is a minor construction activity, and that the preparation of additional environmental documents is not required. This determination shall become effective upon its distribution by DWQ. This determination can be revoked at any time adverse information is made available. The documentation to support this decision will be on file with the North Carolina Department of Environment and Natural Resources, Division of Water Quality, Construction Grants and Loans Section, and is available for public review at www.nccgl.net. Comments concerning this decision may be addressed to Mr. Kim H. Colson, P.E., Assistant Chief, Construction Grants and Loans Section, Division of Water Quality, 1633 Mail Service Center, Raleigh,North Carolina 27699-1633, or he may be reached by phone at(919) 715-6212. Sincerely, Daniel M. Blaisdell, P.E., Chief Construction Grants and Loans Section Division of Water Quality PROJECT BID INFORMATION Previously referred to as the"Part B" in State programs Previously referred to as the"Project Review and Cost Summary" in Federal programs WARD RECIPIENT INFORMATIO Name Project Number Address ID INFORMATIO Attach the following supplemental information and submit with this form: (a) Tabulations of all bids received (sealed by engineer). (b) Copies of the bid(s)and bid bond the applicant wishes to accept. (c) Resolution of tentative award. (d) Engineer's recommendation of award letter. (e) Proof of advertisement (f) MBE/WBE Requirements: State Programs ■ Include affidavits A,B, C or D as required. • Submit certification of subcontract awards to minority business firms with documentation to comply with G.S. 143-128.2. (Complete attached form) Federal Programs(SRF and STAG) ■ Documentation of Contractor's "good faith" effort to procure MBEIWBE subcontractors. ■ Certification regarding debarment, suspension and other responsibility matters for each prime and subcontractor. � D r DITI LL INFORMATIO Addenda All addenda must be submitted to CG&L for approval prior to opening bids. Changes to the scope of the project may require a permit modification. Site Certificates(2) Submit if not previously submitted or if changes have occurred. Additional Items • Land Costs (State Loans& Grants Only) Submit form if seeking payment. • A/E Contracts—Submit for approval if seeking payment. • Sewer Use Ordinance, User Charge System and Sewer budget(SRF Only) Payments stop at 90% of total project costs if not approved. • 4700 Form (SRF Only) 0 Submit proof of adequate resident inspection (resume of inspector). List contractor names below: TOTAL ELIGIBLE L $ $ 2. 3. 4. 5. E UIPMENT AND MATERIALS TECHNICAL SERVICES attach contract LEGAL ADMINISTRATIVE CONTINGENCY 5%of construction OTHER(specify) REAL PROPERTY AC UISTION COSTS CLOSING COSTS i i i List funds that are available for this project: AMOUNT CASH $ GENERAL OBLIGATION BONDS j REVENUE BONDS OTHER(specify) FEDERAL LOAN/GRANT(specify agency) b STATE LOAN STATE GRANT Y y 4�v • � � ��Q Y` Q fiti W The undersigned representative of the Recipient certifies that the information contained above and in any attached statements and material in support thereof is true and correct to the best of his or her knowledge. Signature of Authorized Representative Name and Title(type or print) Date INSTRUCTIONS FOR SUBMITTING PROJECT BID INFORMATION FORM This information must be submitted as soon as possible after construction bids are opened. For STAG and State projects send to: For SRF Projects send to: Don Evans Steve Tsadwa Construction Grants and Loans Section Construction Grants and Loans Section 1633 Mail Service Center 1633 Mail Service Center Raleigh,NC 27699-1633 Raleigh,NC 27699-1633 Page 1 Enter all requested information such as,Name,Address, and Project Number. Documentation listed from(a)to (f)must be submitted. Addenda should be submitted before bids are opened with enough time for CG&L to approve them(7 days). Site information should be attached if not previously submitted. Page 2 PROJECT COST SUMMARY (1) Enter the contractor's company or corporate name. Enter the amount of the bid or bids the applicant wishes to accept. (2) If equipment or materials are to be or have been purchased outside the construction contracts, enter the estimated or actual costs as applicable. (3) If not previously submitted, attach copies of any engineering contracts or agreements. Formal agreements are required for disbursement of funds. (4) Contingency is limited to 5%of the total construction bid amount. (5) Appraisals and a copy of the Deed are required for disbursement of real property costs. (6) Closing costs are not eligible for reimbursement under the SRF. They are 1.5%for State Grants, 2%for SRF Loans and 2.5%for State Loans. REVENUE SOURCES FOR PROJECT CONSTRUCTION (1) Enter the amount of general obligation bonds and revenue bonds authorized but not yet sold for this project. (2) Enter the amount of the grant, if any, offered by Federal or State Agency(s) and list name of agency(s). (3) Enter the amount of the loan or grant offered. (4) Total funds available must equal or exceed the Total Project Cost. The form must be signed by the applicant's authorized representative. 9t THE TOWN DOES HEREBY CERTIFY THAT IT HAS MET THE REQUIREMENTS OF G.S. 143-128.2 IN REFERENCE TO MINORITY BUSINESS CONTRACTS FOR THIS CONSTRUCTION PROJECT. THE CONTRACTOR HAS MET THE GOALS ESTABLISHED BY RESOLUTION OF THE TOWN AND THE FOLLOWING CONTRACTS MEET THE REQUIREMENTS ADOPTED BY THE TOWN: i signature of authorized representative name of authorized representative PLEASE LIST CONTRACTORS AND MINORITY SUBCONTRACTORS: 1 1. CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT 2. CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT $ MINORITY CONTRACT: AMOUNT 3. CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT MINORITY CONTRACT: AMOUNT CONTINUE IF MORE THAN THREE CONTRACTS � 1 OF WArFR IL. Michael F. Easley,Governor Q William G. Ross Jr.,Secretary ' q° yr North Carolina Department of Environment and Natural Resources O Y Alan W. Klimek, P.E., Director Division of Water Quality Asheville July 25, 2006 Ms. Rose Waldroup, Town Administrator Town of Rhodhiss Post Office Box 40 Rhodhiss, North Carolina 28667-0040 Subject: Permit No. WQ0030542 Town of Rhodhiss NC Urgent Needs Wastewater Collection System Extension Burke County Dear Ms. Waldroup: In accordance with your application received on July 13, 2006 we are forwarding herewith Permit No. WQ0030542, dated July 25, 2006, to the Town of Rhodhiss for the construction and operation of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is incorporated therein by reference. Please pay particular attention to Permit Condition 3 which requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2H .0227 or any individual system-wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by the North Carolina-licensed Professional Engineer named in the application. It shall be the Permittee's responsibility to ensure that the as-constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina-licensed Professional Engineer to the licensing board. Asheville Regional Office Internet www.ncwaterquality.org 2090 US Highway 70,Swannanoa, NC 28778 Telephone (828)296-4500 Fax (828)299-7043 One NorthCarolina DENR Customer Service Center Telephone 1 800 623-7748 Naturally An Equal Opportunity Action Employer 50%recycled/10%post-consumer paper �r Town of Rhodhiss July 25, 2006 Page 2 -- In accordance-with-the-provisions-of-Article-2-1-of-Chapter-1 43, General-Statutes-of-North-Carolina as — ---- amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Town of Rhodhiss for the construction and operation of approximately 1,241 linear feet of 8-inch diameter gravity sewer; a 250—gallon per minute pump station with duplex pumps, audible and visual high water alarms, telemetry and an on-site generator with automatic transfer switch; a 300-gallon per minute pump station with duplex pumps, audible and visual high water alarms, telemetry and an on- site generator with automatic transfer switch as well as approximately 380 linear feet of 4-inch diameter force main to replace existing storm damaged sewage pumping stations and the discharge of 1,800 gallons per day of additional domestic wastewater into the Town of Rhodhiss' existing sewerage system, pursuant to the application received on July 13, 2006 and in conformity with 15A NCAC 2H .0200; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the Town of Rhodhiss' Wastewater Treatment Facility (Permit No. NC0025917) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need additional information concerning this matter, please contact Roy Davis at (828) i 296-4500. Sincerely, fortlan We P.E., Director Division of Water Quality cc: Burke County Building Inspector ARO, Surface Water Protection (WWTF Permit No. NC0025917) Benjamin B. Thomas, PE PERCS Files i ,I _I NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES TOWN OF RHODHISS NC URGENT NEEDS BURKE COUNTY WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system-wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2H .0227. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2H .0227: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2L .0200 or the surface water standards in 15A NCAC 213 .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High-priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 1 Permit No VVQ0030542 Town of Rhodhiss NC Urgent Needs Burke County, uly 25 2006 4. This permit shall not be transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Upon completion of construction and prior to operation of these permitted facilities, a certification, a copy of the construction record drawings, as well as supporting design calculations for any pump stations permitted as part of this project shall be received from a North Carolina-licensed Professional Engineer certifying that the facilities have been installed in accordance with this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, - 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Main adopted June 1, 2000 as applicable; and other supporting materials. If this project is to be completed in phases and partially certified, you shall retain the responsibility to track further construction approved under the same permit, and shall provide a final certificate of completion once the entire project has been completed. A copy of the construction record drawings, indicating the facilities constructed in the phase being certified, shall be submitted with each partial certification. Mail the Engineer's Certification, one copy of the "Construction Record Drawings," and one copy of the supporting design calculations to the Non-Discharge Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 7. