September 22, 2020
Mr. Roy Dyer, Mayor
Town of Grover
P.O. Box 189
Grover, NC28073
Subject: Notice of continuing Violation
Compliance Evaluation Inspection
NOV-2020-PC-0424
Grover WWTP
NPDES Permit No. NCO065242
Cleveland County
Dear Mr. Dyer:
and Recommendation for Enforcement
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted
at the subject facility on September 10, 2020, by Ori Tuvia. The cooperation of James Davis during
the site visit was much appreciated. Please advise the staff involved with this NPDES Permit by
forwarding a copy of the enclosed report.
Overall the facility has shown signs of improvement since the last inspection. However,
the facility still has no source of standby/backup power. This is a continuing violation that was
noted on the previous two inspection reports (dated February 14, 2019, and December 20, 2017).
Part II, Section C (7) of NPDES Permit No.NC0065242 dated September 1, 2018, states: Power
Failures "The Permittee is responsible for maintaining adequate safeguards to prevent the
discharge of untreated or inadequately treated wastewater during power failures by means of
alternate power sources, standby generators or retention of inadequately treated effluent ".
Please be advised that this correspondence is being issued as a Notice of Violation with a
Recommendation for Enforcement Action. You are requested to respond to this Notice, in writing,
regarding the above noted violation, within fifteen (15) days of receipt. The response should
include a timeline for the installation of an appropriate standby power source. Failure to respond
and/or failure to resolve the violations could subject you to further action by the Division of Water
Resources. Please be advised that pursuant to G.S. 143-215.6A, a civil penalty of not more than
igaD-E
. --ft
State of North Carolina I Environmental Quality I Water Resources I Water Quality Regional Operations
Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704 663 1699
twenty-five thousand dollars ($25,000.00) per day, per violation and may be assessed against any
person who violates or fails to act in accordance with the terms, conditions, or requirements of any
permit issued pursuant to G.S. 143-215.1.
Should you have any questions concerning this Notice, please do not hesitate to contact
Ori Tuvia at (704) 235-2190 or ori.tuvia@ncdenr.gov or me at (704) 235-2194 or at
corey.basinger@ncdenr.gov
Sincerely,
DocuSigned by:
A14CC681 AF27425...
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
Cc: NPDES, MRO Files (Laserfiche)
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0065242 I11 121 20/09/10 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
1.0 70LJ 71 1„ I 72 L71 74 79
I I I I
80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES Dermit Number)
10:OOAM 20/09/10
18/09/01
Grover WWTP
1229 Bethlehem Church Rd
Exit Time/Date
Permit Expiration Date
Grover NC 28073
11:OOAM 20/09/10
23/08/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
James Lester Davis/ORC/704-813-9342/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Roy Dyer,PO Box 189 Grover NC 28073/Mayor/704-937-9986/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
DocuSigned by:
OriATuvia DWR/MROWQ/704-663-1699/ 9/22/2020
C_ _!-
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger DWR/Division of Water Quality/704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
DocuSigned by:
-- 9/22/2020
aiaccsainFvazs... Page#
NPDES yr/mo/day Inspection Type
NCO065242 I11 12I 20/09/10 117 18 i c i
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Permit: NCO065242 Owner -Facility: Grover WWTP
Inspection Date: 09/10/2020 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
❑
0
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
0
❑
❑
❑
Comment: The subject permit expires on 8/31/2023
Record Keeping
Yes
No
NA NE
Are records kept and maintained as required by the permit?
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc
❑
❑
0
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification'
❑
❑
❑
Is a copy of the current NPDES permit available on site?
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
Comment: Inspection conducted during Covid-19 restrictions. A full file review was not conducted.
Requested lab results, Chain of Custody, ORC Log, and Field parameter results taken
including the calibration data, for the month of June 2020. These were sent via email in a
timely manner and were complete.
Page# 3
Permit: NCO065242
Inspection Date: 09/10/2020
Owner -Facility: Grover WWTP
Inspection Type: Compliance Evaluation
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes
No
NA
NE
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
❑
❑
❑
■
Comment: Inspection conducted during Covid-19 restrictions. No lab review conducted.
