Loading...
HomeMy WebLinkAboutNCC204092_NOI Application_20200922Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/15/2020 11:40:54 AM (NCG01 NOI Submission) Approve by Gwinn, Matt 9/17/2020 3:11:53 PM (Review- Construction NOI 31453) • The task was assigned to Gwinn, Matt by round robin distribution 9/15/2020 11:41 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 17, 2020 5:00 PM 9/15/2020 11:41 AM Submit by Selkane, Aziza 9/22/2020 8:48:50 AM (Payment Verification for NCC204092) * Jacob McLean • Selkane, Aziza assigned the task to Selkane, Aziza 9/22/2020 8:48 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 29, 2020 5:00 PM 9/17/2020 3:12 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Ward Mill Dam Removal Project 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 2. County* Watauga 3. Highway or Street Old Watauga River Road Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Laurel Creek 5. State * NC 6. Zip Code * 28679 7. Latitude* Enter the latitude in decinal degrees 36.2413 8. Longitude* Enter the longitude in decir al degrees (MJST be negative) -81.8304 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/21/2020 Estimated Construction Project Start Date 10. Date to End * 04/30/2021 Estinated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial aassification for Developrrent 12. Acres to be 2.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 2.00 (acres) * 14. Post- 0.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-WATAU-2020-Ward Mill Dam Removal Project Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Watauga River Waterbody* Nsrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 8-(1) Index No.* NCWaterbody Index Nurrber Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Blue Ridge Resource Conservation & Development Council, Inc. It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Jonathan IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Hartsell It Corporation, enter Pbegistered Agent Last %rre 3b. Title Executive Director 4. Permitee E-mail hartselljonathan@gmail.com Address* 5. Permittee 828-284-9818 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box782 Address Line 2 City Spruce Pine Fbstal / Zip Code 28777 Check box if the F Yes street address the same as mailing address State / Frovince / Pegion NC Country USA 7. Permittee Street Street Address Address* 31 Cross Street Address Line 2 Suite 215 City State / F rovince / Faegion Spruce Pine NC Fbstal / Zip Code Country 28777 USA 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jonathan Contact - First Name * 2. Primary Site Hartsell Contact - Last Name * 3. Title Executive Director 4. Site Contact E- hartselljonathan@gmail.com mail Address* 5. Site Contact 828-284-9818 Telephone No. 6. Organization Blue Ridge Resource Conservation & Name Development Council, Inc. 7. Site Contact Street Address Mailing Address* PO Box782 Address Line 2 city Spruce Pine Fbstal / Zip Code 28777 8. Consultant Name (Optional) Jacob McLean First and Last nacre 9. Consultant E-mail jmclean@valdlandseng.com This person will be copied on all correspondence. 10. Consultant 828-545-3865 Telephone No. State / Rovince / Region NC Country USA D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/06/2020 Approved * 2. E&SC Plan Project WATAU-2020-006 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan WATAU-2020-006_20200806_A-M.pdf 5.87MB Approval letter or Mist beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mist be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. This is a dam removal being overseen by Blue Ridge RC&D with designer/engineer Wildlands Engineering. The project oversight is being supported by American Rivers and MountainTrue and the project is being constructed by US Fish & Wildlife Aquatic Restoration Team. The dam is on the Watauga River and is on the Ray and Virginia Ward property. 8. NOI Certification NCG01-eNO1-Certification-Form-20190919-DEMLR- Form 525.37KB SW_BRRCD.pdf Mast be FCFformat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Jonathan Hartsell Title Executive Director Organization Legally Responsible Entity Blue Ridge Resource Conservation & Development, Inc. Date * 09/15/2020 F. Tracking and COC Info NOI Tracking No. 31453 NC Reference No. NCG01-2020-4092 Uses 'count_nunber' variable (increrrented by SP) Certificate of NCC204092 Coverage (COC) Uses 'count nurrber' variable (increrrented by SP) No.* Count Number 4092 Sequential nunber for subnittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC204092-2020 Invoice Due Date 10/17/2020 Initial Fee $ 100.00 Invoice Status OPEN