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2H .0200; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall report by telephone to a water quality staff member at the Asheville Regional Office, telephone number (828) 296-4500, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: 2 Permit No. W00030542. Town of Rhodhiss. NC Urgent Needs, Burke County, July 25 2006 a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management at telephone number (800) 858-0368 or(919) 733-3300. Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence. This report shall outline the actions taken or proposed to ensure that the problem does not recur. Per Condition 1(2), Part II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 25`h day of July, 2006 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION a )a ' /&LUZLoAi_ for Ala W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0030542 3 Permit No W00030542 Town of Rhodhiss NC Urgent Needs Burke County July 25 2006 ENGINEERING CERTIFICATION - POST CONSTRUCTION System Description: 1,241 linear feet of 8-inch diameter gravity seer, a 250 GPM sewage pumping station and a 300 GPM sewage pumping station both with audible and visual high water alarms, telemetry, on-site standby generators with ATSs and 380 linear feet of 4-inch diameter force main Complete and submit this form to the Asheville regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s)or storage greater than longest past three year outage reliability option selected)for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form.Permit modifications are required for any changes resulting in non-compliance with this permit regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial ❑ Final I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (❑ periodically, ❑ weekly, ❑full time)the construction of the above referenced project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM &SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS ROGER C. EDWARDS SURFACE WATER PROTECTION SUPERVISOR ASHEVILLE REGIONAL OFFICE 2090 US HIGHWAY 70 SWANNANOA, NC 28778 ............. The Permittee is responsible for tracking all partial certifications up until a final certification is received.Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. 77777 I)epartment of Environment and Natural Resources State of North Carolina Division of Water Quality FAST-TRACK APPLICATION for TY SEWERS,PUMP STATIONS,AND FORCE MAINS (Pressure sewers systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/add ressed.'the following list of required application package items by checking the space.provided r0ex"or each applicable item� Failure to submit all required items will lead to your application being returned as i6b46MOlete. This form may be photocopied�6r use as an originaL ZU. Application Form - Submit one original and one copy of the completed and appropriately executed application form. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable itanou addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item 1302). It. Application Fee ^ Submit o check in the amount of $400 made payable to: North Conn|ino Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. 7111. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately-owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2a) of this application. 7UV. Operational Agreements — Submit one original and two copies of a properly executed operational agreement if the sewer extension is permitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. |f the applicant ioo homeowners' association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECTWILL BE TURNED OVER TO A MUNICIPALITY, FORM DEV 02/03 IS REQUIRED. Fl V. Flow Acceptance Letters — If the owner of the downstream sewers and/or WW7F is different from the applicant, submit two copies of a flow acceptance letter from the owner of the downstream sewers and WWTF, if different. Flow acceptance letters must contain the following minimum information: applicant and project name, amount of flow accepted, and name and permit number ofthe receiving aewmro/VVVVTF. The flow acceptance must not expire prior to permit issuance and must be dated less than o year prior to the application date. Intergovernmental agreements or other contracts will not be accepted in lieu of a project-specific flow acceptance letter. V|. Map— Submit an 8.5-inch by 1 1-inch COLOR copy of the portion of a 7.5-minute USGS Topographic Map along with this form. The map should identify the entire project area location as well as the closest downslope surface waters as clearly as possible. Each map portion must be labeled with the map name and number, the identified location of the sewer line and pump stations, and be of clear and reproducible quality. For instance, if the project involves 4 miles of interceptor sewer that traverses over or near several different waterbodies (or counties, basins, etc.), the map should have location ID's shown for each different waterbody (where the sewer line is within 100 feet of such waterbody - see Instruction VII). This location ID is self chosen and used to cross reference the location in Section Cnf the permit application. V/|. StrmammC|assifications—Smctien C w |f any portion of the project iovvithin1UOfeetofonydowns|opeourfaoow/oter' GentionCnnuatbenonop|ated for the pertinent sections. w If the entire project area is a minimum of 100 feet away from any down slope surface waters BUT there is a pump station involved where o history of power outage is to be used to provide adequate design storage instead of dual feed or permanent or portable generator, Section C must be completed to demonstrate that the closest down slope surface water is Class C (see 15ANCAC2H .021S(h)(3)(D)\. * Use the guidance document entitled, "Determining Watershed Classifications for Form FTA 02/03 (Fast-Track Sewer Syatemu)' available from orby contacting the appropriate regional office. . .A.~.. Rev. . .4,.. FAST-TRACK APPLICATION for GRAVITY SEWERS,PUMP STATIONS,AND FORCE MAINS PAGE 2 ❑ Vill. Environmental Assessments— If this project is subject to an Environmental Assessment(EA) [15A NCAC 01C], this application can not be used. Send the project application on Form PSFMGSA 10199 to the PERCS Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Applications can not be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ® IX. Certifications—SectionD The application must be certified by both the applicant and a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. Certification by a PE who is unfamiliar with these documents is subject to NC Board referral. ® X. Downstream Sewer&Wastewater Treatment Plant Capacity The applicant has assured downstream pipe, pump station and treatment plant capacity. The addition of new sources of wastewater from this project has been evaluated along the route to the receiving treatment plant. The flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station an route to the receiving wastewater treatment plant. If the applicant is not the owner of the downstream sewer or receiving treatment plant, submittal of flow acceptance letter(s) indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). THE COMPLETED FTA 02/03 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND$400 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Swannanoa, North Carolina 28778 Cherokee, Clay, Graham, Haywood, (828)296-4500 Henderson,Jackson, Macon, Madison, (828)299-7043 Fax McDowell, Mitchell, Polk, Rutherford, Swain,Transylvania,Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Fayetteville, North Carolina 28301 Hoke, Montgomery, Moore, Robeson, (910)486-1541 Richmond,Sampson, Scotland (910)486-0707 Fax Mooresville Regional Office 610 E. Center Avenue,Suite 301 Alexander, Cabarrus,Catawba, Mooresville, North Carolina 28115 Cleveland,Gaston, Iredell, Lincoln, (704)663-1699 Mecklenburg, Rowan,Stanly, Union (704)663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Raleigh,North Carolina 27699-1628 Granville, Halifax,Johnston, Lee, Nash, (919)571-4700 Northampton, Orange, Person,Vance, (919)571-4718 Fax Wake,Warren,Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bartle,Camden, Chowan, Washington, North Carolina 27889 Craven, Currituck, Dare, Gates, Greene, (252)946-6481 Hertford, Hyde,Jones, Lenoir, Martin, (252)975-3716 Fax Pamlico, Pasquotank, Perquimans, Pitt, Tyrrell,Washington,Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, Wilmington, North Carolina 28405 New Hanover, Onslow, Pander (910)395-3900 (910)350-2004 Fax Winston-Salem Regional Office 585 Waughtown Street Alamance,Alleghany,Ashe, Caswell, Winston-Salem, North Carolina 27107 Davidson, Davie, Forsyth, Guilford, (336)771-4600 Rockingham, Randolph, Stokes, Surry, (336)771-4631 Fax Watauga,Wilkes,Yadkin For more information, visit our web site at http.//h2o.enr.state.nc.us/peres/ FTA 02/03 -Rev.3 04/05 FAST-TRACK APPLICATION for GRAVITY SEWERS,PUMP STATIONS,AND FORCE MAINS PAGE 3 USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Application Number: I , �y o�qZ (to be completed by DWQ) 1. Owner: la. Town of Rhodhiss _ Z Full Legal Name(company, municipality, HOA, utility,etc.) Q 1b. Rose Waldroup,Town Administrator P Signing Official Name and Title(Please review 15A NCAC 2H .0206(b)for authorized signing officials!) 1 c. The legal entity who will own this system is. El Individual 0 Federal® Municpality .State/County, Private Partnership El Corporation El Other(specify): 0 ',1d. PO Box40 le. Rhodhiss LL Mailing Address City Z _ 1f. NC 1g. -286670040 Z State Zip Code F 1h. 828-396-8400 1i. 1j. rhodhiss hotmail.com Q Telephone I Facsimile E-mail Q 2. Project(Facility) Information: J 2a. NC Urgent Needs CDBG Sanitary Sewer Improvements 2b. Caldwell and Burke IL Brief Project Name(permit will refer to this name) County Where Project is Located IL _ Q 3. Contact Person: Q3a. Benjamin B.Thomas,PE-project engineer Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. 828-433-5661 3c. ben'iethomas bellsouth.net Phone Number E-mail _.. -----... .......-. --- -..-.-_ ------- ------. _..-............................................... ........ 