Influent Sampling
# Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is sampling performed according to the permit?
Comment:
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
❑ ■ ❑ ❑
❑ ❑ ❑
Comment: At the time of the inspection, the temperature in the composite sampler was higher than 6
degrees. The ORC indicate that due to the sampler not running that day he had the sampler
cooler turned off the previous day.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? ❑ 0 ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable ❑ ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Page# 4
Permit: NCO065242
Inspection Date: 09/10/2020
Operations & Maintenance
Owner -Facility: Grover WWTP
Inspection Type: Compliance Evaluation
Yes No NA NE
Comment: At the time of the inspection, the facility had no source of standby power. This is a continuinc
violation that was noted on the previous inspection report (dated February 14, 2019).
Bar Screens
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment: At the time of the inspection, the bar screen a
the bar screen gaps will be reduced.
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Yes No NA NE
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
too coarse. It is recommended that
Yes No NA NE
Ext. Air
Diffused
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
Comment: Both blowers were operational. The aeration basin should be cleaned to remove sand and
other debris after being underwater during the flooding event on August 21, 2020.
Secondary Clarifier
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ■ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
• ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 5
Permit: NC0065242
Owner -Facility: Grover WWTP
Inspection Date: 09/10/2020
Inspection Type: Compliance Evaluation
Secondary Clarifier
Yes
No
NA
NE
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/
of the sidewall depth) 0
❑
❑
❑
Comment: Since the last inspection, a new clarifier skimmer was installed.
Disinfection -Tablet
Yes
No
NA NE
Are tablet chlorinators operational?
0
❑
❑
❑
Are the tablets the proper size and type?
0
❑
❑
❑
Number of tubes in use?
5
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
0
❑
❑
❑
OT,1,IT-Tin
De -chlorination
Yes
No
NA
NE
Type of system ?
Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
❑
❑
Is storage appropriate for cylinders?
❑
❑
0
❑
# Is de -chlorination substance stored away from chlorine containers?
❑
0
❑
❑
Are the tablets the proper size and type?
0
❑
❑
❑
Comment: The disinfection and dechlorination tablets are stored in closed containers in the same
I1 --4-;-
Are tablet de -chlorinators operational? 0 ❑ ❑ ❑
Number of tubes in use? 5
Comment:
Flow Measurement - Effluent
Yes
No
NA
NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
0
❑
❑
❑
Comment: The Flow meter is calibrated an
Page# 6
Permit: NC0065242 Owner -Facility: Grover WWTP
Inspection Date: 09/10/2020 Inspection Type: Compliance Evaluation
Flow Measurement - Effluent Yes No NA NE
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment: At the time of the inspection, the effluent appeared clear.
Drying Beds
Yes
No
NA
NE
Is there adequate drying bed space?
0
❑
❑
❑
Is the sludge distribution on drying beds appropriate?
0
❑
❑
❑
Are the drying beds free of vegetation?
0
❑
❑
❑
# Is the site free of dry sludge remaining in beds?
0
❑
❑
❑
Is the site free of stockpiled sludge?
0
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
0
❑
❑
❑
# Is the sludge land applied?
❑
0
❑
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
0
❑
Comment:
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
0
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment: Waste sludge is pumped from the digester
to the drying beds with the filtrate returning
to the
head of the plant. Residual cake is placed
in the Republic Services covered dumpster
on
site.
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Yes No NA NE
❑ ■ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Page# 7
Permit: NCO065242 Owner -Facility: Grover WWTP
Inspection Date: 09/10/2020 Inspection Type: Compliance Evaluation
Standby Power
Yes
No
NA
NE
Do the generator(s) have adequate capacity to operate the entire wastewater site?
❑
❑
0
❑
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
❑
❑
0
❑
Is the generator fuel level monitored?
❑
❑
0
❑
Comment: At the time of the inspection, the facility had no source of standby power. This is a continuinc
violation that was noted on the Drevious inspection report (dated February 14. 2019).