1. Project is® New ❑ Modification (of an existing permit) If Modification, Permit No.: _ ----- ...--._ ---------------------------- .__........ .---- ............-..................................... _.-..- ...................... For modifications,attach a separate sheet clearly explaining the reason for the modification (i.e.adding another phase,changing line size/length,etc.). Only include the modified information in this permit application -do not duplicate project information in B(7)and B(10-11)that has already been included in the original permit. .... — - --- 2 Owner is ® Public(skip to Item B(3)) ❑ Private(go to Item 2(a)) ......... ......... .. .............. 2a. If private, applicant will be: 2b. If sold,facilities owned by a (must choose one ❑ Retaining Ownership(i.e.store, church,single office,etc.)or El Public Utility(Instruction III) Z ❑ Leasing units(lots,townhomes, etc.-skip to Item B(3)) ❑ Homeowner Assoc./Developer(Instruction IV) t 0 ❑ Selling units(lots,townhomes, etc.-go to Item B(2b)) 3.H _..Townn ofRhodhiss -...--- _ .. ..-..... Owner of ter his Project 4a. Name of Town of Rhodhiss saWWTPatment Facility(WWTF)Treating Wastewater r�)CO025917 Permit No. WWT LL 5a. Town of Rhodhiss )5b. n/a ® Gravity 5c. discharge is direct) to wwt 0 9 Y P Z Owner of Downstream Sewer Receiving Sewer Size�❑ Force Main I permit Number of Downstream Sewer(if known) (- 6. The origin of this wastewater is(check all that apply): j ® Residential Subdivision i ❑ Car Wash WElApartments/Condominiums El Institution 100 9/6Domestic/Commercial d ❑ Mobile Home Park ❑ Hospital , ❑ School i ❑ Church l Ifidustrtal - ❑ Restaurant ❑ Nursing Home m %Other(specify) ❑ Office ❑ Other(specify) .......... ....--.... ........ ........ ..........._ .......... ..... b .. ,ILI Vim.•L II V .. 7. Volume of wastewater to be allocated for this particular project 1800 gallons r fIJ*Do not include previously permitted allocations 8. If the permitted flow is zero, indicate why: I J U L 13 2006 ❑ Interceptor Line-Flow will be permitted in subsequent permits that connect to thi line I ❑ Flaw has already been allocated in Permit No._ , WATER CL A LI Y CFCTION ❑ Rehabilitation or replacement of existing sewer with no new flow expected Ag17vit.L6 G!ON \L OFF ICE ..- ...... — ---- — --.__. _ "" FTA 02/03 -Rev. 3 04/05 FAST-TRACK APPLICATION for GRAVITY SEWERS,PUMP STATIONS,AND FORCE MAINS PAGE 4 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2H .0219(1)for Item B(7)or the design flow for line or pump station sizing if zero flow in the space below.Values other than that in 15A NCAC 2H .0219(I)(1-2)must be supported with actual water or wastewater use data in accordance with 15A NCAC 2H .0219(1)(3). 5 homes x 3 bedrooms each x 120 GPD/each= 1,800 GPD.All other flow is pre-existing and will diverted to the new pump stations. 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size(inches) Length (feet) Gravity or Force Main (use the pull down menu) 8 1241 Gravity 4 380 Force Main _.._----- O LLJ ----- Z '! _ H ' Z ENTER TOTAL LINE LENGTH IN MILES 0.31 V11. Summary of Pump Stations to be Permitted(attach additional sheets as necessary) Location ID Power Reliability Option (self chosen -as shown on.Design Flow Operational Point (1-dual line feed; 2-permanent generator w/ATS; 3- plans for cross-reference)_ _ (MGD) GPM @ TDH portable generator w/telemetry;4-wet well storage) northside 0.360 250@62' 2 LL southside 0.432 300@ 48' 2 Z H 12. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains(latest version),the Gravity Sewer Minimum Design Criteria(latest version) and 15A NCAC 2H .0200 as applicable? LU ! ®Yes ❑ No If no, please reference the pertinent minimum design criteria or regulation and indicate why a CL variance is requested.SUBMIT TWO COPIES OF PLANS,SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION m 13. Have the following permits/certifications been submitted for approval? Wetland/Stream Crossings-General Permit or 401 Certification? ❑Yes ❑ No ® N/A Sedimentation and Erosion Control Plan? ❑Yes ❑ No ® N/A Stormwater? ❑Yes ❑ No ® N/A 14. Does this project involve aerial lines or siphons? Check if yes: ❑ These lines will be_consldered high nrtority and.must.he checked.onoe every six months ....... 15. Does this project have gravity sewer lines designed at minimum slopes? ❑ Be aware that the Division will not accept installed lines more than 10%flatter than the minimum slope. Lines installed outside this tolerance should be corrected prior to submitting the final engineering certification.. FTA 02/03 -Rev. 3 04/05 FAST-TRACK APPLICATION for GRAVITY SEWERS,PUMP STATIONS,AND FORCE MAINS PAGE 5 1. Use the Division's guidance document entitled, "DETERMINING STREAM CLASSIFICATIONS FOR FORM FTA 02103 (FAST-TRACK SEWER SYSTEMS)"to collect and record the stream classification data below(attach additional sheets as necessary).This document is available from our web site or by contacting the appropriate Division of Water Quality Z regional office(see instructions for addresses)OR indicate the following: O ❑ A Stream Classification is not needed because all parts of the project are at least 100 feet away from any down slope Q --- waterbody;AND, .... __.. --_ --.- --... ........ .. (� ! ❑ A Stream Classification is not needed because the design does not depend on wet well storage as a power reliability option for any pump station near a Class C down slope waterbody. Location ID on Map Q (self chosen-as shown on Name of Waterbody Stream Waterbody J map for cross-reference) Waterbody County River Basin Index Classification V northside pump sta. Catawba River Burke Catawba 11-(51) WS-IV,B;CA southsde pump sta. Catawba River Burke Catawba 11-(51) WS-IV,B;CA W U , Submit the 8.5"x II COLOR topographic map as required in Instruction VI regardless of whether a classification is provided! .............................. _ .....------ .......I.. ......_... ......... ......... __......_. .......... 1. Applicant's Certification: 1, Rose Weldroup, attest that this application for NC Urgent Needs CDBG Sanitary Sewer System Improvements has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed$10,000 as we civil penalties up to$25,000 per violation. 1 a. 0 g e ��G2. or/u 6) 7h),S 9,6 Signing—Official Signature Date 2. Professional Engineer's Certification: Z I attest that this application for NC Urgent Needs CDBG Sanitary Sewer System Improvements 0 has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my Q knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum V Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast-Track LL Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although certain portions of this submittal package may have been developed by other professionals, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to RI be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any V person who knowingly makes any false statement,representation, or certification in any application shall be guilty of a Q Class 2 misdemeanor which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation. 2a. Benjamin B.Thomas, PE r s� Professional Engineer Name 2b.West Consultants, PLLC {M fie"a m Engineering Firm 2c.405 S.Sterling Street Mailing Address ss , A, 2d. Morganton 2e. NC 2f. 28655 City State Zip 2g. 828-433-5661 2h. 828-433-5662 2i. benjiethomas@bellsouth.net Telephone Facsimile E-mail Seal,Signature&Date FTA 02/03 -Rev. 3 04/05 y 'l� � �e. 1/ SC a'',�$3 � ' 'r u`�� .- Lit-- r � '.' (r• kv `�33�r ,k' �} y � � ``�, S '�°�� �i<x ,ai �5��1..;�r� ��F �- r� ��� � • "u• A j�.. va Egg 1t[Ra -/y J rI a �, v� trrt , �� / / �l. --� � � �:�: • .1 a �"-- o �y_ f I� . p}" •�� t.. �—"1�" 3-D TopoQuads Copyright©1999 DeLorme Yarmouth,ME 04096 Source Data:USGS 950ItSole:1:24,000 Detail:13-0 Datum:WGS84 (6AAni1TG- FW(z e PUAO) .. :!a �— i •Y'� e �E � . .._ � ,. i J<T ;�Sfi�ln�► �" LR��tYSi�2 �t++S+�e KrswA���. :�����, I i :�Tt�.t'4r"w WEST CONSULTANTS, PLLC Consulting Engineers 405 South Sterling Street Morganton, North Carolina 28655 Phone (828) 433.5661 Fax (828) 433.5662 JOB NUMBER/PHONE DATE TO Div. Of Water Quality (Asheville) /10/2006 N CD EN R ATTENTION 2090 US Hwy 70 RE: Swannanoa NC 288787 Rhodhiss, NC - NC Urgent Needs CDBG Sanitary Sewer Improvements WE ARE SENDING YOU X Attached Under separate cover via the following items. Shop drawings Prints Plans Specifications Samples Copy of letter Change order Other: COPIES DATE NUMBER DESCRIPTION 2 Fast Track Application For Gravity Sewer Application 1 1416 Application Fee THESE ARE TRANSMITTED as checked below: X For your approval Approved as submitted Resubmit copies for approval For your use Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment Other FOR BIDS DUE/DATE: PRIG� sFi>=r�RNLh�IyrER�oAN To•�lt� , REMARKS y, �l JUL 1 3 2006 Ve4 rr rl 4U/Uil ThN i AEI '/II LT 4� Iil1lrt c =r CIE yy � ' COPY TO SIGNED Y t CIA` i ��`.'. ��k�..K',Vi If enclosures are not as noted,please notify us at once. PRODUCT 13127M USE WITH 771 ENVELOPE NEES TO Reorder:1-800-225-6380 or WWW.l1¢bS.COR1 PRINTED IN U.S.A. A c to -r�3lo� �ImS; 7l/1/p FAST-TRACK APPL�IC/1ATION REVIEW PROCEDURES Project Name: N e l fu Q Review Date: Project Number: Reviewer: All fast-track projects should be submitted on the application entitled "Fast-Track Application for Gravity Sewers, Pump Stations, and Force Mains" (FORM: FTA 02103 Rev 3,currently) unless otherwise directed by the PERCS. Any pump station/force main projects that require an Environmental Assessment(EA) are excluded from the Fast-Track review process, and should be submitted for full review to the Central Office (PERCS) on FORM: PSFMGSA 10/99. Additionally, any projects involving a flow reduction request must receive approval for the flow reduction from the central office. PR!-REV W Does the application package appear to be generally complete (i.e. all attachments, check, key questions answered)? If any portion of the application is not complete, or if any required instruction items have been omitted, RETURN the application package and supporting documents to the applicant using the Project Return Letter template. Send the package and letter via certified mail to the applicant,and a copy of the letter to the engineering consultant. Any projects that are to be returned shall be returned prior to accepting the application (i.e., before logging in the application and depositing the check). After a project has been accepted, any information that is found to be incorrect and/or lacking must be requested via an Additional Information Request in accordance with 15A NCAC 2H .0208(e). t_ Ensure that a check for$400 is submitted and made out to NCDENR. All new projects and major modifications to existing projects require an application fee. A major modification includes any changes to permitted flow volumes, changes in pipe diameter, changes in pipe length greater that 10% of the originally permitted length, changes in the operating points of a pump station, etc. SECTION A—Application Information l�--t the applicant is private(Item B(2)) and listed as a corporation, check the NC Department of the Secretary of State's web site at http://www.secretary.state.nc.us/Corporations/to ensure that the Applicant is registered with the Secretary of State to conduct business as a corporation in the State of NC. Developer's and HOA's should be listed. L/ Ensure that the signing official meets the requirements of 15A NCAC 2H .0206(b). If they do not, request a revised application that has been completed by an appropriate official or a letter from an appropriate official that indicates the person in question is delegated to sign the application on the applicant's behalf. A current list of Delegated Signing Officials can be obtained from the PERCS. If a new delegated sighing official letter is presented with the application, forward a copy to the central office so that the person may be added to the Delegated Signing Official list. The central office will send E-mails to the appropriate region if a new signing official has been added so that the most current list can be used. The Non-Discharge Permitting Unit has an example delegated signing official letter from http://h2o.enr.state.nc.us/PERCS/spraypol.htm]#DELEG. SECT —Per ormation Project ne . Modification? If the project is a modification to an existing permit, be sure to enter the application into BIMS as a permit modification (i.e. "renew/modify application" and not "create new project'). BIMS will pull the previous signing official and affiliations information. Please go through all the tabs and ensure the information is correct for the current project. L//Applicant a public entity (e.g.county, town, sanitary district)? /VA�pplicant a private entity? Own (i.e. lease) units, lots, parcels, etc? 1 FAST-TRACK Application Review Procedures 2003(Rev 2/06) Sell units, lots, pa els, etc? Certificate o Public Convenience and Necessity? 2H.0205(d)(2) �Rzqu rezi iYt �applicant-is a-public utility-ln-lieu of-a Certificate-of Public —- - Convenience d Necessity, they may submit written approval from the North Carolina lities Commission's Public Staff that states that the utility is allowed to provide tility service in the subject project area. Note that the project name on the plication and on the CPCN must match. Contact the NCUC Public Staff if q stions arise. This is NOT REQUIRED for a municipality or county! amples of companies that would provide a CPCN are Heater Will or Caro' a Water Service, etc. *'***.OR******. Operational Agreement? 2H.0205 (2 ♦ Operational Agreements are only r uired if the applicant is not a public entity (i.e. Town, County, etc.) or publ utility as designated by the North Carolina Utilities Commission AND the is beingserved b the collection Y system are to be sold to individual ow er . ♦ If the applicant is a developer, ey must fill out the DEVELOPER J, Operational Agreement(FOR : DEV 02/03). A developer may be responsible for the system f an interim period until the homeowners association is formed, at w ch time a Permit Name/Ownership Change request(FORM: PNOCF /00)will be needed to transfer the permit to the HOA. ♦ If the applicant is a h eowners' association (HOA), they must fill out the ASSOCIATION perational Agreement(FORM: HOA 02/03 The HOA must be regis red with the Secretary of State's office and must provide a copy of a Associations' Bylaws and Articles of Incorporation. These documen should be reviewed to ensure that all applicable language regar ing the collection system is included as is required by the Operatio I Agreement. ♦ The Operation I Agreement should be attached to the permit and ncorporated ' to the language of the permit. Please note that Operational I Agreement nguage should not be altered without approval from the Attorney eneral's Office. Operational Agreements are available at .enr.state.nc.us/PERCS/from the collection system applications page. Approval of flow to receiving sewers and WVVTF? (i.e. P4 procedure, but now in-house!) ♦ Ensure that the receiving sewers and VWVTF have adequate capacity available to accept the flow volume that is being requested, and that the WWTF has been in compliance with their treatment and disposal permit. (-�Flow acceptance letter(s) from the owner of the WVVTF and owner of any intermediate sewers (if different from WWTF owner and applicant)? 2H.0205(d)(3)(C) ♦ Required only if the applicant and the owner of the WWTF/intermediate sewers are not the same entity. ♦ Project specific flow acceptance letters are required. ♦ Ensure that the following items appear in the flow acceptance letter: applicant's name, project name, amount of wastewater flow accepted, date that the flow acceptance was granted, expiration date of the acceptance, and name/permit number of the receiving WWTF. Do not accept a flow acceptance letter that was issued more than one year prior to the receipt of the package. ♦ Ensure that the owner accepted the entire volume of flow listed in application. 7I' 2 FAST-TRACK Application Review Procedures 2003(Rev 2/06) Main Problems Noted: A flow acceptance letter is provided by the receiving WWTP owner but not the downstream sewer owner, which both are different from the applicant. Example, private developer in Knightdale. Both Knightdale and Raleigh would need to provide a flow acceptance letter as Knightdale will transport the wastewater and Raleigh will treat the wastewater. (--Wastewater industrial r dome in nature? ♦ Most projects will b r�wastewater that is domestic in nature, however, if Item B.6 indicates that the wastewater is industrial in nature, notify the Regional Office Pretreatment Coordinator or the WQ Pretreatment Unit Central Office to determine if a pretreatment permit is needed or if a program already in place and compliant. � Flow volume calculated correctly? 2H.0219(l) ♦ Ensure that the daily design flow in the application is based on the guidance provided in the regulations or existing flow, and that the explanation as to how this volume was determined is very specific (i.e., 22 three-bedroom homes, 50,000 s.f. of retail space, 18 employees, etc). This information will be included in the description of the system in the permit. Our regs say 120 gpd/bedroom for residential. Note that for one-bedroom the minimum they can use is 240 gpd. ♦ If daily design flow is not based on regulations, ensure that the applicant has an approved flow reduction of daily design flow rate on file with the Division. A list of approved flow reductions may be obtained from the DWQ Intranet or by contacting the PERCS. Flow reduction requests are to be reviewed by the central office, and must be reviewed and approved before the application is accepted by the regional office for review. ♦ On occasion, there may be an instance where supporting documentation is submitted with the application for a specific facility. Contact PERCS to determine a course of action. ♦ Ensure that the flows shown on the application match up to what is shown on the plans (if available for review). For example, if the application states that 100 lots are to be developed, ensure that there are 100 lots, and not 150 lots, shown on the plans. Plans are only required for review if the applicant is requesting a variance to the MDC or the .0200's. ♦ Do not allocate"future"wastewater flows (i.e., that based on speculative development). These would be permitted in future wastewater collection system extensions. Although, we do allocate"unknown"flows on a per acre basis for industrial/commercial park applications. Generally, the Division has accepted between 900 gpd/acre— 1500 gpd/acre. Let the engineer support his calculation. Adequate information provided regarding the proposed gravity sewer and/or force main (if applicable)? Note 1: An Environmental Assessment may be required if there are 3 miles of gravity sewer over 18-inches in diameter(15A NCAC 1 C .0100). Environmental Assessment projects can NOT go Fast-Track! Main Problems Noted: A public entity specifies 6-inch line when 8-inch is required; 4-inch line is specified and no variance requested Adequate information provided regarding the proposed pump station(s) (if applicable)? Note: An Environmental Assessment may be required if the pump station(s) have a firm capacity of 1,750 GPM or greater (15A NCAC 1 C .0100). If there are any questions about whether an EA may be required, discuss with your supervisor or contact Alex Marks of the Planning Branch's Local Government Assistance Unit. ♦ Power reliability at the pump station provided in accordance with Section 5.04 of the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains document (i.e. dual line feed, portable generator w/telemetry, permanent generator with automatic transfer switch, wet well storage if near Class C waters)? Note 1: Section C of the FTA has to be completed and show a Class C down slope water in order to use wet well storage as a reliability option. Include the special condition in the permit. You will need to ask for storage calculations and the power outage data. Note 2: Ensure telemetry is specified if a portable generator is called out. Check with the engineer if unsure. Note 3: Ensure an automatic transfer switch (ATS) is specified if a permanent(standby) generator is specified. Check with the engineer if unsure. Main Problems Noted: Failure to specify appropriate or applicable power reliability option 3 FAST-TRACK Application Review Procedures 2003(Rev 2/06) roject designed in accordance with 15A NCAC 2H .0200, the Gravity Sewer Minimum Design Criteria and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains document(as applicable)? NO will be checked in Item B(12) of the FTA. If NO _ forward one copy of the supporting documents to the Central Office for review indicating the permit number, owner and pro act name The Central Office will review the variance request and if approvable specific language regarding the variance will be forwarded to the Regional Office reviewer to incorporate into the permit A copy of the variance letter provided by the central office should be kept with the application file. If you catch something in the application or supporting documents that is not in accordance with our regs or MDC, send an additional information request. Main Problems Noted: A public entity specifies 6-inch line when 8-inch is required; 4-inch line is specified and no variance requested; supporting documents show slope issues... SECTION C—Watershed Classification ✓ Color topographic map submitted? Watershed classification required? If YES, you are advised to"spot-check" the classification(s). If NO, ensure the applicantlengineer has indicated why one is not required. BOTH BOXES IN SECTION C MUST BE CHECKED TO NOT PROVIDE A CLASSIFICATION! SECTION D—Applicant Certifications Signing Official's signature? 2H.0206(b) ♦ Ensure that the applicant's signature is the same person as that listed as the applicant's signing official on Page 1 of the application form. _✓PE stamped, signed, and dated application, plans, specifications, and calculations (if applicable)? 2H.0205(d)(1)(A)(iii) ♦ Ensure that the same en and all the engineer has signed, sealed and dated the application 9 9 items,with the exception of items designed by specialty disciplines (i.e., architectural, structural, plumbing, and electrical plans). If not, an explanation and/or authorization is required. li ✓Adequate information provided for the engineer/engineering firm? PE with active license in North Carolina? 2H.0205(d)(1)(A)(iii) or2H.0203(28) ♦ Ensure that ALL pertinent P.E's have active licenses by checking the INC Professional _ Engineer's Board web site (www.ncbels.org -the PE number must be six digits, use leading 0 when needed). . ♦ If the PE seal number does not show up on the web site database, call the PE Board for verification (919) 881-2293. I - Drafting a Permit ♦ In order to be consistent, use the most current version of the Fast-Track permit shell. This permit shell contains specific language with respect to the Minimum Design Criteria, regulations, and collection system permitting. The PERCS will notify you of any changes to this permit shell. ♦ Be specific with respect the system description and information. Indicate the flow, what the project will be serving, length and size of gravity sewer lines and force mains, etc. For projects involving pump stations, the size of the pump stations, as well as the reliability option and any additional info (telemetry, odor control system, etc) should be included. A sample permit is on the DWQ Intranet. ♦ Add or remove any special conditions as necessary. Please call attention to any non-standard permit conditions in the cover letter of the permit and include the permit condition where necessary. See the Example Special Conditions document. j ♦ If the project is a modification, don't forget to include the system description from the previous permit and void the previous permit in the language! Some of these can be tricky so feel free to run the drafted permit through PERCS first before issuance. ♦ It is preferable if Fast-Tracks are saved electronically by permit number under issued year and month. 1 4 FAST-TRACK Application Review Procedures 2003 (Rev 2/06) Denying a Project ♦ If the Reviewer/Supervisor determines that an application package should be denied because it can not meet NC Statutes, rules or regulations, then a denial letter should be drafted. Special attention should be paid to the statutory deadline for permitting. If it is thought that a project might be denied, it is important to review it and draft the denial letter as soon as possible. There must be time allowed for the denial letter to be sent up to the Director and signed prior to the statutory date. ♦ The Reviewer should use the Application Denial Letter template to prepare a denial package for the Supervisor's review and submittal to the Director for signature. The letter should not be dated, but instead will be dated after the Director signs it. A memo to the Director should be attached to the top of the denial package summarizing the reasons for denial. This package must be singed off on by the reviewer, supervisor, Section Chief, and Director. Distribute the letter as directed in "Issuing a Permit" below. Issuing a Permit ♦ Permits should be signed only by those delegated to sign for the Director. ♦ Permits should be distributed as follows (include the signed Operational Agreement with the permit and all distribution copies if applicable!): ✓ Original to the Permittee ✓ Copy to the consulting engineer ✓ Copy to the county health department ✓ Copy to the Mecklenburg County Department of Environmental Protection for all projects located in Mecklenburg County ✓ Copy(ies) to the owner of the WWTF and owner of the downstream sewers (if different than the Permittee) ✓ Electronic Copy and Hard Copy to the PERCS for our files ✓ Copy to Central Files (attach application package and any supporting documents with a staple— do not include any plans unless they are small and can be folded up into an 8.5"x 11" sheet) ✓ Save an electronic version named WQOOXXXXX.doc in a folder on your office shared drive or hard drive. Try to keep your drafts and issued files separate. SEND ELECTRONIC COPIES TO PERCS on a frequent basis—weekly or monthly! Permit Corrections ♦ If a permit has been issued but an error discovered MADE BY US internally or by the Permittee or their engineer, a permit correction is necessary. ♦ Pull the original permit and make the corrections—do not change issue dates or enter a new application in BIMS—resave the permit ♦ Prepare the permit correction cover letter modifying as applicable—the corrections need to be distributed to the same people/agencies who received the orginal permit ♦ Print the corrected permit and permit correction letter—sign if needed ♦ Maintain Permit in BIMS—add permit corrected event date and comments as to what was corrected ♦ Copy and distribute The Certification ♦ Final engineering certifications will be submitted back to your office when the project is complete. These should be date stamped (the certification page, record drawings and calculations, if applicable) ♦ Construction, Grants & Loans (CGL) may request and audit some of these certifications ♦ Regardless of whether the region or CGL reviews a certification, the receipt date must be logged into BIMS. Perform the following: Maintain Permit, Enter Permit No., Go to Events Tab, Add Event, Select Engineering/Tech Specialist Certification Received, Enter Receipt Date ♦ If the certification sheet is marked partial—put partial in the event comment field. ♦ If the certification seems incomplete—missing plans or calculations or no PE seal—note incomplete in the comment field. Send an incomplete certification letter. The certification page in the permit explains exactly what the engineer is to provide. ♦ If the certification is provided to CGL—maintain the engineer certification received event and put"to CGL for review on DATE" in the event engineer certification received comment field. 5 FAST-TRACK Application Review Procedures 2003 (Rev 2/06) -look for items not meeting the minimum design If he region wishes to perform a detailed review o g g ♦ t g criteria or outside of the permit. For instance, minimum cover; slope; minimum separation distances; line-age changes;_lengh eroutes; m n alarms; pump cycle cler times; no indication of record drawing (as-builts) on plans; no PE seal or not out record drawings (land surveyor seals are not appropriate). A certification checklist is being developed. ♦ Regardless of review, certifications need to be processed as this closes out the permit. Follow the processing engineering certifications guidance document. 1 6 FAST-TRACK Application Review Procedures 2003 (Rev 2/06) r C;2005(NI M r INC.fl 14fi -800 33-8810 � a o xUl m 00 N C 0 l a E d x e w w H o � �t o r P� N rn a O a° x m O rq a ao x �1O ID m M py m o � w o g, � x n » yo * � A P. » a OLn m of W v * \S m O W N W _' w� O ID r' O Q O ❑ o rt * O w r $ `" a N = * mmx r_ T wo O m�� O N Z N O N * N r x Z n " qp ^ r O O I s 0 rt m 12 * m * » J A m » n o oo� N o O N N Fl 00 oort O N N OD co Permi(No.W00030542 Town of Rhodhiss NC Urgent Needs Burke County July 25 2006 I ENGINEERING CERTIFICATION — POST CONSTRUCTION system Description: 1,241 linear feet of 8-inch diameter gravity seer, a 250 GPM sewage pumping station and a 300 GPM sewage pumping station both with audible and visual high water alarms, telemetry, on-site standby generators with ATSs and 380 linear feet of 4-inch diameter force main Complete and submit this form to the Asheville regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines)of the wastewater collection system extension • supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s)or storage greater than longest past three year outage reliability option selected)for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form.Permit modifications are required for any changes resulting in non-compliance with this Permit regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION 1 ❑ Partial final 1,3 IJeh, +"rtr a��iq+r r�, as a d registered Professional Engineer in the State of North Carolina, having ,en authorized to observe ( enodically, ❑weekly, ❑full time)the construction of the above referenced project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2H .0200; the Division of Water Quali�aXQivjsion),Gravity Sewer Minimum Design ,qz ,. Criteria adopted February 12, 1996 as applicable; the Division'S'l4tinimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June If 2 O as�ppliIcabld ehd\�th s p rting materials. T _ — i North Carolina Professional Engineer's II Sip 2 5 2008 -u seal, signature, and date: ,-to BYEi 9�®4 '�\k•C pA,Pt o0, ,%Aa 1 (VI n�CLI r R Irl ()i JF:i C'�O GG a�gPaSYny� of dA r SEND,THIS'FORM & SUPPORTING DOCUMEN TION yl` 1i1 WITH REQUIRED ATTLtCHM.ENTS TO THE FOLLOWING ADD SS @0 „ 07 7 ae a�R � I •0 ROGER C. EDWARDS SURFACE WATER PROTECTION SUPERVISOR `°®B ��y a�q°°•••• °"ne04 ASHEVILLE REGIONAL OFFICE '®dad®OB®rg® 4QApR`'��& 2090 US HIGHWAY 70 ot SWANNANOA, NC 28778 fie Permittee is responsible for tracking all partial certifications up until a final certification is received.Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. n 7.•S/a,tJOB 0"YY�� WEST CONSULTANTS, PLLC LETTER OF Consulting Engineers and Surveyors 405 South Sterling Street TRANSMITTAL Morganton, North Carolina 28655 Phone (828) 433.5661 Fax (828) 433.5662 JOB NUMBER/PHONE DATE TO NCDENR - DWQ (Asheville) 04241 9/22/2008 2090 US Highway 70 ATTENTION Swannanoa NC 28778 Surface Water Protection Sect. Superv. RE: Town of Rhodhiss - NC Urgent Needs Wastewater Collection System Extension WE ARE SENDING YOU X Attached Under separate cover via the following items. Shop drawings Prints Plans Specifications Samples Copy of letter Change order Other: COPIES DATE NUMBER DESCRIPTION 1 Engineering Certification, WQ0030542 1 As-Built Drawing THESE ARE TRANSMITTED as checked below: For your approval Approved as submitted Resubmit copies for approval X For your use Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment Other FOR BIDS DUE/DATE: 9/22/2008 PRINTS RETURNED AFTER LOAN TO US j REMARKS III�1��E V SEP 2 5 2008 J ' � W\T1 l��I IIrY (ll��iJ 1 11 R Nv��-r � 5 s r ., IIo _ I O l�E COPY TO Town Of Rhodhiss SIGNED l� If enclosures are not as noted,please notify us at once. PRODUCT 13121G USE WITH 771 C ENVELOPE NEBS TO ReOld2[1-800-225-6380 or wwWAeb5.00111 PRINTED IN US.A. A ENVIRONMENTAL REVIEW TRA�A ET- oR# 07 01ao DWO - WATER QUALITY SECTION DWQ# 13765 DATE: 1011312006 TYPE: ERR TO: Env. Sciences Branch (WQ Lab,MSC 1621) O Trish MacPherson(Biological Assessment) O Jay Sauber(Ecosystems) ❑ (Toxicology) O Dianne Reid(Intensive Survey) Regional Water uality Supervisor Wetlands/401 Unit ❑ Bradley Bennett(Stormwater) 12a'fl ❑ John Hennessy(DOT)Parkview Bldg,MSC 1650) ,Darlene Kucken (Basinwide Planning) 6 s fl O Cyndi Karoly(401) Parkview Bldg, MSC 1650) ❑ Jeff Manning(Classifications &Standards)6a'fl O Boyd DeVane(Water Supply WS) 12`s fl O Rich Gannon(NPS Management Plannini) 6 b fl O Michelle Woolfolk`(Modeling/TMDL)7 fl Surface Water Protection Section (Archdale 9th) O Carl Bailey(Groundwater Plannin ) O Matt Matthews Gil Vinzani or Susan Wilson ( ) � Ill {II s Qeff Poupart(Collection/Pretreatment) ❑ Others: Aquifer Protection Section 1 O Ted Bush(land application/AFO) O Kim Colson (land application) „- Tvricri _ _ ASH�VILLF G11_C IOUA� Off' IGE A copy of the environmental document for the project described below is attached. Subject to the requirements of the NC Environmental Policy Act,you are being asked to review the document for potential significant impacts to the environment, especially pertinent to your jurisdiction,level of expertise, or permit authority. Please return this form, completed, along with your written comments, if any,by the date indicated. Thank you. IF AN EXTENSION IS NEEDED,PLEASE EMAIL OR CALL A REQUEST TO THE SEPA COORDINATOR PRIOR TO THE RESPONSE DEADLINE. Project: Response.Deadline p(� This project will involve the installation of 17,000 LF of 8" sewer line to serve 57 households in Connelly Springs. The homes in the project area are primarily along Israel Chapel Road. The proposed project will connect to an existing pump station located downstream from the project area. Some of the proposed lines will be installed alonq existinq DOT rights-of-ways while the NO COMMENT COMMENTS ATTACHED AND EMAILED SIGNATURE P O(/Cis O C� DATE Return To: Hannah Stallings: (919) 733-5083 ext. 555; hannah.stallings@ncmail.net Basinwide Planning Unit/Planning Section; Archdale 6th; MSC 1617; fax: (919) 715-5637 Notes: 11n ,.Ics hl-C North Carolina Department of Environment and Natural Resources �, DIVISION OF WATER QUALITY oe wnrE9 �►�1 Surface Water Protection Asheville Regional Office a �` NCDENK 2090 U.S. Highway 70 ' Swannanoa, North Carolina 28778 Phone: 828/296-4500 Fax: 8281299-7043 To: Fax: I — at1 ^ 7 5 - S 3 From: CSLM.t,o Date: i7 / �l oZ O d Number of pages including cover: 3 (� MESSAGE: If questions. please call 828129E 4500 Ntnally IX aro. ina W A�-� , - Michael F.Easley,Governor � William G.Ross Jr.,Secretary Carolina Department of Environment and Natural Resources Alan W.Klimek,P.E.Director V / Division of Water Quality Colee Sullins,Deputy Director . - ... Rrvrsion of Water Quality .. October 13, 2006 L� E C E- V E Mr. Roger Edwards Surface Water Protection Supervisor N.C. Division of Water Quality W Ai EIR c uALiry SECTION 2090 US Hwy 70 ASNEVIL_LE REGIONAL OFFICE Swannanoa, NC 28778 Re: Burke County Installation of 17,000 linear feet of sewer line to serve 17 residences in Connelly Springs DENR#07-0130, DWQ#13765 Dear Mr. Edwards: Please find enclosed an Environmental Review document submitted as Phase H of a CDBG Sewer Project by the Town of Connelly Springs to install 17,000 linear feet of sewer line that will connect to an existing pump station that is located downstream of the proposed project area and serve 17 residences. While some of the proposed infrastructure will be installed along existing rights-of-way, others will require easements. It would be helpful if your staff would review this report and return any comments they may have regarding this project to me by Thursday, November 2, 2006. If there are any concerns or questions,please do not hesitate to contact me. Sincerely, Hannah Stallings SEPA Coordinator N N.C.Division of Water Quality 1617 Mail Service Center Raleigh,North Carolina 27699-1617 (919)733-7015 Customer Service 1-877-623-6748 ENVIRONMENTAL REVIEWS AT THE COMMUNITY LEVEL Agency responsible for Project Location:(city and County) Clearinghouse No. Date Completed Town of Connelly Springs Connelly Springs,Burke County Contact Person: Address Phone PO Box 99 Sam Erwin Connelly Springs,NC 28612 82SABS-4229 A. Project Description Briefly Describe Project: Phase 11 CDBG Sewer Prolect This project will involve the installation of 17,000 LF of 8"sewer line to serve 57 households in Connelly Springs. The homes in the project area are primarily along Israel Chapel Road The proposed project will connect to an existing pump station located downstream from the project area. Some of the proposed lines will be installed along existing DOT rights-of-ways while the other lines will require easements. Project Activities CDBG/HOME Funds Other Funds Environmental Impact Status [��PT at. Excluded E.A. 1.Sewer Improvements $700.000 $70,050 X 2.Planning $3,500 X 3. Administration $46,500 X 4. 5. 6. X Original Signature Elected Ofr ill Revision Dated Elltrired Mayor.Town of Connelly Springs _ Amendment Dated UUII�� 3 206 Title r..y` .Town of Connelly Springs.PO Box 99,Connelly Springs.NC 28612 Prior Clearing Review r +`'�- Agency and Address Has Taken Place Regulations III ------ STATUTORY.CHECKLIS_T _ _ checklist of Applicable statutes and 12egu 1. Project Name and Identification No. Connelly Sorinas Phase II CDBG Sewer Protect 2. Attach Project map 3. Are all activities of this project exempt from NEPA Procedures? _Yes No (If yes,this Statutory Checklist need not be filled out) 4. Are activities of this project categorically excluded from NEPA Procedures? _Yes X No (If yes, this Statutory Checklist and all required actions must be completed) Area of Statutory— Regulatory Compliance E s r � c v ur 4 u a `o Impact Categories 0. € a Note Compliance Documentation € c aE 3 z c4 rc a B� Historic Properties X State Preservation Office Floodplain Management X FIRM Map Ili Wetlands Protection X US Army Corp of Engineers Noise X HUD Noise Guidebook Air Quality X WPCOG Air Quality Program Manmade Hazards X None to be used � Thermal Explosive Hazards Project more than 5 miles Airport Clear Zones X from airport Water Quality X DENR,Asheville Navigable Waters Aquifers X None in area Solid Waste Disposal X Town of Connelly Springs. Coastal Areas Coastal Zone Management X N/A Coastal Barrier Resources X N/A Endangered Species US Fish &Wildlife, NC Natural X HAIifnnP. Environmental Justice X No Impact Wild and Scenic Rivers X None in area Farmlands Protection X USDA-NCRS Fish and Wildlife X I I US Fish &Wildlife NC Natural Hp itnnp Prnnrpm State or Local Statues X N/A Prepared By: _Samuel W. Erwin Title: Environmental Administrator _WPCOG PO Box 9026—Hickory, NC 28603 Date: September 28 2006 • Attach evidence that required actions have been taken Data Sources and Documentation Historic Properties State Historic Preservation Office Flood Plain Management FIRM Map Wetlands Protection US Army Corps of Engineers Noise HUD Noise Guide Book Air Quality WPCOG Air Quality Program Manmade Hazards N/A Water Quality DENR, Mooresville Solid Waste Disposal Town of Connelly Springs Coastal Areas N/A Endangered Species US Fish &Wildlife, NC Natural Heritage Program, Farmlands Protection USDA-NCRS Wild and Scenic Rivers N/A I State and Local Statutes N/A I Send 14 Copies of this form and all maps to: Director, Division of Community Assistance, 4313 Mail Service Center, Raleigh, NC 27699-4313. The ERR for Economic Development Projects should be sent directly to the State Clearinghouse: Director, NC State Clearinghouse, Dept. of Administration, 1302 Mail Service Center, Raleigh, NC 27699-1302. 1 ENVIRONMETNAL ASSESSMENT CHECKLIST Page 1 Project Name and Identification No. Connelly Springs Phase 11 CDBG Sewer Proiect v _ � w o m 16 g Impact Categories U m r� a Source or Documentation a, _m .g m a: (Note date of contact or page reference) E m m c Additional Material may be attached z a o01 aoi z rc Land Development Conformance With Ron Hancocks,Connelly Springs Planner,See Comprehensive X Notes Plans and Zoning Compatibility and Urban Impact x Slope X Burke County Soil survey,See Notes Erosion x Soil Suitability x Hazards and Sam Envin,WPCOG,See Notes Nuisances,Including X Site Safety Energy No Impact is anticipated Consumption X Noise Effects of Ambient HUD Noise Guide Book,See Notes Noise on project and X Contribution to Community Noise Levels - ENVIRONMETNAL ASSESSMENT-C-HECKL-IST-- -- - - -- - -- (Continued,Page 2) Project Name and Identification No. Connelly Springs Phase II CDBGI Sewer Project 0 a 0 R w w m' c to 2 - a Source or Documentation Impact Categories W - g P g Q, 1O — m (Note date of contact or page reference) E Additional Material may be attached m v z i ar acr z rc 1 Air Quality Effects of Ambient Air WPCOG Air Quality Program,See Notes Quality on Project and Contribution to Community X Pollution Levels Environmental Design and Historic Values Visual Quality Ron Hancock,Connelly Springs Planner,See Notes Coherence,Diversity X Compatible Use and Scale Historic,Guttural State Historic Preservation Office,See Notes and Archaeological X Resources Socioeconomic Demographic/ X Ron Hancock,Connelly Springs Planner,See Notes Character changes Displacement X None expected i Employment and X retained No impact Community Facilities and Services Educational Facilities X No impact anticipated Commercial Facilities X Project should not impact commercial in immediate araa Health Care X No Impact Social Services X No Impact i i ENVIRONMENTAL ASSESSMENT CHECKLIST (Continued,Page 3) Project Name and Identification No. Connelly Sorings Phase II CDBG Sewer Project 0 a v Impact Categories Ixm a a• _W Source Documentation '5 ' Z' z' w (Note date of contact or page reference) Additional Material may be attached E z a' 0-a1 a'I z rc Community Facilities and Services(Continued) Solid Waste X Town of Connelly Springs. see notes wastewater x Town of Connelly Springs,See Notes Storm Water X Town of Connelly Springs.,See Notes Water Supply x Town of Connelly Springst.,See Notes Public Safety—Police x Burke County Sheriffs Dept.,See Notes Fire X Burke County Fire Marshall.see Notes Burke County EMS,See Notes Emergency x Medical Open open space x No Impact anticipated Space and Recreation Recreation x State Historic Preservation Office,See Notes. Cultural x Transportation x John Marshall,WPCOG Transportation Planner,See Notes ENVIRONMENTAL ASSESSMENT CHECKLIST (Continued,Page 4) Project Name and Identification No. Connelly Springs Phase II CDBG Sewer Project C a a y m Impact Categories i Source Documentation u v d v o (Note date of contact or page reference) to > .W o Additional Material may be attached 15 zo a° a oa z 0-: Natural Features Water Resources X NC DENR,Asheville See Notes I i iu Surface Water X I a Floodplains X FIRM Map—See Notes Wetlands X US Army Corps of Engineers, NWI Map, Environmental Services Inc. See Notes Coastal Zone X NIA I Unique Natural USDA-NRCS,See Notes Features and X Agricultural Lands -I Vegetation and X US Fish&Wildlife and NC Natural Heritage Program, Wildlife Environmental Services Inc.See Notes i ENVIRONMENTAL ASSESSMENT CHECKLIST (Continued,Page 5) Summary of Findings and Conclusions: The proposed project will provide sewer service to 57 households. The project will serve families residing on portions of Israel Chapel Road, Cobbs Place and Chapel Street. The residents have had problems with their septic systems resulting from poor soile The wastewater would ultimately end up at the Town of Valdese Lake .Rhodhiss wastewater treatment plant. Summary of Environmental Conditions: The project will follow DOT tights-of-ways and a large portion will go through properties undeveloped. The Town contracted with Environmental Services to conduct a wetlands delineation and an Endangered Species survey. There were no wetlands found along the proposed route nor were there any threatened or endangered species. There are no floodplains in the project area. There will be several creek crossings and a permit will be needed from the US Army Corps of Engineers. Project Modifications and Altematives Considered There were two alternative considered. The first would be to install new drainfields at each of the 57 houses. This Was not practical because many of the homes did not have enough suitable space for an additional drainfreld. The Second alternative was the proposed project which was chosen. ENVIRONMENTAL ASSESSMENT CHECKLIST (Continued,Page 6) Additional Studies Performed (Attach Study or Summary) None J J 1 I i Mitigation Measures Needed: I None I II i ENVIRONMENTAL ASSESSMENT CHECKLIST (Continued, Page 7) 1. Supply a clear, legible map of the proposed site and surrounding area. Mark area to be acquired and construction site. 2. Utilities Utilities to serve Projected Demand Length of Lines to be Capacity of Lines Environmentally Sensitive Areas Project per day Constructed (inches diameter) to be Cut(for Utility acres) Electric Potable Water Sewage 17,000 S" Solid Waste Disposal Natural Gas Water 3. Land Alterations Alteration Present Use Previous Use Acres Percent of (planned use) (before changes) (historical) Project Area To Be Acquired To Be Developed To Be Originally Cleared To Be Landscaped To Be Covered by Impermeable Surface (Square Feet) To Be Cut (Cubic Yards) To Be Filled (Cubic Yards) 4. Cultural Resources a)Please give any known archaeological or historical sites on project land: None b)What kind,if any,site preparation has already been conducted: None c)Has area been previously surveyed by an archaeologist? If so,give name of principle investigator and date of survey: No d),yes X no are buildingalstructures on site now?(abandoned bams,farmhouse,tobacco sheds,bridges,etc.) e)Ages of each buildinglstructure:NIA f)Will any of these structures be demolished? (indicate which)one house will be cleared NIA g)Will any of these structures be rehabilitated or renovated? (indicate which) N/A h)Please include photographs of any buildings constructed prior to WWII if project activities include Rehabilitation,Acquisition,Clearance or Demolition. ENVIRONMENTALASS ,SSMENT-CHECKLIST- - - -- - -- -- -- - (continued,Page 8) 5.Topography Types of Vegetation %of Soil Types Forested Non-Forested Slope Acres Area (use USDA and SCS classification) Pine Hardwood Mixed Brush Grassland Other 0 5% 20 Cecil Association X x X X X X 5-10% 35 Cecil Association X X X X X X 10%+ 35 Cecil Association X X X X X X 6.Stream that surface runoff from project area drains into(illustrated relative position on maps in Section) _Yes Site includes/borders _Yes Site includes/borders on _Yes Site includes/borders on classified trout waters estuarine waters drinking water sources X No X No X No The project will involve impoundment or withdrawal of water. If yes,mark impound on map. If impoundment is planned,the amount of water to be impounded is approximately acreffeet and surface acresifeet. Yes X No i 7. Note classes of wildlife known to exist in the general area: 1 Bear Turkey X Small Game(squirrel,quail,rabbit,raccoon,dove,etc. Deer —Waterfowl Endangeredrrhreatened Species(osprey eagle,alligator,red cockaded woodpecker,etc) 8.Will proposed forestry practices such as burning,clearcutting, or thinning have adverse effects on any of the above species? Explain: No i 9.Are proposed pesticides or herbicides known to have adverse effects on humans or any of the above species? Which species? NIA I ENVIRONMENTAL ASSESSMENT CHECKLIST (continued,Page 9) 1o.Give name, position and office telephone number of an individual in the appropriate local government unit that can confirm the compatibility of the proposed activity with existing and/or proposed land use economic development plans: Name: Sam Erwin Position: Environmental Administrator Phone:(828)4864229 11. List all N.C. State permits,authorizations and licenses that must be acquired to initiate and complete the mminnewd artivitian- Permit NC General Statute Application Date Approval Date a)Stationary Air Contaminant Source 143.215.108 b)Air Quality Complex Source 143.215.109 c)Construction of Wastewater Pretreatment Facilities 143215.1 d)Wastewater Discharge(to surface waters) 143215 e)Approval to Construct Public Water Systems 130A-315 NCAC T15A.18C. f)Dredge and Fill 113.229 g)Withdrawal of Water from"Capacity Use Area" 143.215.15 h)Erosion Control Plan 113A.61 i)Zoning Change or Variance t)Coastal Resource Commission 113A.118 k)Noise Control Regulations 153A.113 1)Others(list) 9753(28)a-k (supp) (OSHA) 1. Is the project in compliance with applicable laws and regulations? X Yes _No 2. Is an EIS required? _Yes X No 3. A Finding of No Significant Impact(FONSI) can be made. Project will not significantly affect the quality of the human environment. X Yes _No 4. Send 14 copies of this ERR for State Environmental Clearinghouse review to: Director, Division of Community Assistance, 1307 Glenwood Avenue, 4313 Mail Service Center, Raleigh, NC 27699-4313 5. Prepared by: Title: Samuel W. Erwin Environmental Administrator WPCOG PO Box 9026—HicKory NC 28603 Law 9/281106 Town of Connelly Springs Phase 11 CDBG Sewer Project Environmental Assessment Notes Plans and Zoning� Conformance with Comprehensive g—Ron Hancock, Town Planner The project conforms with plans that the Town has and the proposed project will not impact zoning nin for the Town. Compatibility and Urban Impact—Ron Hancock The project is compatible with the existing environment. It is designed to serve the residential area in need. Soil,Erosion and Soil Suitability—Burke County Soil Survey A review of the Burke County Soil Survey shows that soils in the project area tend to be in the Cecil Association. None of these soils should present any problems for the proposed sewerline construction. 1 Hazards and Nuisances,Including Site Safety—Sam Erwin, WPCOG i There should not be any hazards associated with the project other than the usual hazards for construction projects similar to this type. The Town will monitor the project site for safety. Effects of Ambient Noise on Project and Contribution to Community Noise Levels- HUD Noise Guide Book There may be a slight increase in noise levels during the construction phase of the project from the use of heavy construction equipment. This will abate upon completion of the project. The ambient noise levels in the area are not impacted by a major highway, airport or train. Effect of Ambient Air Quality on Project and Contribution to Community Pollution Levels—WPCOG Air Quality Program There may be a slight increase in airborne particulates during the construction phase of the project from the use of heavy construction equipment. This slight increase will abate 1 upon completion of the project. There are no special air quality permits needed for the project. Visual Quality Coherence,Diversity Compatible Use and Scale—Ron Hancock The visual quality of the area should not be impacted. The proposed sewerlines will be underground. 7 Historic,Cultural and Archeological Resources—State Historic Preservation Office As part of the State Clearinghouse process, the SHPO will comment on the project. There are no known historic, cultural or archeological resources along the proposed project route. Demographic/Character Changes—Ron Hancock No impact is expected Solid Waste—Town of Connelly Springs The amount of solid waste generated by the project should be minimal. Solid waste pick- up in the Town is contracted with GDS. The waste will be taken to the Burke County Transfer Station for ultimate disposal in the Foothills Regional Landfill in Caldwell County. None of the waste is considered hazardous. Waste Water—Town of Connelly Springs The proposed sewerlines will connect with an existing pump station owned by Burke County on Island Creek. The wastewater will then go to the Lake Rhodhiss Wastewater Treatment Plant owned an operated by the Town of Valdese. This plant has the capacity to handle the additional waste generated by the project. The proposed project should have a beneficial benefit in that homes with faulty septic systems will be brought onto municipal sewer. Water Supply—Town of Connelly Springs The Town gets there water from the Icard Water Corporation. The proposed project should have no impact on water supply. Storm Water—Town of Connelly Springs There should not be any negative impact on storm water. Public Safety,Police—Burke County Sheriffs Department Since the project involves existing homes, the response times to the project area should not change. Public Safety,Fire—Burke County Fire Marshall The location of the project is within the response time for the volunteer fire department that serves the area. Emergency Medical—Burke County EMS Since no new houses will result from this project. Emergency or medical response times to the area should not be negatively impacted. Cultural— State Historic Preservation Office As part of the state clearinghouse process,the SHPO will comment on any negative . impacts on cultural resources. There are no known cultural resources in or near the project area. III Transportation—John Marshall, WPCOG Transportation Planner Since no new homes will added as a result of the project,transportation patterns should not change. There may be some delays along the proposed route due to construction, but these should be minimal since the rural roads do not carry a lot of traffic Water Resources—NC DENR, Asheville A section of the proposed project line will follow Island Creek before it connects to an existing pump station. The proposed project area is not.located in the watershed area. j Since this is not a water supply project, water resources should not be negatively 'i impacted. 1 Surface Water—NC DENR, Asheville j There will be creek crossings involved with the project. The Town will need to apply to the US Army Corps of Engineers for a permit. Floodplains—FIRM Map A review of the appropriate floodplain maps(370034 0150C and 370034 0250C) shows that there are no floodplains in the project area. j Wetlands—NWI Map, Burke County Soil Survey, US Army Corps of Engineers, Environmental Services Inc. A review of the National Wetlands Inventory Map shows that there are no wetlands along -j the proposed sewer line route. In addition none of the soils in the project area are 1 considered hydric. Environmental Services Inc. conducted a wetlands delineation of the proposed sewer lines and found one small wetland. However, it was located off the proposed route. Since several creek crossings will be required, a permit from the US J Army Corps of Engineers will be required. 1 Unique Natural Features and Agricultural Lands—USDA-NRCS There are no unique natural features or agricultural lands that will be impacted. None of the proposed sewerline route has been farmed in the last five years. Vegetation and Wildlife—US Fish&Wildlife,NC Natural Heritage Program and Environmental Services Inc. A review of the data base for US Fish&Wildlife and NC Natural Heritage Program shows that the Dwarf Flowered Heartleaf has found in the county. This plant is considered threatened. A portion of the proposed sewer line will go through wooded areas that could provide habitat for the plant. Environmental Services Inc. conducted a survey of the proposed sewerline route that will go through wooded areas and did not find any plants and determined that the proposed project would not have no effect on species.. 10/01/2006 20:38 8284335662 WEST & ASSOCIATES PAGE 03 OeL 02 06 Q6a15a jtatl 82g-254-0912 N• � ENV1koNMENTAL SERVICES, I 4C. )."PATTON AVENUE SUITE C AFHEVTLLs,NORTH CAEOLtNA 2MOB II• FAX 82&-254-C812 62d 254-as ,Mxw.csiac.ee 2 October 7006 Mr.David Poore West consultants,PLLC 405 South Ster11119 Street Morganton NC 28655 Re: Connelly Springs CI)BG Sewerlina Investigation ESI Project Number EED6-033 Mr.Poore: Environmental Services, Inc., (ESI) appreciates the opportunity to offer you our services. Al your request,ESI has conducted a jurisdictional wetland and stream delineation effort within an propo approximately 2,800 linear foot corridor far a sod sewerline project. Additionally,this area was reviewed to determine the presence or absence of potentially suitable habitat for the federally Threatated species. dwarf-flowered heartleaf(HexasVis nanii fora). This letter serves s the deliverable for this project. � a The project study area is located within the Catawba River Drainage basin. The proposed 1 corridor is approximately 5D feet in width and 2.800 feet in length. The proposed condor begins at a tie-in point at an existing seworline located east of Island Crack. The proposed corridor extends north for approximately 300 feet; crossing an unnamed tributary to Island Creek. The proposed corridor turns east, paralleling the urmamed tributary for approximately 2,500 feet, ending at Israel Chapel Road(SR 1607). The field effort for this project was conducted on 21 September 2006 by ESI biologist,Jan Gay. Ivtr. Gay is a Senior Project Manager with more than 14 years of professional exeperienee. Jurlac 'onal Delineation ESI reviewed the proposed route to determine the presence or absence of jurisdictional wetland areas using the three-parameter approach hydrophyiic vegetation,hydric soils,and evidence of jurisdictional hydrology) as outlined by the U.S. Army Corps of Engineers (COE) 1487 Wetlands Delineation Manual. The proposed route was also reviewed for the prese nce of jurisdictionsl stream channels using criteria provided by the COE and the N.C.Division of Water Quality(DWQ)- Based on this approach, the proposed route includes one jurisdictional wetland area located o wwithina llptar depression 'Vegetation within this area was hydrophytic in nature,consisting of giant cane (Arundinaria g(gantea) and cinnaaton fern (Osmunda cfmtanmmea), as well as scattered saplings of red maple (Acer rubrum). Soils exhibited hydric ehazacteristics NUMB 1ACMOkgV1:Lr • $T.AVOV•J71NE• COCOA •JUPITER • DEMN • SAVANNAH • ATLANTA• RA1BIGH • M0LOVE •ASHBVILLB I 10/01/2006 20:38 8284335662 WEST & ASSOCIATES PAGE e4 Oat 02 O6 Oae ]Be jray 820-254-0812 P•8 ENvtRoNmENTAL SERVICES, INC, Connally springs Delineation ES06-033 Page 2 of 3 sence of color 10YR 3/1). Evidence of jurisdictional hydrology was noted, including the pre redoximorphic featutca. No other jurisdictional wetland areas were noted within the peed yards mute. Vegetarian within the remaining pa WM rts or the proposed route consisted of maintained yards and fore holly). red map", and Armlican forest vegetation including ironwood adjace(cwpnt t the unnamed tributary, and areas of virgins (Ilex opnca) along the existing Levee adjacetrt to the pine(?irsus vfrgittlura), rod maple,white nak(Qsercus albs), attd sosttexed thickets of Chinese slips unseil color IOYR privet (Ltgtistrum slttarsaa). Soils did not exbiR>r� bs of�the snfl spa 4/3). No evidence of]ta]sdjctional hydrology The prepoeed route contains faun jurisdictional stream❑hamtels.including the trruutmei tributay to Island Creel and three unnamed tributaries to tills channel. The main channel is a perennial stxcaat chsnnc1, approximately 20 feet in width with asand/gravel substrate. "L'he throe smaller chanmels are likely perennial channels, ranging from 1 to 4 feet in width with gravel/sand substrate. e..ve,.,!"l+unnel Bum. The proposed route is located within the Catawba River Drainage basin Currently,b'affers are dictated for the main stem of the Catawba River below Lake James. This buffer requirement within the proposed route. The stream channels within the does not apply to the stream channels Best Usage Classification and therefore shore the proposed route do not have a separate classification of their receiving water, Island Creek (Steam index Number 11-46 (0.5)). This reach of island Creak has a Bast Usage Classification of wS-IV,indicating a water supply within IL highly developed watershed. Any buffers on these channels will be regulated through the Counry sedimcot and erosion control plan. e.lt Thr�t nod and Eadgg& Species with the federal etas cation of Endangered, Threatened, officially Proposed for such listing, am protected under the Endangered Species Act of 1973 (ESA), as amended (16 USC 1531 et seq). EST evaluated the proposed route for potential habitat for one of the federally listed Threatened species known to occur in Burke County,dwarf-flowered bearded(U.S. Fish and Wildlife list date, 8 March 2006). Dwarf-flowered heattleaf has the smallest flower of any North American member of this genus. Habitat for this species includes acidic sandy loam soils along bllui ad by slopes eswith 8 ris and generally northern aspect, hillsides and ravines, and in boggyadjacent stems, This species needs abundant sunlight in early spring for maximum flowering and seed production. A review of records held by the N.C.Natural Heritage Program indicates no known occurrences of this species or any other federally listed species documented within 1.0 mile of the proposed route. 10/01/2006 20:38 8284335662 WEST & ASSOCIATES PAGE 05 Oct 02 06 08: t6x ,�Cay 828-254-0812 P-4 ENVIRONMENTAL SI.PvICES. INC. Connelly Springs Delineation EE06-033 Page 3 of 3 route. The Potentially suitable habitat for this species is not present within tb' proposed _ does it contain W ' proposed route does not contain bluffs oroutetindieatcs Oita$•no randhridtA plants of the Genus ra%6ew conducted within am proposed flesostylis are present within the proposed route. A Biological Conclusion of No Effect is warranted for this project. Summ�c . cbawcis are present within the propoud Une jurisdictional wetland area and fora stream sawexline route. The Catawba River buffer rules do not apply to the srcarn chainwithin in 1h- proposed route. No potentially suitable habitat for the feduaily 1'lireatened species flowered heartleaf is present within the proposed scwerline route- Environmental Services. Inc., appreciates the opportunity to offer you our services. I£you have spy questions or comments,or need any additional information,please tat me know• Sincerely.. 1, EN V9t�AIRN A SERVICES,INC. ]art y '^ nior Pr anger Attached! 1 Routine Wetland Determination Forms